HomeMy Public PortalAbout2009 - CAMPO Unified Planning Work Program - Adopted 2008-08-20. . . For the Jefferson City, Missouri Metropolitan Region Adopted August 20, 2008 . ' The preparation of this report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, and Federal Transit Administration in cooperation with the Missouri Department of Transportation. The opinions, findings, and conclusions expressed in this report are not necessarily those of the Federal Highway Administration, Federal Transit Administration, or the Missouri Highway and Transportation Department. The FY 2009 Unified Planning Work Program has been approved and adopted by the Capital Area Metropolitan Planning Organization Board of Directors at the regularly scheduled meeting of August 20,2008. Minutes of the meeting are on file at the Department of Community Development/Planning Division - Room 120, John G. Christy Municipal Building, 320 East McCarty, Jefferson City, Missouri 65101. MPO Administration is provided by the City of Jefferson, Missouri Department of Community Development/Planning Division Room 120 John G. Christy Municipal Building 320 East McCarty Jefferson City, Missouri Telephone 573-634-6410 http://www.jeffcitymo.org/cd/campo/campo.html For questions or comments, contact Janice McMillan or Alan Morrison at the Planning Division Photography and Graphics by Alan Morrison, Planning Division RESOLUTION 2009-01 CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION A RESOLUTION ADOPTING THE FISCAL YEAR 2009 UNIFIED PLANNING WORK PROGRAM FOR THE JEFFERSON CITY URBANIZED AREA WHEREAS, the Board of Directors of the Capital Area Metropolitan Planning Organization (CAMPO) is the Executive Body of the metropolitan planning organization designated by the Governor of the State of Missouri for the Jefferson City Urbanized Area, and responsible for carrying out the provisions of Section 134 Title 23 U.S. Code and Section 5303 Title 49 U.S. Code; and WHEREAS , the federal regulations for Metropolitan Transportation Planning and Programming, as specified in 23 CFR Part 450.314, requires that CAMPO develop a Unified Planning Work Program as part of the continuing, cooperative, and comprehensive transportation planning process; and WHEREAS, the Unified Planning Work Program has been developed with recommended activities included in the Fiscal Year 2009 Unified Work Program; and WHEREAS, these projects have been submitted for review to the CAMPO Technical Committee and the Board of Directors; and WHEREAS, the Technical Committee endorses the Fiscal Year 2009 UPWP and recommends approval and adoption by the Executive Committee. NOW, THEREFORE, BE IT RESOLVED that the Board of Directors of the Capital Area Metropolitan Planning Organization hereby approves and adopts the Fiscal Year 2009 Unified Planning Work Program. Adopted this 20th day of August, 2008 . q~V~aUman 17 A J, Attest:~ Anne Stratman, Administrative Assistant Table of Contents Introduction ...................................................................................................................................................................... 1 Administration and Staff for the MPO .................................................................................................................. 1 Financial Support of the MPO ................................................................................................................................ 1 Purpose of the UPWP ............................................................................................................................................... 2 Major CAMPO Accomplishments for FY 2008 ..................................................................................................... 2 Unified Planning Work Program Elements for FY 2008 ............................................................................................. 3 Unified Planning Work Program Work Element Tasks ............................................................................................. 4 1.0 CAMPO Program Administration and Support .......................................................................................... 4 1.1 Program Support .................................................................................................................................... 4 1.2 Public Participation ................................................................................................................................ 5 1.3 Staff Development .................................................................................................................................. 7 2.0 General Development and Comprehensive Planning ................................................................................. 8 2.1 Data Acquisition and Maintenance ...................................................................................................... 8 3 .0 Long Range Transportation Planning ............................................................................................................ 9 4 .0 Short Range Transportation Planning .......................................................................................................... 11 4.1 Coordination of Public Transit Human Service Transportation .................................................... 11 4.2 Bicycle and Pedestrian Planning ......................................................................................................... 13 4.3 Goods Movement/Freight Planning ................................................................................................... 14 4.4 Transportation Safety Planning .......................................................................................................... 14 4.5 Transportation Security Planning ....................................................................................................... 16 5.0 Transportation Improvement Plan ............................................................................................................... 