HomeMy Public PortalAboutFY21 Preliminary Budget SupplementMetropolitan St. Louis Sewer District
St. Louis, Missouri
BUDGETBUDGETSUPPLEMENTSUPPLEMENT
PRELIMINARY
FISCAL YEAR2021
JULY 1, 2020 – JUNE 30, 2021JULY 1, 2020 – JUNE 30, 2021
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
BUDGET SUPPLEMENT FOR FISCAL YEAR 2021
PREFACE
This annual Budget Supplement provides information about the Metropolitan St. Louis Sewer
District's intended Capital Improvement and Replacement Program during Fiscal Year 2021 (July 1, 2020 to
June 30, 2021). This document is divided into the following sections:
•Program Summary (includes a glossary of terms used in the Budget Supplement)
•Wastewater Engineering Projects
•Wastewater Construction Projects
•Wastewater Continued Projects
•Wastewater Contingency Projects
•Wastewater Program
•Stormwater Engineering Projects
•Stormwater Construction Projects
•Stormwater Continued Projects
•Stormwater Contingency Projects
•Stormwater Program
•Appendix
The Wastewater Construction Projects and Stormwater Construction Projects sections list projects
that have scheduled construction starts during Fiscal Year 2021. The Wastewater Engineering Projects and
Stormwater Engineering Projects sections list projects that have scheduled engineering starts during Fiscal
Year 2021 (which includes design, planning, and data collection/system investigation services). Due to the
magnitude and complexity of these projects and the requirements for permitting and easement acquisition,
their construction is scheduled in future years. The Contingency Projects sections detail projects that are
currently scheduled for Fiscal Year 2022, but may be expedited to begin construction during Fiscal Year
2021, if revenue becomes available and project schedules allow. The Wastewater and Stormwater Program
sections summarize the capital program by fund.
For each new project identified for funding in Fiscal Year 2021, this document provides information
regarding the approximate project scope and estimated cost. For projects continued from previous fiscal
years, only the estimated construction cost and reason for continuance are provided. Specific information
regarding Continued Projects was included in previous Budget Supplement documents in the fiscal years in
which the projects were initially identified. Lastly, a listing of all Fiscal Year 2021 projects sorted by
municipality is provided in the Appendix.
On the Cover: MSD Project Clear (MSDPC) is two utilities in one - responsible for 9,000+ miles of public
wastewater and stormwater sewer systems in the St. Louis region. MSDPC is investing billions of dollars over a
generation to improve water quality and minimize wastewater and stormwater issues by maintaining regulatory
compliance, planning, designing, and building community rainscaping & system improvements, and an ambitious
program of maintenance and repair.
MSD
B
o
u
n
d
a
r
y
St. Louis County Boundary 44
55
64
70
270
44
64
70
270
55
170
255
144
163
153
199
140
165
148 147
145
164
149
143 202
146
151
150
152
157 160159
156
142
203
201
158
155
162
141
206205
204
154
198
200
161
87
5
9
3
4
1
2
53
97 90
56
65
93
94 13
91
19
64
58
54
96
20
23
92
49
57
47
68
6160
8887
14
79
28
22
62
27
24
16
73
66
63
89
46
9921
51
82
80
26
78
8610
50
75
95
7271
11
67
98
48
15
85
59
52
178
188
193
104
194
195
126
102
171170
169
174173
125
120
128
116
122
135
132
134
136
113
190 176
177
101
105
123
129
106
121
119
138
133
189
107
124
127
186180
175
117
181
114
112
103
182167
187
196
185 184
139
118
168
172
131
130
179
137
197
183
Map produced by MSD GIS Mapping, January 21, 2020
The Metropolitan St. Louis Sewer DistrictCapital Improvement and Replacement ProgramFiscal Year 2021
Legend
FISCAL YEAR 2021
Wastewater
Stormwater
FISCAL YEAR 2022
Stormwater
Wastewater
Combined Sewer Area
PAGE NO. SYSTEM6121718252930313233343536373839404142434445556970747677818384100108109110111115166191192
MSD DISTRICT WIDE PROJECTS
FISCAL YEAR 2021
24 February 2020
Page 1 of 8
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY21
PAGE NUMBER PROJECT NAME
1 AMBLEWOOD SANITARY RELIEF (WATERFORD DR TO BIRCHBARK DR)
2 BANFF SANITARY RELIEF (CAITHNESS RD TO LANARK RD)
3 BAXTER - MERAMEC BOTTOMS - VALLEY PARK PRIVATE I/I REDUCTION
4 BISSELL & LEMAY WWTF FLUIDIZED BED INCINERATORS
5 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2022)
CONTRACT A
6 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2022)
CONTRACT B
7 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
8 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
9 BISSELL POINT WWTF FINE SCREEN, CONCRETE AND GATE IMPROVEMENTS
10 BISSELL POINT WWTF TRICKLING FILTER MEDIA REPLACEMENT
11 CAULKS CREEK PUMP STATION B (P-751) RELOCATION
12 CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2020)
13 CITYSHED MITIGATION PROGRAM DESIGN (CONTRACT A)
14 COLDWATER CREEK WWTF REPAIRS AND IMPROVEMENTS (2022)
15 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP
TUNNEL FACILITIES
16 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER
CREEK TUNNELS
17 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP
STATION FACILITIES
18 CRITICAL INFRASTRUCTURE ASSESSMENT AND ASSET INVESTIGATION (2020)
19 CSO - MARY AVENUE SOUTH OF MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION PHASE II
20 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) - PUMP STATION
21 EARTH CITY EXPRESSWAY PUMP STATION (P-708) REPLACEMENT
22 EDMUNDSON SANITARY RELIEF (EDMUND AVE TO BATAAN DR)
24 February 2020
Page 2 of 8
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY21
PAGE NUMBER PROJECT NAME
23 ELTORA WET WEATHER STORAGE FACILITY
24 FLORISSANT/DUNN SANITARY RELIEF (ST. ANTHONY LN TO I-270)
25 FLOW METERING AND MONITORING (2017)
26 FRIEDENS (PARTIAL) I/I REDUCTION (CHAIN OF ROCKS DR AND FONTAINE PL)
27 GASLIGHT SQUARE SEWER IMPROVEMENTS
28 GC-06 GRAVOIS CREEK TO BRIARSTONE AND GATES SANITARY RELIEF
PHASE II
29 GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (2019)
30 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2020)
CONTRACT A
31 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2020)
CONTRACT B
32 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2020) CONTRACT A
33 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2020) CONTRACT B
34 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2020) CONTRACT C
35 GENERAL SERVICES AGREEMENT - LANDSCAPE DESIGN (2019)
36 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2021) CONTRACT
A
37 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2021) CONTRACT B
38 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2021) CONTRACT C
39 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2021) CONTRACT
D
40 GENERAL SERVICES AGREEMENT - SEWER AND CHANNEL DESIGN (2021)
CONTRACT A
41 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT A
42 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT B
43 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT C
44 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT D
45 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT E
24 February 2020
Page 3 of 8
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY21
PAGE NUMBER PROJECT NAME
46 GLENFIELD SANITARY RELIEF (WATSON WOODS CT TO S LINDBERGH BLVD)
47 GRAVIOS CREEK SANITARY TRUNK RELOCATION AND STREAM
STABILIZATION (AFFTON ATHLETIC COMPLEX TO GREEN PK IND DR)
48 HAMPTON CREEK SANITARY RELIEF (DEER CREEK TRUNK TO OXFORD DR)
PHASE I
49 HARLEM BADEN RELIEF SYSTEM IMPROVEMENT DESIGN (CONTRACT A)
50 HATHAWAY DRIVE SANITARY RELIEF
51 HORTON PUMP STATION (P-814) ELIMINATION
52 HUNTLEIGH TRAILS LN SANITARY RELIEF (TWO MILE CREEK TRUNK SEWER
TO N GEYER RD)
53 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS)
54 LEMAY NO. 3 PUMP STATION AND FORCE MAIN
55 LEMAY PUBLIC I/I REDUCTION AND REHABILITATION (2022) CONTRACT A
56 LEMAY WWTF REPAIRS AND IMPROVEMENTS (2023)
57 LINDSAY - ST. ALBERT PRIVATE I/I REDUCTION
58 LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES)
59 LOUISA AND ARSENAL PUMP STATIONS (P-112 AND P-113) UPGRADES
60 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
61 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
62 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
63 LOWER MERAMEC WWTF EXPANSION PHASE II
64 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF
ROCKS DR TO CHURCH DR)
65 MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION
66 NEW ENGLAND TOWN CLIFF CAVE PUMP STATION (P-323) IMPROVEMENTS
67 NEWPORT LANDING PUMP STATION (P-480) ELIMINATION
68 NORTH FEE FEE CREEK PUBLIC I/I REDUCTION
24 February 2020
Page 4 of 8
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY21
PAGE NUMBER PROJECT NAME
69 PUMP STATION REPAIR AND IMPROVEMENT DESIGN (CONTRACT C)
70 RADAR RAINFALL DATA (2020)
71 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC
SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT)
72 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC
SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT)
73 S BRENTWOOD BLVD SANITARY RELIEF (DAYTONA DR TO WALINCA
TERRACE)
74 SCADA SYSTEM UPGRADE
75 SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-809 TO P-750)
76 STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS)
77 STREAM FLOW WATER QUALITY SAMPLING (2020)
78 TM-01 TWO MILE CREEK OUTFALL SANITARY RELIEF
79 UPPER BADEN SANITARY RELIEF (JENNINGS STATION RD TO OAKRIDGE
BLVD)
80 UPPER MATTESE TRUNK SANITARY RELIEF (THEISS RD TO LIBERTY TRAIL
RD)
81 WET WEATHER OPTIMIZATION STUDY
82 WHITE PLAINS SANITARY RELIEF (SALTBOX DR TO CEDAR CREEK RD)
83 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2021)
CONTRACT A
84 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2021)
CONTRACT B
85 BISSELL POINT WWTF MAIN SUBSTATION SWITCHGEAR AND MCC
REPLACEMENT
86 BISSELL POINT WWTF TRICKLING FILTER MEDIA REPLACEMENT
87 CAREY CT 1664 SANITARY AND STORM SEWER REPLACEMENT
88 CAREY CT 1664 SANITARY AND STORM SEWER REPLACEMENT
89 CAULKS CREEK A PUMP STATION (P-750) IMPROVEMENTS
90 CSO - MARY AVENUE SOUTH OF MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION PHASE I
24 February 2020
Page 5 of 8
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY21
PAGE NUMBER PROJECT NAME
91 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE
92 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE - RIVER DES PERES
93 DACEY BRANCH SANITARY RELIEF (BELLA CLARE DR TO PRIOR DR)
94 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
95 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP)
96 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) - PUMP STATION
97 DEER CREEK TRUNK SEWER RELOCATION (BRECKENRIDGE INDUSTRIAL CT
TO MARY AVE)
98 E. WATSON SANITARY RELIEF (RUDSON LN TO RICHVIEW DR)
99 EARTH CITY EXPRESSWAY PUMP STATION (P-708) REPLACEMENT
100 EASEMENT ACQUISITION FOR WASTEWATER PROJECTS (2021)
101 FF-07 FEE FEE CREEK SANITARY RELIEF (MEADOWSIDE DR TO WILLOW
BROOK DR)
102 GEYER SANITARY RELIEF AND WINDSOR SPRINGS P-521 STORAGE (BIG BEND
BLVD TO WINDSOR SPRINGS DR)
103 GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY REHABILITATION (FANNIE
AVE TO PARDEE LANE)
104 HAMPTON CREEK SANITARY RELIEF (DEER CREEK TRUNK TO OXFORD DR)
PHASE IA
105 HARLEM - BADEN RELIEF PHASE IV (HEBERT) (GOODFELLOW TO HAMILTON)
106 HARLEM BADEN RELIEF PHASE IV (HEBERT) - HAMILTON TO DARVER TRUNK
SEWER
107 HARLEM BADEN RELIEF PHASE IV (HEBERT) - TRUNK SEWER
REHABILITATION
108 INFRASTRUCTURE REPAIRS (FACILITIES) (2021)
109 INFRASTRUCTURE REPAIRS (REHABILITATION) (2021) CONTRACT A
110 INFRASTRUCTURE REPAIRS (REHABILITATION) (2021) CONTRACT B
111 INFRASTRUCTURE REPAIRS (WASTEWATER) (2021)
112 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS)
24 February 2020
Page 6 of 8
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY21
PAGE NUMBER PROJECT NAME
113 LANG ROYCE SANITARY RELIEF (FARGO DR TO FLORIDALE CT)
114 LANGLEY AND PHILO SANITARY STORAGE
115 LEMAY PUBLIC I/I REDUCTION (2021) CONTRACT A
116 LEMAY WWTF AERATION BASIN GATES
117 LINDLEY DRIVE SANITARY RELIEF (I-170 TO ASHMONT DR) (UR-07)
118 LOUISA AND ARSENAL PUMP STATIONS (P-112 AND P-113) UPGRADES
119 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
120 LOWER MERAMEC TUNNEL I/I SOURCE REDUCTION
121 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (RAIN GARDEN)
122 MARKET ST 2350 GREEN INFRASTRUCTURE - ENTRANCE AND LANDSCAPING
IMPROVEMENTS
123 MIDLAND SANITARY RELIEF (MIDLAND BLVD TO SIMS AVE)
124 MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION PHASE II
125 MISSOURI RIVER WWTF TUNNEL SERVICE WATER PIPING REPLACEMENT
126 NORTH POINTE DETENTION BASIN OPTI RETROFIT
127 RIVERPORT 6 PUMP STATION (P-781) REHABILITATION
128 RIVERSIDE AND YARNELL SANITARY RELIEF REPLACEMENT
129 SPIRIT OF ST. LOUIS 2 PUMP STATION (P-736) REPLACEMENT
130 SPRING AVE SANITARY RELIEF (YEATMAN AVE TO DALE AVE)
131 TULANE-WILBUR OUTFALL SANITARY RELIEF SEWER (WEBER RD TO
HILDESHEIM AVE)
132 TULANE-WILBUR OUTFALL SANITARY RELIEF SEWER (WEBER RD TO
HILDESHEIM AVE)
133 VALLEY PUBLIC I/I REDUCTION (CLARKSON RD AND KEHRS MILL RD)
134 WATKINS CREEK PUMP STATION (P-101) FORCEMAIN REPLACEMENT (COAL
BANK RD TO SPRING GARDEN DR)
135 WATKINS CREEK PUMP STATION (P-101) REPLACEMENT
136 WEST LOCKWOOD SANITARY RELIEF
24 February 2020
Page 7 of 8
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY21
PAGE NUMBER PROJECT NAME
137 WHITE AND ROSALIE I/I REDUCTION AND BRIDGEPORT SEWER SEPARATION
138 WHITE BIRCH PUMP STATION (P-725) ELIMINATION
139 WOODS MILL SANITARY RELIEF (I-64 TO BROOK MILL LN)
166 GENERAL SERVICES AGREEMENT - WATER QUALITY SUPPORT SERVICES
(2021)
167 MAINTENANCE YARD VEHICLE STORAGE BUILDING (MINTERT)
168 OMCI STORMWATER INFRASTRUCTURE IMPROVEMENT DESIGN (2021)
169 OMCI STORMWATER INFRASTRUCTURE IMPROVEMENT DESIGN (2021)
170 OMCI STORMWATER INFRASTRUCTURE IMPROVEMENT DESIGN (2021)
171 OMCI STORMWATER INFRASTRUCTURE IMPROVEMENT DESIGN (2021)
172 OMCI STORMWATER STREAMBANK STABILIZATION DESIGN (2021)
173 OMCI STORMWATER STREAMBANK STABILIZATION DESIGN (2021)
174 OMCI STORMWATER STREAMBANK STABILIZATION DESIGN (2021)
175 BRUNSTON DR. #4875 BANK STABILIZATION
176 CARL AVE., AVIS ST., AND MAIN ST. STORM SEWER
177 COLDWATER CREEK OMCI REIMBURSEMENTS PROGRAM
178 DEER CREEK OMCI REIMBURSEMENTS PROGRAM
179 DRURY - SWITZER STORM SEWER
180 GLEASON #656 STORM SEWER
181 LARKWOOD - JAYWOOD - SPARROWWOOD BANK STABILIZATION (CRE-07)
182 MAINTENANCE YARD VEHICLE STORAGE BUILDING (MINTERT)
183 MARTIGNEY CREEK STREAMBANK STABILIZATION - FAIRWICK AND GOLDEN
VALLEY BANK STABILIZATION (MGMB-150)
184 MARTIGNEY CREEK STREAMBANK STABILIZATION - FAIRWICK AND GOLDEN
VALLEY BANK STABILIZATION (MGMB-150)
185 NOTTINGHAM ESTATES DR. #5217 STORM SEWER
186 RAFORD CT. STORM SEWER SEPARATION
187 REYNOSA - MELITTA STREAMBANK STABILIZATION
24 February 2020
Page 8 of 8
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY21
PAGE NUMBER PROJECT NAME
188 SEMINARY OMCI REIMBURSEMENTS PROGRAM
189 SIMS AVE STORM BUYOUT
190 STANWOOD DR. AND BELWOOD DR. STORM SEWER AND BANK
STABILIZATION
191 STORMWATER INFRASTRUCTURE REPAIRS (2021)
192 STORMWATER QUALITY GREEN INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
193 SUGAR CREEK OMCI REIMBURSEMENTS PROGRAM
194 UNIVERSITY CITY OMCI REIMBURSEMENTS PROGRAM
195 WATER QUALITY STORMWATER BMP PARK ALONG DEER CREEK (HANLEY
RD TO SOUTH BRENTWOOD BLVD)
196 WEATHERBY DRIVE STORM SEWER
197 WILBORN DRIVE #5361 STORM SEWER
24 February 2020
Page 1 of 2
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX CONTINGENCY PROJECTS - FY22
PAGE NUMBER PROJECT NAME
140 BADEN CITYSHED MITIGATION BASINS (CALVARY, FREDERICK, PARTRIDGE
AND TILLIE)
141 BISSELL POINT WWTF TRICKLING FILTER MEDIA REPLACEMENT
142 CAULKS CREEK A PUMP STATION (P-750) IMPROVEMENTS
143 CAULKS CREEK FORCEMAIN (RIVER VALLEY RD TO L-52)
144 CAULKS CREEK FORCEMAIN IMPROVEMENTS (CAULKS PUMP STATION A TO
HOG HOLLOW RD)
145 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE
146 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE - RIVER DES PERES
147 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
148 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
149 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) - PUMP STATION
150 DOLAN PLACE AND GRANDVIEW PLACE COMBINED SEWER RELIEF
151 FF-07 FEE FEE CREEK SANITARY RELIEF (MEADOWSIDE DR TO WILLOW
BROOK DR)
152 HARLEM BADEN RELIEF PHASE IV (HEBERT) - HAMILTON TO DARVER TRUNK
SEWER
153 HARLEM CITYSHED MITIGATION BASINS (ASHLAND AND ESSEX)
154 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS)
155 LINDLEY DRIVE SANITARY RELIEF (I-170 TO ASHMONT DR) (UR-07)
156 LOUISVILLE AVENUE AND OAKLAND AVENUE COMBINED SEWER RELIEF
157 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
158 MINNIE AVE. TO GREENHAVEN STORM SEWER SEPARATION
159 NEW ENGLAND TOWN CLIFF CAVE PUMP STATION (P-323) IMPROVEMENTS
160 NEW ENGLAND TOWN CLIFF CAVE PUMP STATION (P-323) IMPROVEMENTS
161 PARK DRIVE SANITARY RELIEF (ENGELHOLM AVENUE) PHASE II
162 SOUTH BROADWAY AT MERAMEC COMBINED SEWER REPLACEMENT
24 February 2020
Page 2 of 2
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX CONTINGENCY PROJECTS - FY22
PAGE NUMBER PROJECT NAME
163 SOUTH COUNTY RELIEF FORCE MAIN REPLACEMENT (P-419 TO BECKER RD)
164 WATKINS CREEK PUMP STATION (P-101) FORCEMAIN REPLACEMENT (COAL
BANK RD TO SPRING GARDEN DR)
165 WATKINS CREEK PUMP STATION (P-101) REPLACEMENT
198 BROADHEAD #921 STORM SEWER
199 CLAYTON CITY HALL STORM SEWER
200 DEKAMAY DRIVE STORM SEWER (MGJB-130)
201 GENTLE COURT CHANNEL IMPROVEMENT (WILL-06)
202 HALL STREET STORM SEWERS
203 ORCHARD AND WINDSOR LANE STORM SEWER
204 ST. SIMON CT. #10023 STORM CHANNEL (GCMB-250)
205 WC-33 LA PADERA - EL CAMARA STORM IMPROVEMENT
206 WC-33 LA PADERA - EL CAMARA STORM IMPROVEMENT
24 February 2020
Page 1 of 1
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY - FY21
TYPE OF PROJECT NUMBER OF
PROJECTS
PROJECT COST
Wastewater Engineering 79 $62,306,000
Wastewater Construction 55 $296,215,000
Stormwater Engineering 4 $1,975,000
Stormwater Construction 22 $15,919,877
TOTAL:160 $376,415,877
Wastewater Continued 6 $24,803,000
Stormwater Continued 4 $2,029,000
TOTAL:10 $26,832,000
GRAND TOTAL:170 $403,247,877
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
1 of 7
The identification and prioritization of projects to be included in the Capital Improvement
and Replacement Program is a multi-step process, requiring monitoring and updating to ensure
that the highest priority problems within the District are addressed in a timely manner, given
funding limitations. These stages include: project identification, conceptual solution,
preliminary study, final design, and construction.
At each step in the process, the project scope is reevaluated to verify that it continues to
meet regulatory requirements and customers’ needs. The project cost is updated based on
available information, and the project’s priority is assessed with the goal that the highest priority
projects are funded first.
Project cost estimates used in the budget preparation process and shown in the Budget
Supplement are usually based on the preliminary study stage of the process. At this stage there is
typically a minimal amount of detailed information available regarding geotechnical conditions,
utility relocation requirements, easement requirements, and other site-specific issues that have
the potential to significantly affect the project’s construction cost. Preliminary study cost
estimates are intended to be within thirty percent of the design engineer’s final estimates.
Individual projects may vary to a greater degree than the average, due to unanticipated site-
specific conditions that impact the project cost.
New projects are identified on an ongoing basis to ensure that the District is in
compliance with the regulatory requirements of the United States Environmental Protection
Agency and Missouri Department of Natural Resources, to address customer stormwater or
wastewater problems, remedy deficiencies identified through planning studies and hydraulic
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
2 of 7
analysis of the system, and implement required collection system and wastewater treatment plant
repairs and upgrades.
Upon the initial identification of regulatory issues, localized problems, or system
deficiencies, a conceptual solution is developed, which includes a project scope, cost estimate,
and priority ranking of the project relative to similar projects. This solution and associated cost
estimate are general, based on a single site visit and a “table-top” analysis of the problem. The
project may then be incorporated into the Capital Improvement and Replacement Program in a
specific fiscal year, based on the availability of funds and priority of the project.
Before the year in which funding of the project is anticipated, a preliminary study is
performed. In this study, scope is reevaluated in greater detail to ensure that the conceptual
solution is still viable, given current conditions, regulatory requirements, and updated project
cost estimate and priority ranking. In performing this preliminary study, the District may make
multiple site visits to inspect the problem area and estimate alignment of the sewer or channel to
be constructed. Preliminary survey information may be obtained and a more detailed hydraulic
analysis performed than was done at the conceptual solution level. Preliminary studies are
typically performed by the Engineering Department. However, the District may use engineering
consultants to perform preliminary studies during periods of heavy workload, or for large,
complex projects such as new treatment plants, upgrades to existing treatment plants, tunnel
projects, or major sewer upgrades.
Upon completion of a preliminary study, the project’s priority ranking is reevaluated
relative to other, similar projects. A project may be rescheduled to a later fiscal year within the
Capital Improvement and Replacement Program, should its priority ranking be reduced due to
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
3 of 7
increased project cost estimate or modification of its scope.
The final design of a project is performed by either the District’s Engineering Department
staff or via engineering consultant services. As part of the final design process, topographic and
geotechnical information is collected, utility conflicts are identified, construction plans and
specifications are prepared, easement plats are drafted, and easements are obtained.
In FY 2021, 37 engineering budget items have been procured using the Watershed
Consultant approach, retaining firms for multi-year efforts on a related suite of projects, in order
to increase efficiency, expedite the program and meet Consent Decree requirements and
schedule. Following is a listing of the Watershed Consultant related engineering projects and
associated professional service firms:
Project
Number Project Name Page
Number Budget
Watershed Program Consultant - 11151 - Construction Management Services -
Tank/Treatment/Pump Station Facilities
11151 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES 17 6,200,000
Watershed Program Consultant - 11152 - Construction Management Services -
Lower and Middle RDP Tunnel Facilities
11152 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES 15 3,000,000
Watershed Program Consultant - 11826 - Construction Management Services -
Lower Meramec and Deer Creek Tunnels
11826 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS 16 6,700,000
Watershed Program Design Consultant - 11109 - Lower & Middle RDP CSO Controls
System Improvements
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN 54 250,000
11656 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) 64 150,000
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) 53 500,000
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES) 58 200,000
11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 60 200,000
11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 61 270,000
Watershed Program Design Consultant - 11110 - Deer Creek Sanitary System
Improvements
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
4 of 7
12615 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) - PUMP STATION 20 1,000,000
Watershed Program Design Consultant - 11144 - Bissell - Coldwater - Missouri -
Meramec Sanitary System Improvements
12077 AMBLEWOOD SANITARY RELIEF (WATERFORD DR TO BIRCHBARK DR) 1 307,000
12085 BANFF SANITARY RELIEF (CAITHNESS RD TO LANARK RD) 2 57,000
12088 BAXTER - MERAMEC BOTTOMS - VALLEY PARK PRIVATE I/I REDUCTION 3 147,000
12584 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2022) CONTRACT A 5 100,000
13031 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2022) CONTRACT B 6 44,000
12159 EDMUNDSON SANITARY RELIEF (EDMUND AVE TO BATAAN DR) 22 399,000
12178 FLORISSANT/DUNN SANITARY RELIEF (ST. ANTHONY LN TO I-270) 24 730,000
12185 FRIEDENS (PARTIAL) I/I REDUCTION (CHAIN OF ROCKS DR AND FONTAINE PL) 26 388,000
13432 HATHAWAY DRIVE SANITARY RELIEF 50 215,000
12330 LINDSAY - ST. ALBERT PRIVATE I/I REDUCTION 57 227,000
12357 NEWPORT LANDING PUMP STATION (P-480) ELIMINATION 67 214,000
12433 NORTH FEE FEE CREEK PUBLIC I/I REDUCTION 68 61,000
12241 UPPER BADEN SANITARY RELIEF (JENNINGS STATION RD TO OAKRIDGE BLVD) 79 483,000
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 7 1,000,000
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 8 635,000
Watershed Program Design Consultant - 11145 - Lemay Sanitary System
Improvements
12157 GC-06 GRAVOIS CREEK TO BRIARSTONE AND GATES SANITARY RELIEF PHASE II 28 520,000
12264 GLENFIELD SANITARY RELIEF (WATSON WOODS CT TO S LINDBERGH BLVD) 46 374,000
12815 GRAVIOS CREEK SANITARY TRUNK RELOCATION AND STREAM STABILIZATION (AFFTON ATHLETIC COMPLEX TO GREEN PK IND DR) 47 449,000
12308 HORTON PUMP STATION (P-814) ELIMINATION 51 172,000
12590 LEMAY PUBLIC I/I REDUCTION AND REHABILITATION (2022) CONTRACT A 55 110,000
12195 S BRENTWOOD BLVD SANITARY RELIEF (DAYTONA DR TO WALINCA TERRACE) 73 737,000
Watershed Program Design Consultant - 11153 - RDP Tributaries (Deer Creek)
Controls System Improvements
12140 CSO - MARY AVENUE SOUTH OF MANCHESTER CSO INTERCEPTOR (I-132)/OUTFALL (L-106) ELIMINATION PHASE II 19 150,000
12334 HAMPTON CREEK SANITARY RELIEF (DEER CREEK TRUNK TO OXFORD DR) PHASE I 48 50,000
11746 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL 62 750,000
12472 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE III AND PHASE IV 148 500,000
11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 71 300,000
11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 72 575,000
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
5 of 7
For projects of significant scope and impact, coordination with property owners who will
benefit or who will be affected by the construction of the project is achieved at neighborhood
meetings hosted by the District. For smaller projects, property owners are individually contacted
during the design of the project.
Many projects require that new easements be acquired to enable the project to be
constructed. The time required to acquire these easements is lengthy and may result in delays in
the planned construction schedule. When necessary, the District may utilize its eminent domain
powers to condemn for easements in order to ensure that a project is constructed. Any required
condemnation proceedings are performed in full compliance with state and federal law. Some
projects may additionally require specific permitting from other government agencies, such as
the Missouri Department of Natural Resources or US Army Corps of Engineers, prior to bidding.
