Loading...
HomeMy Public PortalAbout10854 O R D I N A N C E NO. 10854 AN ORDINANCE, appropriating Seventy-Six Thousand Dollars ($76,000.00) from the Sanitary Replacement Fund for engineering services for the final design of Country Village (P-178) (Infrastructure Repair #197) (97048); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-963 with Clayton Engineering Co. for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Seventy-Six Thousand Dollars ($76,000.00) is hereby appropriated from the Sanitary Replacement Fund for engineering services for the final design of Country Village (P-178) (Infrastructure Repair #197) (97048). Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-963 with Clayton Engineering Co. for engineering services for the final design of Country Village (P-178) (Infrastructure Repair #197) (97048); said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. 2 Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted December 14, 2000 by the following vote – Ayes – T.W. Purcell, M.G. Reichert, M.C. Williams, C.D. Seward, and P.P. Finn. Nays – None. Secretary-Treasurer