HomeMy Public PortalAbout10829 O R D I N A N C E NO. 10829
AN ORDINANCE, appropriating Eighty-nine Thousand Dollars
($89,000.00) from the Sanitary Replacement Fund for engineering services for the
final design of CC-22 Schoettler/Clayton to Highway 40 Sanitary Replacement
Phase I (90015); and authorizing the Executive Director and Secretary-Treasurer
on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-955
with Zambrana Engineering, Inc. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Eighty-nine Thousand Dollars ($89,000.00)
is hereby appropriated from the Sanitary Replacement Fund for engineering
services for the final design of CC-22 Schoettler/Clayton to Highway 40 Sanitary
Replacement Phase I (90015).
Section Two. The Executive Director and Secretary-Treasurer are
hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract E-955 with Zambrana Engineering, Inc. for engineering services for
the final design of CC-22 Schoettler/Clayton to Highway 40 Sanitary Replacement
Phase I (90015); said contract to be comprised of such terms and conditions as
are approved by the office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance,
shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted October 12, 2000 by the following vote –
Ayes – T.W. Purcell, M.G. Reichert, M.C. Williams, C.D. Seward, and J.W. Siscel.
Nays – None.
Secretary-Treasurer