17 6.0 Public Transportation (Transit) Planning .................................................................................................... 18 Budgets and Allocations ............................................................................................................................................... 20 FY 2009 Federal and Local Funding Support ...................................................................................................... 20 Contract and Staff Time Allocations .................................................................................................................... 20 FY 2009 Local Funding Support by Jurisdiction ................................................................................................. 21 MPO Work Program Budget ................................................................................................................................. 22 iii Introduction A Metropolitan Planning Organization (MPO) is a federally required planning body responsible for transportation planning and project selection within an urbanized area and for transportation related planning in a surrounding region. MPOs are also responsible for meeting the federal metropolitan planning regulations for transportation within the CAMPO region, a geographical area that includes portions of Cole and Callaway Counties, the cities of Jefferson and Holts Summit, and the towns of St. Martins and Lake Mykee, in central Missouri. The Capital Area Metropolitan Planning Organization (CAMPO) was designated by the Governor of Missouri as the metropolitan planning organization for the Jefferson City urbanized area on May 7, 2003, and is comprised of a Technical Committee that consists of representatives from the agencies' professional staffs and acts in an advisory capacity and a Board of Directors composed of elected and appointed officials from Holts Summit, Jefferson City, Callaway County, Cole County, selected state agencies, and Federal transportation representatives serving as ex- officio members. Officers to the Technical Committee and the Board of Directors are elected annually, and any member of the respective committee may serve. Administration and Staff for CAMPO The CAMPO memorandum of understanding identifies the City of Jefferson as having the responsibility for administration of CAMPO, and as such, provides staffing for CAMPO. For FY 2009, the City of Jefferson provides for a Director, a Staff Assistant, and two full time transportation planners. Financial Support for CAMPO MPO designation allows CAMPO to be the recipient of metropolitan planning funds through the Missouri Department of Transportation (MoDOT) from the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) of the US Department of Transportation. Metropolit an planning funds from FHWA are "PL" funds and those from FTA are referred to as Section 5303 funds. The two funds are combined into a Consolidated Planning Grant (CPG) and administered through MoDOT. Since these funds are consolidated, they are not identified separately by work task within this document. Federal funds shown for fiscal years are estimates, based on formulas used by MODOT for distribution of Missouri allocations. FY 2009 CAMPO Unified Planning Work Program 1 Based on the Memorandum of Understanding, financial obligation to support CAMPO consists of 80% Federal funding through the CPG, composed of FHWA PL funds and FTA 5303 planning funds, and 20% in local funding. The participants providing the local funding are Callaway County, Cole County and Jefferson City. Jefferson City provides 60% of the local support, Cole County provides 25% of the local support, and Callaway County provides the remaining 15% of local matching funds. The Purpose of the UPWP The Unified Planning Work Program (UPWP) outlines a yearly program of transportation planning activities to be funded through the Consolidated Planning Grant and local funds, and serves as the basis for funding agreements with the Missouri Department of Transportation (MoDOT). It also serves as a management tool for scheduling, budgeting and monitoring the planning activities of the participating agencies and governments related to transportation planning for the area. In developing a planning work program, the newest transportation act, SAFETEA-LU, requires that eight planning factors be considered during the development of any MPO plan. Planning factors are a set of broad objectives defined in Federal legislation (SAFETEA-LU) to be "considered" in the metropolitan planning process. The following list identifies the SAFETEA-LU Planning Factors: 1. Support the economic vitality of the metropolitan area, especially by enabling global competitiveness, productivity, and efficiency. 2. Increase the safety of the transportation system for motorized and non-motorized users. 3. Increase the security of the transportation system for motorized and non-motorized users. 4. Increase accessibility and mobility options available to people and for freight. 5. Protect and enhance the environment, promote energy conservation, improve the quality of life, and promote consistency between transportation improvements and State and local planned growth and economic development patterns. 6. Enhance the integration and connectivity of the transportation system, across and between modes, for people and freight. 7. Promote efficient system management and operation. 