A project is advertised for public bidding a minimum of 30 days, followed by a formal
bid opening. Bids are evaluated to determine the lowest responsive, responsible bidder.
Appropriation and contract ordinances are submitted to the Board of Trustees for their approval.
Upon final approval, contracts are executed and notices to proceed are issued.
In addition to wastewater and stormwater projects, the District may construct sanitary
sewer sub-district projects at the request of property owners currently served by private systems
or individual septic tank systems. These sub-districts are financed by the benefiting property
owners, using special benefit assessments. The affected property owners initiate the projects by
submitting a petition to the District, which provides design and construction management
assistance. Because of the uncertainty of the viability and/or schedule of sub-district projects,
they are not always listed in the Budget Supplement.
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
6 of 7
Wastewater projects are funded via revenue from the wastewater user charge paid by
ratepayers. The user charge also supports the sale of revenue bonds to fund the wastewater
program. Generally, Fund 6660, the Sanitary Replacement Fund, is used to pay for capital
wastewater work, while Fund 1101, the General Fund, is used to pay for non-capital wastewater
related work. The allocation of a given project’s costs between these two funds is an accounting
function necessary to facilitate capitalization of District assets (adding the value of work
completed to the overall value of all physical assets owned by the District). Wastewater projects
may also be funded by various Operation, Maintenance, Construction and Improvement (OMCI)
funds, Construction Funds, Special Funds, or the Improvement Fund.
Stormwater projects may be funded via the Districtwide Stormwater Fund, the
Stormwater Regulatory Fund, the Improvement Fund, or from various Operation, Maintenance,
Construction, and Improvement (OMCI) funds. These OMCI funds are established in certain
areas of the District, are supported by property tax collection, and must be spent only within their
specific areas of tax collection.
The sections included in this Budget Supplement document are:
• Program Summary – summary of budget, and number and type of projects. Includes
general description of the capital program and budgeting process, and a glossary of often
used terms.
• Wastewater Engineering Projects – summary and details on wastewater engineering
consulting services and other professional services necessary to implement the
wastewater program.
• Wastewater Construction Projects – summary and details on wastewater construction
projects and other expenses such as property rights acquisition necessary to implement
the wastewater program.
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
7 of 7
• Wastewater Continued Projects – summary of wastewater projects continued from
previous fiscal years, due to difficulties in easement acquisition, permitting process or
coordination with other agencies, design revisions or status, or other special issues.
• Wastewater Contingency Projects – summary and details on wastewater projects
currently budgeted in the next fiscal year, but having the chance to be expedited into the
current fiscal year, if scheduling or budget allow.
• Wastewater Program – annual alphabetical listing of wastewater projects by fund,
including the type of service (task) budgeted.
• Stormwater Engineering Projects - summary and details on stormwater engineering
consulting services and other professional services necessary to implement the
stormwater program.
• Stormwater Construction Projects - summary and details on stormwater construction
projects and other expenses such as property rights acquisition necessary to implement
the stormwater program.
• Stormwater Continued Projects - summary of stormwater projects continued from
previous fiscal years, due to difficulties in easement acquisition, permitting process or
coordination with other agencies, design revisions or status, or other special issues.
• Stormwater Contingency Projects - summary and details on stormwater projects currently
budgeted in the next fiscal year, but having the chance to be expedited into the current
fiscal year, if scheduling or budget allow.
• Stormwater Program - annual alphabetical listing of stormwater projects by fund,
including the type of service (task) budgeted.
• Appendix – list of projects by municipality.
Please note that the detail sheets for each project in this document include locations and
quantities of work to be performed. These maps and quantities are approximate only, and final
location and extent of work may vary depending on final design and/or field conditions during
construction.
GLOSSARY
BIORETENTION A concave landscape feature which stores, filters, and infiltrates
stormwater runoff.
BIOSTABILIZATION A method of repairing eroding streams by utilizing the structural
properties of live plants to rebuild eroded streambanks and incised
channels.
BIOSWALE A sloped open drainage channel with landscape elements designed to
store, filter, and infiltrate stormwater runoff.
CD The Federal Consent Decree, entered on April 27, 2012 and all
appendices and all modifications or amendments thereto, between
MSD, United States of America, and the Missouri Coalition for the
Environment Foundation designed to eliminate or reduce overflows
from the Combined and Separate Sewer Systems in order to improve
water quality and protect human health and the environment.
CIPP Cured in Place Pipe, a construction method to rehabilitate a sewer pipe
by lining it with a new pipe. This work does not require excavating the
pipe and replacing it in total.
CIRP Capital Improvement and Replacement Program, the ongoing system
improvement efforts by MSD.
CMOM Capacity, Management, Operations, and Maintenance program.
COE United States Army Corps of Engineers.
COMBINED SEWER The portion of MSD's sewer system designed to convey municipal
sewage (i.e. domestic, commercial and industrial wastewaters) and
stormwater runoff through a single-pipe system to a wastewater
treatment facility and/or to a CSO outfall.
CONSENT DECREE See “CD”.
CSO Combined Sewer Overflow, any discharge from the combined sewer
system at a point prior to the headworks of a wastewater treatment
facility.
FORCE MAIN A pressurized sewer pipe that can carry wastewater. Sewer force mains
are necessary when topography, or other system characteristics, do not
allow wastewater to move through the line by the influence of gravity
alone. Force mains are the pipes that convey wastewater under pressure
through the work of pumps located in pump stations or lift stations.
GI Green Infrastructure, environmentally friendly and sustainable
stormwater management practices that reduce runoff by using
infiltration, such as bioretention and bioswales.
GRADE CONTROL
STRUCTURE
A structure constructed in a creek or stream to control erosion. The
structure allows water to pass to a lower elevation while directing the
energy and velocity of the water in a manner that minimizes erosion
that would otherwise change the shape of the stream.
GLOSSARY
I/I Inflow and Infiltration; inflow refers to direct connections of rainwater
sources to the sanitary sewer system; infiltration refers to groundwater
sources of flows into sewer pipes. Inflow sources can include roof
downspouts, yard and area drains, foundation drains, manhole covers,
cross connections from storm sewers, or inlets. Infiltration sources can
include defective building laterals, sewer pipes, pipe joints,
connections, or manhole walls.
INFILTRATION Infiltration refers to groundwater sources of flows into sewer pipes.
Infiltration sources can include defective building laterals, sewer pipes,
pipe joints, connections, or manhole walls.
INFLOW Inflow refers to direct connections of rainwater sources to the sanitary
sewer system. Inflow sources can include roof downspouts, yard and
area drains, foundation drains, manhole covers, cross connections from
storm sewers, or inlets.
LATERAL A sewer connecting a building with the publicly owned sanitary sewer
main.
LIFT STATION Lift stations are used for pumping wastewater or stormwater from a
point of lower elevation to a point of higher elevation. Lift stations
utilize pumps to lift the wastewater from the lower elevation to the
higher elevation. Wastewater then flows by gravity to the next location
in the system.
LMRDP Lower and Middle River Des Peres, generally the river from University
City south to the Mississippi River.
LTCP Long Term Control Plan, a long duration plan to manage/improve the
combined sewer system and abate combined sewer overflows, through
the identification of a capital improvement plan tailored to receiving
stream water quality and the community's financial capability.
MAIN A smaller public sewer collecting flows from buildings via lateral
connections.
MGD Million Gallons per Day, a measure of flow over time. 1 MGD is
equivalent to 700 gallons per minute of flow.
MSD Metropolitan St. Louis Sewer District, district formed in 1954 via vote
of the people, with responsibility for wastewater and stormwater
services in St. Louis City and most of St. Louis County.
OMCI Operation Maintenance Construction Improvement district, funds
generated by tax payments in certain districts can be used for capital
improvements in those districts. Funds can be used for capital projects
or maintenance.
OUTFALL The point of discharge to the environment from a constructed SSO or
CSO.
PRIVATE I/I REDUCTION Reduction of inflow and infiltration sources on private property, from
private sources, such as downspout and driveway drain connections to
the sanitary sewer system (inflow) or deteriorated service laterals or
broken connections (infiltration).
PUBLIC I/I REDUCTION Reduction of public inflow and infiltration sources such as cracked and
broken sewer pipes or deteriorated manholes.
GLOSSARY
PUMP STATION Pump stations are facilities which include pumps and ancillary
equipment, for pumping fluids from one place to another. A pump is a
mechanical device that converts mechanical energy to pressure, in order
to convey wastewater or stormwater. Pumping results in pressurized
sewer pipes that are called force mains.
RAIN GARDEN A landscaped shallow swale or depression that temporarily holds water
and reduces stormwater runoff as the water infiltrates into the soil. The
water is absorbed by plants and is filtered as it percolates through the
soil.
RAINSCAPING Any combination of plantings, water features, catch basins, permeable
pavement and other activities that manage stormwater as close as
possible to where it falls, rather than moving it someplace else.
RDP River Des Peres, a river in the central and south portions of the
metropolitan area, which was enlarged in the early 1900s to provide
conveyance to the Mississippi River of stormwater runoff in order to
reduce surface flooding.
RFP Request for Proposals.
RFQ Request for Qualifications.
SANITARY SEWER SYSTEM The portion of the sewer system designed to convey only sewage, and
not stormwater, from residences, commercial buildings, industrial
plants and institutions for treatment at a wastewater treatment facility
SKME Sverdrup Kwame Metcalf Eddy - a planning team that identified system
needs in the early 2000s.
SSO Sanitary Sewer Overflow, any overflow, spill, diversion, or release of
wastewater from or caused by MSD's sanitary sewer system. This CD
term shall include: (i) discharges to surface waters of the State or
United States from MSD's sanitary sewer system and (ii) any release of
wastewater from MSD's sanitary sewer system to public or private
property that does not reach waters of the United States or the State.
SSO MP Sanitary Sewer Overflow Control Master Plan, a capital improvement
plan which describes the results of system evaluations and the specific
measures that will result in the Elimination of all Constructed SSOs
Outfalls, all known SSOs, and Building Backups, and/or that are
necessary to ensure that there is adequate capacity in the Sanitary Sewer
System to collect, convey, and treat anticipated peak wet weather flows
under current and projected future conditions as defined in Paragraphs
21(e) and (g) of the CD.
SUBTRUNK A sewer that serves a smaller or sub-watershed area, which brings flow
to a trunk sewer.
TRUNK SEWER A major sewer which serves a large area. A trunk sewer typically is
centrally located within a watershed to which subtrunks and other
sewers are tributary.
USGS United States Geological Survey.
GLOSSARY
WASTEWATER Wastewater, also written as waste water, is any water that has been
adversely affected in quality by human influence. Wastewater can
originate from a combination of domestic, industrial, commercial or
agricultural activities, and from sewer inflow or infiltration.
WATERSHED An area of land which drains to a specific creek, river, or other body of
water.
WATERSHED CONSULTANT A consulting firm retained for a multi-year design effort on a related
suite of projects in a specific watershed.
WWTF Wastewater Treatment Facility, any facility, method or process which
removes, reduces or renders less obnoxious pollutants or water
contaminants released from any source.
WWTP Wastewater Treatment Plant, a municipal facility that removes, reduces
or renders less obnoxious pollutants or water contaminants from
wastewater before releasing it to the environment.
24 February 2020
Page 1 of 5
WASTEWATER ENGINEERING PROJECTS - FY21
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12077 AMBLEWOOD SANITARY RELIEF
(WATERFORD DR TO BIRCHBARK DR)
$307,000 1
12085 BANFF SANITARY RELIEF (CAITHNESS RD TO
LANARK RD)
$57,000 2
12088 BAXTER - MERAMEC BOTTOMS - VALLEY
PARK PRIVATE I/I REDUCTION
$147,000 3
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
$3,000,000 4
12584 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2022)
CONTRACT A
$100,000 5
13031 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2022)
CONTRACT B
$44,000 6
11144 BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$1,000,000 7
11144 BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$635,000 8
12548 BISSELL POINT WWTF FINE SCREEN,
CONCRETE AND GATE IMPROVEMENTS
$2,000,000 9
12566 BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
$100,000 10
12114 CAULKS CREEK PUMP STATION B (P-751)
RELOCATION
$500,000 11
12000 CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2020)
$2,500,000 12
12693 CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT A)
$989,000 13
12552 COLDWATER CREEK WWTF REPAIRS AND
IMPROVEMENTS (2022)
$951,000 14
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
$3,000,000 15
11826 CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
$6,700,000 16
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
$6,200,000 17
24 February 2020
Page 2 of 5
WASTEWATER ENGINEERING PROJECTS - FY21
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12907 CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2020)
$1,700,000 18
12140 CSO - MARY AVENUE SOUTH OF MANCHESTER
CSO INTERCEPTOR (I-132)/OUTFALL (L-106)
ELIMINATION PHASE II
$150,000 19
12615 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP) - PUMP STATION
$1,000,000 20
12153 EARTH CITY EXPRESSWAY PUMP STATION (P-
708) REPLACEMENT
$75,000 21
12159 EDMUNDSON SANITARY RELIEF (EDMUND
AVE TO BATAAN DR)
$399,000 22
11737 ELTORA WET WEATHER STORAGE FACILITY $800,000 23
12178 FLORISSANT/DUNN SANITARY RELIEF (ST.
ANTHONY LN TO I-270)
$730,000 24
12759 FLOW METERING AND MONITORING (2017)$2,500,000 25
12185 FRIEDENS (PARTIAL) I/I REDUCTION (CHAIN
OF ROCKS DR AND FONTAINE PL)
$388,000 26
11137 GASLIGHT SQUARE SEWER IMPROVEMENTS $750,000 27
12157 GC-06 GRAVOIS CREEK TO BRIARSTONE AND
GATES SANITARY RELIEF PHASE II
$520,000 28
12386 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2019)
$3,000,000 29
12397 GENERAL SERVICES AGREEMENT - FACILITY
& SEWER DESIGN (2020) CONTRACT A
$550,000 30
13059 GENERAL SERVICES AGREEMENT - FACILITY
& SEWER DESIGN (2020) CONTRACT B
$200,000 31
12391 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT A
$85,000 32
12392 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT B
$85,000 33
12393 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT C
$85,000 34
24 February 2020
Page 3 of 5
WASTEWATER ENGINEERING PROJECTS - FY21
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
13044 GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2019)
$200,000 35
13087 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT A
$75,000 36
13088 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT B
$75,000 37
13089 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT C
$75,000 38
13090 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT D
$75,000 39
12400 GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2021) CONTRACT A
$200,000 40
12413 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT A
$50,000 41
12416 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT B
$50,000 42
12417 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT C
$50,000 43
12418 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT D
$50,000 44
12419 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT E
$50,000 45
12264 GLENFIELD SANITARY RELIEF (WATSON
WOODS CT TO S LINDBERGH BLVD)
$374,000 46
12815 GRAVIOS CREEK SANITARY TRUNK
RELOCATION AND STREAM STABILIZATION
(AFFTON ATHLETIC COMPLEX TO GREEN PK
IND DR)
$449,000 47
12334 HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
$50,000 48
12695 HARLEM BADEN RELIEF SYSTEM
IMPROVEMENT DESIGN (CONTRACT A)
$500,000 49
13432 HATHAWAY DRIVE SANITARY RELIEF $215,000 50
12308 HORTON PUMP STATION (P-814) ELIMINATION $172,000 51
24 February 2020
Page 4 of 5
WASTEWATER ENGINEERING PROJECTS - FY21
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12312 HUNTLEIGH TRAILS LN SANITARY RELIEF
(TWO MILE CREEK TRUNK SEWER TO N GEYER
RD)
$405,000 52
11711 JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
$500,000 53
11817 LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
$250,000 54
12590 LEMAY PUBLIC I/I REDUCTION AND
REHABILITATION (2022) CONTRACT A
$110,000 55
13153 LEMAY WWTF REPAIRS AND IMPROVEMENTS
(2023)
$900,000 56
12330 LINDSAY - ST. ALBERT PRIVATE I/I
REDUCTION
$227,000 57
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY
TO RDP TUBES)
$200,000 58
12489 LOUISA AND ARSENAL PUMP STATIONS (P-112
AND P-113) UPGRADES
$300,000 59
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
$200,000 60
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
$270,000 61
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
$750,000 62
12255 LOWER MERAMEC WWTF EXPANSION PHASE
II
$2,500,000 63
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
$150,000 64
12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION
$200,000 65
10715 NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
$250,000 66
12357 NEWPORT LANDING PUMP STATION (P-480)
ELIMINATION
$214,000 67
12433 NORTH FEE FEE CREEK PUBLIC I/I REDUCTION $61,000 68
24 February 2020
Page 5 of 5
WASTEWATER ENGINEERING PROJECTS - FY21
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12699 PUMP STATION REPAIR AND IMPROVEMENT
DESIGN (CONTRACT C)
$810,000 69
12006 RADAR RAINFALL DATA (2020)$150,000 70
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$300,000 71
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$575,000 72
12195 S BRENTWOOD BLVD SANITARY RELIEF
(DAYTONA DR TO WALINCA TERRACE)
$737,000 73
13467 SCADA SYSTEM UPGRADE $500,000 74
12628 SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-809
TO P-750)
$1,517,000 75
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
$600,000 76
12004 STREAM FLOW WATER QUALITY SAMPLING
(2020)
$300,000 77
12231 TM-01 TWO MILE CREEK OUTFALL SANITARY
RELIEF
$1,530,000 78
12241 UPPER BADEN SANITARY RELIEF (JENNINGS
STATION RD TO OAKRIDGE BLVD)
$483,000 79
12249 UPPER MATTESE TRUNK SANITARY RELIEF
(THEISS RD TO LIBERTY TRAIL RD)
$1,460,000 80
13436 WET WEATHER OPTIMIZATION STUDY $1,500,000 81
12280 WHITE PLAINS SANITARY RELIEF (SALTBOX
DR TO CEDAR CREEK RD)
$400,000 82
TOTAL:$62,306,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
AMBLEWOOD SANITARY RELIEF (WATERFORD DRTO BIRCHBARK DR)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS ALONG THE PADDOCK CREEK LATERAL IN THEVICINITY OF AMBLEWOOD DRIVE.
CONSTRUCT 2,400 FEET OF 10-INCH TO 24-INCH SANITARY SEWER.SADDLEST
E
E
D
BIRCHBARK
N
E
W
H
A
L
L
S
F
E
R
R
Y
PARKER SPURAINTREEWA
T
E
R
F
O
R
D
DERHAKELIVERPOOLA M BLEWOO
D
HARNESSASCOT
MILLSTONE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12077
Wastewater
11
$307,000
Florissant
Coldwater
Coldwater Creek
Capital
1Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BANFF SANITARY RELIEF (CAITHNESS RD TOLANARK RD)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 275 FEET OF 12-INCH SANITARY SEWER.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 13031.CAMERONTAY
PRESLEY
LANARK
CAITHNESS
C R A W F O R D
ESTRIDGE
LANCASHIRE BALMORALBANFF MIDLOT
H
I
A
N
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12085
Wastewater
11
$57,000
Unincorporated
Bissell
Bissell
Capital
2Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BAXTER - MERAMEC BOTTOMS - VALLEY PARKPRIVATE I/I REDUCTION
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS IN THE BAXTER STUDY AREA.
CONSTRUCT 290 FEET OF 12-INCH TO 24-INCH STORM SEWER ANDPERFORM PRIVATE I/I REDUCTION AT 14 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12586. INCLUDESPRIVATE I/I REDUCTION FROM PROJECTS 12350 AND 12258.HENRYCLA Y T O N
HOLLOWAYC L A Y MONTDUTCHM IL LS
T
R
A
U
B
MANORSMARIEISLEVIEWHILLTRAILGLA N T A I
TIMKASPRINGMEADOWSWO
O
D
S
M
I
LLLOCKB U R G U NDY
CORALC LAYW O R T H
ALGONQ
UIN
K E N ILW O R THPAR
KCLAYMONTESTATES
SHIRLEYWHITEL A NE
RANCHWILD BRIERB R IARWYC K PRIVATECHESTERTONMAYMO NT
SAVOYCLEARMEADOWS
B
ROOKTREE
J
U
L
I
A
N
N
A
JARES
GUEN E V E R E
REDONDO
CORONADO
STRAUB HILL
FOR R E S TER
NORTHMOOR
B A N T R Y
P
E
N
N
Y
ANDERSOHNPACKFORDKINGRIDGEROYALVILLAG E
OLDOA K SBAXTONGEORGETOWN
ORCHARDGLENNHAPPY WOODSMILLPRIVATE
NMO141HWYMANCHES T E R R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12088
Wastewater
11
$147,000
Ballwin
Meramec
Grand Glaize Creek
Capital
3Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL & LEMAY WWTF FLUIDIZED BEDINCINERATORS
Design Services
6660 - SanitaryReplacement Fund
LONG TERM SOLUTION FOR SOLIDS HANDLING AT TREATMENTFACILITIES IS NEEDED.
CONSTRUCT FLUIDIZED BED INCINERATORS AT THE BISSELL ANDLEMAY WASTEWATER TREATMENT FACILITIES, TO INCLUDEREDUNDANT SLUDGE ACCEPTANCE SYSTEMS AND SOLIDS HANDLINGSYSTEM IMPROVEMENTS.
§¨¦55
§¨¦64
§¨¦44
§¨¦70
§¨¦55
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12565
Wastewater
11
$3,000,000
Various
Various
Various
Capital
4Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2022) CONTRACT A
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED INPLACE PIPE METHOD, TO REDUCE PUBLIC I/I.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12345, 12331, 12165,AND 12187.
§¨¦270
§¨¦170
§¨¦170
L I N D B ERGHST C
H
A
R
L
E
S
R
O
C
K
R
DNLINDBERGHBLVD RIVERVIEWDRLEWIS N CLARK BLVDNATURALBRIDGE
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12584
Wastewater
11
$100,000
Various
Various
Various
Capital
5Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2022) CONTRACT B
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED INPLACE PIPE METHOD, TO REDUCE PUBLIC I/I.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12185, 12159, 12085,AND 12210.
§¨¦70
§¨¦270
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13031
Wastewater
11
$44,000
Various
Various
Various
Capital
6Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECSANITARY SYSTEM IMPROVEMENTS (WATERSHEDCONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS ACTIVATINGCONSTRUCTED SSOS.
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING,ANALYSIS, AND DESIGN SERVICES THROUGHOUT THE BISSELL,COLDWATER, MISSOURI AND MERAMEC WATERSHEDS TO MEETCONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64 §¨¦270
§¨¦170
§¨¦44
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11144
Wastewater
16
$1,000,000
Various
Various
Various
Asset Management
7Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECSANITARY SYSTEM IMPROVEMENTS (WATERSHEDCONSULTANT)
Professional Services
1101 - General Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS ACTIVATINGCONSTRUCTED SSOS.
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING,ANALYSIS, AND DESIGN SERVICES THROUGHOUT THE BISSELL,COLDWATER, MISSOURI AND MERAMEC WATERSHEDS TO MEETCONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64 §¨¦270
§¨¦170
§¨¦44
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11144
Wastewater
16
$635,000
Various
Various
Various
Asset Management
8Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL POINT WWTF FINE SCREEN, CONCRETEAND GATE IMPROVEMENTS
Design Services
6660 - SanitaryReplacement Fund
COMMINUTOR, CONCRETE AND SLUICE GATE DETERIORATION DUE TOAGING INFRASTRUCTURE.
INSTALL FINE SCREENS TO REPLACE FAILING COMMINUTORS, REPAIRSLUICE GATES AND COMPONENTS, AND CONCRETE.
H
A
L
L
GRANDN
O
R
F
O
LK
SOUTHERN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12548
Wastewater
11
$2,000,000
St. Louis City
Bissell
Bissell
Capital
9Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL POINT WWTF TRICKLING FILTER MEDIAREPLACEMENT
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
AGING TRICKLING FILTER MEDIA NEARING END OF USEFUL LIFE.
REPLACE TRICKLING FILTER MEDIA ON SIX FILTERS AT THE BISSELLPLANT.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS$22,500,000.
H
A
L
L
GRANDN
O
R
F
O
LK
SOUTHERN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12566
Wastewater
11
$100,000
St. Louis City
Bissell
Bissell
Capital
10Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK PUMP STATION B (P-751)RELOCATION
Design Services
6660 - SanitaryReplacement Fund
PUMP STATION AT MAXIMUM CAPACITY, ACCESS IMPACTED BYFLOODING, UTILITY COMPLICATIONS, AND NO ROOM ON SITE FORNEEDED EMERGENCY STORAGE.
RECONSTRUCT PUMP STATION AT NEW LOCATION.
PROJECT MAY BE IMPLEMENTED IN CONJUNCTION WITH NEARBYPRIVATE REDEVELOPMENT.
§¨¦64
§¨¦64CENTRALMIDLAND
ALR
I
C
K
DORESAY
OLDCHESTERFIELD
BIG
E
L
O
W
GRI
M
S
T
O
N
E
GILE
A
D
CENTRAL MIDLAN D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12114
Wastewater
11
$500,000
Chesterfield
Missouri
Caulks Creek
Capital
11Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CCTV INSPECTION AND PHYSICAL INSPECTION OFSEWERS (2020)
Vendor Services
1101 - General Fund
FIELD INVESTIGATION OF SEWERS IS NEEDED TO IDENTIFY PROBLEMSAND QUANTIFY REQUIRED REPAIRS/IMPROVEMENTS AND CLEANING.
PERFORM CCTV OR PHYSICAL INSPECTION AND CLEANING OFSELECTED SEWERS. SERVICES MAY BE RENEWED THROUGH FY2022BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12000
Wastewater
16
$2,500,000
Various
Various
Various
Asset Management
12Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CITYSHED MITIGATION PROGRAM DESIGN(CONTRACT A)
Professional Services
6660 - SanitaryReplacement Fund
INADEQUATE CITYSHED COMBINED SEWER SYSTEM CAUSINGSURFACE FLOODING AND BUILDING BACKUPS.
DESIGN CITYSHED SYSTEM IMPROVEMENTS TO INCLUDEINFRASTRUCTURE SUCH AS SOFT SEPARATION, GREENINFRASTRUCTURE, SEWERS, STRUCTURES, AND DETENTION BASINS.
CONSTRUCTION IMPLEMENTED IN PHASES UNDER VARIOUS PROJECTS.
§¨¦44
§¨¦70
§¨¦55
§¨¦64
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12693
Wastewater
16
$989,000
St. Louis City
Various
Various
Asset Management
13Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COLDWATER CREEK WWTF REPAIRS ANDIMPROVEMENTS (2022)
Design Services
6660 - SanitaryReplacement Fund
AERATION PIPING NEEDS TO BE REPLACED, AND BOSKERS SWITCHTRACK NEEDS TO BE IMPROVED.
REPLACE AERATION CONTROL PIPING AND INSTRUMENTATION, ANDINSTALL A PARALLEL BOSKER SWITCH TRACK SYSTEM AND ONE NEWBOSKER UNIT.PRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12552
Wastewater
11
$951,000
Unincorporated
Coldwater
Coldwater Creek
Capital
14Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -LOWER AND MIDDLE RDP TUNNEL FACILITIES
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR THE LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES),AND THE JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TOMARTIGNEY PS).
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦64
§¨¦270
§¨¦44
§¨¦255
§¨¦70
§¨¦170
§¨¦55
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11152
Wastewater
16
$3,000,000
Various
Lemay/RDP
Various
Asset Management
15Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -LOWER MERAMEC AND DEER CREEK TUNNELS
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR THE DEER CREEK TUNNEL & TRUNK SEWER, MALINE CREEKSTORAGE FACILITY, RDP TRIBUTARIES CSO TUNNEL, UPPER RDP CSOSTORAGE TUNNEL, AND THE LOWER MERAMEC SYSTEMBAUMGARTNER TO FENTON WWTF TUNNEL.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦270
§¨¦55
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11826
Wastewater
16
$6,700,000
Various
Various
Various
Asset Management
16Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -TANK/TREATMENT/PUMP STATION FACILITIES
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATHE CONSTRUCTION OF STORAGE TANKS AND PUMP STATIONS, ANDTREATMENT FACILITY IMPROVEMENTS.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR TANK, TREATMENT, AND PUMP STATION PROJECTS THROUGHOUTTHE DISTRICT.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11151
Wastewater
16
$6,200,000
Various
Various
Various
Asset Management
17Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CRITICAL INFRASTRUCTURE ASSESSMENT ANDASSET INVESTIGATION (2020)
Vendor Services
1101 - General Fund
INVESTIGATION NEEDED TO DETERMINE SEWER CONDITIONS ANDSYSTEM DEFECTS TO PROVIDE THE BASIS FOR PREVENTATIVEMAINTENANCE AND REHABILITATION ACTIVITIES.
