Loading...
HomeMy Public PortalAbout10839 O R D I N A N C E NO. 10839 AN ORDINANCE, appropriating One Hundred Seventy-six Thousand Dollars ($176,000.00) from the Operation, Maintenance and Construction Improvement Fund of Deer Creek for engineering services for the final design of Des Peres - Twinbrook Storm Channel (DCSD-190)(2000076); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-958 with Crawford, Murphy & Tilly, Inc. for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of One Hundred Seventy-six Thousand Dollars ($176,000.00) is hereby appropriated from the Operation, Maintenance and Construction Improvement Fund of Deer Creek for engineering services for the final design of Des Peres-Twinbrook Storm Channel (DCSD-190)(2000076). Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-958 with Crawford, Murphy & Tilly, Inc. for engineering services for the final design of Des Peres-Twinbrook Storm Channel (DCSD-190)(2000076); said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted November 9, 2000 by the following vote – Ayes – T.W.Purcell, M.G. Reichert, M.C. Williams, C.D. Seward, P.P. Finn, and J.W. Siscel. Nays – None. Secretary-Treasurer