8. Emphasize the preservation of the existing transportation system. Major CAMPO Accomplishments during the 2008 Fiscal Year The following UPWP projects have been completed: 1. The revised Public Participation Plan for the Jefferson City, Missouri Urbanized Area was adopted on February 20, 2008 2. The first CAMPO Limited English Proficiency Plan for the Jefferson City, Missouri Urbanized Area was adopted on February 20, 2008 3. The first CAMPO 2030 Metropolitan Transportation Plan for the Jefferson City, Missouri Urbanized Area was adopted on April16, 2008 4 . The first CAMPO Coordinated Public Transit Human Services Transportation Plan was FY 2009 CAMPO Unified P lanning Work Program 2 adopted on November 28,2007 5. The existing TIP was extended through a second fiscal year and updated through a series of Amendments 6. Revised and expanded CAMPO website 7. Updated the CAMPO MPA road database 8. Completed the Federal Roadway Functional Classification update Unified Planning Work Program Elements for FY 2009 The work program for the MPO identifies what the MPO will do to meet the federal transportation planning requirements, affect coordination and cooperation in comprehensive planning for the region, and identify and satisfy the needs and priorities of the MPO membership to the greatest extent possible and consists of work elements that focus on the different components required to accomplish the work program. These work elements are themselves divided into sections that identify the funding used in accomplishing the work element, the activities intended to accomplish those work elements, the agency or organization will perform those activities, an estimated schedule for completing the activity and the resulting products of the activities. The CAMPO UPWP consists of the following work elements: 1. CAMPO Program Administration and Support 2. General Development and Comprehensive Planning 3. Long Range Transportation Planning 4. Short Range Transportation Planning 5. Transportation Improvement Program 6. Transit Planning FY 2009 CAMPO Unified Planning Work Program 3 Unified Planning Work Program Work Element Tasks 1.0 CAMPO Program Administration and Support This work element reflects basic overhead, direct program support and general administrative costs. Activities under this work item include direct program support, administration, interagency coordination, citizen participation, public information, local assistance, and UPWP development. Funding Federal Local Total 1.1. Program Support $21,604 $5 ,401 $27,004 1.1.1. Responsible Agency: 1.1.2. Background Consolidated Planning Grant Member jurisdictions CAMPO staff CAMPO manages the metropolitan transportation planning process in compliance with applicable local and state requirements, and federal laws . UPWP Work Task MPO Program Administration & Support Program Support 1.1.3. Accomplished Tasks 40% Federal $21 ,6 04 $8,641 Local $5,401 $2,160 Total $27,004 $10,802 Previous activities included preparation of agendas, minutes, amendments, exhibits, quarterly progress reports for Technical Committee and Board of Directors meetings, and participation in these same meetings, along with occasional special meetings . The FY 2008 UPWP, budget, the quarterly progress reports and the annual report were completed, and an amended budget was approved with the revised participation agreement concluded by Holts Summit and Callaway County. A listing of obligated projects for the year preceding FY 2008 was developed and distributed to members and posted on the CAMPO website. 1.1.4. Program Objectives a. Provide for the administrative and support functions necessary for the federally required metropolitan transportation planning process FY 2009 CAMPO Unified Planning Work Program 4 b. Support CAMPO transportation and related committees and ensure communications among and between the committees c. Insure that all grants and contracts are administered to allow timely completion of scheduled activities and products, and federal funding administered of in an appropriate manner 1.1.5. Program Activities (Methodology) a. Prepare agendas, materials and minutes for CAMPO Committee and subcommittee meetings and respond to individual committee information requests b . Develop the unified planning work program and budget for the fiscal year c. Attend meetings as required to accomplish program objectives d. Prepare and submit documents required by State and Federal agencies, including annual reports, monthly progress reports, monthly invoice statements, and other documents as needed such as but not limited to TI~ UPWP, amendments, minutes, and correspondence files e. Produce a list of obligated projects from the previous fiscal year f. Provide templates, information, a workshop and data for CAMPO members to develop Limited English Proficiency (LEP) plans. 1.1.6. Products (estimated completion dates) a. Annual work program budget (June 2009) b . Annual work program (June, 2009) c. Quarterly progress report (February, May, August 2009) d. Annual progress report (November, 2008) e. A list of obligated projects from the previous year (November, 2008) f. Templates and LEP workshop (November, 2008) 1.2. Public Participation 1.2.1. Responsible Agency: CAMPO staff 1.2.2. Background CAMPO provides a forum for cooperative decision-making by elected officials from the metropolitan planning area, is responsible for coordinating transportation planning for a multi- modal transportation system, and establishes a "proactive public involvement process that provides complete information, timely public notice, full public access to key decisions, and supports early and continuing involvement." UPWP Work Task MPO Program Administration & Support Public Participation FY 2009 CAMPO Unified Planning Work Program 30% Federal $21,604 $6,481 Local $5,401 $1,620 Total $27,004 $8,101 5 1.2.3. Accomplished Tasks With the promotion of public participation and inclusiveness as one of the principal doctrines of metropolitan transportation planning, CAMPO convened stakeholder meetings, held two open houses and repeatedly surveyed stakeholders in the development of the Coordinated Public Transit Human Services Transportation Plan. For the Metropolitan Transportation Plan (MTP), CAMPO held two public workshops and four open houses, within Callaway and Cole counties. Public participation over the past year was even more extensive than previous public participation activities done for the Comprehensive Greenways Plan Update and the Transit Development Plan. Notices and display ads are published in accordance with the Public Participation Plan and later, as per the revised Public Participation Plan, with documents placed at locations identified in the Public Participation Plans and on CAMPO website. Occasional TV and radio news items appeared during public participation activities, and the media was generally attending the meetings and public participation activities. Documentation of comments and recommendations were kept and are on file and available for viewing. And, in some plans such as the Coordinated Public Transit Human Services Transportation Plan, and the MTP, public comments from meetings were included in appendices of the plans. 