PERFORM SERVICES SUCH AS FIELD RECONNAISSANCE ANDINSPECTION, MAP UPDATES, WORK ORDER MANAGEMENT,FLOODWALL GATE INSPECTIONS, SSO MONITORING EQUIPMENTMAINTENANCE, AND CCTV VIDEO REVIEW. SERVICES MAY BERENEWED THROUGH FY2022 BASED ON PERFORMANCE.
THIS PROJECT WILL PROVIDE SUPPORT FOR THE OPERATIONSDEPARTMENT, DESIGN AND PLANNING ACTIVITIES, AND UPDATES TOASSET INFORMATION PROGRAMS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12907
Wastewater
16
$1,700,000
Various
Various
Various
Asset Management
18Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO - MARY AVENUE SOUTH OF MANCHESTERCSO INTERCEPTOR (I-132)/OUTFALL (L-106)ELIMINATION PHASE II
Design Services
6660 - SanitaryReplacement Fund
AREA EXPERIENCES EXCESSIVE INFLOW THROUGH COMBINEDSEWERS. REMOVAL OF I-132 AND L-106 REQUIRED BY THE LONG TERMCONTROL PLAN.
CONSTRUCT 5,200 FEET OF 15-INCH TO 30-INCH SANITARY SEWER, AND4,100 FEET OF 15-INCH TO 27-INCH STORM SEWER. PERFORM PUBLICAND PRIVATE I/I REDUCTION. REMOVE INTERCEPTOR I-132 AND CSOOUTFALL L-106.
PINE
MCKNIGHTWHITE
LAWN
BRENTWOODSWAN
EULALIE
ROSALIE
DOROTHYHIGHSCHOOLMADGE
SALEMST CLAIRURBAN
Y O R K
CECELIAROSE
R
O
CK
F
O
RDMARYPARKRIDGEFLORENCE
BREMERTONMORITZ
WRENWOOD
LOUISSONORA
PENDLETONANNALEEHARRISON
EVANS
REMINGTONRUTHSTRASSNER
MERRITT HILLJOSEPH
LITZSINGER
POCAHONTASPOWELL KENTLANDMANDERLYCOLLIERBERRY
HELENWHITEHALL
SUTTON
RARITAN
HENRIETTA
B R ID G E P O R T
HILLDALEGOLDEN GATE CANARYKENILWORTHBOMPARTPATTONR EDBIRDYORKH IL L S
UNIONPACIFIC
GENEVIEVE
WHITE
LITZSINGER
MARYLITZSINGER SWANMARYMORITZ
LAWN
BRIDGEPORT
M A N C H ES TE R RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12140
Wastewater
11
$150,000
Brentwood
Lemay/RDP
Deer Creek
Capital
19Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP) - PUMP STATION
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT A 21 MGD PUMP STATION FACILITY, FOR THE DEER CREEKTUNNEL PROJECT.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$41,800,000.
§¨¦44
METROLINKBURLINGT
O
N
N
O
RT
HE
R
N
S
A
NT
A F
E
CARR LA
NE BURLINGTONNORTHERNSANTAFEBURLINGT
O
N
N
O
RT
HE
R
N
S
A
NT
A FE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12615
Wastewater
11
$1,000,000
Shrewsbury
Lemay/RDP
Deer Creek
Capital
20Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EARTH CITY EXPRESSWAY PUMP STATION (P-708)REPLACEMENT
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
PUMP STATION P-708 NEEDS REPLACEMENT TO MEET CURRENTSERVICE LEVEL DEMANDS.
REPLACE PUMP STATION P-708.
THIS PROJECT WAS DESIGNED UNDER PROJECT 11701.
R
A
M
S
LAKEFRONT EARTH C
ITYAMERICAN
EAGLE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12153
Wastewater
11
$75,000
Unincorporated
Missouri
Mississippi River Tributary Areas
Capital
21Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EDMUNDSON SANITARY RELIEF (EDMUND AVE TOBATAAN DR)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
CONSTRUCT 3,200 FEET OF 15-INCH TO 18-INCH SANITARY SEWER.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 13031.
MURIEL EDMUNDSONTIPTON
HAROLD
EDMUND
BATAAN
ROSLANLYNNTOWNCHESTER
KATHLYN
CORREGIDOR
LA
M
B
E
R
T
A
M
I
T
Y BEAUTYROSLAN
HAROLD
MURIEL
CHESTER
CORREGIDOR
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12159
Wastewater
11
$399,000
Woodson Terrace
Coldwater
Coldwater Creek
Capital
22Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ELTORA WET WEATHER STORAGE FACILITY
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS. CONSTRUCTED SSOOUTFALLS REQUIRE REMOVAL.
CONSTRUCT A 2 MILLION GALLON SANITARY STORAGE FACILITY,PUMP STATION, AND COLLECTION SEWERS.
PAGE
TERMINAL
PENNSYLVANIATEAL
ROBBINS
FERGUSONNIXONPARTRIDGEFARISLEROYCANTON COLBYDOVERVERLMALLARD
RUDDY
PURCELLIONABUCKNERBALF
O
U
R
HAZELWOOD MILFORDWILLOW TREE GRIEFIELDCAMDENLARCH
MCNAMEE
DUNLEER
PRIMROSE
ARDEEROBERTS
A
L
L
E
NGREEN
CANTON
FARISMALLARD §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11737
Wastewater
11
$800,000
Pagedale
Lemay/RDP
University City Branch
Capital
23Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FLORISSANT/DUNN SANITARY RELIEF (ST.ANTHONY LN TO I-270)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 6,085 FEET OF 10-INCH TO 24-INCH SANITARY SEWER.
§¨¦270
DUNN
PERSHALL
STANTHO N Y
JEANELMDERHAKE
MAPLE
GAHANW
A
S
H
I
N
G
T
O
N
VALLEYST DANIEL
ST
M
A
R
K
DUC
H
E
S
NELOCU
S
T
STBERNADETTESTE DW ARDCLOVERS T L U K E
DESMETS T N I C H O L A S
ST
M
A
T
T
H
E
W
ST PA
TRIC
K
SPRING
D
U
B
O
U
R
GSTEUGENE
ST GREGORYS
T
J
O
A
N
BRACKLEIGHCASTELLO
CHATEAUST JAMES
SANTACRUZ
LA HAVRER
EIGHL EYS
T
J
U
D
I
T
H
CLAIREF A T IM A
ST COR N E L IU S S TMARTHAS T G E N E V IE V E
ST MICHAELS
T
R
I
C
H
A
R
D
ST THOMASST ROSEWILLOW
MEADOW
DERHAKE §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12178
Wastewater
11
$730,000
Florissant
Coldwater
Coldwater Creek
Capital
24Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FLOW METERING AND MONITORING (2017)
Vendor Services
1101 - General Fund
COMPUTER MODELING OF THE SEWER SYSTEM REQUIRES FLOW DATAIN ORDER TO BE ACCURATELY CALIBRATED TO FIELD CONDITIONS.
CONDUCT FLOW METERING AND MONITORING OF THE WASTEWATERSYSTEM TO COLLECT AND ANALYZE DATA ON FLOWS AND SYSTEMRESPONSE DURING WET WEATHER EVENTS. THIS INFORMATION WILLBE USED TO CALIBRATE HYDRAULIC MODELS TO DETERMINE IFPROJECTS ARE REQUIRED.
SERVICES MAY BE RENEWED THROUGH FY2021 BASED ONPERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12759
Wastewater
16
$2,500,000
Various
Various
Various
Asset Management
25Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FRIEDENS (PARTIAL) I/I REDUCTION (CHAIN OFROCKS DR AND FONTAINE PL)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
CONSTRUCT 2,120 FEET OF 15-INCH TO 18-INCH STORM SEWER, ANDPERFORM PRIVATE I/I REDUCTION AT 42 PROPERTIES.
INCLUDES PRIVATE I/I REDUCTION FROM PROJECT 13432. PUBLIC I/IREDUCTION INCLUDED IN PROJECT 13031.
MARIAS
FONTAINE
CHAIN OF ROCKS
RAFORD RIVER RUN
RIVER TRAIL
HALLMAKALU
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12185
Wastewater
11
$388,000
Bellefontaine Neighbors
Bissell
Maline Creek
Capital
26Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GASLIGHT SQUARE SEWER IMPROVEMENTS
Pre-Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED COMBINED SEWERS CAUSING WET WEATHERBUILDING BACKUPS.
CONSTRUCT COMBINED SEWER IMPROVEMENTS IN THE GASLIGHTSQUARE AREA.
OLIV
E
BOYLESARAHWHITTIERMCP
H
E
R
S
O
N
WES
T
M
I
N
S
T
E
R
WAS
H
I
N
G
T
O
N
LINDELL
DEL
M
A
R
MARYLAND
MCP
H
E
R
S
O
N
WES
T
M
I
N
S
T
E
R
MARYLAND
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11137
Wastewater
11
$750,000
St. Louis City
Bissell
Western Mill Creek
Capital
27Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GC-06 GRAVOIS CREEK TO BRIARSTONE ANDGATES SANITARY RELIEF PHASE II
Design Services
6660 - SanitaryReplacement Fund
CONSTRUCTED SSO OUTFALL BP-382 REQUIRES REMOVAL.
CONSTRUCT 4,800 FEET OF 12-INCH TO 15-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-382.
DENNY
SAPPINGTONEMILTEALRIDGE
LARKRIDGE
CARAVAN
FANTASY
BADGLEYHAZELRIDGEWESTMINSTER
PARKLINDALEPPO
GOLTERMANC
OVERLYFOXGLENHEDGEFIELD
BEIRUTWERKDALECASTANETLEMONACOHEDG
E
B
R
OOKTAFFYGRAVOIS RD
S
L
I
N
D
B
E
R
G
H
B
L
V
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12157
Wastewater
11
$520,000
Various
Lemay/RDP
Gravois Creek
Capital
28Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -CONSTRUCTION MANAGEMENT (2019)
General Services -Construction Inspection
6660 - SanitaryReplacement Fund
CONSTRUCTION MANAGEMENT NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OFINTERNAL STAFF.
RETAIN CONSTRUCTION MANAGEMENT CONSULTANT FOR AS NEEDEDSERVICES. SERVICES MAY BE RENEWED THROUGH FY2021 BASED ONPERFORMANCE.
A PORTION OF THE CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12386
Wastewater
14
$3,000,000
Various
Various
Various
Asset Management
29Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - FACILITY &SEWER DESIGN (2020) CONTRACT A
GSA - (Design) CIRPFunds
6660 - SanitaryReplacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGNSERVICES. SERVICES MAY BE RENEWED THROUGH FY2021 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12397
Wastewater
11
$550,000
Various
Various
Various
Asset Management
30Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - FACILITY &SEWER DESIGN (2020) CONTRACT B
GSA - (Design) CIRPFunds
6660 - SanitaryReplacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGNSERVICES. SERVICES MAY BE RENEWED THROUGH FY2021 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13059
Wastewater
11
$200,000
Various
Various
Various
Asset Management
31Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (2020) CONTRACT A
GSA - GeotechnicalCIRP Funds
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12391
Wastewater
11
$85,000
Various
Various
Various
Asset Management
32Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (2020) CONTRACT B
GSA - GeotechnicalCIRP Funds
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12392
Wastewater
11
$85,000
Various
Various
Various
Asset Management
33Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (2020) CONTRACT C
GSA - GeotechnicalCIRP Funds
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12393
Wastewater
11
$85,000
Various
Various
Various
Asset Management
34Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - LANDSCAPEDESIGN (2019)
GSA - (Design)Operating Funds
1101 - General Fund
LANDSCAPE ARCHITECTURAL DESIGN SERVICES ARE NEEDED TOSUPPORT PROJECTS THROUGHOUT THE DISTRICT.
RETAIN LANDSCAPE ARCHITECTURE FIRM FOR AS NEEDED DESIGNSERVICES. SERVICES MAY BE RENEWED THROUGH FY2021 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13044
Unallocated
11
$200,000
Various
Various
Various
Asset Management
35Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2021) CONTRACT A
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2023BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13087
Unallocated
12
$75,000
Various
Various
Various
Non-recurring
36Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2021) CONTRACT B
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2023BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13088
Unallocated
12
$75,000
Various
Various
Various
Non-recurring
37Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2021) CONTRACT C
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2023BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13089
Unallocated
12
$75,000
Various
Various
Various
Non-recurring
38Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2021) CONTRACT D
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2023BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13090
Unallocated
12
$75,000
Various
Various
Various
Non-recurring
39Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SEWER ANDCHANNEL DESIGN (2021) CONTRACT A
GSA - (Design) CIRPFunds
6660 - SanitaryReplacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER AND CHANNEL DESIGN.SERVICES MAY BE RENEWED THROUGH FY2022 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT WILL BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12400
Wastewater
11
$200,000
Various
Various
Various
Asset Management
40Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2020) CONTRACT A
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12413
Wastewater
11
$50,000
Various
Various
Various
Asset Management
41Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2020) CONTRACT B
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12416
Wastewater
11
$50,000
Various
Various
Various
Asset Management
42Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2020) CONTRACT C
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12417
Wastewater
11
$50,000
Various
Various
Various
Asset Management
43Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2020) CONTRACT D
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12418
Wastewater
11
$50,000
Various
Various
Various
Asset Management
44Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2020) CONTRACT E
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12419
Wastewater
11
$50,000
Various
Various
Various
Asset Management
45Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GLENFIELD SANITARY RELIEF (WATSON WOODSCT TO S LINDBERGH BLVD)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 2,600 FEET OF 15-INCH SANITARY SEWER.LYNNWATSON
COURT
ED
D
I
E
N
P
A
R
K GLADLEAWOODFOXWOODPARKEGGELINGRYEGATEC HRISANNMARET SUNSET WOODSC OU R T Y A RD
L
A
K
E
WATSON
S
L
I
N
D
B
E
R
G
H
B
L
V
D
S
LIN
D
B
E
R
G
H
B
L
V
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12264
Wastewater
11
$374,000
Sunset Hills
Lemay/RDP
Gravois Creek
Capital
46Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAVIOS CREEK SANITARY TRUNK RELOCATIONAND STREAM STABILIZATION (AFFTON ATHLETICCOMPLEX TO GREEN PK IND DR)
Design Services
6660 - SanitaryReplacement Fund
TRUNK SEWER RELOCATION OUT OF GRAVIOS CREEK REQUIRED.EROSION THREATENING SANITARY SEWER.
CONSTRUCT 1,780 FEET OF 42-INCH SANITARY SEWER, AND 110 FEET OF8-INCH SANITARY SEWER.
INCLUDES SCOPE OF WORK FROM PROJECT 12814.
MEATH
BUF
F
T
O
N
SQUIRE
MEADOWS
ROS
C
O
M
M
O
N
FLORINDA
WILL
D
A
N
PUT
T
I
N
G
T
O
N
TESSHIREKILLORENKILRUSHLEITRIMKILMEADER ODIUM
PARKMAN
STO
N
E
L
L
GRANTFOREST
A N TR IM
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12815
Wastewater
11
$449,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
47Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HAMPTON CREEK SANITARY RELIEF (DEERCREEK TRUNK TO OXFORD DR) PHASE I
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SEWERS. ELIMINATION OF CONSTRUCTED SSOOUTFALL REQUIRED.
CONSTRUCT 6,000 FEET OF 36-INCH TO 72-INCH SANITARY SEWER.
§¨¦64
§¨¦170
§¨¦64 §¨¦170
DALE
CLAYTON
ME
T
RO
L
I
N
K
WISE
BRENTWOODWYDOWN
PINE
FOLK YALEBELLEVUEHANLEYDAVIS
ETHEL
WHITE LINDENBREDELLBOLANDSUTTONROSALIE
LAWN
EULALIE
YORK
CLAYTONIAHOOVER
PARK
SWAN
McCAUSLANDZEPHYR FORESTLOUISGAYOLA
PRIVATE
DELNORTEWI L L I A M S
HIGHSCHOOLMADGEMCCUTCHEON
UNIONPACIFICAUDUBONALAMO
SALEMB
U
C
K
MARYBRUNO
WRENWOOD
OXFORD
EAGER
URBAN
ALICIA
CECELIADE MUNLILE
ELINOR
ROSE
P
OLO HILLVALE
FLORENCE MARTINIMOORLANDSPARKDALE
LYLEPLATEAU
ANNALINDBERGH
SARAHELLISOLETA
MAPLEPENDLETON
RANKEN HIAWATHA
LOHMEYER
A R L IN G T O NCOLLINSRALPH
HA Z E LMELVINO AKKNOLLSNOWDON BLENDONHILLLITZSINGER
VINE
GALLERIA
MITCHELL
PORTERHORNERST RITAGARDEN
WARNER
RICHERTHELENEDWARDCOMFORT
BRIDGEPORT
GERHARDOAKLANDSUDBURY
ALABAMA
HOPEBRUNO
MARYYALEL I N DBERGHYALEALICIA
M A N C H ESTERRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12334
Wastewater
11
$50,000
Various
Lemay/RDP
Deer Creek
Capital
48Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM BADEN RELIEF SYSTEM IMPROVEMENTDESIGN (CONTRACT A)
Professional Services
6660 - SanitaryReplacement Fund
INADEQUATE COMBINED SEWER SYSTEM IN THE HARLEM AND BADENWATERSHEDS CAUSING SURFACE FLOODING AND BUILDING BACKUPS.
DESIGN HARLEM BADEN WATERSHED SYSTEM IMPROVEMENTS TOINCLUDE SEWER SEPARATION, SEWER CONSTRUCTION, AND SEWERREHABILITATION.
CONSTRUCTION WILL BE IMPLEMENTED IN PHASES UNDER VARIOUSPROJECT NUMBERS, INCLUDING 11797, 11798, AND 11799.
TERMINAL
KIENLENST L
O
U
I
S
MYRON
LUCASNHUNT67TH68TH69THMOU
N
T EDMUNDSALZMANERICKWELL
S
M
A
R CRESCENTOGDENLESC
H
E
N
VALLELINDELLCHERRYMAR
K
E
T
GRE
E
R
OAKDALEOVERLEAJESS
E
J
A
C
K
S
O
N PRIVATEROSEBUDMYRT
L
E ARDENWELLSTONROC
K
B
R
O
O
K
LOR
R
A
I
N
E
KEN
N
E
R
L
Y
AUD
R
E
Y
ISAB
E
L
L
AGROVE LEXI
N
G
T
O
N
LATT
A
DA
R
D
A
N
E
L
L
A
IDAD
A
L
E
OAK GROVEWABADAOAK GROVEPRIVATE
CHERRYPRIV
A
T
E
WELLSTON§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12695
Wastewater
16
$500,000
St. Louis City
Bissell
Various
Asset Management
49Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HATHAWAY DRIVE SANITARY RELIEF
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED MAIN.
CONSTRUCT 1,042 FEET OF 10-INCH SANITARY SEWER, AND PERFORMPRIVATE I/I REDUCTION AT 6 PROPERTIES.
PUBLIC I/I REDUCTION TO BE ACCOMPLISHED VIA WORK ORDER ONFUTURE REHABILITATION PROJECT.EDNALONGRIDGEH
ATHAWAY
B
AG
L
E
Y
DUENKE
AUBURNJENNINGS STATI
ON
EDGEWATER GARWOODCATALINABLUEGR
ASS
DICKERS
O
N
KIMBALL
HAMLET
LA RUELEWISNCLARKBLVD §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13432
Wastewater
11
$215,000
Jennings
Bissell
Maline Creek
Capital
50Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HORTON PUMP STATION (P-814) ELIMINATION
Design Services
6660 - SanitaryReplacement Fund
PUMP STATION P-814 NEEDS TO BE REPLACED OR ELIMINATED.
CONSTRUCT 1,535 FEET OF 8-INCH SANITARY SEWER. DECOMMISSIONAND ABANDON EXISTING PUMP STATION P-814 AND ASSOCIATEDFORCEMAIN.
POST OAK HOR T O N
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12308
Wastewater
11
$172,000
Town and Country
Lemay/RDP
Deer Creek
Capital
51Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HUNTLEIGH TRAILS LN SANITARY RELIEF (TWOMILE CREEK TRUNK SEWER TO N GEYER RD)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 3,500 FEET OF 15-INCH TO 24-INCH SANITARY SEWER.GEYERSQUIRESHU
N
TLEIGHTRAILS
PAMELA
BAMBURY
BRIAR RIDGE
TWIN FA W NSTIMBERWYCK
SCOTTSDALE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12312
Wastewater
11
$405,000
Huntleigh
Lemay/RDP
Deer Creek
Capital
52Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENTCONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TODAMAGE IN HIGH RIVER CONDITIONS.
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL,ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS(P-305) PUMP STATIONS.
§¨¦255
§¨¦55
§¨¦255
§¨¦55
KOCHK
INSWOOD GREGGREAVIS
B
A
R
R
ACKSFOR
D
E
R CCCGRANTLIN
D TELFOR D
HOFFM
E
IS
T
E
R
ARLEE
S
HERMAN
MILDGENTRYFAIN
IONE
PRIVATEJOPLINCLIFFRINGER
SHE R ID A NPO
T
T
L
E
ORI
E
N
T
RIP
A
LUNAPOP
L
A
R
GARK
WILL LARKCLAGEROUTE R
VICTORY AVENUE HBOUNDARYHO
R
N
JEFFERSONIAN
PAU
L
E
HAL S EYFIRSTPECAN
A
S
HROCK
JAC
I
N
T
O
SOUTHSHIRE
ARRA
S
J
E
FFERSONBLUE RIDGEBANISTERALL
E
N
LI
S
I
E
U
X KASKEBUNKERBIRCHP
R
IVATETELEGRAPHR DLEMAYFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11711
Wastewater
11
$500,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
53Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY NO. 3 PUMP STATION AND FORCE MAIN
Design Services
6660 - SanitaryReplacement Fund
JEFFERSON BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMPSTATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT.
CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMPSTATION AND FORCE MAIN AND AMEREN CUSTOMER SUBSTATION.DEMOLISH EXISTING LEMAY PUMP STATION (P-303), MARTIGNEY PUMPSTATION (P-306), AND JEFFERSON BARRACKS PUMP STATION (P-305).
P
R
I
V
A
T
E
UNION PACIFICUNION PACIFICP
R
I
V
A
T
E
UNION PACIFICUNION PACIFICUNION PACIFICUNIONPACIFICP
R
I
VATE
UNION PACIFICUNION PACIFIC§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11817
Wastewater
11
$250,000
Unincorporated
Lemay/RDP
River Des Peres
Non-recurring
54Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUBLIC I/I REDUCTION ANDREHABILITATION (2022) CONTRACT A
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED INPLACE PIPE METHOD, TO REDUCE PUBLIC I/I AND TO RENEW THESYSTEM.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12328, 12141, AND12339.
§¨¦44ME
T
RO
L
I
N
K
HANLEYUNION PACIFICFOLK
LANSDOWNE
MARSHALL YALECLARK McCAUSLANDBOMPARTPERNODNEWPORT
TUXEDO
FYLER
OLEATHABELLEVUE
BANCROFT WATSONLINDENWOODBUR LINGTONNORTHERNSANTAFEWHITE
SO U T H W E S TBREDELL
MU RDOCH SUTTONROSALIEEULALIE WEAVER
ARSENAL
GLENHANCOCK
WABASHP ACIFIC
SUMMITZEPHYR
JOYPLATEAU
FOREST
PINE
LOUISGAYOLA
MARQUETTE
WINONA
WI L L I A M S
MARDEL
C A MBRIDGEGARNER
FLORA
BRADLEYSALEMMARY
SUTHERLAND
G R EENWOODBRUNO
GLADES
LOCKWOOD
FAIRV IEW
LYNDOVER
M ANHATTANPRATHERARTHUR
MITCHELL
IVANHOEBARTOLDURBAN
YEATMANSMILEY
ALICIA
SCANLANCECELIA
SPRINGPARKFLORENCE MARTINIOXFORD
C O MMONWEALTHELM
THOLOZANLYLE
ARLINGT
O
N SUSSEXANNA KRAFTODELL
SARAHELLIS
MAURICE
GOFF WALDEMAR
JAMES
RANKENSTRAS
S
N
E
R
GREELEY
LA VETA
MELVINLANHAM
SUNNE N ECOFFVINEPORTER RICHERTHELENCOMFORTGERHARDALABAMA
GREELEY YALEALICIA
SUMMITWABASHMARYUNIONPACIFIC
GLADES
GLENBRUNO
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12590
Wastewater
11
$110,000
Various
Lemay/RDP
Various
Capital
55Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY WWTF REPAIRS AND IMPROVEMENTS(2023)
Design Services
6660 - SanitaryReplacement Fund
AGING AND DETERIORATED FACILITIES AND MECHANICALEQUIPMENT REQUIRE REPAIR AND REPLACEMENT.
CONSTRUCT CONCRETE REPAIRS, REPLACE SECONDARY CLARIFIERDUCT BANK, AND RENEW 4 GRIT TANKS.
GRIT TANK RENEWAL MAY BE CONSTRUCTED AS A SEPARATE PROJECTUNDER PROJECT NUMBER 13304.
P
R
I
V
A
T
E
H
O
F
F
M
E
I
S
T
E
R
RUBYWEI
S
S
P
R
I
V
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13153
Wastewater
11
$900,000
Unincorporated
Lemay/RDP
Lemay Creek
Capital
56Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LINDSAY - ST. ALBERT PRIVATE I/I REDUCTION
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
CONSTRUCT 870 FEET OF 8-INCH TO 12-INCH SANITARY SEWER, ANDPERFORM PRIVATE I/I REDUCTION AT 27 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 13124. INCLUDESPRIVATE I/I REDUCTION FROM PROJECT 12210.
KE
E
V
E
N
LIN
D
S
A
Y
PAULLAFAYETTECH
A
R
B
O
N
I
E
R
WASHIN
G
T
O
N
DUNN GRAHAMCLARKBOONEHU
M
E
S
ST M
A
R
I
E
CO
A
C
H
W
A
Y
S T A N TH O N Y
FL
O
RDAWN
EST
E
S
TAH
O
E
WR
E
N
YAQU ILO
E
K
E
S
CASTELLORUE
S
T
D
E
N
I
S
AUBUCHONKO
S
T
K
A
ST J
O
S
E
P
H
MAPLE
LAY
V
E
N
JE
N
K
E
E
MU
L
L
A
N
P
H
Y
AS
P
E
N
F
LORLAND
LIL
A
C
TAY
L
O
R STCHARLESEL
M
G
R
O
V
E
MANRESA KAYSTJEANQU
E
E
N
A
N
N
CARLA
LYN
N
H
A
V
E
N
RU
T
H
ST
C
I
NCAMPIONCOACHLIGHT
D E R H A KE
BEL
L
A
R
M
I
N
E
SUNSETRYA
N
TRINIT YAL
M
AALBERTPALMNAOMICA
N
D
L
E
L
I
G
H
T
TA
M
M
A ROSETTADE
L
R
E
Y
LOY OLA MERCURYST MAURICE
SIELOFF
ST REGIS
SALLY
ST EDITHFLORVALBABLER
FOXTRAIL RONDAGERALD
MERRIA V ANT
BR
U
C
E
P R IVATEJEA
N
E
T
T
E CROSBYBELLMLOUISEWESCOTT
D UNNLINDBE R GH
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12330
Wastewater
11
$227,000
Florissant
Coldwater
Coldwater Creek
Capital
57Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LMRDP CSO STORAGE TUNNEL (BROADWAY TORDP TUBES)
Miscellaneous Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
CONSTRUCT A 30 FOOT FINISHED DIAMETER, 9 MILE LONG, 200 TO 250FOOT DEEP STORAGE TUNNEL WHICH FOLLOWS APPROXIMATELY THERIVER DES PERES ALIGNMENT, INCLUDING SEVERAL CONNECTINGTUNNELS, ACCESS SHAFTS AND INTAKE STRUCTURES, IN THE LEMAYWATERSHED.
§¨¦64
§¨¦44
§¨¦70
§¨¦170§¨¦64
GRAVOISRDM A N C H E S T E R R D
W A T S O NRDC HIPPEWA BLVD
LEMAYFERRYRDTESSONFERRYRDCHIPPEWA BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11820
Wastewater
11
$200,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
58Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOUISA AND ARSENAL PUMP STATIONS (P-112 ANDP-113) UPGRADES
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
MECHANICAL SYSTEMS ARE AGING AND IN NEED OF REPLACEMENT.
CONSTRUCT UPGRADE OF MECHANICAL VALVE AND PIPING SYSTEMS.UNION PACIFICA
R
S
E
N
A
L
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12489
Wastewater
11
$300,000
St. Louis City
Bissell
Mississippi River Tributary Areas
Capital
59Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATIONSEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSOINCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS ANDPRELIMINARY STUDIES.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦270
§¨¦44
§¨¦70
§¨¦64
§¨¦170
§¨¦255
§¨¦70
§¨¦270
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11109
Wastewater
16
$200,000
Various
Lemay/RDP
Various
Asset Management
60Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATIONSEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSOINCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS ANDPRELIMINARY STUDIES.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦270
§¨¦44
§¨¦70
§¨¦64
§¨¦170
§¨¦255
§¨¦70
§¨¦270
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11109
Wastewater
16
$270,000
Various
Lemay/RDP
Various
Asset Management
61Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC RIVER SYSTEMIMPROVEMENTS - BAUMGARTNER TO FENTONWWTF TUNNEL
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
THE FENTON WWTF IS AN INTERIM FACILITY AND IT'S ELIMINATION ISPART OF THE EAST WEST GATEWAY SECTION 208 REGIONAL WATERQUALITY MANAGEMENT PLAN.
