HomeMy Public PortalAbout10862 O R D I N A N C E NO. 10862
AN ORDINANCE, appropriating Twenty-five Thousand Dollars
($25,000.00) from the Operation, Maintenance and Construction Improvement Fund of
Blackjack-Dellwood Creek for engineering services for the final design of Crown Point
Storm Channel (99060); and authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract
E-973 with EFK Moen, LLC for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES
OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Twenty-five Thousand Dollars ($25,000.00) is
hereby appropriated from the Operation, Maintenance and Construction Improvement
Fund of Blackjack-Dellwood Creek for engineering services for the final design of
Crown Point Storm Channel (99060).
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract
E-973 with EFK Moen, LLC for engineering services for the final design of Crown Point
Storm Channel (99060); said contract to be comprised of such terms and conditions as
are approved by the office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance, shall
take effect immediately upon its enactment.
The foregoing Ordinance was adopted December 14, 2000 by the following vote –
Ayes – T.W. Purcell, M.G. Reichert, M.C. Williams, C.D. Seward, and P.P. Finn.
Nays – None.
Secretary-Treasurer