1.2.4. Program Objectives (Methodology) a. Improve communications and participation from persons within the community served by CAMPO, including those traditionally underserved by transportation and those who have not traditionally participated in the planning process b. The provision of opportunities for convenient public access, review and comment on CAMPO planning and programming documents, as well as the data and forecasts on which they are based c. Promote comprehensive public participation activities at all levels of planning, throughout the CAMPO area d. Support public engagement activities intended to develop public infrastructure through active community involvement 1.2.5. Program Activities a. Provide the public with notice of CAMPO committee meetings, forums, and focus groups b. Promote public participation techniques to reach out to those traditionally underserved by transportation and those who have not traditionally participated in the planning process c. Conduct public participation, public meetings, hearings and workshops, as needed and in accordance with the Public Participation Plan d. Maintain CAMPO data and files for Title VI, Environmental Justice, and related non- discrimination activities FY 2009 CAMPO Unified Planning Work Program 6 e . Improve notice and documentation for opportunities to comment on proposed transportation projects, plans and programs for citizens, affected public agencies, private transportation providers, and other interested parties 1.2.6. Products (estimated completion dates) a. CAMPO meeting notices, publications and advertisements (ongoing) b. Maintain web pages on transportation plans and programs and the data, policies and forecasts that support them (ongoing) c. Updates to the CAMPO Public Participation Plan if warranted (July 2009) 1.3. Staff Development 1.3.1. Responsible Agency: CAMPO staff 1.3.2. Background Development and improvement in planning skills and techniques are vital to achieving the goals and objectives of Federal, State, and local interests for plan development. The National Transit Institute and the Federal Highways Administration provides training and technical assistance, as does the Environmental Protection Administration, and a host of other organizations. Local conferences and seminars provide local-oriented training, techniques, and collaboration with other planning staff. UPWP Work Task MPO Program Administration & Support Staff Development 1.3.3. Accomplished Tasks 30% Federal $21,604 $6,481 Local $5,401 $1,620 Total $27,004 $8,101 Professional development for the first h alf of FY 2008 included the NTI State and Metropolitan Transportation Programming, and an NHI travel demand modeling introductory course. 1.3.4. Program Objectives a . Improve the professional skills needed by CAMPO staff to accomplish the requirements of federal, state and local transportation regulations and laws 1.3.5. Program Activities (Methodology) a. Participate in professional meetings, conferences and workshops in areas related to transportation planning and Metropolitan Planning Organization activities. b. Training in computer applications and technical processes through vendors, NTI, NHI, FHWA, and FTA (for example) c . Seek professional development for incorporating freight into transportation planning FY 2009 CAMPO Unified P lanning Work Program 7 1.3.6. Products (estimated completion dates) a. Freight planning program (ongoing) 2.0 General Development and Comprehensive Planning This work item emphasizes regional policy and system planning for non-transportation functional areas, including the development and maintenance of related data collection and analysis systems, demographic analysis and non-transportation modeling and forecasting activity, such as land use, housing, human services, environmental and natural resources, recreation and open space, public facilities, and utilities. Funding Federal Local Total $36,006 $9,001 $45,007 Consolidated Planning Grant Member jurisdictions 2.1. Data Acquisition and Maintenance 2.1.1. Responsible Agency: CAMPO staff 2.1.2. Background To better understand the context that the transportation system exists in, and to support the decision-making process, CAMPO collects land use, demographic, socio-economic and census data, along with environmental and natural resource related data. UPWP Work Task General Development and Comprehensive Planning Data Acquisition and Maintenance 2.1.3. Accomplished Tasks 100% Federal Local $36,006 $9,001 $36,006 $9,001 Total $45,007 $45,007 In 2007 and 2008, staff developed the Metropolitan Transportation Plan, extending long range planning to the year 2030 . And, to do this CAMPO needed data, beginning with land use data in the form of parcel data obtained from Cole and Callaway County assessor data files. City of Jefferson GIS staff and MPO staff worked with the County Assessor offices in obtaining parcel level data, and developed current land uses throughout CAMPO planning boundary. To estimate the amount of growth and the probable location of this growth, CAMPO acquired population trend data from local, sate and national population data. Through population forecasts, staff formulated estimates of residential housing development and commercial development required to meet population growth, and extrapolated future land FY 2009 CAMPO Unified Planning Work Program 8 .. uses out to year 2030. With future land uses in place staff identified possible roadway network improvements required out to year 2030. Socio-economic and Census data was used for Environmental Justice!fitle VI and Limited English Proficiency studies and plans, and Coordinated Public Transit Human Services Transportation Planning. 