CONSTRUCT 36,000 FEET OF 8-FOOT DIAMETER DEEP TUNNEL TOCONVEY WASTEWATER FROM THE FENTON WWTF TO THEBAUMGARTNER TUNNEL, TO ENABLE TREATMENT OF FLOWS AT THELOWER MERAMEC WWTF.
PROJECT ELIMINATES PUMP STATIONS P-446 and P-483. P-489 TO BEELIMINATED BY SEPARATE PROJECT # 10869. TOTAL CONSTRUCTIONBUDGET IS $212,000,000.
§¨¦55
§¨¦270
§¨¦55 KERTHMA
T
T
I
S
G R A V O ISWELLSKELLERMERAMEC BOTT O M AMBSKENNE
R
L
Y
T
H
EI
SSEA
S
T
CONCORD
AL
L
E
N ALSWELLSC H U E S SLERMENTZHILL
RI N G ERB A UERBU T L E R HILL
GREENTONS
USONHILLS
PO I N T E
CARIBEEHAWKINSGE
R
A
L
D
KE
M
P
F
HAGEMANNOLSENGREGORY
DIERSPR
I
VATE
MAIN
RI V ERCURVE VALMEYERTESCORDMAN G OWAT
SO
N
GATESBURY
DANTONAIREGRIFFINA C O RN LANGTREEVALLEYSIDEFUCHSFIJIBAHNFYREFERN BEACHED LOUCLAYRIDGESTARLITATLNTIC LARKINLITTLEROCKTIOGA
COYL
E
TOWNE S O UTHPRIVATEPRIVATE
AMBS
BAUER
PRIVATEP
R
I
V
A
T
E
T E S S ONFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11746
Wastewater
11
$750,000
Various
Meramec
Meramec Tributary Areas
Capital
62Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF EXPANSION PHASE II
Design Services
6660 - SanitaryReplacement Fund
ADDITIONAL FLOW TO THE LOWER MERAMEC WWTF DUE TOELIMINATION OF THE FENTON WWTF, AND POTENTIAL FUTURENUTRIENT REMOVAL PERMIT REQUIREMENTS.
EXPAND THE EXISTING WWTF TO INCREASE CAPACITY FORADDITIONAL FLOW, AND UPGRADE THE FACILITY TO ENABLEACCOMMODATION OF POTENTIAL NUTRIENT REMOVALREQUIREMENTS.FINEPRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12255
Wastewater
11
$2,500,000
Unincorporated
Meramec
Mississippi River Tributary Areas
Capital
63Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MALINE CREEK CSO BP 051 & 052 LOCALSTORAGE FACILITY (CHAIN OF ROCKS DR TOCHURCH DR)
Design Services
6660 - SanitaryReplacement Fund
CONTROL OF COMBINED SEWER OVERFLOWS IS REQUIRED BY THECONSENT DECREE.
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWERSTORAGE FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION,AND ASSOCIATED COLLECTION SEWERS.
SUPPLEMENTAL FUNDING FOR POST CONSTRUCTION MONITORINGAND VALIDATION REQUIRED BY THE CONSENT DECREE.HALLGUSTAVLOWELLJORDANCHAIN OF ROCKS
FONTAINE
MELVIN
LOGAN
RAFORD
G
A
S
T
NASSAU
JACKSON
JENNINGSSTATION
FREMONT
DONNELL
CHURCH
R IVER RUN
RIVER TRAIL
P O R T L A N D
MA K A L U
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11656
Wastewater
11
$150,000
St. Louis City
Bissell
Maline Creek
Capital
64Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MISSISSIPPI FLOODWALL ORS PUMP STATIONSREHABILITATION
Design Services
6660 - SanitaryReplacement Fund
FLOODWALL ORS PUMP STATIONS, GATES, AND STRUCTURES AREOVER 50 YEARS OLD, AND ARE IN NEED OF REHABILITATION.
REHABILITATE FLOODWALL PUMP STATIONS, GATES, ANDSTRUCTURES. PROJECT INCLUDES MULTIPLE PHASES. CONSTRUCTIONUNDER THIS PROJECT NUMBER INCLUDES WORK AT THE MILL CREEK(P-161) AND BADEN (P-143) PUMP STATIONS, AND HARLEM EMERGENCYCLOSURE STRUCTURE.
§¨¦70
§¨¦64
§¨¦44
§¨¦55 §¨¦70RIVERVIEWDRMANCHESTER RD
NATURALBRIDGERDNATU
R
A
L
B
R
I
D
G
E
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12483
Wastewater
11
$200,000
St. Louis City
Various
Various
Capital
65Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NEW ENGLAND TOWN CLIFF CAVE PUMP STATION(P-323) IMPROVEMENTS
Design Services
6660 - SanitaryReplacement Fund
PUMP STATION IS AT THE END OF ITS LIFE CYCLE. DETERIORATEDSANITARY AND STORM SEWERS.
CONSTRUCT 3,500 FEET OF 8-INCH TO 12-INCH SANITARY SEWER, 575FEET OF 12-INCH TO 18-INCH STORM SEWER, 1,600 FEET OF 6-INCHFORCEMAIN, AND REPLACE SANITARY PUMP STATION P-323.
FUND 5120 FUNDING IS FOR STORMWATER PROJECT 10356 TO BECONSTRUCTED WITH THIS PROJECT. TOTAL CONSTRUCTION BUDGET IS$5,723,000.BUSSENCLIFF CAVECHATPORT BLUFFDOBER
HUNTSPORTGLENRICH
HEMPLINE
W IN C A N T ON
PIERPORTSTEELE RIDGEASHTON CIRCLEHALYARD
ROCK HARBORHEMPLINE §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10715
Wastewater
11
$250,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
66Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NEWPORT LANDING PUMP STATION (P-480)ELIMINATION
Design Services
6660 - SanitaryReplacement Fund
PUMP STATION P-480 NEEDS TO BE REPLACED OR ELIMINATED.
CONSTRUCT 1,555 FEET OF 8-INCH SANITARY SEWER. DECOMMISSIONAND ABANDON EXISTING PUMP STATION P-480 AND ASSOCIATEDFORCEMAIN.
SPRI
N
G
L
I
L
Y
H E R ITAGEVALLEY
N O CHEWINTERCHASESUMMERPOINTNO
C
H
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12357
Wastewater
11
$214,000
Unincorporated
Meramec
Fenton Creek
Capital
67Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NORTH FEE FEE CREEK PUBLIC I/I REDUCTION
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
REHABILITATE PUBLIC SEWERS, MANHOLES, AND LATERAL SERVICECONNECTIONS.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12361.
§¨¦70
§¨¦270
§¨¦70
§¨¦270 FEEFEEADIEMCKELVEYRIDERRULE
AVERY
SMILEYPRIVATE
LINKGIST
C R EVECO E U R M I L L
AMELING
INTERSTAT
E
TERRYHAASEARTHCITY
WELDONPARI
S
H
SCHUETZMETRO FALCONB
E
NE
DETTA
G ARDENMARINEWESF ORD FOXWOODBOEN
K
E
R
MARS
M
AJELLA
LAKEMARK TWA I N
RAYMONDCASI
N
OC
E
NT
E
R
DA X
DODDRIDGEMORRO
W
DE RUNTZ
REDCO A T WARNEN
LON G
IVANGLENOAK
P
HELPS
LUDLOWLOCKELEIGH
LONGMONT
W IL W O OD
BROUSTERTAYLORINVER
N
E
S
S EASYDALEYDEP A U LPLUMMELO
D
Y
BR ITTANYMILLWELLC
H
A
P
A
R
R
A
L
BOBBETT
RULEADIEPRIVATEFEEFEEPRI
VATEPRIVA
TE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12433
Wastewater
11
$61,000
Various
Missouri
Fee Fee Creek
Capital
68Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PUMP STATION REPAIR AND IMPROVEMENTDESIGN (CONTRACT C)
Professional Services
6660 - SanitaryReplacement Fund
AGING PUMP STATION FACILITIES ARE IN NEED OF REPAIR ANDIMPROVEMENT.
DESIGN PUMP STATION FACILITY IMPROVEMENTS TO INCLUDENEEDED REPAIRS, RENOVATIONS, RECONSTRUCTION, OR ELIMINATION.PUMP STATIONS P-417, P-448, P-734, AND P-735 TO BE INCLUDED IN THISWORK.
CONSTRUCTION WILL BE IMPLEMENTED IN PHASES UNDER VARIOUSPROJECT NUMBERS, INCLUDING BUT NOT LIMITED TO 12189, 12206,12291, AND 12262.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12699
Wastewater
16
$810,000
Various
Various
Various
Asset Management
69Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RADAR RAINFALL DATA (2020)
Vendor Services
1101 - General Fund
PIPE FLOWS FROM INFLOW AND INFILTRATION DUE TO RAIN EVENTSARE NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEM MODELS.
INTEGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING,FOR USE IN CONJUNCTION WITH FLOW METERING,INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODELCALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2024 BASEDON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12006
Wastewater
16
$150,000
Various
Various
Various
Asset Management
70Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RDP TRIBUTARIES & UPPER RDP CSO CONTROLS& LOWER MERAMEC SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
MAJOR WASTEWATER SYSTEM CONTROLS ARE REQUIRED TO OBTAINCONSENT DECREE COMPLIANCE.
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING,ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER SYSTEMCONTROLS TO MEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70
§¨¦170
§¨¦255
§¨¦64
§¨¦55
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11153
Wastewater
16
$300,000
Various
Various
Various
Asset Management
71Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RDP TRIBUTARIES & UPPER RDP CSO CONTROLS& LOWER MERAMEC SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
MAJOR WASTEWATER SYSTEM CONTROLS ARE REQUIRED TO OBTAINCONSENT DECREE COMPLIANCE.
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING,ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER SYSTEMCONTROLS TO MEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70
§¨¦170
§¨¦255
§¨¦64
§¨¦55
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11153
Wastewater
16
$575,000
Various
Various
Various
Asset Management
72Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
S BRENTWOOD BLVD SANITARY RELIEF(DAYTONA DR TO WALINCA TERRACE)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 2,800 FEET OF 8-INCH TO 24-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-623.
§¨¦170
§¨¦170
FRANC
I
S
ME
TRO
L
INK BRENTWOODDAVIS MERAMECWATKINS
DAYTONA
VENETIAN
ORLANDO
ROSILINE
H A L IF A X
WALINCA
ROXBURGH
COLMAR
FORESTPARK
CORPORATE
P
A
R
K
SUDBURYEDINBURGH
METRO L I N K
ME
TRO
L
INK
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12195
Wastewater
11
$737,000
Clayton
Lemay/RDP
Deer Creek
Capital
73Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SCADA SYSTEM UPGRADE
Pre-Design Services
6660 - SanitaryReplacement Fund
MONITORING AND AUTOMATION CAPABILITIES NEEDED TO OPTIMIZETHE USE OF AVAILABLE INFRASTRUCTURE, AND INCREASE LEVEL OFSERVICE.
CONSTRUCT SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)IMPROVEMENTS TO ALLOW FOR ACTIVE CONTROLS TO MANAGE WETWEATHER FLOWS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13467
Wastewater
11
$500,000
Various
Various
Various
Capital
74Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-809 TOP-750)
Design Services
6660 - SanitaryReplacement Fund
LACK OF CAPACITY FOR EXISTING FORCEMAIN.
CONSTRUCT 8,350 FEET OF 2-INCH TO 16-INCH FORCEMAIN.
EDISON SPIRITCEPI
GODDARDCENTRAL MIDLA
N
D TRADE CENTERUNION
PAC
IF
IC
SPURCHESTERFI
ELDI
NDUSTRI
ALPRI VATEWILDHORSECREEK CHESTERFIELD BUSINESSPRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12628
Wastewater
11
$1,517,000
Chesterfield
Missouri
Missouri River Tributary Areas
Capital
75Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STREAM FLOW GAUGE OPERATION ANDMAINTENANCE (USGS)
Vendor Services
1101 - General Fund
DATA IS REQUIRED TO DETERMINE URBAN RAINFALL/RUNOFFRESPONSE OF WATERSHEDS AND IS UTILIZED FOR WATER QUANTITYAND QUALITY EVALUATION OF STREAMS.
CONTINUE THE STREAM GAUGE DATA COLLECTION PROGRAM INCONJUNCTION WITH WASTEWATER AND STORMWATER PLANNING ANDDESIGN EFFORTS, AND TO SUPPORT REPORTING WHICH IS REQUIREDPURSUANT TO THE CONSENT DECREE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10766
Unallocated
16
$600,000
St. Louis City and County
Various
Various
Asset Management
76Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STREAM FLOW WATER QUALITY SAMPLING (2020)
Vendor Services
1101 - General Fund
STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITYCHANGES FROM IMPLEMENTATION OF THE CSO LTCP, SSOELIMINATIONS, & STORMWATER MANAGEMENT PROGRAMS.
PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITYWITHIN MSD'S SERVICE AREA. SERVICES MAY BE RENEWED THROUGHFY2022 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12004
Unallocated
16
$300,000
Various
Various
Various
Asset Management
77Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
TM-01 TWO MILE CREEK OUTFALL SANITARYRELIEF
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 11,400 FEET OF 8-INCH TO 48-INCH SANITARY SEWER.
T R E N TWARSONOLD WARSON
LITZSINGER
WOODLAWNGILBERTM E D I N A NORTH
D E NN Y
MARK DES PERESWILD DEER
DEACONHUDSON
BENNETTLOGCAB IN
COPP E R H IL L OVERBROOKANDREWHIGHHAMP T O N
ROLFE
WINDI N G R IDGEPR IV ATEWAT E R B URYM ONACODUN
L
E
I
THLEAGRAMRADNOR
W O ODACREWARSONWOODSBABLER
BRIDLECREEKD E E R CREEK
HOLLIST ON
KINSELLA
PRIVATE
LITZSINGER
S LINDBERGH BLVDS LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12231
Wastewater
11
$1,530,000
Various
Lemay/RDP
Deer Creek
Capital
78Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UPPER BADEN SANITARY RELIEF (JENNINGSSTATION RD TO OAKRIDGE BLVD)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALL BP-001 REQUIRES REMOVAL.
CONSTRUCT 4,100 FEET OF 15-INCH TO 27-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-001.
§¨¦70
§¨¦70
LILLI
A
N
KENW OO D
JUNE
BEGGBEUL
A
HHATZ
EDGEWOODROXIESTIVERS
THEO
D
O
R
E
ROH
N
MATHEW
DAIBER SEATTLENELSONFLETCHERKENEWAH
DONALD RAVENWOODUPSHAWDAW
S
O
N
MARYELL
E
N
BARRJORDANCOLLEGEOAKRIDGEKAHNSMUR
R
A
Y
MOT
TE
OAKWOODMELWOODST
RAT
F
ORDB ARK
E
NPRIV
A
T
E
BEGGROHNFLETCHEROAKRIDGEROH
N
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12241
Wastewater
11
$483,000
Northwoods
Bissell
Bissell
Capital
79Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UPPER MATTESE TRUNK SANITARY RELIEF(THEISS RD TO LIBERTY TRAIL RD)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 13,335 FEET OF 8-INCH TO 36-INCH SANITARY SEWER.
§¨¦270
§¨¦55
§¨¦270
§¨¦55
MA
T
T
I
S
T
H
E
I
S
S
AMBSK
E
N
N
E
R
L
Y
VONTALGESUNSETGE
R
A
L
DROXANNA
KE
M
P
F
CARIBEEGREGORY
RUSTYDIERSLEEBUR
ELIVALMEYERTO
WNECENTRE
ANTIGO
BUTLERHILL TESCORDGATESBURYPRIVATEMUELLERCONCORDSCHO
OL
GEMINI
DO
R
S
I
E
B R U NSTONLANGTREE VERMILIO N FLORIELNOREFUCHSBA U E R
ST
A
N
H
O
P
E
KERTHFIJIREYNOSA
TEALBYTWILIGHTFOUL
K
LO
N
G
VIEWLINCORDEIMESAKURAJAMIELONGSPURJOSSESCHUESSLERPATSYMUSICYUMA
A UDJ I L L
HELTA
CONCORDLARKINCONCORD V IL LA G EREVEREROSSMOORW ORTH IN G T O N FIVEOAKSROANNA
SUNHILL
TIOGA
CHA R WICKHURSLEY
ME
A
D
O
W
F
I
E
L
D
BASLERLEONARDKRAMPEROLDE
SILVER
VALLE
Y C
REST
PATSTONREBECCACHARDINOLD TESSONCONCORD
PRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12249
Wastewater
11
$1,460,000
St. Louis County
Meramec
Mattese Creek
Capital
80Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WET WEATHER OPTIMIZATION STUDY
Pre-Design Services
1101 - General Fund
ACTIVE CONTROLS ON TUNNELS AND TANKS CAN IMPROVE WATERQUALITY BY INCREASING THE LEVEL OF SERVICE OF EXISTINGINFRASTRUCTURE AND PLANNED IMPROVEMENTS.
PERFORM WET WEATHER OPTIMIZATION STUDY TO INCREASE THELEVEL OF SERVICE OF EXISTING AND PLANNED INFRASTRUCTURE.INCLUDES MODELING AND ALTERNATIVES ANALYSIS, AND SUPPORTFOR ESTABLISHING A SENSOR NETWORK AND SCADA FOR ACTIVECONTROLS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13436
Wastewater
11
$1,500,000
Various
Various
Various
Non-recurring
81Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WHITE PLAINS SANITARY RELIEF (SALTBOX DRTO CEDAR CREEK RD)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 2,785 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.
§¨¦64§¨¦64 LUR
A
Y
RUTLANDSTILLHOUSECREEKA
P
PALAC
HIA
NKENNEBEC
NORTH OUT
E
R
F
O
R
T
Y SALTBOXSPRI N G R U NBEAVERCREEK P
OCONOTIMBER LA K E M A N O RPRIVATEPRIVATE §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12280
Wastewater
11
$400,000
Chesterfield
Missouri
Creve Coeur Creek
Capital
82Page
2021
24 February 2020
Page 1 of 4
WASTEWATER CONSTRUCTION PROJECTS - FY21
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12508 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2021)
CONTRACT A
$5,350,000 83
12509 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2021)
CONTRACT B
$2,330,000 84
12494 BISSELL POINT WWTF MAIN SUBSTATION
SWITCHGEAR AND MCC REPLACEMENT
$4,400,000 85
12566 BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
$14,000,000 86
12753 CAREY CT 1664 SANITARY AND STORM SEWER
REPLACEMENT
$1,160,000 87
12753 CAREY CT 1664 SANITARY AND STORM SEWER
REPLACEMENT
$40,000 88
12248 CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
$6,000,000 89
13404 CSO - MARY AVENUE SOUTH OF MANCHESTER
CSO INTERCEPTOR (I-132)/OUTFALL (L-106)
ELIMINATION PHASE I
$3,500,000 90
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
$8,000,000 91
13078 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
$3,000,000 92
12142 DACEY BRANCH SANITARY RELIEF (BELLA
CLARE DR TO PRIOR DR)
$605,000 93
12472 DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD) PHASE
III AND PHASE IV
$22,000,000 94
11731 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP)
$15,000,000 95
12615 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP) - PUMP STATION
$15,000,000 96
13480 DEER CREEK TRUNK SEWER RELOCATION
(BRECKENRIDGE INDUSTRIAL CT TO MARY
AVE)
$3,000,000 97
12152 E. WATSON SANITARY RELIEF (RUDSON LN TO
RICHVIEW DR)
$2,820,000 98
12153 EARTH CITY EXPRESSWAY PUMP STATION (P-
708) REPLACEMENT
$2,600,000 99
24 February 2020
Page 2 of 4
WASTEWATER CONSTRUCTION PROJECTS - FY21
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12818 EASEMENT ACQUISITION FOR WASTEWATER
PROJECTS (2021)
$2,000,000 100
10012 FF-07 FEE FEE CREEK SANITARY RELIEF
(MEADOWSIDE DR TO WILLOW BROOK DR)
$4,000,000 101
12175 GEYER SANITARY RELIEF AND WINDSOR
SPRINGS P-521 STORAGE (BIG BEND BLVD TO
WINDSOR SPRINGS DR)
$4,400,000 102
10496 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY REHABILITATION (FANNIE AVE TO
PARDEE LANE)
$6,800,000 103
13405 HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE IA
$5,400,000 104
11769 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(GOODFELLOW TO HAMILTON)
$600,000 105
11796 HARLEM BADEN RELIEF PHASE IV (HEBERT) -
HAMILTON TO DARVER TRUNK SEWER
$6,000,000 106
11800 HARLEM BADEN RELIEF PHASE IV (HEBERT) -
TRUNK SEWER REHABILITATION
$880,000 107
12995 INFRASTRUCTURE REPAIRS (FACILITIES)
(2021)
$3,000,000 108
13014 INFRASTRUCTURE REPAIRS
(REHABILITATION) (2021) CONTRACT A
$2,500,000 109
13015 INFRASTRUCTURE REPAIRS
(REHABILITATION) (2021) CONTRACT B
$2,500,000 110
12987 INFRASTRUCTURE REPAIRS (WASTEWATER)
(2021)
$7,000,000 111
11711 JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
$55,000,000 112
12325 LANG ROYCE SANITARY RELIEF (FARGO DR
TO FLORIDALE CT)
$1,050,000 113
13336 LANGLEY AND PHILO SANITARY STORAGE $2,221,000 114
12059 LEMAY PUBLIC I/I REDUCTION (2021)
CONTRACT A
$7,938,000 115
13303 LEMAY WWTF AERATION BASIN GATES $1,000,000 116
24 February 2020
Page 3 of 4
WASTEWATER CONSTRUCTION PROJECTS - FY21
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12329 LINDLEY DRIVE SANITARY RELIEF (I-170 TO
ASHMONT DR) (UR-07)
$4,000,000 117
12489 LOUISA AND ARSENAL PUMP STATIONS (P-112
AND P-113) UPGRADES
$3,300,000 118
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
$25,000,000 119
13164 LOWER MERAMEC TUNNEL I/I SOURCE
REDUCTION
$2,635,000 120
12762 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (RAIN GARDEN)
$200,000 121
13296 MARKET ST 2350 GREEN INFRASTRUCTURE -
ENTRANCE AND LANDSCAPING
IMPROVEMENTS
$1,400,000 122
12352 MIDLAND SANITARY RELIEF (MIDLAND BLVD
TO SIMS AVE)
$1,460,000 123
12484 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION PHASE II
$5,000,000 124
13223 MISSOURI RIVER WWTF TUNNEL SERVICE
WATER PIPING REPLACEMENT
$400,000 125
13386 NORTH POINTE DETENTION BASIN OPTI
RETROFIT
$350,000 126
12188 RIVERPORT 6 PUMP STATION (P-781)
REHABILITATION
$1,000,000 127
12840 RIVERSIDE AND YARNELL SANITARY RELIEF
REPLACEMENT
$4,400,000 128
12207 SPIRIT OF ST. LOUIS 2 PUMP STATION (P-736)
REPLACEMENT
$1,300,000 129
12208 SPRING AVE SANITARY RELIEF (YEATMAN
AVE TO DALE AVE)
$1,100,000 130
12239 TULANE-WILBUR OUTFALL SANITARY RELIEF
SEWER (WEBER RD TO HILDESHEIM AVE)
$248,000 131
12239 TULANE-WILBUR OUTFALL SANITARY RELIEF
SEWER (WEBER RD TO HILDESHEIM AVE)
$2,484,000 132
12507 VALLEY PUBLIC I/I REDUCTION (CLARKSON
RD AND KEHRS MILL RD)
$2,880,000 133
24 February 2020
Page 4 of 4
WASTEWATER CONSTRUCTION PROJECTS - FY21
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12922 WATKINS CREEK PUMP STATION (P-101)
FORCEMAIN REPLACEMENT (COAL BANK RD
TO SPRING GARDEN DR)
$4,000,000 134
12491 WATKINS CREEK PUMP STATION (P-101)
REPLACEMENT
$5,000,000 135
11679 WEST LOCKWOOD SANITARY RELIEF $2,389,000 136
11212 WHITE AND ROSALIE I/I REDUCTION AND
BRIDGEPORT SEWER SEPARATION
$4,000,000 137
12583 WHITE BIRCH PUMP STATION (P-725)
ELIMINATION
$1,200,000 138
12296 WOODS MILL SANITARY RELIEF (I-64 TO
BROOK MILL LN)
$1,375,000 139
TOTAL:$296,215,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2021) CONTRACT A
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 65,630 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12121, 12146, 12173,12184, AND 12311.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦255
§¨¦55
§¨¦44 §¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12508
Wastewater
15
$5,350,000
Various
Various
Various
Capital
83Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2021) CONTRACT B
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 60,160 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12213 AND 12376.
§¨¦64
§¨¦70
§¨¦270 §¨¦170
§¨¦55
§¨¦270
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12509
Wastewater
15
$2,330,000
Various
Various
Various
Capital
84Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL POINT WWTF MAIN SUBSTATIONSWITCHGEAR AND MCC REPLACEMENT
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXISTING SWITCHGEAR IS OBSOLETE AND REPLACEMENT ISREQUIRED TO MINIMIZE POWER SERVICE INTERRUPTIONS.
CONSTRUCT REPLACEMENT OF MAIN SUBSTATION SWITCHGEAR ANDPRELIMINARY AND PRIMARY TREATMENT MOTOR CONTROL CENTERUNITS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 21. TOTAL CONSTRUCTION BUDGET IS$10,400,000.
H
A
L
L
GRANDN
O
R
F
O
LK
SOUTHERN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12494
Wastewater
15
$4,400,000
St. Louis City
Bissell
Bissell
Capital
85Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL POINT WWTF TRICKLING FILTER MEDIAREPLACEMENT
Construction
6660 - SanitaryReplacement Fund
AGING TRICKLING FILTER MEDIA NEARING END OF USEFUL LIFE.
REPLACE TRICKLING FILTER MEDIA ON SIX FILTERS AT THE BISSELLPLANT.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS$22,500,000.
H
A
L
L
GRANDN
O
R
F
O
LK
SOUTHERN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12566
Wastewater
15
$14,000,000
St. Louis City
Bissell
Bissell
Capital
86Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAREY CT 1664 SANITARY AND STORM SEWERREPLACEMENT
Construction
6660 - SanitaryReplacement Fund
SLOPE FAILURES CAUSING DAMAGE TO EXISTING SANITARY SEWER.
CONSTRUCT 668 FEET OF 8-INCH SANITARY SEWER, 585 FEET OF30-INCH TO 42-INCH STORM SEWER TO REPLACE ERODING CHANNEL,AND 30 FEET OF 15-INCH STORM SEWER.
MOST OF THE STORM SEWER CONSTRUCTION IS REQUIRED TOPROTECT THE SANITARY LINE FROM EROSION AND SLOPE FAILURE.DUNNVILLEMARIAMIS
S
O
U
RI
B
O
T
T
O
M CAREYL
E
AFCREST
C
OR
K
P
RI
VATEHURSTBOROUGH§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12753
Wastewater
15
$1,160,000
Hazelwood
Missouri
Bonfils
Capital
87Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAREY CT 1664 SANITARY AND STORM SEWERREPLACEMENT
Construction
5120 - DistrictwideStormwater Fund
SLOPE FAILURES CAUSING DAMAGE TO EXISTING SANITARY SEWER.
CONSTRUCT 668 FEET OF 8-INCH SANITARY SEWER, 585 FEET OF30-INCH TO 42-INCH STORM SEWER TO REPLACE ERODING CHANNEL,AND 30 FEET OF 15-INCH STORM SEWER.
MOST OF THE STORM SEWER CONSTRUCTION IS REQUIRED TOPROTECT THE SANITARY LINE FROM EROSION AND SLOPE FAILURE.DUNNVILLEMARIAMIS
S
O
U
RI
B
O
T
T
O
M CAREYL
E
AFCREST
C
OR
K
P
RI
VATEHURSTBOROUGH§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12753
Wastewater
15
$40,000
Hazelwood
Missouri
Bonfils
Capital
88Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK A PUMP STATION (P-750)IMPROVEMENTS
Construction
6660 - SanitaryReplacement Fund
EXISTING PUMP STATION IS DETERIORATING AND REQUIRESIMPROVEMENT.
CONSTRUCT IMPROVEMENTS TO PUMP STATION P-750.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL BUDGET IS $10,000,000.
