Loading...
HomeMy Public PortalAbout10861 O R D I N A N C E NO. 10861 AN ORDINANCE, appropriating Forty-four Thousand Dollars ($44,000.00) from the Operation, Maintenance and Construction Improvement Fund of Blackjack-Dellwood Creek for engineering services for the final design of Bristol Rock-Tobaggon Trail Storm Channel (MCBJ-130) (2000077); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-969 with EFK Moen, LLC for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Forty-four Thousand Dollars ($44,000.00) is hereby appropriated from the Operation, Maintenance and Construction Improvement Fund of Blackjack-Dellwood Creek for engineering services for the final design of Bristol Rock-Tobaggon Trail Storm Channel (MCBJ-130) (2000077). Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-969 with EFK Moen, LLC for engineering services for the final design of Bristol Rock-Tobaggon Trail Storm Channel (MCBJ-130) (2000077); said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted December 14, 2000 by the following vote – Ayes – T.W. Purcell, M.G. Reichert, M.C. Williams, C.D. Seward, and P.P. Finn. Nays – None. Secretary-Treasurer