2.1.4. Program Objectives a. Better understanding of demographic and socioeconomic patterns and trends within the CAMPO region b. Respond to requests for information from local, state and private agencies and the public 2.1.5. Program Activities (Methodology) a. Expand, organize and maintain socioeconomic and demographic databases. Include items such as land use, transportation infrastructure, housing, environmental, and open space b . Maintain data on low-income, elderly, disabled, and minority populations to support environmental justice outreach and analysis c. Coordinate with GIS staff for the production, collection, storage, analysis and presentation of information for CAMPO and public use 2.1.6. Products (estimated completion dates) a. Preparation of maps, other graphics, and databases as necessary for CAMPO and local agency use (ongoing) b. Up to date data bases suitable for identifying trends, and conducting analyses, such as demographic and socioeconomic analyses (ongoing) 3.0 Long Range Transportation Planning Funding Federal Local Total $36,006 $9,001 $45,007 3.1.1. Responsible Agency: 3.1.2. Background Consolidated Planning Grant Member jurisdictions CAMPO staff This work item is intended to provide for long range transportation planning activities and studies supporting the transportation planning process out to at least 20 years, for the Jefferson City metropolitan area. Long Range Transportation Planning may include both system level planning activities and project level activities. FY 2009 CAMPO Unified Planning Work Program 9 System level planning includes long range travel forecasting and modeling (including appropriate data base development and maintenance for transportation in the entire metropolitan area or state, system analysis), sketch planning, system plan development, reappraisal or revision, and all long range, Transportation System Management (TSM) activities. Project level planning includes Major Investment Studies (corridor and subarea studies), cost effectiveness studies, feasibility and location studies, and the preparation of related draft environmental impact studies. 3.1.3. Accomplished Tasks Staff developed current and future land use databases and maps, contracted Travel Demand Modeling services, and held workshops and open houses and focus groups for public comment and recommendations for development of the MTP, which was completed and adopted. CAMPO used intersection turning movement and traffic counts, 24-hour traffic counts obtained through the cooperation of the City of Jefferson, Cole and Callaway counties, and existing AADT counts through the state DOT traffic count program, to prepare travel demand modeling of CAMPO roadway network. 3.1.4. Program Objectives a. Maintenance and update of databases relevant to the MTP to keep them current b. Amend and update the Metropolitan Transportation Plan as necessary c. Facilitate community dialogue concerning regional development and mobility goals and to evaluate land use and transportation policies suggested as a means to achieve these goals 3.1.5. Program Activities (Methodology) a. Process amendments to the MTP to support the region's long-range planning process b. Organize the MTP components (databases, maps, plans, and modeling) for maintenance and updating, (along with transportation data, see land use and socioeconomic information in General Development and Comprehensive Planning). c. Maintain an inventory of multi-modal transportation facilities and services within the metropolitan planning area for transit, rail, river, aviation, freight, and other transportation modes d. Develop and maintain traffic count and congestion data e. Traffic Analysis Zone review, maintenance and update as necessary f. Assist MODOT in maintaining current maps of roadway functional classifications g. Census TAZ update 3.1 .6. Products (estimated completion dates) a. Consolidated CAMPO area transportation databases (July, 2009) FY 2009 CAMPO Unified Planning Work Program 10 b. Cooperative studies and exchanges of information between agencies (on-going) c. Traffic Analysis Zone( TAZ) review (June 2009) d. Travel demand model data update (continuous) e. Census TAZ update (April-July 2009) 4.0 Short Range Transportation Planning Background This work item reflects short range transportation system or project planning and analysis proposed in the next three to five years, including management analyses of internal operations such as management and administration, maintenance, personnel, and labor relations; service planning including appropriate data base development and maintenance; TDP preparation; financial management planning, including alternative fare box policies; all short range Transportation System Management (TSM) activities including vanpool/ridesharing, high occupancy vehicles, and parking management. Funding Federal Local Total $36,006 $9,001 $45,007 Consolidated Planning Grant Member jurisdictions 4.1. Coordination of Public Transit Human Service Transportation 4.1.1. Responsible Agency: CAMPO staff 4.1.2. Background Coordination of Public Transit Human Services Transportation is intended as a means to implement FTA programs for underserved populations. The Elderly Individuals and Individuals with Disabilities program (Section 5310); the Job Access and Reverse Commute program (Section 5316); and the New Freedom program (section 5317) funding and projects must be derived from a locally developed, coordinated public transit-human services transportation plan. UPWP Work Task Federal Local Total Short Range Transportation Planning $36,006 $9,001 $45,007 Coordination of Public Transit Human 15% $5,401 $1,350 $6,751 Service Transportation FY 2009 CAMPO Unified Planning Work Program 11 .. 