EDISON
CENTRAL MIDLAND
CRYSTALSPR IN G S
B R IG H T H URST
L
A
N
S
B
ROOKE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12248
Wastewater
15
$6,000,000
Chesterfield
Missouri
Caulks Creek
Capital
89Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO - MARY AVENUE SOUTH OF MANCHESTERCSO INTERCEPTOR (I-132)/OUTFALL (L-106)ELIMINATION PHASE I
Construction
6660 - SanitaryReplacement Fund
AREA EXPERIENCES EXCESSIVE INFLOW THROUGH COMBINEDSEWERS. REMOVAL OF I-132 AND L-106 REQUIRED BY THE LONG TERMCONTROL PLAN.
CONSTRUCT 2,300 FEET OF 12-INCH TO 36-INCH SANITARY SEWER.
THIS FUNDING FOR A PORTION OF THE PROJECT TO BE CONSTRUCTEDBY THE CITY OF BRENTWOOD PER AN INTERGOVERNMENTALAGREEMENT WITH THE DISTRICT.MARYRUTHPRIVATEBRAZEAUHELENMAGDALEN DOROTHYBOMPARTPENDLETON
U N I O N P A C I F I C
FLORENCE
VANMARKMARY
MANCHESTER RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13404
Wastewater
15
$3,500,000
Brentwood
Lemay/RDP
Deer Creek
Capital
90Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO VOLUME REDUCTION GREENINFRASTRUCTURE
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS ASREQUIRED BY THE CONSENT DECREE.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCESTORMWATER VOLUMES ENTERING THE COMBINED SEWER SYSTEM INTHE MISSISSIPPI WATERSHED.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE CITYOF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL ANDNON-CAPITAL SERVICES.
§¨¦70
§¨¦270
§¨¦55
§¨¦64
§¨¦44
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11146
Wastewater
15
$8,000,000
Various
Bissell
Mississippi River Tributary Areas
Non-recurring
91Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO VOLUME REDUCTION GREENINFRASTRUCTURE - RIVER DES PERES
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS ASREQUIRED BY THE CONSENT DECREE.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCESTORMWATER VOLUMES ENTERING THE COMBINED SEWER SYSTEM INTHE RIVER DES PERES WATERSHED.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE CITYOF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL ANDNON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦70
§¨¦64
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13078
Wastewater
15
$3,000,000
Various
Lemay/RDP
River Des Peres
Non-recurring
92Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DACEY BRANCH SANITARY RELIEF (BELLA CLAREDR TO PRIOR DR)
Construction
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS, AND A MANHOLE LOCATEDWITHIN A BRANCH OF DELLWOOD CREEK.
CONSTRUCT 279 FEET OF 12-INCH SANITARY SEWER AND GRADECONTROL STRUCTURES.
RELATED CONSTRUCTED SSO OUTFALL BP-313 TO BE REMOVED VIASEPARATE WORK ORDER.CAPITOL
VENTURACLOVERDALECROWN POINTBELLA CLARE
EMPIRECAVALIER §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12142
Wastewater
15
$605,000
Unincorporated
Bissell
Maline Creek
Capital
93Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DC-02 & DC-03 SANITARY RELIEF (BRENTWOODBLVD TO CONWAY RD) PHASE III AND PHASE IV
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWERACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 16,200 FEET OF 8-INCH TO 54-INCH SANITARY SEWER, TOALLEVIATE SYSTEM SURCHARGING. ELIMINATE CONSTRUCTED SSOOUTFALLS BP-155, BP-170, BP-348, BP-349, BP-198, BP-545, AND BP-591.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$56,240,000.
§¨¦64
§¨¦64
CLAYTON
LAYOLD WARSON MCKNIGHTT R ENTWARSONPRICELITZSINGER
SOUTHFORTY BARNESDANIELCELLAKENTROANOVERHIL
LS
D E N N Y
GODW INCONWAYMAGNOLIASPRINGWOOD
ARTHUR
P IC A R DY
WIND IN GR I D G E
INDIAN
ELLSWORTHLOG CABINPAR KOVERBROOKHIGHDOWNANZEIGER
PRIV ATE
TWIN SPRINGS R
O
LLINGROCKMAYFAIRWARRIDGE
WILD ROSE
WATE RBURYLYLEWOOD
RAUS
C
H
E
R
DUNLEIT
HOAK BENDLIN D W O RTHDWYERLEAGRAMW OODACREEXMOORCAPITOL
D E E R C REEKPRIVATE
PRIVATE
P RIVA T E
LITZSINGER
S LINDBERGH BLVDS LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12472
Wastewater
15
$22,000,000
Ladue
Lemay/RDP
Deer Creek
Capital
94Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS ANDACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 22,800 FEET OF 19 FOOT DIAMETER STORAGE TUNNEL ANDDIVERSION STRUCTURES.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL BUDGET IS $153,000,000.PUMP STATION CONSTRUCTED UNDER 12615.
§¨¦44
§¨¦64
§¨¦170
DALE
ME
T
R
OL
I
N
K
CLAYTON
UNIONPACIFICPINE
ELMLAYFOLKMCKNIGHT
NEWPORT
MARSHALL YALECLARK McCAUSLANDLITZSINGER LACLEDESTATIONIVANHOEBELLEVUEPERNOD
KIRKHAMETHEL
WHITE
BELLBREDELLBOLANDSUTTONLAWN
OLEATHALINDENEULALIE
LINDENWOODGLENGOR
E
FYLERCLAYTONIA
LEE
ARUNDEL
EUCLID SW A N
PA R KLITHIA
P ACIFIC HANLEYFORESTLOUISDELNORTEPLATEAU
W I L L IA M S
ALAMO
MARDEL
MADGE
HANCOCKMCCUTCHEONWISE
C A M BRIDGEARSENALFLORASALEMB
U
C
KHICKS
ST CLAIRMARYG R EENWOODBRUNO
FAIRVIEW M A NHATTANPRATHERBARTOLDRUSSEL
L
YEATMANROCK HILLEAGER
RO S E
FLORENCE
MARTINIOXFORD
GODW IN
C O M M ONWEALTHMOORLANDSY ORKBACON
MORITZ
LYLEDESPERESPRIVATEARLINGTON
ANNA
WAYMIRE
ELLSWORTH
WELLINGTON
JAMES
MAPLECIRCLECOLLINS
GREELEY ECOFFBLENDONCORONAEAST PORTEREXETERHORNER
BERRY RICHERTHATTONSAN BONITA
UNIONPACIFIC FORESTMARYWHITE
IVANHOEELMMANCHESTERRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11731
Wastewater
15
$15,000,000
Various
Lemay/RDP
Deer Creek
Capital
95Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP) - PUMP STATION
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT A 21 MGD PUMP STATION FACILITY, FOR THE DEER CREEKTUNNEL PROJECT.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$41,800,000.
§¨¦44
METROLINKBURLINGT
O
N
N
O
RT
HE
R
N
S
A
NT
A F
E
CARR LA
NE BURLINGTONNORTHERNSANTAFEBURLINGT
O
N
N
O
RT
HE
R
N
S
A
NT
A FE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12615
Wastewater
15
$15,000,000
Shrewsbury
Lemay/RDP
Deer Creek
Capital
96Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK TRUNK SEWER RELOCATION(BRECKENRIDGE INDUSTRIAL CT TO MARY AVE)
Construction
6660 - SanitaryReplacement Fund
CITY OF BRENTWOOD DEVELOPMENT REQUIRES RELOCATION OF THEDEER CREEK TRUNK SEWER OUT OF A NEW FLOOD PLAIN AREA.
RELOCATE 3,000 FEET OF THE 6.5 FOOT DEER CREEK TRUNK SEWER.
THIS PROJECT TO BE CONSTRUCTED BY THE CITY OF BRENTWOOD PERAN INTERGOVERNMENTAL AGREEMENT WITH THE DISTRICT.
PACIFI
C
GLENMARY
UNIO NPA C IF IC LOUISSALEMMELVINRUTHCECELIAPORTERHELENFORESTDOROTHY FAWN
FLORENCE
BOMPARTSUMMITV A N M A R KMARY FLORENCE
BOMPARTMANCHESTER RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13480
Wastewater
15
$3,000,000
Brentwood
Lemay/RDP
Deer Creek
Capital
97Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
E. WATSON SANITARY RELIEF (RUDSON LN TORICHVIEW DR)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 4,450 FEET OF 12-INCH TO 15-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-409.
WATSON
MANDARUSDONMAEBERN
RICHVIEW
STURDYGAYLEK
A
T
H
Y
LYNNGLENFIELDGLADLEA TOWNHILLWOODFOXWOODPARKEGGELINGGLEN ROSEF
E
R
N
GLENCRESTWOOD FOX PARKWATSON WOODSBARBERTON
DREW
JULIUS NORTHWAY
STURDY§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12152
Wastewater
15
$2,820,000
Various
Lemay/RDP
Gravois Creek
Capital
98Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EARTH CITY EXPRESSWAY PUMP STATION (P-708)REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
PUMP STATION P-708 NEEDS REPLACEMENT TO MEET CURRENTSERVICE LEVEL DEMANDS.
REPLACE PUMP STATION P-708.
THIS PROJECT WAS DESIGNED UNDER PROJECT 11701.
R
A
M
S
LAKEFRONT EARTH C
ITYAMERICAN
EAGLE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12153
Wastewater
15
$2,600,000
Unincorporated
Missouri
Mississippi River Tributary Areas
Capital
99Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EASEMENT ACQUISITION FOR WASTEWATERPROJECTS (2021)
Property RightsAcquisition
6660 - SanitaryReplacement Fund
IMPLEMENTATION OF THE CAPITAL IMPROVEMENT ANDREPLACEMENT PROGRAM AND CONSENT DECREE, REQUIRE PROPERTYRIGHTS ACQUISITION FOR EASEMENTS AND PURCHASES.
PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITALIMPROVEMENT AND REPLACEMENT PROGRAM WASTEWATERPROJECTS.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12818
Wastewater
13
$2,000,000
Various
Various
Various
Asset Management
100Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FF-07 FEE FEE CREEK SANITARY RELIEF(MEADOWSIDE DR TO WILLOW BROOK DR)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 3,700 FEET OF 8-INCH TO 24-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-069.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS $5,985,000.WILLOWBROOKMEADOWSIDEQUEENSWAY
DUNSTONCRESTED VIEWPORT DIANEG ANDYTENNANTCRICKETT HILL
PRIVATEPINE ROWPORT ROYALMEDIAPOOL
PEBBLEBROOKRIS H O NHILLWILL ROGERS
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10012
Wastewater
15
$4,000,000
Unincorporated
Missouri
Fee Fee Creek
Capital
101Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GEYER SANITARY RELIEF AND WINDSOR SPRINGSP-521 STORAGE (BIG BEND BLVD TO WINDSORSPRINGS DR)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
CONSTRUCT 6,460 FEET OF 10-INCH FORCEMAIN, UPGRADE WINDSORSPRINGS PUMP STATION, AND PERFORM PRIVATE I/I REDUCTION AT 7PROPERTIES.
§¨¦44
§¨¦44 GEYERFORESTLEMP
WILTONORCHARDCOUCHBURLINGTO
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
CRAGWOLD
G R A ND
MARYHURSTDEANE
PRIVATE
S U N S E T H IL LS
WINDSOR
MONICA
MIDWAY
MARCO OAKSHIREWINDSORSPR IN G
GRANDVIEW
FOREST GLEN
S U N S E T
O
F F IC E
GEY E R FOR E S T
PROSPECT
TAYLORFLORALEA
ASHWOOD
HARRISONSTATION BENDHUTHMAKERS KIRKWOOD RDWATSON RD
MO366 HWY S KIRKWOOD RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12175
Wastewater
15
$4,400,000
Various
Lemay/RDP
Gravois Creek
Capital
102Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARYREHABILITATION (FANNIE AVE TO PARDEE LANE)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS ANDOVERCHARGED SEWERS.
REHABILITATE 39,560 FEET OF 36-INCH TO 72-INCH SANITARY TRUNKSEWER AND REHABILITATE 103 MANHOLES.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 21. TOTAL CONSTRUCTION BUDGET IS$16,800,000.
§¨¦55
§¨¦270 UNIONMACKENZIEROCKHILL
PARDEEMUSICKELMGREGGGRANT
REAVISBARRA
C
K
S
WIL
L
GERMANIA
RIVERVALCOURMORGANFORDWACHTELBAY
L
E
S
S
ZEISSH
ALE
SEIBERT
CCCGREENPARK PARDELLAI O NELACLEDE STATIONCH
E
SHIRE
RIVER
DESPERES
BAPTIST CHURCHTELFORDMA
T
T
I
S ELTONCORDESBLO
W
ARLEE
TULIP
LIT TIE
GENTRYMATHILDAFAIN
IVY
SHERMAN JOPLINREAVIS
RADIOSHARPP R IVA TE
ALICETON
MOHEGAN
ELIS
E NEW HAMPSHIREKAYEDGAR
RIP
ASELMA
MUELLERHEI
D
E
L
B
E
R
G
KITWEBER
GRANDCLIFFRUSTYDIERSVAUK
LUCIABUXTONLARKFORMAN
OUTE RWELLSSUN
R
A
Y ACORNTESCORDGATESBURY
SUN
S
H
I
N
E
SEDANALTHEAVASELFLORIJEFFLEIGHCAMINOMAYOLANZINZER
HAL S EYVIRGOBUF
F
T
O
N
LINCORDAFFTON
JAMIEJAN
PECANASHBURY
PICKWICKREGINABUCKLEYLAK
E
S
I
D
E
LARKINSIG
S
B
E
E
HE
E
G
E
VIC
T
O
R
Y PHILOHEA
L
Y
FATI
M
A
CEC
I
L
JOELOLEDELKOERBER
SONATAEIF
F
E
L
ALL
E
N WANDARAYPINOAKJUBILPEARHEEGE
GRANT
WEBER
GRANTLEMAYFERRYRDTESSONFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10496
Wastewater
15
$6,800,000
Various
Lemay/RDP
Gravois Creek
Capital
103Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HAMPTON CREEK SANITARY RELIEF (DEERCREEK TRUNK TO OXFORD DR) PHASE IA
Construction
6660 - SanitaryReplacement Fund
OVERCHARGED SEWERS. ELIMINATION OF CONSTRUCTED SSOOUTFALL REQUIRED.
CONSTRUCT 6,000 FEET OF 36-INCH TO 72-INCH SANITARY SEWER.
THIS FUNDING FOR A PORTION OF THE PROJECT TO BE CONSTRUCTEDBY THE CITY OF BRENTWOOD PER AN INTERGOVERNMENTALAGREEMENT WITH THE DISTRICT.HANLEYFOLKME
T
RO
L
I
N
K
BRUNO
BREDELLSUTTONWEAVERLACLEDE STATIONLOUISFLORASALEM WILLIAMS
JEROME
ROSALIE
ALICIA
CECELIABARTOLDRANNELLS
EULALIE
MARTINIELM
WHITE
LYLEELLIS
HAZELFLORENT
MAPLE
RANKEN
ZEPHYRHIAWATHA
STRASSNER LINDBERGHUNIONPACIFIC VALLEYJONES
MELVINWESTON
LOHMEYER
LYNDOVERMCCREADY
PORTERRICHMONDBONETAHANLEYINDUSTRIAL
HELENBANNEKERCOMFORT
COLEMANGRAYLITZSINGER
FLORENCE STOCKARDWOODLAND
MARION MARGARETTEDOUGLAS BERKLEYMARI KAYBOOKERALICIA
ELMHELEN SUTTONBARTOLDMET
ROL
I
N
K
FLORA
COMFORT BREDELLMANCHESTER
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13405
Wastewater
15
$5,400,000
Brentwood
Lemay/RDP
Deer Creek
Capital
104Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM - BADEN RELIEF PHASE IV (HEBERT)(GOODFELLOW TO HAMILTON)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
STREET FLOODING AND BUILDING BACKUPS DUE TO OVERCHARGEDCOMBINED SEWERS.
CONSTRUCT 7,200 FEET OF 12-INCH TO 48-INCH SEWER, AND 3,000 FEETOF SEWER LINING.
THIS APPROPRIATION FUNDS A UTILITY RELOCATION ALLOWANCE FORTHE PROJECT, WHICH THE CORPS CANNOT FUND UNDER ITS PROJECTCONSTRUCTION AGREEMENT.
TERR
Y
ST LO
U
I
S
MAFFITT
ROO
S
E
V
E
L
T
GOODFELLOWKENN
E
R
L
Y
LABA
D
I
E
GRE
E
R
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11769
Wastewater
15
$600,000
St. Louis City
Bissell
Harlem
Capital
105Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM BADEN RELIEF PHASE IV (HEBERT) -HAMILTON TO DARVER TRUNK SEWER
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGEDCOMBINED SEWERS.
CONSTRUCT 2,050 FEET OF 12-INCH TO 102-INCH STORM ANDCOMBINED SEWERS, 900 FEET OF PIPE IN TUNNEL, AND 325 FEET OFSEWER LINING, IN THE CITY OF ST. LOUIS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS $9,300,000.KIENLENTERMINAL
S T L O UISDARVER
HAMILTONEDMUNDPRIVA
T
E CRESCENTGRE
E
R
IDAD
A
L
E
BAIL
E
Y
AUD
R
E
Y IRVINGJAMESAHARVEYSTO
R
E
Y
ST L
O
U
I
S
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11796
Wastewater
15
$6,000,000
Various
Bissell
Bissell
Capital
106Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM BADEN RELIEF PHASE IV (HEBERT) -TRUNK SEWER REHABILITATION
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGEDCOMBINED SEWERS.
CONSTRUCT 109,900 SQUARE FEET OF SHOTCRETE LINER, 1,240 FEET OFCIPP LINING, AND 6,400 SQUARE FEET OF SPOT REPAIRS, ALONG 7,000FEET OF 8 TO 12 FOOT DIAMETER SEWER.
THIS PROJECT IS BEING CONSTRUCTED BY THE CORPS OF ENGINEERSUNDER A COOPERATIVE AGREEMENT WITH THE DISTRICT.KIENLENTERMINAL
CLARAGOODFELLOWBELTSTLOUIS
LOT
U
S
MYRON
TERR
Y
GREE
R
BURDMAFF
I
T
T
LABA
D
I
E
WEL
L
S
ROO
S
E
V
E
L
T
HODIAMONTELWA
R
D
EDMUNDF
E
RRIS
VALLEERICKWELL
S
M
A
R
SEMPLECRESCENTPERR
Y
HERBERTHAMILTON
IRVINGDARBYWAB
A
D
A
THE
O
D
O
S
I
A
RID
G
E
HIGH
L
A
N
D
KENN
E
R
L
YCHERRYCOT
E
B
R
I
L
L
I
A
N
T
E67TH MCAR
T
H
UR
PRIVATEOAKDALEOVERLEAROSEBUDARDENSELBER
MYRT
L
E DRES
S
ELL
AS
H
L
A
N
D
DARDANELLA
LOR
R
A
I
N
E
ST
I
L
L
W
E
L
L
MOUNT PINEGROVELESCHEN
WELLSTONALLEY
SIEMERSEVANSTON
NAYL
O
R
JAMES A HARVEYELM
B
A
N
KCHEVROLET
HIGH
L
A
N
D
MAFF
I
T
T
ST LOUIS
WAB
A
D
A
ST L
O
U
I
S OAKDALEHAMILTONGREE
R
KENN
E
R
L
Y
PRIV
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11800
Wastewater
15
$880,000
Various
Bissell
Bissell
Capital
107Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (FACILITIES) (2021)
Work Order Repair Costs(Capital)
6660 - SanitaryReplacement Fund
FACILITIES HAVE NEEDS FOR REPAIRS OR IMPROVEMENTS THAT POSEMAJOR OPERATIONAL DIFFICULTY, EXPENSE, OR RISK TO WAIT FORCAPITAL PROJECT DELIVERY.
CONSTRUCT REPAIR, REPLACEMENT, OR IMPROVEMENT PROJECTS TOADDRESS NEEDS AT FACILITIES SUCH AS TREATMENT PLANTS ANDPUMP STATIONS.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12995
Wastewater
17
$3,000,000
Various
Various
Various
Asset Management
108Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (REHABILITATION)(2021) CONTRACT A
Construction
6660 - SanitaryReplacement Fund
DETERIORATED AND DAMAGED SEWER LINES CAUSE PIPE COLLAPSES,BLOCKED MAINS, AND BUILDING BACKUPS.
CONSTRUCT CURED-IN-PLACE PIPE INSTALLATION FOR SYSTEMREHABILITATION AND REPAIR, AS NEEDS ARE IDENTIFIED BY SEWERCLEANING AND INSPECTION EFFORTS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13014
Wastewater
15
$2,500,000
Various
Various
Various
Capital
109Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (REHABILITATION)(2021) CONTRACT B
Construction
6660 - SanitaryReplacement Fund
DETERIORATED AND DAMAGED SEWER LINES CAUSE PIPE COLLAPSES,BLOCKED MAINS, AND BUILDING BACKUPS.
CONSTRUCT CURED-IN-PLACE PIPE INSTALLATION FOR SYSTEMREHABILITATION AND REPAIR, AS NEEDS ARE IDENTIFIED BY SEWERCLEANING AND INSPECTION EFFORTS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13015
Wastewater
15
$2,500,000
Various
Various
Various
Capital
110Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (WASTEWATER) (2021)
Work Order Repair Costs(Capital)
6660 - SanitaryReplacement Fund
AGING AND DETERIORATING WASTEWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR OR REPLACEMENT OF WASTEWATERINFRASTRUCTURE DISTRICTWIDE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12987
Wastewater
17
$7,000,000
Various
Various
Various
Asset Management
111Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENTCONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TODAMAGE IN HIGH RIVER CONDITIONS.
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL,ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS(P-305) PUMP STATIONS.
§¨¦255
§¨¦55
§¨¦255
§¨¦55
KOCHK
INSWOOD GREGGREAVIS
B
A
R
R
ACKSFOR
D
E
R CCCGRANTLIN
D TELFOR D
HOFFM
E
IS
T
E
R
ARLEE
S
HERMAN
MILDGENTRYFAIN
IONE
PRIVATEJOPLINCLIFFRINGER
SHE R ID A NPO
T
T
L
E
ORI
E
N
T
RIP
A
LUNAPOP
L
A
R
GARK
WILL LARKCLAGEROUTE R
VICTORY AVENUE HBOUNDARYHO
R
N
JEFFERSONIAN
PAU
L
E
HAL S EYFIRSTPECAN
A
S
HROCK
JAC
I
N
T
O
SOUTHSHIRE
ARRA
S
J
E
FFERSONBLUE RIDGEBANISTERALL
E
N
LI
S
I
E
U
X KASKEBUNKERBIRCHP
R
IVATETELEGRAPHR DLEMAYFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11711
Wastewater
15
$55,000,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
112Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LANG ROYCE SANITARY RELIEF (FARGO DR TOFLORIDALE CT)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALL BP-291 REQUIRES REMOVAL.
CONSTRUCT 1,520 FEET OF 8-INCH TO 15-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-291.
KAPPEL
FARGODELLWOOD WESTDELLFIR
F
L
O
R
I
D
A
L
E
SCHLUETERFLORWOODGAGEVENICE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12325
Wastewater
15
$1,050,000
Dellwood
Bissell
Maline Creek
Capital
113Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LANGLEY AND PHILO SANITARY STORAGE
Construction
6660 - SanitaryReplacement Fund
WET WEATHER FLOWS EXCEED THE CAPACITY OF THE SANITARYSEWER.
CONSTRUCT 115,000 GALLONS OF SANITARY STORAGE, INCLUDING 400FEET OF 84-INCH SANITARY STORAGE PIPE, AND 510 FEET OF 8-INCH TO18-INCH SANITARY SEWER.
LANGLEY
VINE
WALDO
LODE
PILOTACORNPHILOLA
K
E
W
O
O
D
HARMONYLACEYKATHLEENHI
L
D
A
ROSEMARYVIRGILLODE
VINE
PILOTGRAVOIS R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13336
Wastewater
15
$2,221,000
Unincorporated
Lemay/RDP
Mackenzie Creek
Capital
114Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUBLIC I/I REDUCTION (2021) CONTRACT A
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 100,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12335, 12278, 12175,AND 12228.
§¨¦64
§¨¦270
§¨¦44
§¨¦55
§¨¦170
§¨¦270
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12059
Wastewater
15
$7,938,000
Various
Lemay/RDP
Various
Capital
115Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY WWTF AERATION BASIN GATES
Construction
6660 - SanitaryReplacement Fund
EXISTING VALVES ARE DETERIORATED AND INOPERABLE.
CONSTRUCT GATES ON AERATION BASINS.
P
R
I
V
A
T
E
H
O
F
F
M
E
I
S
T
E
R
RUBYWEI
S
S
P
R
I
V
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13303
Wastewater
15
$1,000,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
116Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LINDLEY DRIVE SANITARY RELIEF (I-170 TOASHMONT DR) (UR-07)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALLS BP-416, BP-417, BP-433, AND BP-476REQUIRE REMOVAL.
CONSTRUCT 5,770 FEET OF 8-INCH TO 21-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALLS BP-416, BP-417, BP-433, ANDBP-476. ELIMINATE WET WEATHER PUMP STATION P-790.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL BUDGET IS $7,100,000.
§¨¦170
§¨¦170
PRICEDIELMANOLD BONHO
M
M
E
ENGEL
LE PEREHILLTOPENFIELDBON AIREHIGHGATEALICE
ARBORBELL
SPOONELBRINGGE
OF
F
RYRYEDIELMAN IN
D
U
S
T
R
IALLA G U NAVILLA
LADUE HILLSWHITE ROSEPRICEWO O DSPRIVATEHARVESTMAGNETCOLLINGWOODDOLORESELKINGTONH IGH ACRES
WATSONIA
GLENMARYCORDELLLOCUST
ALDANBONHOMME W O O D S
BEAUWOODL L E WELLYNPUTTERPLANTERSBON P RICEINDIAN TRAILSFRIESELONGACRESENGELTONB I R N A W OODSWAYFIELDF A IR W INDSBERRY HILLWOODMOORBRISCOEJACKLYNNCIMARRON
BERKLEY PLACEHILLTOP MANOR
MARBROOKE
HARVEST
VILLA
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12329
Wastewater
15
$4,000,000
Olivette
Lemay/RDP
University City Branch
Capital
117Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOUISA AND ARSENAL PUMP STATIONS (P-112 ANDP-113) UPGRADES
Construction
6660 - SanitaryReplacement Fund
MECHANICAL SYSTEMS ARE AGING AND IN NEED OF REPLACEMENT.
CONSTRUCT UPGRADE OF MECHANICAL VALVE AND PIPING SYSTEMS.UNION PACIFICA
R
S
E
N
A
L
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12489
Wastewater
15
$3,300,000
St. Louis City
Bissell
Mississippi River Tributary Areas
Capital
118Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC RIVER SYSTEMIMPROVEMENTS - BAUMGARTNER TO FENTONWWTF TUNNEL
Construction
6660 - SanitaryReplacement Fund
THE FENTON WWTF IS AN INTERIM FACILITY AND IT'S ELIMINATION ISPART OF THE EAST WEST GATEWAY SECTION 208 REGIONAL WATERQUALITY MANAGEMENT PLAN.
CONSTRUCT 36,000 FEET OF 8-FOOT DIAMETER DEEP TUNNEL TOCONVEY WASTEWATER FROM THE FENTON WWTF TO THEBAUMGARTNER TUNNEL, TO ENABLE TREATMENT OF FLOWS AT THELOWER MERAMEC WWTF.
PROJECT ELIMINATES PUMP STATIONS P-446 and P-483. P-489 TO BEELIMINATED BY SEPARATE PROJECT # 10869. TOTAL CONSTRUCTIONBUDGET IS $212,000,000.
§¨¦55
§¨¦270
§¨¦55 KERTHMA
T
T
I
S
G R A V O ISWELLSKELLERMERAMEC BOTT O M AMBSKENNE
R
L
Y
T
H
EI
SSEA
S
T
CONCORD
AL
L
E
N ALSWELLSC H U E S SLERMENTZHILL
RI N G ERB A UERBU T L E R HILL
GREENTONS
USONHILLS
PO I N T E
CARIBEEHAWKINSGE
R
A
L
D
KE
M
P
F
HAGEMANNOLSENGREGORY
DIERSPR
I
VATE
MAIN
RI V ERCURVE VALMEYERTESCORDMAN G OWAT
SO
N
GATESBURY
DANTONAIREGRIFFINA C O RN LANGTREEVALLEYSIDEFUCHSFIJIBAHNFYREFERN BEACHED LOUCLAYRIDGESTARLITATLNTIC LARKINLITTLEROCKTIOGA
COYL
E
TOWNE S O UTHPRIVATEPRIVATE
AMBS
BAUER
PRIVATEP
R
I
V
A
T
E
T E S S ONFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11746
Wastewater
15
$25,000,000
Various
Meramec
Meramec Tributary Areas
Capital
119Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC TUNNEL I/I SOURCEREDUCTION
Construction
6660 - SanitaryReplacement Fund
DURING FLOOD INUNDATION AND HIGH GROUNDWATER, INFLOW ANDINFILTRATION OCCURS INTO THE LOWER MERAMEC TUNNEL.
