HomeMy Public PortalAbout10761 O R D I N A N C E NO. 10761
AN ORDINANCE, appropriating Eleven Thousand Dollars ($11,000.00)
from the Sanitary Replacement Fund for engineering services for the final design of
Infrastructure Repair #014P Barrett Brae Pump Station (P-413)(90043); and
authorizing the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into Contract E-949 with Kenneth Balk
& Associates, Inc. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Eleven Thousand Dollars ($11,000.00) is hereby
appropriated from the Sanitary Replacement Fund for engineering services for the
final design of Infrastructure Repair #014P Barrett Brae Pump Station (P-413)(90043).
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract
E-949 with Kenneth Balk & Associates, Inc. for engineering services for the final design
of Infrastructure Repair #014P Barrett Brae Pump Station (P-413)(90043); said
contract to be comprised of such terms and conditions as are approved by the office of
the General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance, shall
take effect immediately upon its enactment.
The foregoing Ordinance was adopted May 11, 2000 by the following vote –
Ayes – T.W. Purcell, M.G. Reichert, C.D. Seward, P.P. Finn, J.W. Siscel, M.C.
Williams.
Nays – None.
Secretary-Treasurer