4.1.3. Accomplished Tasks CAMPO developed a plan with an inventory of social service and human service agencies and activities that fall under the previously identified programs, identification of needs and service gaps, and developed a Coordinated Public Transit Human Services Transportation Plan as part of SAFTEA- LU requirements and in support the 3-C planning process. 4.1.4 . Program Objectives (Methodology) a. Improve employment related transportation for disabled and low-income residents b. Convene focus groups c. Improve coordination and efficiency in human services transportation planning d. Support improved job access and reverse commuting through section 3516 funding . e. Support and assist in actions and programs that go beyond required ADA actions f. Improve awareness and facilitate applications for section 5310 funding. 4.1.5. Program Activities a. Provide assistance to local governments and applicant agencies in developing transit/paratransit projects for inclusion in the Transportation Improvement Program b . Participate in transit-related studies sponsored by other agencies and jurisdictions c. Convene an annual human services transportation group meeting d. Monitor, prepare, and distribute information on the region's senior and disabled transportation services. e. Review applications for Section 5310 vehicles and recommend funding recipients f. Identify or maintain a clearinghouse of information and resources for coordinating agencies. g. Develop and maintain a directory of local state, and federal contacts for agencies dealing with human services transportation. h. Develop and maintain a directory of human service agencies and transportation providers, along with their services. 4.1.6. Products (estimated completion dates) a. Information and resources for agencies and organizations (ongoing) b . Forum for multi-agency human services transportation planning (annual) c. Additional Section 5310 applications for human service agencies for 2010 funding (May-July 1, 2009) FY 2009 CAMPO Unified Planning Work Program 12 4.2. Bicycle and Pedestrian Planning 4.2.1. Responsible Agency: CAMPO staff 4.2.2. Background It is Federal State and increasingly, local transportation policy to promote the increased use and safety of bicycling and walking as transportation modes•. UPWP Work Task Short Range Transportation Planning Bicycle and Pedestrian Planning 4.2.3. Accomplished Tasks 45 % Federal $36,006 $16,203 Local $9,001 $4,051 Total $45,007 $20,253 Long range bicycle and pedestrian planning was completed with the completion of the MTP. TIP amendments were made for 1) Safe Routes to School project for Holts Summit, 2) a greenway trail extension from the Katy trail to Summit Drive, and 3) a greenway trail extension from Covington Gardens to County Park Lake. Focus groups were convened for plan development outreach. 4.2 .4. Program Objectives a. Maintain and implement the Bicycle and Pedestrian Elements of the Long-Range Transportation Plan, as necessary b. Encourage communities to integrate bicycle and p e destrian transportation needs in local plans, capital improvement programs and transportation improvement projects c. Address the needs of bicyclists and pedestrians through technical and planning assistance 4.2.5. Program Activities (Methodology) a. Participate in coordination with City departments and representatives from agencies, such as Parks and Recreation, MODOT committees, focus groups, technical staff, and private interest groups for bicycle and pedestrian planning b . Assist local governments and other project sponsors in the development or design of bicycle and pedestrian plans or projects c. Convene an annual bicycle/pedestrian focus group meeting d. Assistance in development of the Jefferson City local sidewalk plan e . Review Transportation Enhancement applications bicycle and/or pedestrian components (on- going) 4.2.6. Products (estimated completion dates) a . Maintain and implement the Bicycle and Pedestrian Elements of CAMPO plans (on-going) FY 2009 CAMPO Unified Planning Work Program 13 b. Amendments to the MTP and TIP for bicycle and pedestrian projects if necessary (on-going) 4.3. Goods Movement/Freight Planning 4.3.1. Responsible Agency: CAMPO staff 4.3.2. Background Freight transportation is primarily, although not exclusively operated through the private sector. In the CAMPO area, limited air and river freight are transported in and through the area, with air freight being a higher value item and river traffic more oriented to bulk commodities. Most of the freight transported is by motor vehicles, trucks and cars. UPWP Work Task Short Range Transportation Planning Goods Movement I Freight Planning 4.3.3. Accomplished Tasks 15 % Federal $36,006 $5 ,401 Local $9,001 $1,350 Total $45,007 $6 ,751 The 2030 Metropolitan Transportation Plan identified strategies for improving freight transportation planning for CAMPO. Freight related needs and were discussed at the freight focus group meetings, and included in the MTP for future short range and long range planning. 