REHABILITATE 2,150 FEET OF 60-INCH DIAMETER SANITARY SEWER,AND REHABILITATE 4,000 FEET OF 8-INCH TO 24-INCH SANITARY SEWERAND 120 STRUCTURES.
INCLUDES SCOPE OF WORK FROM PROJECT 13165.
YAEGER
BAUMGARTNERHEINTZOL D B A U M GARTNERMILBURNMILDBURLINGTONNORTHERN S ANTAFEW
HIT
E
PI
NEFIRELEAFB
LACKFOREST
SAG E
PRIVATEFOXFIRE
GATLING
PATTERSON
CHAU
V
E
AUFALCONVIEW
G WENMILLWILDBROOKSUMMER LYN
TREERIDGEHOLLOW OAKLAKEVIE W H E I G H T S
B U R G U N D Y W A Y
BRISTLECONEINNS
B
R
U
C
KPARISHEINTZ
P R I V ATE PRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13164
Wastewater
15
$2,635,000
Unincorporated
Meramec
Mattese Creek
Capital
120Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MALINE CREEK CSO BP 051 & 052 LOCALSTORAGE FACILITY (RAIN GARDEN)
Construction
6660 - SanitaryReplacement Fund
IMPLEMENTATION OF THE CSO LONG TERM CONTROL PLAN ISREQUIRED.
CONSTRUCT RAIN GARDENS AND LANDSCAPING ADJACENT TO THENEW MALINE CSO PUMP STATION.HALLCHAIN OF ROCKS
RAFORD
JACKSON
RIVER RUN
RIVER TRAIL
LOWELLMAK A L U
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12762
Wastewater
15
$200,000
St. Louis City
Bissell
Maline Creek
Capital
121Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MARKET ST 2350 GREEN INFRASTRUCTURE -ENTRANCE AND LANDSCAPING IMPROVEMENTS
Construction
5110 - StormwaterRegulatory Fund
IMPLEMENTATION OF THE CSO VOLUME REDUCTION GREENINFRASTRUCTURE PROGRAM AND STORMWATER WATER QUALITYEDUCATION AND OUTREACH.
REPLACE SIDEWALKS AND LANDSCAPING, PAVEMENT, HANDICAPRAMP, AND INSTALL RAINGARDEN.
IMPROVEMENTS WILL PROVIDE PUBLIC EDUCATION AND OUTREACHON GREEN INFRASTRUCTURE AND STORMWATER WATER QUALITYISSUES.
PINE
MARKET
22NDCLARK 23RDWALNUT
CHESTNUTBEAUMONT §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13296
Unallocated
15
$1,400,000
St. Louis City
Bissell
Camp Springs
Capital
122Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MIDLAND SANITARY RELIEF (MIDLAND BLVD TOSIMS AVE)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALLS BP-095 AND BP-145 REQUIRE REMOVAL.
CONSTRUCT 2,530 FEET OF 8-INCH TO 18-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALLS BP-095 AND BP-145.SIMSGASSWISMERLESLIEWALLISMI
L
TON
SPENCERT
E
N
N
Y
SO
N
D E N N I S O N
ROBERTSONMILTONTENNYSO
NWISMERTENNYSON §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12352
Wastewater
15
$1,460,000
Overland
Coldwater
Coldwater Creek
Capital
123Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MISSISSIPPI FLOODWALL ORS PUMP STATIONSREHABILITATION PHASE II
Construction,Design-Build(Supplemental)
6660 - SanitaryReplacement Fund
FLOODWALL ORS PUMP STATIONS, GATES, AND STRUCTURES AREOVER 50 YEARS OLD, AND ARE IN NEED OF REHABILITATION.
REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURESAT THE BADEN (P-143) AND RIVERVIEW (P-141) PUMP STATIONS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 21. TOTAL CONSTRUCTION BUDGET IS$12,000,000.
§¨¦44
§¨¦70
§¨¦55
§¨¦64
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12484
Wastewater
15
$5,000,000
St. Louis City
Various
Various
Capital
124Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MISSOURI RIVER WWTF TUNNEL SERVICE WATERPIPING REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
CORRODED WATER PIPING AT END OF USEFUL LIFE.
REPLACE THE SERVICE WATER PIPING IN THE DIGESTER ANDSECONDARY TUNNELS.
PRIVATE PRIVATE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13223
Wastewater
15
$400,000
Maryland Heights
Missouri
Missouri River Tributary Areas
Capital
125Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NORTH POINTE DETENTION BASIN OPTIRETROFIT
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS, STREET FLOODING, AND STRUCTURE FLOODINGALONG BADEN TRUNK SEWER, AND COMBINED SEWER OVERFLOWSTO THE MISSISSIPPI RIVER.
MODIFY EXISTING BASIN OUTFALL STRUCTURE, INSTALL OPTIPLATFORM, AND OPTIMIZE BASIN TO MITIGATE STORMWATERDISCHARGE TO THE COMBINED SEWER.
GLADY
S
MELRO
S
E
TARAETON
VIVIAN
NORFO
L
K
S
O
U
T
H
E
R
NDRURYPARTRIDGE ORIOLENOR
T
H
P
O
I
N
T
E TARAMELRO
S
EDRURY
RIVERVIEW DRRIVERVIEW DR§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13386
Wastewater
15
$350,000
St. Louis City
Bissell
Baden
Capital
126Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RIVERPORT 6 PUMP STATION (P-781)REHABILITATION
Construction
6660 - SanitaryReplacement Fund
PUMP STATION P-781 NEEDS REHABILITATION TO MEET CURRENTSERVICE LEVEL DEMANDS.
REHABILITATE PUMP STATION P-781.
RIVERPO
RT
MAGELLANPR
I
VA
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12188
Wastewater
15
$1,000,000
Maryland Heights
Missouri
Missouri River Tributary Areas
Capital
127Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RIVERSIDE AND YARNELL SANITARY RELIEFREPLACEMENT
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
PIPE WITH LEAKING JOINTS AND GROUND SURFACE SUBSIDENCE.
REPLACE APPROXIMATELY 5,700 FEET OF 36-INCH TO 42-INCHSANITARY SEWER, AND MAKE POINT REPAIRS AT 4 LOCATIONS ON36-INCH PIPE AND 1 POINT REPAIR ON 48-INCH PIPE.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 21. TOTAL CONSTRUCTION BUDGET IS $7,700,000.GRAVOISLARKIN WILLIAMS
WATSONMAI
N
GREEN ACRES
PRIVATE
NEWSMIZER
MILL
DART
WA
T
E
R
OLDSMIZERMILL
FABICK
FURY
ROCK ALVAPEFFER
S O U T H
OP
P
SYARNELLMONTEVALEVALIANTFORESTKNOLLRIVERSIDEFERRYSENNAWOODSWEANEYRIVERHILLS
CHRYSLER
OLDGRAVOIS
H A Y S H ILLRAINTREEF
R
I
N
G
E
WEST
F
R
E
D
E
GRAVES U M ME RT
O
PWOODWAYF
E
N
T
O
N
V
I
E
W
S
K
I
N
K
E
R
FENTONPARK WA
T
S
O
N
PRIVATE PRIVATEE MO30 HWY W MO30 HWY
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12840
Wastewater
15
$4,400,000
Fenton
Meramec
Fenton Creek
Capital
128Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SPIRIT OF ST. LOUIS 2 PUMP STATION (P-736)REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
DETERIORATED PUMP STATION REQUIRES REPLACEMENT.
CONSTRUCT REPLACEMENT OF DETERIORATED PUMP STATION.
EDISON
GODDARDUNION
PAC
IF
IC
SPUR
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12207
Wastewater
15
$1,300,000
Chesterfield
Missouri
Missouri River Tributary Areas
Capital
129Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SPRING AVE SANITARY RELIEF (YEATMAN AVE TODALE AVE)
Construction
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALLBP-440 REQUIRES REMOVAL.
CONSTRUCT 2,460 FEET OF 15-INCH TO 48-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-440.
§¨¦44
NEWPORT
SUMMITSPRINGOAKWOOD
DA
L
E
AMELIA
FAIRLAWNSUNNYSIDE PAGEELMWOOD
PR O V I D ENCE
JERSEYCAROLINECHAM
B
E
R
L
A
I
NTHEATRESUMMIT §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12208
Wastewater
15
$1,100,000
Webster Groves
Lemay/RDP
Deer Creek
Capital
130Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
TULANE-WILBUR OUTFALL SANITARY RELIEFSEWER (WEBER RD TO HILDESHEIM AVE)
Construction
5120 - DistrictwideStormwater Fund
OVERCHARGED SANITARY SEWERS. YARD AND STRUCTUREFLOODING. CONSTRUCTED SSO OUTFALL BP-618 REQUIRES REMOVAL.
CONSTRUCT 4,630 FEET OF 8-INCH TO 21-INCH SANITARY SEWER, 762FEET OF 12-INCH TO 21-INCH STORM SEWER, AND ELIMINATECONSTRUCTED SSO OUTFALL BP-618.
FUND 5120 FUNDING IS FOR STORMWATER PROJECT 11042, WHICH IS TOBE COMBINED WITH AND CONSTRUCTED UNDER THIS PROJECTNUMBER.
WE
B
E
R
KAMMERERUNIONSE
I
B
E
R
T
FORMANMOHEGAN
KA
Y
TIE
M
A
N
N
HE
E
G
EPHILO
PAPOOSEFAT
I
M
A JULIAHILDESHEIMWEBER TRAILKR
A
M
E
R
ST
O
N
E
VIRGILALLEY
DA
RPINTOBIG CHIEFBA
Y
B
R
O
O
K
BLACKHAWK
DE
B
R
A
K
A
Y
FRA
N
K
F
O
R
T
WARRIORROSEMARYCR
E
E
L
M
A
N
MACKINAWCANOE DECORUMHENZEOVERTONLIT
T
L
E
C
H
I
E
F
CAY
U
G
A
MA
R
O
O
N
SC
H
M
I
T
T
W
O
O
D
SHENLINSTEFFENWIGWAM
LASALETTE
DON RON
LA
S
A
T
AWEBERTERRACECANDACEDAVEMARMOCCASIN
TO
M
O
R
E
KOGLIN
HERSHEY
WAMPUMCAYUGA
FAT
I
M
A HILDESHEIMCAYUGA
FAT
I
M
A
SCHMITTWOODS
D O NRONGRAVOIS R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12239
Wastewater
15
$248,000
Unincorporated
Lemay/RDP
Mackenzie Creek
Capital
131Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
TULANE-WILBUR OUTFALL SANITARY RELIEFSEWER (WEBER RD TO HILDESHEIM AVE)
Construction
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS. YARD AND STRUCTUREFLOODING. CONSTRUCTED SSO OUTFALL BP-618 REQUIRES REMOVAL.
CONSTRUCT 4,630 FEET OF 8-INCH TO 21-INCH SANITARY SEWER, 762FEET OF 12-INCH TO 21-INCH STORM SEWER, AND ELIMINATECONSTRUCTED SSO OUTFALL BP-618.
FUND 5120 FUNDING IS FOR STORMWATER PROJECT 11042, WHICH IS TOBE COMBINED WITH AND CONSTRUCTED UNDER THIS PROJECTNUMBER.
WE
B
E
R
KAMMERERUNIONSE
I
B
E
R
T
FORMANMOHEGAN
KA
Y
TIE
M
A
N
N
HE
E
G
EPHILO
PAPOOSEFAT
I
M
A JULIAHILDESHEIMWEBER TRAILKR
A
M
E
R
ST
O
N
E
VIRGILALLEY
DA
RPINTOBIG CHIEFBA
Y
B
R
O
O
K
BLACKHAWK
DE
B
R
A
K
A
Y
FRA
N
K
F
O
R
T
WARRIORROSEMARYCR
E
E
L
M
A
N
MACKINAWCANOE DECORUMHENZEOVERTONLIT
T
L
E
C
H
I
E
F
CAY
U
G
A
MA
R
O
O
N
SC
H
M
I
T
T
W
O
O
D
SHENLINSTEFFENWIGWAM
LASALETTE
DON RON
LA
S
A
T
AWEBERTERRACECANDACEDAVEMARMOCCASIN
TO
M
O
R
E
KOGLIN
HERSHEY
WAMPUMCAYUGA
FAT
I
M
A HILDESHEIMCAYUGA
FAT
I
M
A
SCHMITTWOODS
D O NRONGRAVOIS R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12239
Wastewater
15
$2,484,000
Unincorporated
Lemay/RDP
Mackenzie Creek
Capital
132Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
VALLEY PUBLIC I/I REDUCTION (CLARKSON RDAND KEHRS MILL RD)
Construction
6660 - SanitaryReplacement Fund
EXCESSIVE PUBLIC I/I CAUSING BUILDING BACKUPS ANDOVERCHARGED SANITARY SEWERS.
REHABILITATE 38,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12257.
CLAYTON
V
A
L
L
E
Y
C O U N T R YRIDGEFIELD
VIRGINIA
P A RASOLWILSON
DEL EB R OKETTINGTON
SUNSETSUNMEADOWTREVI PROVI
DENCEHERWOR T H
PRIVATE
WOLFFFORES T C LUB
CAMARGO
CRESTLA N D
K E H R S RID
G
E
CHERRY H
ILL
L ONECAB IN
CHIPPE NHAMWILSON CREEK
FAIRVIEW
SKYLINEPEPPERMILLWESTPARWHITINGCLAYHEATHW E S T W O O DBEDFORDSYCAMOREWETHERBUR
N
AUTUMN RUNCLARKS O N W O O D S
GOLFVIEWHILLHOUSEJ O Y C E R ID G ESHEP
KEIGHLYFIELD CLARKSONRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12507
Wastewater
15
$2,880,000
Clarkson Valley
Missouri
Caulks Creek
Capital
133Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WATKINS CREEK PUMP STATION (P-101)FORCEMAIN REPLACEMENT (COAL BANK RD TOSPRING GARDEN DR)
Construction
6660 - SanitaryReplacement Fund
EXISTING FORCEMAIN HAS EXTENSIVE DAMAGE CAUSED BYHYDROGEN SULFIDE AND AIR POCKETS.
CONSTRUCT 10,100 FEET OF 20-INCH FORCEMAIN.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS $7,500,000.REPLACES CAPACITY PROJECT 12254.
§¨¦270
§¨¦270DUNN
COAL BANK
PRIVATEUPHILLMILDREDDUNDEE
LOOKAWAYRODERICK GLEN GARRYSPRINGGARDENMONT
E
I
T
H
M CALPINE
BRIGADOON
P R I V ATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12922
Wastewater
15
$4,000,000
St. Louis City
Bissell
Watkins Creek
Capital
134Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WATKINS CREEK PUMP STATION (P-101)REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
AGING MECHANICAL AND ELECTRICAL SYSTEMS, SECONDARYCONTAINMENT IS NEEDED FOR ON-SITE CHEMICALS, AND CURRENTLOCATION IS SUBJECT TO FREQUENT FLOODING.
CONSTRUCT NEW SUBMERSIBLE PUMP STATION AT AN ALTERNATELOCATION OUTSIDE OF THE FLOODPLAIN.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS $8,500,000.REPLACES CAPACITY PROJECT 12254.
COAL BANK
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12491
Wastewater
15
$5,000,000
Unincorporated
Bissell
Watkins Creek
Capital
135Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WEST LOCKWOOD SANITARY RELIEF
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 3,324 FEET OF 8-INCH TO 30-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALLS BP-187 AND BP-587.ROCK HILLLOCKWOODUNION PACIFICJACKSON
BAKEROAKS PAPINHOLLYWOODALGONQUIN
SOMERSETCROFTONWOODLAWN
BELLEVIEW
SIMMONSSHEFFIELDYORKSHIREBLACKMERBRISTOL
MCDONALD
BARSTOW
WESTBOROUGHPLANTHURSTALGONQUINUNION PACIFICBAK
E
R
LOCKWOOD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11679
Wastewater
15
$2,389,000
Webster Groves
Lemay/RDP
Deer Creek
Capital
136Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WHITE AND ROSALIE I/I REDUCTION ANDBRIDGEPORT SEWER SEPARATION
Construction
6660 - SanitaryReplacement Fund
STREET FLOODING AND BUILDING BACKUPS DUE TO INADEQUATECOMBINED SEWERS.
CONSTRUCT 1,900 FEET OF 12-INCH TO 30-INCH STORM SEWER, 1,400FEET OF 12-INCH TO 15-INCH SANITARY SEWER, AND PERFORM PRIVATEI/I REDUCTION AT 7 PROPERTIES.
WHITE MARYEULALIE
ROSALIE
DOROTHYBRENTWOOD
BRIDGEPORT
HA R R I S ONPATTON
LITZSING E RANNALEE
MARYBRIDGEPORT
WHITE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11212
Wastewater
15
$4,000,000
Brentwood
Lemay/RDP
Deer Creek
Capital
137Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WHITE BIRCH PUMP STATION (P-725)ELIMINATION
Construction
6660 - SanitaryReplacement Fund
DETERIORATED PUMP STATION REQUIRES REPLACEMENT ORELIMINATION.
CONSTRUCT 2,800 FEET OF 8-INCH SANITARY SEWER. DECOMMISSIONAND ABANDON EXISTING PUMP STATION P-725 AND ASSOCIATEDFORCEMAIN.
TES
O
N
PRIVATE
WO
O
D
C
R
E
S
T FREELANDPRIVATEPRI
V
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12583
Wastewater
15
$1,200,000
Hazelwood
Coldwater
Coldwater Creek
Capital
138Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WOODS MILL SANITARY RELIEF (I-64 TO BROOKMILL LN)
Construction
6660 - SanitaryReplacement Fund
OVERCHARGED SEWERS.
CONSTRUCT 2,100 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.SAVVISOLDWOODSMILLWOODS MILLBROOKMILLSOUT H OUTER FOR T Y
K E LLW O ODPRIVA TE
LAKEMILLS MO141 HWYN MO141 HWY§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12296
Wastewater
15
$1,375,000
Town and Country
Missouri
Creve Coeur Creek
Capital
139Page
2021
25 February 2020
Page 1 of 1
WASTEWATER CONTINUED PROJECTS - FY21
PROJECT
NUMBER
PROJECT NAME REASON PROJECT CONTINUED COST
ESTIMATE
11790 CAULKS CREEK
FORCEMAIN (RIVER
VALLEY RD TO L-52)
PROJECT CONTINUED DUE TO COORDINATION WITH
PREVIOUS PHASE. ANTICIPATE BOARD INTRODUCTION IN
SEPTEMBER 2020.
$15,000,000
11790 CAULKS CREEK
FORCEMAIN (RIVER
VALLEY RD TO L-52)
PROJECT CONTINUED DUE TO COORDINATION WITH
PREVIOUS PHASE. ANTICIPATE BOARD INTRODUCTION IN
SEPTEMBER 2020.
$800,000
13082 LOWER MERAMEC WWTF
FITTING REPLACEMENT
PROJECT CONTINUED DUE TO COORDINATION WITH
OTHER PROJECTS. ANTICIPATE BOARD INTRODUCTION IN
MAY 2021.
$2,203,000
10716 NEW ENGLAND TOWN
QUARRY PUMP STATION
(P-307) (SKME-544)
IMPROVEMENTS
PROJECT CONTINUED DUE TO COORDINATION WITH
OTHER PROJECTS, PROPERTY OWNERS, AND UTILITIES.
ANTICIPATE BOARD INTRODUCTION IN SEPTEMBER 2020.
$3,500,000
13344 UNIVERSITY CITY I/I
REDUCTION - EAST (UR-08
AND UR-09) PHASE II
PROJECT CONTINUED DUE TO COORDINATION WITH
PROPERTY OWNERS. ANTICIPATE BOARD INTRODUCTION
IN AUGUST 2020.
$2,000,000
11678 WEBSTER GROVES TRUNK
E SANITARY
REHABILITATION AND I/I
REDUCTION PHASE IV
(PART 3)
PROJECT CONTINUED DUE TO COORDINATION WITH
PROPERTY OWNERS. ANTICIPATE BOARD INTRODUCTION
IN APRIL 2021.
$1,300,000
TOTAL: $24,803,000
24 February 2020
Page 1 of 2
WASTEWATER CONTINGENCY PROJECTS - FY22
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
13232 BADEN CITYSHED MITIGATION BASINS
(CALVARY, FREDERICK, PARTRIDGE AND
TILLIE)
$3,520,000 140
12566 BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
$8,500,000 141
12248 CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
$4,000,000 142
11790 CAULKS CREEK FORCEMAIN (RIVER VALLEY
RD TO L-52)
$15,000,000 143
13481 CAULKS CREEK FORCEMAIN IMPROVEMENTS
(CAULKS PUMP STATION A TO HOG HOLLOW
RD)
$9,000,000 144
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
$5,000,000 145
13078 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
$3,000,000 146
12472 DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD) PHASE
III AND PHASE IV
$12,000,000 147
12472 DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD) PHASE
III AND PHASE IV
$500,000 148
12615 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP) - PUMP STATION
$11,800,000 149
12740 DOLAN PLACE AND GRANDVIEW PLACE
COMBINED SEWER RELIEF
$3,200,000 150
10012 FF-07 FEE FEE CREEK SANITARY RELIEF
(MEADOWSIDE DR TO WILLOW BROOK DR)
$1,985,000 151
11796 HARLEM BADEN RELIEF PHASE IV (HEBERT) -
HAMILTON TO DARVER TRUNK SEWER
$3,300,000 152
13231 HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX)
$9,000,000 153
11711 JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
$35,000,000 154
12329 LINDLEY DRIVE SANITARY RELIEF (I-170 TO
ASHMONT DR) (UR-07)
$3,100,000 155
12741 LOUISVILLE AVENUE AND OAKLAND AVENUE
COMBINED SEWER RELIEF
$2,100,000 156
24 February 2020
Page 2 of 2
WASTEWATER CONTINGENCY PROJECTS - FY22
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
$70,000,000 157
11507 MINNIE AVE. TO GREENHAVEN STORM SEWER
SEPARATION
$350,000 158
10715 NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
$123,000 159
10715 NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
$4,000,000 160
13375 PARK DRIVE SANITARY RELIEF (ENGELHOLM
AVENUE) PHASE II
$802,000 161
10756 SOUTH BROADWAY AT MERAMEC COMBINED
SEWER REPLACEMENT
$1,741,000 162
13472 SOUTH COUNTY RELIEF FORCE MAIN
REPLACEMENT (P-419 TO BECKER RD)
$1,841,000 163
12922 WATKINS CREEK PUMP STATION (P-101)
FORCEMAIN REPLACEMENT (COAL BANK RD
TO SPRING GARDEN DR)
$3,500,000 164
12491 WATKINS CREEK PUMP STATION (P-101)
REPLACEMENT
$3,500,000 165
TOTAL:$215,862,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BADEN CITYSHED MITIGATION BASINS (CALVARY,FREDERICK, PARTRIDGE AND TILLIE)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS, STRUCTURE AND STREET FLOODING.
CONSTRUCT 4 STORMWATER DETENTION BASINS, AND 3 RAINGARDENS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS $9,520,000.
SW
I
T
Z
E
R
BAD
E
N CHURCHNORFOLKSOUTHERN
BITTNERNEWBYGARTH
FRE
D
E
RIC
K
TILLIEROBINORIOLEPEG
G
Y
GILMOREPARTRIDGEETO
N
LYNHAVEN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13232
Wastewater
15
$3,520,000
St. Louis City
Bissell
Baden
Capital
140Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL POINT WWTF TRICKLING FILTER MEDIAREPLACEMENT
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
AGING TRICKLING FILTER MEDIA NEARING END OF USEFUL LIFE.
REPLACE TRICKLING FILTER MEDIA ON SIX FILTERS AT THE BISSELLPLANT.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS$22,500,000.
H
A
L
L
GRANDN
O
R
F
O
LK
SOUTHERN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12566
Wastewater
15
$8,500,000
St. Louis City
Bissell
Bissell
Capital
141Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK A PUMP STATION (P-750)IMPROVEMENTS
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXISTING PUMP STATION IS DETERIORATING AND REQUIRESIMPROVEMENT.
CONSTRUCT IMPROVEMENTS TO PUMP STATION P-750.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL BUDGET IS $10,000,000.
EDISON
CENTRAL MIDLAND
CRYSTALSPR IN G S
B R IG H T H URST
L
A
N
S
B
ROOKE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12248
Wastewater
15
$4,000,000
Chesterfield
Missouri
Caulks Creek
Capital
142Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK FORCEMAIN (RIVER VALLEY RDTO L-52)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXISTING FORCEMAIN IS UNDERSIZED AND OVER THIRTY YEARS OLD.
CONSTRUCT 17,000 FEET OF 30-INCH FORCEMAIN AND 1,000 FEET OF36-INCH SANITARY SEWER.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS$30,000,000.RIVER VALLEYCENTRAL MIDLANDCREV
E
COE
U
R
MILLHOG HOLLOWAMIOTW ATERW O R K S
GL E N COVEWATERWORKSPRIVATE
W HITERIDGECRE S TR ID G E T RAIL
HIGHVA LLEYWOODSMILLLAKERIVER B E N D
TOREADOR
H IG H L A NDPARKWESTER NMILLC O L IS E U M
PRIVATEPRIVATE
OLIVE BLVD
E MO364 HWY
WMO364 HWY
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11790
Wastewater
15
$15,000,000
Maryland Heights
Missouri
Missouri River Tributary Areas
Capital
143Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK FORCEMAIN IMPROVEMENTS(CAULKS PUMP STATION A TO HOG HOLLOW RD)
Construction
6660 - SanitaryReplacement Fund
FORCEMAIN CONVERSION TO REDUNDANT FORCEMAIN REQUIRESREHABILITATION DUE TO AGE AND CONDITION.
REHABILITATE OR REPLACE 30,000 FEET OF 20-INCH TO 24-INCHFORCEMAIN FROM PUMP STATION A TO THE 36-INCH FORCEMAIN.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 23. TOTAL CONSTRUCTION BUDGET IS$14,600,000.
§¨¦64§¨¦64
THF
C E N T R A L MI D L A N D LADUEEDISONW
E
S
T
APPALACHIANWILDHORSECREEK HOGHOLLOWPRIVATEW
IL
S
O
N GREENTRAILSSWINGLEY RIDGECHESTERFIELD
WATE R W O RKS
W
HITE PETZOLDRA I NYLAKENOO
N
I
NGTREE
LYDIAHILL
CON W A Y
W E S T E R N M I L L
PR IV A T E
PRIVA T E
P
R
I
V
A
T
E
PR IVATEOLIVEBLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13481
Wastewater
15
$9,000,000
Various
Missouri
Missouri River Tributary Areas
Capital
144Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO VOLUME REDUCTION GREENINFRASTRUCTURE
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS ASREQUIRED BY THE CONSENT DECREE.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCESTORMWATER VOLUMES ENTERING THE COMBINED SEWER SYSTEM INTHE MISSISSIPPI WATERSHED.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE CITYOF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL ANDNON-CAPITAL SERVICES.
§¨¦70
§¨¦270
§¨¦55
§¨¦64
§¨¦44
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11146
Wastewater
15
$5,000,000
Various
Bissell
Mississippi River Tributary Areas
Non-recurring
145Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO VOLUME REDUCTION GREENINFRASTRUCTURE - RIVER DES PERES
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS ASREQUIRED BY THE CONSENT DECREE.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCESTORMWATER VOLUMES ENTERING THE COMBINED SEWER SYSTEM INTHE RIVER DES PERES WATERSHED.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE CITYOF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL ANDNON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦70
§¨¦64
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13078
Wastewater
15
$3,000,000
Various
Lemay/RDP
River Des Peres
Non-recurring
146Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DC-02 & DC-03 SANITARY RELIEF (BRENTWOODBLVD TO CONWAY RD) PHASE III AND PHASE IV
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWERACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 16,200 FEET OF 8-INCH TO 54-INCH SANITARY SEWER, TOALLEVIATE SYSTEM SURCHARGING. ELIMINATE CONSTRUCTED SSOOUTFALLS BP-155, BP-170, BP-348, BP-349, BP-198, BP-545, AND BP-591.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$56,240,000.
