Loading...
HomeMy Public PortalAbout10691 O R D I N A N C E NO. 10691 AN ORDINANCE, appropriating One Million Two Hundred Twenty Thousand Dollars ($1,220,000.00) from the Sanitary Replacement Fund for engineering services for the preliminary design of Gravois Trunk (Whitecliff to River des Peres) 90032; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-936 with Kuhlmann Design Group, Inc. for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of One Million Two Hundred Twenty Thousand Dollars ($1,220,000.00) is hereby appropriated from the Sanitary Replacement Fund for engineering services for the preliminary design of Gravois Trunk (Whitecliff to River des Peres) 90032. Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-936 with Kuhlmann Design Group, Inc. for engineering services for the preliminary design of Gravois Trunk (Whitecliff to River des Peres) 90032; said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted February 10, 2000 by the following vote – Ayes – C. L. Barnhart, G. J. Sheffield, C.D. Seward, P.P. Finn, J.W. Siscel, and M.C. Williams. Nays – None. Secretary-Treasurer