4.3.4. Program Objectives a . Integrate freight transportation issues and concerns within the overall metropolitan transportation planning process 4.3.5. Program Activities (Methodology) a. Research data sources and information on the freight related programs and plans b. Improve estimates of freight traffic movement and freight generation within CAMPO area c. Convene an annual transportation goods movement/freight focus group meeting d. Review necessity of an update of the freight element of the MTP 4.3.6. Products (estimated completion dates) a. Development of freight and goods movement databases (ongoing) 4.4. Transportation Safety Planning 4.4.1 . Responsible Agency: CAMPO staff 4.4 .2. Background SAFETEA-LU requires that "Each statewide and metropolitan planning process shall provide for FY 2009 CAMPO Unified Planning Work Program 14 consideration of projects and strategies that will increase the safety of the transportation system for motorized and non-motorized users". CAMPO has included the objective of incorporating emergency, disaster and safety plans into metropolitan transportation planning into the MTP and to support the inclusion of safety features in trans portation planning. UPWP Work Task Short Range Transportation Planning Transportation Safety Planning 4.4.3. Accomplished Tasks 15 % Federal $36,006 $5,401 Local $9,001 $1,350 Total $45,007 $6,751 CAMPO compiled accident data on roadway accidents, car/train accidents, and bicycle and pedestrian accidents for inclusion of the MTP. Natural hazards, disaster and emergency plans for jurisdictions within CAMPO area were reviewed for the MTP. 4.4.4. Program Objectives a. Foster communication and regional collaboration among local, state, regional, and federal safety activities and cooperation with regional planning organizations, city, county and state safety planning organizations and safety stakeholders on transportation safety issues b . Support the Strategic Highway Safety Plan (SHSP), and emergency planning and coordination for accident reduction and natural hazard planning 4.4 .5. Program Activities (Methodology) a . CAMPO intends to increase the amount of accident and safety data collected, and to identify accidents and natural hazards as areas for CAMPO to focus on. b. Seek additional technical and financial resources to assist in developing transportation safety analysis tools for the region and to improve crash data quality. c. Work with local agencies, state DOT, FHWA, and FTA to refine the CAMPO role in SAFETEA- LU transportation safety planning d. Develop and maintain transportation system safety data, acquire and maintain accident and crash data for CAMPO region e. Support member agencies in integrating safety considerations into project evaluation f. Convene an annual transportation safety focus group meeting FY 2009 CAMPO Unified Planning Work Program 15 4.4.6. Products (estimated completion dates) a . Updated database of traffic accidents and safety-related data (ongoing) b. Mapping of crash data (July, 2009) c. Annual report containing analyses of accident data at CAMPO level (October, 2009) 4.5. Transportation Security Planning 4.5.1. Responsible Agency: CAMPO staff 4.5.2. Background Security is defined in the MTP as protection of persons or property from intentional damage or destruction caused by vandalism, criminal activity, or terrorist events. Metropolitan planning organizations in the U .S. have widely varying political and institutional contexts and there is no single model that can best describe the most appropriate role for an MPO in security, and/or disaster planning, and CAMPO staff is working towards identifying the most effective and appropriate role for CAMPO. CAMPO has included as part of the objectives of the MTP, to improve transportation security response planning and to consider development of regional Intelligent Transportation System (ITS) technology to promote coordination between entities. Hazardous materials and truck routing information and data may also be an activity for CAMPO. UPWP Work Task Short Range Transportation Planning Transportation Security Planning 4.5.3 . Accomplished Tasks 10% Federal $36,006 $3,601 Local $9,001 $900 Total $45 ,007 $4,501 The MTP proposes that CAMPO can participate in improving security best by identifying possible emergency routes, identifying alternate routes, encouraging accessibility by emergency vehicles in neighborhood and street design and through supporting interagency cooperation. Development of the MTP included holding focus group meetings and a review of emergency operations plans. 4.5.4. Program Objectives a. CAMPO will assist state and local planning efforts through collection and analysis of accident and infrastructure condition data, and improvements in project selection and investment b. Enhance protection of critical transportation infrastructure c. Identify and improve communication with special needs populations during emergencies d . Support the development of emergency evacuation plans FY 2009 CAMPO Unified Planning Work Program 16 4.5.5. Program Activities (Methodology) a. Identify special needs populations in the CAMPO area b . Support emergency management agency development of evacuation and emergency response plans c. Add security as a component in evaluating project priorities d. Convene an annual transportation security focus group meeting 4.5.6. Products (estimated completion dates) a. Report on special needs population (July, 2009) 5.0 Transportation Improvement Plan Funding 5.1.1. 5.1.2. Federal Local Total $7.201 $1.800 $9.001 Responsible Agency: Background Consolidated Plannine Grant Member iurisdictions CAMPO staff The Transportation Improvement Program (TIP) is a prioritized, fiscally-constrained, multi-year list of federally funded transportation projects and improvements within CAMPO area and authorizes the obligation of federal funds for listed projects and operations. A federal fund obligation commits the federal government to pay or reimburse the State or other governmental entity for the federal share of the project's eligible costs. 5.1.3. Accomplished Tasks CAMPO produced the 2007 TIP, extended the TIP through 2008 during the development of the MTP, and updated the TIP through a series of amendments. 