§¨¦64
§¨¦64
CLAYTON
LAYOLD WARSON MCKNIGHTT R ENTWARSONPRICELITZSINGER
SOUTHFORTY BARNESDANIELCELLAKENTROANOVERHIL
LS
D E N N Y
GODW INCONWAYMAGNOLIASPRINGWOOD
ARTHUR
P IC A R DY
WIND IN GR I D G E
INDIAN
ELLSWORTHLOG CABINPAR KOVERBROOKHIGHDOWNANZEIGER
PRIV ATE
TWIN SPRINGS R
O
LLINGROCKMAYFAIRWARRIDGE
WILD ROSE
WATE RBURYLYLEWOOD
RAUS
C
H
E
R
DUNLEIT
HOAK BENDLIN D W O RTHDWYERLEAGRAMW OODACREEXMOORCAPITOL
D E E R C REEKPRIVATE
PRIVATE
P RIVA T E
LITZSINGER
S LINDBERGH BLVDS LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12472
Wastewater
15
$12,000,000
Ladue
Lemay/RDP
Deer Creek
Capital
147Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DC-02 & DC-03 SANITARY RELIEF (BRENTWOODBLVD TO CONWAY RD) PHASE III AND PHASE IV
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWERACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 16,200 FEET OF 8-INCH TO 54-INCH SANITARY SEWER, TOALLEVIATE SYSTEM SURCHARGING. ELIMINATE CONSTRUCTED SSOOUTFALLS BP-155, BP-170, BP-348, BP-349, BP-198, BP-545, AND BP-591.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$56,240,000.
§¨¦64
§¨¦64
CLAYTON
LAYOLD WARSON MCKNIGHTT R ENTWARSONPRICELITZSINGER
SOUTHFORTY BARNESDANIELCELLAKENTROANOVERHIL
LS
D E N N Y
GODW INCONWAYMAGNOLIASPRINGWOOD
ARTHUR
P IC A R DY
WIND IN GR I D G E
INDIAN
ELLSWORTHLOG CABINPAR KOVERBROOKHIGHDOWNANZEIGER
PRIV ATE
TWIN SPRINGS R
O
LLINGROCKMAYFAIRWARRIDGE
WILD ROSE
WATE RBURYLYLEWOOD
RAUS
C
H
E
R
DUNLEIT
HOAK BENDLIN D W O RTHDWYERLEAGRAMW OODACREEXMOORCAPITOL
D E E R C REEKPRIVATE
PRIVATE
P RIVA T E
LITZSINGER
S LINDBERGH BLVDS LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12472
Wastewater
11
$500,000
Ladue
Lemay/RDP
Deer Creek
Capital
148Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP) - PUMP STATION
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT A 21 MGD PUMP STATION FACILITY, FOR THE DEER CREEKTUNNEL PROJECT.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE YEARS. TOTAL CONSTRUCTION BUDGET IS$41,800,000.
§¨¦44
METROLINKBURLINGT
O
N
N
O
RT
HE
R
N
S
A
NT
A F
E
CARR LA
NE BURLINGTONNORTHERNSANTAFEBURLINGT
O
N
N
O
RT
HE
R
N
S
A
NT
A FE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12615
Wastewater
15
$11,800,000
Shrewsbury
Lemay/RDP
Deer Creek
Capital
149Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DOLAN PLACE AND GRANDVIEW PLACECOMBINED SEWER RELIEF
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED MAINS.
CONSTRUCT 675 FEET OF 12-INCH TO 21-INCH COMBINED SEWER, AND620 FEET OF REINFORCED CONCRETE BOX CULVERT 9 FOOT WIDE BYSIX FOOT HIGH.
§¨¦64
§¨¦64
WISE
WEST PARK CENTRALCLA
Y
T
O
N
KRAFTFORESTDOLAN
OAKLAND
BERTHOLD
RAMP I64 GRANDVIEWMcCAUSLANDFORESTWISE
BERTHOLD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12740
Wastewater
15
$3,200,000
St. Louis City
Lemay/RDP
Oakland
Capital
150Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FF-07 FEE FEE CREEK SANITARY RELIEF(MEADOWSIDE DR TO WILLOW BROOK DR)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 3,700 FEET OF 8-INCH TO 24-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-069.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS $5,985,000.WILLOWBROOKMEADOWSIDEQUEENSWAY
DUNSTONCRESTED VIEWPORT DIANEG ANDYTENNANTCRICKETT HILL
PRIVATEPINE ROWPORT ROYALMEDIAPOOL
PEBBLEBROOKRIS H O NHILLWILL ROGERS
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10012
Wastewater
15
$1,985,000
Unincorporated
Missouri
Fee Fee Creek
Capital
151Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM BADEN RELIEF PHASE IV (HEBERT) -HAMILTON TO DARVER TRUNK SEWER
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGEDCOMBINED SEWERS.
CONSTRUCT 2,050 FEET OF 12-INCH TO 102-INCH STORM ANDCOMBINED SEWERS, 900 FEET OF PIPE IN TUNNEL, AND 325 FEET OFSEWER LINING, IN THE CITY OF ST. LOUIS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS $9,300,000.KIENLENTERMINAL
S T L O UISDARVER
HAMILTONEDMUNDPRIVA
T
E CRESCENTGRE
E
R
IDAD
A
L
E
BAIL
E
Y
AUD
R
E
Y IRVINGJAMESAHARVEYSTO
R
E
Y
ST L
O
U
I
S
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11796
Wastewater
15
$3,300,000
Various
Bissell
Bissell
Capital
152Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM CITYSHED MITIGATION BASINS(ASHLAND AND ESSEX)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND STREET FLOODING.
CONSTRUCT 4 STORMWATER DETENTION BASINS, AND 4 RAINGARDENS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 23. TOTAL BUDGET IS $15,000,000.
§¨¦70
§¨¦70
UNIONLEE
PAG
E BELTRID
G
E SHREVEWEL
L
S EUCLIDLABA
D
I
E
MAFF
I
T
TNEWSTEADWAB
A
D
AGOODFELLOW
MINERVASEMPLEBURD ASHL
A
N
D
KOSS
U
T
H
CART
E
R
T E R M INAL
CORABRO
W
N RUSKINST L
O
U
I
S
TERR
Y
T
H
E
K
L
A
TAYLORBESS
I
E
CLARAAND
E
R
S
O
N
R
O
S
A
L
I
E
PALM
MAR
K
E
T LAMBDINLI
L
L
I
A
N
H
A
R
N
E
Y
PENR
O
S
E
GREE
R GERALDINELOTU
S
FARL
I
NDARBYALCOTT
COTT
A
G
E
LEDU
CNORWOOD TURNERBIRCHERKIENLENARLINGTON
NORT
H
L
A
N
D
FAIRMARCUSWHITTIERBARTMER
LEXI
N
G
T
O
N
ELW
A
R
D
HIGH
L
A
N
D
ELMB
A
N
K
HERBERT
CUPP
L
E
S
F
E
RRIS QUEENSHAM
M
E
T
T
THEODOSIA
CALVINHAMILTON
ACADEMYL
E
A
H
Y
AUBERTH
O
O
K
E
ALDI
N
E ROLLAKENN
E
R
L
Y
KORTE
DRYDENMARNICESAN
F
R
A
N
C
I
S
C
O
PR
I
V
A
T
E
PATT
O
N
VINE GROVENEW ASHLANDCORAFARL
I
N
HAMILTONGRE
E
R
MAFF
I
T
T
LOTUS
ASHL
A
N
D
LOTU
S
PENR
O
S
E
MAFF
I
T
T
CORATERR
Y EUCLIDARLINGTONT E R M IN A L
PALM
PALM
LOTU
S
BRO
W
N
PALM
NATURALBRIDGERD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13231
Wastewater
15
$9,000,000
Various
Bissell
Harlem
Capital
153Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENTCONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TODAMAGE IN HIGH RIVER CONDITIONS.
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL,ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS(P-305) PUMP STATIONS.
§¨¦255
§¨¦55
§¨¦255
§¨¦55
KOCHK
INSWOOD GREGGREAVIS
B
A
R
R
ACKSFOR
D
E
R CCCGRANTLIN
D TELFOR D
HOFFM
E
IS
T
E
R
ARLEE
S
HERMAN
MILDGENTRYFAIN
IONE
PRIVATEJOPLINCLIFFRINGER
SHE R ID A NPO
T
T
L
E
ORI
E
N
T
RIP
A
LUNAPOP
L
A
R
GARK
WILL LARKCLAGEROUTE R
VICTORY AVENUE HBOUNDARYHO
R
N
JEFFERSONIAN
PAU
L
E
HAL S EYFIRSTPECAN
A
S
HROCK
JAC
I
N
T
O
SOUTHSHIRE
ARRA
S
J
E
FFERSONBLUE RIDGEBANISTERALL
E
N
LI
S
I
E
U
X KASKEBUNKERBIRCHP
R
IVATETELEGRAPHR DLEMAYFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11711
Wastewater
15
$35,000,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
154Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LINDLEY DRIVE SANITARY RELIEF (I-170 TOASHMONT DR) (UR-07)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALLS BP-416, BP-417, BP-433, AND BP-476REQUIRE REMOVAL.
CONSTRUCT 5,770 FEET OF 8-INCH TO 21-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALLS BP-416, BP-417, BP-433, ANDBP-476. ELIMINATE WET WEATHER PUMP STATION P-790.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL BUDGET IS $7,100,000.
§¨¦170
§¨¦170
PRICEDIELMANOLD BONHO
M
M
E
ENGEL
LE PEREHILLTOPENFIELDBON AIREHIGHGATEALICE
ARBORBELL
SPOONELBRINGGE
OF
F
RYRYEDIELMAN IN
D
U
S
T
R
IALLA G U NAVILLA
LADUE HILLSWHITE ROSEPRICEWO O DSPRIVATEHARVESTMAGNETCOLLINGWOODDOLORESELKINGTONH IGH ACRES
WATSONIA
GLENMARYCORDELLLOCUST
ALDANBONHOMME W O O D S
BEAUWOODL L E WELLYNPUTTERPLANTERSBON P RICEINDIAN TRAILSFRIESELONGACRESENGELTONB I R N A W OODSWAYFIELDF A IR W INDSBERRY HILLWOODMOORBRISCOEJACKLYNNCIMARRON
BERKLEY PLACEHILLTOP MANOR
MARBROOKE
HARVEST
VILLA
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12329
Wastewater
15
$3,100,000
Olivette
Lemay/RDP
University City Branch
Capital
155Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOUISVILLE AVENUE AND OAKLAND AVENUECOMBINED SEWER RELIEF
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED MAINS.
CONSTRUCT 950 FEET OF 12-INCH TO 36-INCH RELIEF SEWER, AND 800FEET OF 96-INCH COMBINED SEWER FOR WET WEATHER STORAGE.
§¨¦64
§¨¦64
OAKLAND
BERTHOLD TAMMWELLS
CLAYTON ART HILLSANFORDCHILDRESSLOUISVILLEFAIRMOUNTTAMM§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12741
Wastewater
15
$2,100,000
St. Louis City
Lemay/RDP
Oakland
Capital
156Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC RIVER SYSTEMIMPROVEMENTS - BAUMGARTNER TO FENTONWWTF TUNNEL
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
THE FENTON WWTF IS AN INTERIM FACILITY AND IT'S ELIMINATION ISPART OF THE EAST WEST GATEWAY SECTION 208 REGIONAL WATERQUALITY MANAGEMENT PLAN.
CONSTRUCT 36,000 FEET OF 8-FOOT DIAMETER DEEP TUNNEL TOCONVEY WASTEWATER FROM THE FENTON WWTF TO THEBAUMGARTNER TUNNEL, TO ENABLE TREATMENT OF FLOWS AT THELOWER MERAMEC WWTF.
PROJECT ELIMINATES PUMP STATIONS P-446 and P-483. P-489 TO BEELIMINATED BY SEPARATE PROJECT # 10869. TOTAL CONSTRUCTIONBUDGET IS $212,000,000.
§¨¦55
§¨¦270
§¨¦55 KERTHMA
T
T
I
S
G R A V O ISWELLSKELLERMERAMEC BOTT O M AMBSKENNE
R
L
Y
T
H
EI
SSEA
S
T
CONCORD
AL
L
E
N ALSWELLSC H U E S SLERMENTZHILL
RI N G ERB A UERBU T L E R HILL
GREENTONS
USONHILLS
PO I N T E
CARIBEEHAWKINSGE
R
A
L
D
KE
M
P
F
HAGEMANNOLSENGREGORY
DIERSPR
I
VATE
MAIN
RI V ERCURVE VALMEYERTESCORDMAN G OWAT
SO
N
GATESBURY
DANTONAIREGRIFFINA C O RN LANGTREEVALLEYSIDEFUCHSFIJIBAHNFYREFERN BEACHED LOUCLAYRIDGESTARLITATLNTIC LARKINLITTLEROCKTIOGA
COYL
E
TOWNE S O UTHPRIVATEPRIVATE
AMBS
BAUER
PRIVATEP
R
I
V
A
T
E
T E S S ONFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11746
Wastewater
15
$70,000,000
Various
Meramec
Meramec Tributary Areas
Capital
157Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MINNIE AVE. TO GREENHAVEN STORM SEWERSEPARATION
Construction
6660 - SanitaryReplacement Fund
STREET AND YARD FLOODING, AND NEED TO SEPARATE STORM FLOWSFROM THE COMBINED SEWER SYSTEM.
CONSTRUCT 448 FEET OF 12-INCH TO 18-INCH STORM SEWER.JANETLENA
ROSL
Y
N
MINN
I
E
GREE
N
H
A
V
E
N
JENNINGS STATIONFAIRVIEWGAYLORDLAMONTHAR
N
E
YPAISLEY
HELENMAN
E
TTEBELDON
BRAMLAGELENA
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11507
Wastewater
15
$350,000
Jennings
Bissell
Baden
Capital
158Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NEW ENGLAND TOWN CLIFF CAVE PUMP STATION(P-323) IMPROVEMENTS
Construction
5120 - DistrictwideStormwater Fund
PUMP STATION IS AT THE END OF ITS LIFE CYCLE. DETERIORATEDSANITARY AND STORM SEWERS.
CONSTRUCT 3,500 FEET OF 8-INCH TO 12-INCH SANITARY SEWER, 575FEET OF 12-INCH TO 18-INCH STORM SEWER, 1,600 FEET OF 6-INCHFORCEMAIN, AND REPLACE SANITARY PUMP STATION P-323.
FUND 5120 FUNDING IS FOR STORMWATER PROJECT 10356 TO BECONSTRUCTED WITH THIS PROJECT. TOTAL CONSTRUCTION BUDGET IS$5,723,000.BUSSENCLIFF CAVECHATPORT BLUFFDOBER
HUNTSPORTGLENRICH
HEMPLINE
W IN C A N T ON
PIERPORTSTEELE RIDGEASHTON CIRCLEHALYARD
ROCK HARBORHEMPLINE §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10715
Wastewater
15
$123,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
159Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NEW ENGLAND TOWN CLIFF CAVE PUMP STATION(P-323) IMPROVEMENTS
Construction
6660 - SanitaryReplacement Fund
PUMP STATION IS AT THE END OF ITS LIFE CYCLE. DETERIORATEDSANITARY AND STORM SEWERS.
CONSTRUCT 3,500 FEET OF 8-INCH TO 12-INCH SANITARY SEWER, 575FEET OF 12-INCH TO 18-INCH STORM SEWER, 1,600 FEET OF 6-INCHFORCEMAIN, AND REPLACE SANITARY PUMP STATION P-323.
FUND 5120 FUNDING IS FOR STORMWATER PROJECT 10356 TO BECONSTRUCTED WITH THIS PROJECT. TOTAL CONSTRUCTION BUDGET IS$5,723,000.BUSSENCLIFF CAVECHATPORT BLUFFDOBER
HUNTSPORTGLENRICH
HEMPLINE
W IN C A N T ON
PIERPORTSTEELE RIDGEASHTON CIRCLEHALYARD
ROCK HARBORHEMPLINE §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10715
Wastewater
15
$4,000,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
160Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PARK DRIVE SANITARY RELIEF (ENGELHOLMAVENUE) PHASE II
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALL SSO BP-451 REQUIRES REMOVAL.
CONSTRUCT 2,300 FEET OF 10-INCH TO 18-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-451.
BP-621 REMOVED WITH PROJECT 12163.SALERNOFERGUSONPAR
K
P
R
IV
A
T
E
LEADALE
PENNSYLVANIACURTIS
MARKET
DONCASTERSALERNOST
C
H
A
R
L
E
S
R
O
C
K
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13375
Wastewater
15
$802,000
Various
Lemay/RDP
University City Branch
Capital
161Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SOUTH BROADWAY AT MERAMEC COMBINEDSEWER REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
EXISTING 15-INCH COMBINED SEWER IS DETERIORATED WITHNUMEROUS GRADE CHANGES. LINE HOLDS DEBRIS AND BLOCKSEASILY CAUSING STREET FLOODING.
CONSTRUCT 1,700 FEET OF 12-INCH TO 30-INCH COMBINED SEWER.
§¨¦55 §¨¦55OHIOIOWAGASCONADE
MERAMECCALIFORNIA MONTANA
UNION PACIFICJUDITHCHARITON PIEDMONTGASCONADE
IOWAIOWAGASCONADE
UNIONPACIFIC§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10756
Wastewater
15
$1,741,000
St. Louis City
Bissell
Dakota
Capital
162Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SOUTH COUNTY RELIEF FORCE MAINREPLACEMENT (P-419 TO BECKER RD)
Construction
6660 - SanitaryReplacement Fund
FORCE MAIN BREAKS AND FAILURES.
CONSTRUCT 4,215 FEET OF 12-INCH REPLACEMENT FORCE MAIN.UNION PACIFICJOHNCHRIST
O
P
H
E
R
BECKERFI
NES
TOWN
HILLY HAV EN
E L K P E A K
PINEYPOINTERIVERW ALK§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13472
Wastewater
15
$1,841,000
Unincorporated
Meramec
Mississippi River Tributary Areas
Capital
163Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WATKINS CREEK PUMP STATION (P-101)FORCEMAIN REPLACEMENT (COAL BANK RD TOSPRING GARDEN DR)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXISTING FORCEMAIN HAS EXTENSIVE DAMAGE CAUSED BYHYDROGEN SULFIDE AND AIR POCKETS.
CONSTRUCT 10,100 FEET OF 20-INCH FORCEMAIN.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS $7,500,000.REPLACES CAPACITY PROJECT 12254.
§¨¦270
§¨¦270DUNN
COAL BANK
PRIVATEUPHILLMILDREDDUNDEE
LOOKAWAYRODERICK GLEN GARRYSPRINGGARDENMONT
E
I
T
H
M CALPINE
BRIGADOON
P R I V ATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12922
Wastewater
15
$3,500,000
St. Louis City
Bissell
Watkins Creek
Capital
164Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WATKINS CREEK PUMP STATION (P-101)REPLACEMENT
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
AGING MECHANICAL AND ELECTRICAL SYSTEMS, SECONDARYCONTAINMENT IS NEEDED FOR ON-SITE CHEMICALS, AND CURRENTLOCATION IS SUBJECT TO FREQUENT FLOODING.
CONSTRUCT NEW SUBMERSIBLE PUMP STATION AT AN ALTERNATELOCATION OUTSIDE OF THE FLOODPLAIN.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS $8,500,000.REPLACES CAPACITY PROJECT 12254.
COAL BANK
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12491
Wastewater
15
$3,500,000
Unincorporated
Bissell
Watkins Creek
Capital
165Page
2022
24 February 2020
Page 1 of 9
WASTEWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $635,000
12000 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2020)
Various $2,500,000
12907 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2020)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $8,000,000
13078 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
Various $3,000,000
12759 Vendor
Services
FLOW METERING AND MONITORING (2017) Various $2,500,000
13044 GSA - (Design)
Operating
Funds
GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2019)
Various $200,000
13087 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT A
Various $75,000
13088 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT B
Various $75,000
13089 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT C
Various $75,000
13090 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT D
Various $75,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $200,000
12006 Vendor
Services
RADAR RAINFALL DATA (2020)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $575,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$600,000
12004 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2020)
Various $300,000
13436 Pre-Design
Services
WET WEATHER OPTIMIZATION STUDY Various $1,500,000
FUND TOTAL: $22,160,000
5110 - STORMWATER REGULATORY FUND
24 February 2020
Page 2 of 9
WASTEWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13296 Construction MARKET ST 2350 GREEN INFRASTRUCTURE
- ENTRANCE AND LANDSCAPING
IMPROVEMENTS
St. Louis City $1,400,000
FUND TOTAL: $1,400,000
5120 - DISTRICTWIDE STORMWATER FUND
12753 Construction CAREY CT 1664 SANITARY AND STORM
SEWER REPLACEMENT
Hazelwood $40,000
12239 Construction TULANE-WILBUR OUTFALL SANITARY
RELIEF SEWER (WEBER RD TO HILDESHEIM
AVE)
Unincorporated $248,000
FUND TOTAL: $288,000
6660 - SANITARY REPLACEMENT FUND
12077 Design Services AMBLEWOOD SANITARY RELIEF
(WATERFORD DR TO BIRCHBARK DR)
Florissant $307,000
12085 Design Services BANFF SANITARY RELIEF (CAITHNESS RD
TO LANARK RD)
Unincorporated $57,000
12088 Design Services BAXTER - MERAMEC BOTTOMS - VALLEY
PARK PRIVATE I/I REDUCTION
Ballwin $147,000
12565 Design Services BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $3,000,000
12508 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2021)
CONTRACT A
Various $5,350,000
12509 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2021)
CONTRACT B
Various $2,330,000
12584 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2022)
CONTRACT A
Various $100,000
13031 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2022)
CONTRACT B
Various $44,000
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $1,000,000
12548 Design Services BISSELL POINT WWTF FINE SCREEN,
CONCRETE AND GATE IMPROVEMENTS
St. Louis City $2,000,000
12494 Construction
(Supplemental
Appropriation)
BISSELL POINT WWTF MAIN SUBSTATION
SWITCHGEAR AND MCC REPLACEMENT
St. Louis City $4,400,000
24 February 2020
Page 3 of 9
WASTEWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12566 Engineering
During
Construction
Services
BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
St. Louis City $100,000
12566 Construction BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
St. Louis City $14,000,000
12753 Construction CAREY CT 1664 SANITARY AND STORM
SEWER REPLACEMENT
Hazelwood $1,160,000
12248 Construction CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
Chesterfield $6,000,000
11790 Construction CAULKS CREEK FORCEMAIN (RIVER
VALLEY RD TO L-52)
Maryland Heights $15,000,000
11790 Engineering
During
Construction
Services
CAULKS CREEK FORCEMAIN (RIVER
VALLEY RD TO L-52)
Maryland Heights $800,000
12114 Design Services CAULKS CREEK PUMP STATION B (P-751)
RELOCATION
Chesterfield $500,000
12693 Professional
Services
CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT A)
St. Louis City $989,000
12552 Design Services COLDWATER CREEK WWTF REPAIRS AND
IMPROVEMENTS (2022)
Unincorporated $951,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $3,000,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $6,700,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $6,200,000
13404 Construction CSO - MARY AVENUE SOUTH OF
MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION PHASE I
Brentwood $3,500,000
12140 Design Services CSO - MARY AVENUE SOUTH OF
MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION PHASE
II
Brentwood $150,000
12142 Construction DACEY BRANCH SANITARY RELIEF (BELLA
CLARE DR TO PRIOR DR)
Unincorporated $605,000
12472 Construction
(Supplemental
Appropriation)
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
Ladue $22,000,000
11731 Construction
(Supplemental
Appropriation)
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP)
Various $15,000,000
24 February 2020
Page 4 of 9
WASTEWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12615 Engineering
During
Construction
Services
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP) - PUMP STATION
Shrewsbury $1,000,000
12615 Construction
(Supplemental
Appropriation)
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP) - PUMP STATION
Shrewsbury $15,000,000
13480 Construction DEER CREEK TRUNK SEWER RELOCATION
(BRECKENRIDGE INDUSTRIAL CT TO MARY
AVE)
Brentwood $3,000,000
12152 Construction E. WATSON SANITARY RELIEF (RUDSON LN
TO RICHVIEW DR)
Various $2,820,000
12153 Construction EARTH CITY EXPRESSWAY PUMP STATION
(P-708) REPLACEMENT
Unincorporated $2,600,000
12153 Engineering
During
Construction
Services
EARTH CITY EXPRESSWAY PUMP STATION
(P-708) REPLACEMENT
Unincorporated $75,000
12818 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2021)
Various $2,000,000
12159 Design Services EDMUNDSON SANITARY RELIEF (EDMUND
AVE TO BATAAN DR)
Woodson Terrace $399,000
11737 Design Services ELTORA WET WEATHER STORAGE
FACILITY
Pagedale $800,000
10012 Construction FF-07 FEE FEE CREEK SANITARY RELIEF
(MEADOWSIDE DR TO WILLOW BROOK DR)