5.1 .4. Program Objectives a . Improve and maintain a current Transportation Improvement Program b. Identify projects and programs over a three to five year planning horizon c. Facilitate coordination and cooperation from Federal, State and local members of CAMPO in the production of the TIP 5.1.5. Program Activities (Methodology) a . Prepare an updated 2009-2012 CAMPO Transportation Improvement Plan FY 2009 CAMPO Unified Planning Work Program 17 b. Incorporate annual transit Program of Projects public participation activities into the annual TIP public participation activities c. Facilitate amendment of the Transportation Improvement Plan, as required d. Refine TIP program forms and procedures 5.1.6. Products (estimated completion dates) a. An approved 2009 TIP (August 2009) b. TIP amendments as required (on-going) 6.0 Public Transportation (transit) Planning Funding Federal Local Total $7,201 $1,800 $9,001 6.1.1 . Responsible Agency: 6.1.2. Background Consolidated Planning Grant Member jurisdictions CAMPO staff, JEFFTRAN CAMPO assists public transit in fulfilling the requirements for coordination and cooperative transportation planning. 6.1.3. Accomplished Tasks In 2008, staff provided information to assist JEFFTRAN in their triennial review. Long Range transit planning has been incorporated into the adopted MTP. 6.1.4. Program Objectives a. Assistance in transit planning b. Improve local and regional mobility and modal choice c. Advocacy for development of intermodal facilities 6.1.5. Program Activities (Methodology) a. Assist in route evaluation and Environmental Justice evaluations if required b . Support transit providers in the integration of safety and security considerations into projects c. Assist and cooperate with transit security planning activities d. Assist and cooperate with transit LEP planning activities e . Include transit Program of Projects into TIP preparation and advertisement FY 2009 CAMPO Unified Planning Work Program 18 f. MPO staff to provide project management and coordination for transit in a transfer and maintenance facility feasibility and site analysis study, the actual study is to be done by consultant 6.1.6. Products (estimated completion dates) a. Improvements in transit safety and security (continuous) b. Transit maintenance and transfer facility feasibility study by consultants(October, 2009) FY 2009 CAMPO Unified Planning Work Program 19 Budgets and Allocations The following tables contain, proposed federal and local support of CAMPO, staff allocations of time and expenditures, including salaries and direct expenses, proposed local support by jurisdiction and the proposed overall budget. FY 2009 Federal and local funding support: UPWP Work Task Federal Local Total MPO Program Administration & Support $21,604 $5,401 $27,004 General Development and Comprehensive $36,006 $9,001 $45,007 Planning Long Range Transportation Planning $36,006 $9,001 $45,00 7 Short Range Transportation Planning $36,006 $9,001 $45,007 Transportation Improvement Program $7,201 $1,800 $9,001 Transit Planning $7,201 $1,800 $9,001 Total $144,023 $36,006 $180,029 Work Program Task Contract and Staff Time Allocations -This Item identifies the amount of time and cost that are anticipated to be dedicated to particular tasks throughout the year. Salaries, Direct % benefits, Costs Totals UPWP Work Task Cost Allocation indirect costs MPO Program Administration & $23,922 $3,083 $27,004 Support 15% General Development and $39,870 $5,138 $45,007 Comprehensive Planning 25% Long Range Transportation Planning 25 % $39,870 $5,138 $45,007 Short Range Transportation Planning 25% $39,870 $5,138 $45,007 Transportation Improvement Program 5 % $7,974 $1,028 $9,001 Transit Planning 5% $7,974 $1,028 $9,001 Total 100% $159,479 $20,550 $180,029 FY 2009 CAMPO Unified Planning Work Program 20 The FY 2009 local funding support by jurisdiction: UPWP Work Task Jefferson Cole Callaway Totals City County County MPO Program Administration & Support $3,241 $1,350 $810 $5,401 General Development and Comprehensive $5,401 $2,250 $1 ,350 $9,001 Planning Long Range Transportation Planning $5,401 $2,250 $1,350 $9,001 Short Range Transportation Planning $5,401 $2,250 $1,350 $1,800 Transportation Improvement Program $1,080 $450 $270 $1,800 Transit Planning $1,080 $450 $270 $36,006 Total $21 ,604 $9,001 $5,401 $36,006 FY 2009 CAMPO Unified Planning Work Program 21 CAMPO Budget for FY 2009 Major Cost Category Federal Local Total Labor Salaries (staff/ labor) $94,318 $23,580 $117,898 Benefits $33,265 $8,316 $41,582 Labor Subtotal $127,583 $31,896 $159,479 Contractual Services Professional Services $0 $0 $0 Contracted Total $0 $0 $0 Direct Costs Materials & Supplies Advertising $800 $200 $1,000 Postage $640 $160 $800 Printing $800 $200 $1 ,000 Operational Supplies $400 $100 $500 Food $400 $100 $500 Office Supplies $400 $100 $500 Copies $800 $200 $1,000 Subtotal $4,240 $1,060 $5,300 Other Contracted Services Dues & Publications $800 $200 $1,000 Meetings/Conferences $2,800 $700 $3,500 Training/Education $6,400 $1,600 $8,000 Subtotal $10,000 $2,500 $12,500 Utilities Telephone $1,040 $260 $1,300 Subtotal $1,040 $260 $1,300 Equipment Repair and Maintenance Vehicle Wash $40 $10 $50 Maintenance Agreement $1120 $280 $1400 Subtotal $1,160 $290 $1,450 Capital Purchases Equipment/software $0 $0 $0 Subtotal $0 $0 $0 Direct Costs Total $16,440 $4,110 $20,550 Total Labor and All Costs $144,023 $36,006 $180,029 FY 2009 CAMPO Unified Planning Work Program 22 Budget Summary: The staff costs for two full time planner positions for FY 2009 are $117,898 in salaries and $41,582 in benefits, for a total of $159,479. This is an increase of $4,535 or 4%. Labor costs are 88.5% of the UPWP budget. Direct costs will decrease from $29,280 in FY 2008 to $20,550 for FY 2009 . Materials and Supplies remain essentially the same, as with Other Contracted Services and Utilities, with less emphasis on food and operating materials costs and more on advertising, postage and printing/copying. Equipment and repair and maintenance cost increases by around $1200. Funding available through FHWA PL and FTA 5303 planning funds totals $140,365 for CAMPO FY 2009 (November 1 2008 through October 31, 2009). Overall, the FY 2009 budget is $180,029, compared to the FY 2008 budget of $183,316. The FY 2009 budget is $3,287 less. $3,658 is used from reserve federal planning funds. The remaining balance of federal planning funds for use in the UPWP is calculated at $11,789. FY 2009 CAMPO Unified Planning Work Program 23