Unincorporated $4,000,000
12178 Design Services FLORISSANT/DUNN SANITARY RELIEF (ST.
ANTHONY LN TO I-270)
Florissant $730,000
12185 Design Services FRIEDENS (PARTIAL) I/I REDUCTION (CHAIN
OF ROCKS DR AND FONTAINE PL)
Bellefontaine
Neighbors
$388,000
11137 Pre-Design
Services
GASLIGHT SQUARE SEWER
IMPROVEMENTS
St. Louis City $750,000
12157 Design Services GC-06 GRAVOIS CREEK TO BRIARSTONE
AND GATES SANITARY RELIEF PHASE II
Various $520,000
12386 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2019)
Various $3,000,000
12397 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2020)
CONTRACT A
Various $550,000
13059 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2020)
CONTRACT B
Various $200,000
12391 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT A
Various $85,000
24 February 2020
Page 5 of 9
WASTEWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12392 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT B
Various $85,000
12393 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT C
Various $85,000
12400 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2021) CONTRACT A
Various $200,000
12413 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT A
Various $50,000
12416 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT B
Various $50,000
12417 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT C
Various $50,000
12418 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT D
Various $50,000
12419 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT E
Various $50,000
12175 Construction GEYER SANITARY RELIEF AND WINDSOR
SPRINGS P-521 STORAGE (BIG BEND BLVD
TO WINDSOR SPRINGS DR)
Various $4,400,000
12264 Design Services GLENFIELD SANITARY RELIEF (WATSON
WOODS CT TO S LINDBERGH BLVD)
Sunset Hills $374,000
12815 Design Services GRAVIOS CREEK SANITARY TRUNK
RELOCATION AND STREAM STABILIZATION
(AFFTON ATHLETIC COMPLEX TO GREEN
PK IND DR)
Unincorporated $449,000
10496 Construction
(Supplemental
Appropriation)
GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY REHABILITATION (FANNIE AVE
TO PARDEE LANE)
Various $6,800,000
12334 Design Services HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
Various $50,000
13405 Construction HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE IA
Brentwood $5,400,000
11769 Construction
(Supplemental
Appropriation)
HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (GOODFELLOW TO HAMILTON)
St. Louis City $600,000
11796 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - HAMILTON TO DARVER TRUNK
SEWER
Various $6,000,000
11800 Construction
(Supplemental
Appropriation)
HARLEM BADEN RELIEF PHASE IV
(HEBERT) - TRUNK SEWER
REHABILITATION
Various $880,000
12695 Professional
Services
HARLEM BADEN RELIEF SYSTEM
IMPROVEMENT DESIGN (CONTRACT A)
St. Louis City $500,000
13432 Design Services HATHAWAY DRIVE SANITARY RELIEF Jennings $215,000
12308 Design Services HORTON PUMP STATION (P-814)
ELIMINATION
Town And Country $172,000
24 February 2020
Page 6 of 9
WASTEWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12312 Design Services HUNTLEIGH TRAILS LN SANITARY RELIEF
(TWO MILE CREEK TRUNK SEWER TO N
GEYER RD)
Huntleigh $405,000
12995 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2021)
Various $3,000,000
13014 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2021) CONTRACT A
Various $2,500,000
13015 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2021) CONTRACT B
Various $2,500,000
12987 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2021)
Various $7,000,000
11711 Engineering
During
Construction
Services
JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $500,000
11711 Construction
(Supplemental
Appropriation)
JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $55,000,000
12325 Construction LANG ROYCE SANITARY RELIEF (FARGO
DR TO FLORIDALE CT)
Dellwood $1,050,000
13336 Construction LANGLEY AND PHILO SANITARY STORAGE Unincorporated $2,221,000
11817 Design Services LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $250,000
12059 Construction LEMAY PUBLIC I/I REDUCTION (2021)
CONTRACT A
Various $7,938,000
12590 Design Services LEMAY PUBLIC I/I REDUCTION AND
REHABILITATION (2022) CONTRACT A
Various $110,000
13303 Construction LEMAY WWTF AERATION BASIN GATES Unincorporated $1,000,000
13153 Design Services LEMAY WWTF REPAIRS AND
IMPROVEMENTS (2023)
Unincorporated $900,000
12329 Construction LINDLEY DRIVE SANITARY RELIEF (I-170 TO
ASHMONT DR) (UR-07)
Olivette $4,000,000
12330 Design Services LINDSAY - ST. ALBERT PRIVATE I/I
REDUCTION
Florissant $227,000
11820 Miscellaneous
Services
LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $200,000
12489 Engineering
During
Construction
Services
LOUISA AND ARSENAL PUMP STATIONS (P-
112 AND P-113) UPGRADES
St. Louis City $300,000
12489 Construction LOUISA AND ARSENAL PUMP STATIONS (P-
112 AND P-113) UPGRADES
St. Louis City $3,300,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
24 February 2020
Page 7 of 9
WASTEWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11746 Construction LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $25,000,000
11746 Engineering
During
Construction
Services
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $750,000
13164 Construction LOWER MERAMEC TUNNEL I/I SOURCE
REDUCTION
Unincorporated $2,635,000
12255 Design Services LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $2,500,000
13082 Construction LOWER MERAMEC WWTF FITTING
REPLACEMENT
Unincorporated $2,203,000
11656 Design Services MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR
TO CHURCH DR)
St. Louis City $150,000
12762 Construction MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (RAIN GARDEN)
St. Louis City $200,000
12352 Construction MIDLAND SANITARY RELIEF (MIDLAND
BLVD TO SIMS AVE)
Overland $1,460,000
12483 Design Services MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $200,000
12484 Construction,
Design-Build
(Supplemental
Appropriation)
MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION PHASE II
St. Louis City $5,000,000
13223 Construction MISSOURI RIVER WWTF TUNNEL SERVICE
WATER PIPING REPLACEMENT
Maryland Heights $400,000
10715 Design Services NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
Unincorporated $250,000
10716 Construction NEW ENGLAND TOWN QUARRY PUMP
STATION (P-307) (SKME-544)
IMPROVEMENTS
Unincorporated $3,500,000
12357 Design Services NEWPORT LANDING PUMP STATION (P-480)
ELIMINATION
Unincorporated $214,000
12433 Design Services NORTH FEE FEE CREEK PUBLIC I/I
REDUCTION
Various $61,000
13386 Construction NORTH POINTE DETENTION BASIN OPTI
RETROFIT
St. Louis City $350,000
12699 Professional
Services
PUMP STATION REPAIR AND
IMPROVEMENT DESIGN (CONTRACT C)
Various $810,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $300,000
12188 Construction RIVERPORT 6 PUMP STATION (P-781)
REHABILITATION
Maryland Heights $1,000,000
24 February 2020
Page 8 of 9
WASTEWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12840 Construction
(Supplemental
Appropriation)
RIVERSIDE AND YARNELL SANITARY
RELIEF REPLACEMENT
Fenton $4,400,000
12195 Design Services S BRENTWOOD BLVD SANITARY RELIEF
(DAYTONA DR TO WALINCA TERRACE)
Clayton $737,000
13467 Pre-Design
Services
SCADA SYSTEM UPGRADE Various $500,000
12628 Design Services SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-
809 TO P-750)
Chesterfield $1,517,000
12207 Construction SPIRIT OF ST. LOUIS 2 PUMP STATION (P-
736) REPLACEMENT
Chesterfield $1,300,000
12208 Construction SPRING AVE SANITARY RELIEF (YEATMAN
AVE TO DALE AVE)
Webster Groves $1,100,000
12231 Design Services TM-01 TWO MILE CREEK OUTFALL
SANITARY RELIEF
Various $1,530,000
12239 Construction TULANE-WILBUR OUTFALL SANITARY
RELIEF SEWER (WEBER RD TO HILDESHEIM
AVE)
Unincorporated $2,484,000
13344 Construction UNIVERSITY CITY I/I REDUCTION - EAST
(UR-08 AND UR-09) PHASE II
Various $2,000,000
12241 Design Services UPPER BADEN SANITARY RELIEF
(JENNINGS STATION RD TO OAKRIDGE
BLVD)
Northwoods $483,000
12249 Design Services UPPER MATTESE TRUNK SANITARY RELIEF
(THEISS RD TO LIBERTY TRAIL RD)
St. Louis County $1,460,000
12507 Construction VALLEY PUBLIC I/I REDUCTION
(CLARKSON RD AND KEHRS MILL RD)
Clarkson Valley $2,880,000
12922 Construction WATKINS CREEK PUMP STATION (P-101)
FORCEMAIN REPLACEMENT (COAL BANK
RD TO SPRING GARDEN DR)
St. Louis City $4,000,000
12491 Construction WATKINS CREEK PUMP STATION (P-101)
REPLACEMENT
Unincorporated $5,000,000
11678 Construction,
Phase III
WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION
PHASE IV
Webster Groves $1,300,000
11679 Construction WEST LOCKWOOD SANITARY RELIEF Webster Groves $2,389,000
11212 Construction WHITE AND ROSALIE I/I REDUCTION AND
BRIDGEPORT SEWER SEPARATION
Brentwood $4,000,000
12583 Construction WHITE BIRCH PUMP STATION (P-725)
ELIMINATION
Hazelwood $1,200,000
12280 Design Services WHITE PLAINS SANITARY RELIEF
(SALTBOX DR TO CEDAR CREEK RD)
Chesterfield $400,000
12296 Construction WOODS MILL SANITARY RELIEF (I-64 TO
BROOK MILL LN)
Town And Country $1,375,000
FUND TOTAL: $359,476,000
GRAND TOTAL:$383,324,000
24 February 2020
Page 1 of 8
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $620,000
12000 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2020)
Various $2,500,000
12907 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2020)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
13078 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
Various $3,000,000
12801 Vendor
Services
FLOW METERING AND MONITORING (2022) Various $2,500,000
13096 GSA - (Design)
Operating
Funds
GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2022)
Various $200,000
13087 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT A
Various $75,000
13088 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT B
Various $75,000
13089 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT C
Various $75,000
13090 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT D
Various $75,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $400,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $395,000
12006 Vendor
Services
RADAR RAINFALL DATA (2020)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $800,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$605,000
12004 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2020)
Various $300,000
13436 Pre-Design
Services
WET WEATHER OPTIMIZATION STUDY Various $1,500,000
FUND TOTAL: $19,970,000
24 February 2020
Page 2 of 8
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5120 - DISTRICTWIDE STORMWATER FUND
12110 Construction CANTERBURY AND ROLAND SANITARY
RELIEF (NELSON DR TO ROLAND BLVD)
Northwoods $360,000
10715 Construction NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
Unincorporated $123,000
FUND TOTAL: $483,000
6660 - SANITARY REPLACEMENT FUND
12079 Design Services ARV ELLEN SANITARY RELIEF (TESSON
CREEK ESTATES DR TO MADAFORD LN)
Unincorporated $95,000
13232 Construction
(Supplemental
Appropriation)
BADEN CITYSHED MITIGATION BASINS
(CALVARY, FREDERICK, PARTRIDGE AND
TILLIE)
St. Louis City $3,520,000
12565 Design Services BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $2,050,000
12584 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2022)
CONTRACT A
Various $3,380,000
13031 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2022)
CONTRACT B
Various $2,141,000
12585 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT A
Various $55,000
13032 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT B
Various $84,000
13033 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT C
Various $130,000
12586 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT D
Various $102,000
12587 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT E
Various $60,000
13124 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT F
Various $110,000
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
12548 Construction BISSELL POINT WWTF FINE SCREEN,
CONCRETE AND GATE IMPROVEMENTS
St. Louis City $7,000,000
24 February 2020
Page 3 of 8
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12566 Construction
(Supplemental
Appropriation)
BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
St. Louis City $8,500,000
12107 Design Services BUCKLEY SANITARY RELIEF (DACE LN TO
POPLAR DR)
Unincorporated $143,000
12108 Design Services BURNING TREE INFRASTRUCTURE REPAIR
(N. WATERFORD DR TO FOX RUN DR)
Florissant $103,000
12110 Construction CANTERBURY AND ROLAND SANITARY
RELIEF (NELSON DR TO ROLAND BLVD)
Northwoods $1,370,000
12248 Construction
(Supplemental
Appropriation)
CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
Chesterfield $4,000,000
11790 Construction
(Supplemental
Appropriation)
CAULKS CREEK FORCEMAIN (RIVER
VALLEY RD TO L-52)
Maryland Heights $15,000,000
13481 Construction CAULKS CREEK FORCEMAIN
IMPROVEMENTS (CAULKS PUMP STATION A
TO HOG HOLLOW RD)
Various $9,000,000
12122 Design Services CLARK AVE SANITARY RELIEF (LACLEDE
STA RD TO YEATMAN AVE)
Webster Groves $117,000
12552 Construction COLDWATER CREEK WWTF REPAIRS AND
IMPROVEMENTS (2022)
Unincorporated $4,754,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $3,000,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $6,000,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $5,100,000
12130 Design Services CONWAY ROAD SANITARY RELIEF
(CONWAY LN TO DWYER AVE)
Ladue $352,000
12132 Design Services CONWOOD LN SANITARY RELIEF (CONWAY
RD TO WESTWOOD CT)
Westwood $30,000
12134 Design Services COWMIRE CREEK SANITARY
REPLACEMENT I-70 CROSSING (ST.
CHARLES ROCK RD TO MARK TWAIN LN)
Bridgeton $115,000
12141 Design Services CSO - SHREWSBURY AVE CSO
INTERCEPTOR (I-293)/OUTFALL (L-166)
SEWER SEPARATION
Shrewsbury $370,000
12143 Design Services DANIEL BOONE I/I REDUCTION
(SHACKELFORD RD AND MULLANPHY LN)
Florissant $100,000
12472 Construction
(Supplemental
Appropriation)
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
Ladue $12,000,000
24 February 2020
Page 4 of 8
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12472 Engineering
During
Construction
Services
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
Ladue $500,000
12145 Design Services DC-04 DEER CREEK SANITARY RELIEF
PHASE III (LAKESHORE DR TO NEW BALLAS
RD)
Creve Coeur $182,000
12615 Construction
(Supplemental
Appropriation)
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP) - PUMP STATION
Shrewsbury $11,800,000
11833 Design Services DELCREST SANITARY RELIEF Various $432,000
12740 Construction DOLAN PLACE AND GRANDVIEW PLACE
COMBINED SEWER RELIEF
St. Louis City $3,200,000
12819 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2022)
Various $2,000,000
11888 Construction FABICK PUMP STATION (P-444)
IMPROVEMENTS (SKME-404E)
Fenton $750,000
12167 Design Services FENTON CREEK EAST I/I REDUCTION (OLD
TOWN FENTON)
Fenton $68,000
12166 Construction FENTON CREEK PUMP STATION (P-425)
IMPROVEMENTS
Unincorporated $722,000
12170 Design Services FENTON WASTEWATER TREATMENT
FACILITY ELIMINATION
Fenton $2,324,000
10012 Construction
(Supplemental
Appropriation)
FF-07 FEE FEE CREEK SANITARY RELIEF
(MEADOWSIDE DR TO WILLOW BROOK DR)
Unincorporated $1,985,000
12171 Construction FF-15 AND FF-16 SANITARY RELIEF PHASE II
REHABILITATION
Maryland Heights $500,000
13046 Design Services FILLMORE PUMP STATION (P-308)
REHABILITATION
St. Louis City $500,000
12173 Construction FISHPOT TRUNK WEST AND ED LOU LANE
I/I REDUCTION (SMITH DR AND VLASIS DR)
Ballwin $230,000
12387 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2022)
Various $3,500,000
13098 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2022)
CONTRACT A
Various $450,000
13099 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2022)
CONTRACT B
Various $450,000
13102 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT A
Various $85,000
13103 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT B
Various $85,000
24 February 2020
Page 5 of 8
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13104 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT C
Various $85,000
12400 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2021) CONTRACT A
Various $200,000
13108 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT A
Various $50,000
13109 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT B
Various $50,000
13110 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT C
Various $50,000
13111 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT D
Various $50,000
13112 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT E
Various $50,000
12272 Construction GRAND GLAIZE TRUNK SANITARY RELIEF
(BALLWIN GOLF CLUB TO CLAYMONT
COVE CT)
Ballwin $1,100,000
11797 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - DARVER TO 69TH STREET
TRUNK SEWER
Various $4,000,000
11796 Construction
(Supplemental
Appropriation)
HARLEM BADEN RELIEF PHASE IV
(HEBERT) - HAMILTON TO DARVER TRUNK
SEWER
Various $3,300,000
13231 Construction HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX)
Various $9,000,000
13337 Design Services HARMONY-ACORN SEWER SEPARATION
AND I/I REDUCTION PHASE II
Unincorporated $250,000
12299 Design Services HAWTHORNE ESTATES SANITARY RELIEF
(RANCH LN TO CLAYTON HILLS LN)
Town And Country $87,000
12996 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2022)
Various $3,000,000
13016 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2022) CONTRACT A
Various $2,500,000
13017 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2022) CONTRACT B
Various $2,500,000
13342 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2022) CONTRACT C
Various $500,000
12988 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2022)
Various $7,000,000
11711 Construction
(Supplemental
Appropriation)
JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $35,000,000
11711 Engineering
During
Construction
Services
JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $400,000
24 February 2020
Page 6 of 8
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13227 Design Services L51 PUMP STATION FORCEMAIN
IMPROVEMENTS
Various $900,000
11817 Engineering
During
Construction
Services
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $440,000
12590 Construction LEMAY PUBLIC I/I REDUCTION AND
REHABILITATION (2022) CONTRACT A
Various $2,932,000
11943 Design Services LINDBERGH SANITARY RELIEF
(MEADOWSIDE DR TO N LINDBERGH BLVD)
Unincorporated $241,000
12329 Construction
(Supplemental
Appropriation)
LINDLEY DRIVE SANITARY RELIEF (I-170 TO
ASHMONT DR) (UR-07)
Olivette $3,100,000
12332 Design Services LITTLETON CT. SANITARY RELIEF (OLD
SMIZER MILL RD AND 141 TO LA PALMA
DR)
Fenton $193,000
12741 Construction LOUISVILLE AVENUE AND OAKLAND
AVENUE COMBINED SEWER RELIEF
St. Louis City $2,100,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
11746 Engineering
During
Construction
Services
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $1,000,000
11746 Construction
(Supplemental
Appropriation)
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $70,000,000
13409 Construction LOWER MERAMEC WWTF -
ADMINISTRATION BUILDING FACILITY
IMPROVEMENTS
Unincorporated $1,500,000
13408 Construction LOWER MERAMEC WWTF - INFLUENT PUMP
STATION IMPROVEMENTS
Unincorporated $6,500,000
13407 Construction LOWER MERAMEC WWTF - SOLIDS
HANDLING EQUIPMENT REPLACEMENT
Unincorporated $4,200,000
12499 Construction,
Phase II
LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS
Unincorporated $1,500,000
12255 Engineering
During
Construction
Services
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $1,500,000
12255 Construction
Management
Services During
Construction
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $1,800,000
12255 Construction LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $30,000,000
12337 Design Services MAIN SANITARY RELIEF (VANCE RD TO
INEZ AVE)
Valley Park $208,000
24 February 2020
Page 7 of 8
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12344 Design Services MARTIGNEY SANITARY RELIEF (KOCH RD
TO WOOD HILL DR)
Unincorporated $1,550,000
10024 Construction MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
Various $6,000,000
12346 Design Services MCCUTCHEON RD AND THORNDELL
SANITARY RELIEF
Richmond Heights $49,000
11507 Construction MINNIE AVE. TO GREENHAVEN STORM
SEWER SEPARATION
Jennings $350,000
12483 Design Services MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $1,000,000
13222 Construction MISSOURI RIVER WWTF DIGESTER GAS
STORAGE COVER REPLACEMENT
Maryland Heights $1,100,000
12355 Design Services MULBERRY CREEK SANITARY RELIEF
(HARWICH DR TO S LINDBERGH BLVD)
Crestwood $326,000
10715 Construction NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
Unincorporated $4,000,000
12360 Design Services NORMANDIE SANITARY RELIEF (PAGE AVE
TO SAINT CHARLES ROCK ROAD)
Unincorporated $735,000
12433 Construction NORTH FEE FEE CREEK PUBLIC I/I
REDUCTION
Various $4,750,000
12364 Construction OAKWOOD FARMS PUMP STATION (P-470)
ELIMINATION
Ballwin $400,000
13375 Construction PARK DRIVE SANITARY RELIEF
(ENGELHOLM AVENUE) PHASE II
Various $802,000
13467 Design Services SCADA SYSTEM UPGRADE Various $1,000,000
10161 Construction SCHUETZ ROAD SANITARY RELIEF (FOREST
BROOK LN TO SUNNY WOOD CT)
Creve Coeur $780,000
12201 Construction SHREWSBURY SANITARY RELIEF SEWER
AND I/I REDUCTION (WEIL AVE AND I-44)
Various $1,312,000
12202 Design Services SMITH CREEK LADUE ROAD SANITARY
RELIEF (ROYAL MANOR DR TO HEWLETT
CT)
Creve Coeur $360,000
10756 Construction SOUTH BROADWAY AT MERAMEC
COMBINED SEWER REPLACEMENT
St. Louis City $1,741,000
13472 Construction SOUTH COUNTY RELIEF FORCE MAIN
REPLACEMENT (P-419 TO BECKER RD)
Unincorporated $1,841,000
12213 Construction ST. JACQUES SANITARY RELIEF (ST.
JACQUES ST TO N LAFAYETTE ST)
Florissant $564,000
12214 Design Services ST. JOACHIM'S SANITARY RELIEF (ST.
GENEVIEVE LN TO LYNROS DR)
St. Ann $295,000
12216 Design Services ST. JOACHIM'S SANITARY RELIEF (ST.
GENEVIEVE LN TO MARMARY DR)
St. Ann $261,000
12217 Design Services ST. MATTHIAS SANITARY RELIEF (ST.
SHAWN LN TO STONEHARD DR)
St. Ann $211,000
12221 Construction SUB-TRUNK #2 SANITARY RELIEF
(BIRMINGHAM CT TO COVE LN)
Unincorporated $2,515,000
11669 Construction SUB-TRUNK #3 SANITARY RELIEF (MURIEL
DR TO JENNER LN)
Unincorporated $1,905,000
24 February 2020
Page 8 of 8
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12233 Design Services TM-04 TWO MILE SANITARY RELIEF PHASE
II (LOCKETT RD TO MEIER RD)
Des Peres $51,000
12242 Design Services UPPER FISHPOT EAST SANITARY RELIEF
(FIELD AVE TO WOLFF LN)
Ellisville $303,000
12245 Design Services UPPER LAWNVIEW CREEK SANITARY
RELIEF (RHAPSODY LN TO MILLVALLEY
DR)
Unincorporated $418,000
12922 Construction
(Supplemental
Appropriation)
WATKINS CREEK PUMP STATION (P-101)
FORCEMAIN REPLACEMENT (COAL BANK
RD TO SPRING GARDEN DR)
St. Louis City $3,500,000
12491 Construction
(Supplemental
Appropriation)
WATKINS CREEK PUMP STATION (P-101)
REPLACEMENT
Unincorporated $3,500,000
12271 Design Services WATKINS-SPANISH SANITARY RELIEF
(MALAGA ST TO TRAMPE AVE)
Unincorporated $290,000
12277 Design Services WEIDMAN I/I REDUCTION (HWY 141 AND
DUTCH MILL DR)
Unincorporated $59,000
12284 Design Services WILSON AVE SANITARY RELIEF (HARRISON
AVE TO CLEVELAND AVE)
Kirkwood $68,000
12287 Design Services WILSON SANITARY RELIEF (WILD HORSE
CREEK RD TO CLARKSON RD)
Chesterfield $751,000
12300 Design Services WOODSON SANITARY RELIEF (FLORA AVE
TO LACKLAND RD)
Overland $420,000
FUND TOTAL: $359,957,000
GRAND TOTAL:$380,410,000
24 February 2020
Page 1 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
12804 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2023)
Various $3,000,000
12908 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
(2023)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
13078 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
Various $3,000,000
12801 Vendor
Services
FLOW METERING AND MONITORING (2022) Various $2,500,000
13096 GSA - (Design)
Operating
Funds
GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2022)
Various $200,000
13087 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT A
Various $75,000
13088 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT B
Various $75,000
13089 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT C
Various $75,000
13090 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT D
Various $75,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $410,000
12006 Vendor
Services
RADAR RAINFALL DATA (2020)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$605,000
12806 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2023)
Various $350,000
13436 Pre-Design
Services
WET WEATHER OPTIMIZATION STUDY Various $1,500,000
FUND TOTAL: $20,615,000
24 February 2020
Page 2 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5590 - MO RIVER BONFIL SUBD #448 OMCI FUND
12353 Design Services MISSOURI RIVER BONFILS SANITARY
SEWER REHABILITATION PHASE III
Hazelwood $45,000
FUND TOTAL: $45,000
6660 - SANITARY REPLACEMENT FUND
12077 Construction AMBLEWOOD SANITARY RELIEF
(WATERFORD DR TO BIRCHBARK DR)
Florissant $1,683,000
12847 Construction BADEN CITYSHED MITIGATION BASINS
(CALVARY, FREDERIK, PARTRIDGE AND
TILLIE) - SEPARATION SEWERS
St. Louis City $4,000,000
12085 Construction BANFF SANITARY RELIEF (CAITHNESS RD
TO LANARK RD)
Unincorporated $135,000
12088 Construction BAXTER - MERAMEC BOTTOMS - VALLEY
PARK PRIVATE I/I REDUCTION
Ballwin $336,000
12565 Construction, Pr
oposer Stipend
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $1,000,000
12565 Engineering
During
Construction
Services
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $8,600,000
12565 Construction, D
esign-Build
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $86,000,000
12585 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT A
Various $1,780,000
13032 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT B
Various $2,774,000
13033 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT C
Various $4,300,000
12586 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT D
Various $3,381,000
12587 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT E
Various $2,000,000
13124 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT F
Various $3,500,000
12548 Construction
(Supplemental
Appropriation)
BISSELL POINT WWTF FINE SCREEN,
CONCRETE AND GATE IMPROVEMENTS
St. Louis City $4,475,000
11847 Construction BLACK CREEK - HADDINGTON COURT
RELIEF SEWERS
Ladue $7,000,000
24 February 2020
Page 3 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12105 Design Services BRUNSTON SANITARY RELIEF (BRUNSTON
DR TO MATTESE VILLA DR)
St. Louis City And
County
$112,000
13481 Construction
(Supplemental
Appropriation)
CAULKS CREEK FORCEMAIN
IMPROVEMENTS (CAULKS PUMP STATION A
TO HOG HOLLOW RD)
Various $5,600,000
12114 Construction CAULKS CREEK PUMP STATION B (P-751)
RELOCATION
Chesterfield $1,500,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $3,000,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $5,400,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $2,100,000
12139 Construction CSO - BRENTWOOD AND RED BUD AVE CSO
INTERCEPTOR (I-118)/OUTFALL (L-111)
ELIMINATION AND SEWER SEPARATION
Richmond Heights $10,000,000
12140 Construction CSO - MARY AVENUE SOUTH OF
MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION PHASE
II
Brentwood $16,000,000
12140 Engineering
During
Construction
Services
CSO - MARY AVENUE SOUTH OF
MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION PHASE
II
Brentwood $250,000
12472 Construction
(Supplemental
Appropriation)
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
Ladue $9,240,000
12820 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2023)
Various $2,000,000
12159 Construction EDMUNDSON SANITARY RELIEF (EDMUND
AVE TO BATAAN DR)
Woodson Terrace $1,733,000
11737 Construction ELTORA WET WEATHER STORAGE
FACILITY
Pagedale $6,000,000
12178 Construction FLORISSANT/DUNN SANITARY RELIEF (ST.
ANTHONY LN TO I-270)
Florissant $4,000,000
12185 Construction FRIEDENS (PARTIAL) I/I REDUCTION (CHAIN
OF ROCKS DR AND FONTAINE PL)
Bellefontaine
Neighbors
$1,617,000
11137 Design Services GASLIGHT SQUARE SEWER
IMPROVEMENTS
St. Louis City $1,500,000
12157 Construction GC-06 GRAVOIS CREEK TO BRIARSTONE
AND GATES SANITARY RELIEF PHASE II
Various $2,600,000
12387 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2022)
Various $4,000,000
24 February 2020
Page 4 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13098 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2022)
CONTRACT A
Various $450,000
13099 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2022)
CONTRACT B
Various $450,000
13102 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT A
Various $85,000
13103 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT B
Various $85,000
13104 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT C
Various $85,000
13095 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2023) CONTRACT A
Various $200,000
13108 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT A
Various $50,000
13109 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT B
Various $50,000
13110 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT C
Various $50,000
13111 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT D
Various $50,000
13112 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT E
Various $50,000
12174 Design Services GEYER SANITARY RELIEF (W. MONROE AVE
TO W. ESSEX AVE)
Kirkwood $515,000
12264 Construction GLENFIELD SANITARY RELIEF (WATSON
WOODS CT TO S LINDBERGH BLVD)
Sunset Hills $1,916,000
13221 Design Services GRAND GLAIZE WWTF REPAIRS AND
IMPROVEMENTS (2024)
Valley Park $100,000
12281 Design Services GRAND NATIONAL SANITARY RELIEF
(GRAND NATIONAL DR TO KNEELAND RD)
Unincorporated $136,000
12815 Construction GRAVIOS CREEK SANITARY TRUNK
RELOCATION AND STREAM STABILIZATION
(AFFTON ATHLETIC COMPLEX TO GREEN
PK IND DR)
Unincorporated $1,830,000
12291 Construction GREENBRIAR #2 PUMP STATION (P-448)
ELIMINATION
Des Peres $689,000
12334 Construction HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
Various $13,000,000
12334 Engineering
During
Construction
Services
HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
Various $250,000
24 February 2020
Page 5 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11797 Construction
(Supplemental
Appropriation)
HARLEM BADEN RELIEF PHASE IV
(HEBERT) - DARVER TO 69TH STREET
TRUNK SEWER
Various $2,800,000
11798 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - HODIAMONT TO CHERRY
TRUNK SEWER B
Various $5,000,000
13231 Construction
(Supplemental
Appropriation)
HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX)
Various $6,000,000
13432 Construction HATHAWAY DRIVE SANITARY RELIEF Jennings $902,000
12308 Construction HORTON PUMP STATION (P-814)
ELIMINATION
Town And Country $745,000
12997 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2023)
Various $3,000,000
13018 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2023) CONTRACT A
Various $2,500,000
13019 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2023) CONTRACT B
Various $2,500,000
12989 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2023)
Various $7,000,000
11957 Construction JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
Unincorporated $5,245,000
11957 Engineering
During
Construction
Services
JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
Unincorporated $65,000
11817 Construction LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $14,000,000
13304 Construction LEMAY WWTF GRIT TANK 1-4 RENEWAL Unincorporated $1,380,000
13153 Construction LEMAY WWTF REPAIRS AND
IMPROVEMENTS (2023)
Unincorporated $2,284,000
12330 Construction LINDSAY - ST. ALBERT PRIVATE I/I
REDUCTION
Florissant $564,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
11746 Engineering
During
Construction
Services
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $1,000,000
11746 Construction
(Supplemental
Appropriation)
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $60,000,000
24 February 2020
Page 6 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12255 Construction
Management
Services During
Construction
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $1,200,000
12255 Construction
(Supplemental
Appropriation)
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $30,000,000
12255 Engineering
During
Construction
Services
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $750,000
10024 Construction
(Supplemental
Appropriation)
MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
Various $4,000,000
12483 Design Services MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $1,000,000
10715 Construction
(Supplemental
Appropriation)
NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
Unincorporated $1,600,000
12357 Construction NEWPORT LANDING PUMP STATION (P-480)
ELIMINATION
Unincorporated $626,000
12368 Construction PRICE TO PIONEER SANITARY RELIEF Olivette $4,774,000
12189 Construction ROBYN HILLS NUMBER 1 PUMP STATION (P-
417) REPLACEMENT
Sunset Hills $670,000
12195 Construction S BRENTWOOD BLVD SANITARY RELIEF
(DAYTONA DR TO WALINCA TERRACE)
Clayton $4,681,000
12196 Design Services S GORE AVE SANITARY RELIEF (GRAY AVE
TO OAK TERR)
Webster Groves $140,000
12200 Construction SAYLESVILLE SANITARY RELIEF
(SAYLESVILLE DR TO S GREENTRAILS DR)
Chesterfield $2,960,000
13467 Construction SCADA SYSTEM UPGRADE Various $5,000,000
13185 Professional
Services
SLUDGE TRANSFER FORCEMAIN DESIGN
(CONTRACT A)
Various $7,200,000
12628 Construction SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-
809 TO P-750)
Chesterfield $7,000,000
12212 Construction ST. GEORGE CREEK SANITARY RELIEF
(DAISY LN TO GRAVOIS RD TO NEW
HAMPSHIRE AVE)
Unincorporated $2,260,000
12218 Construction STONINGTON PLACE SANITARY RELIEF
(CLAYTON RD TO GEORGIAN ACRES ST)
Frontenac $300,000
13444 Construction VALLEY SANITARY RELIEF PHASE III Various $4,500,000
12262 Construction VALLEY VIEW PUMP STATION (P-734)
REPLACEMENT
Wildwood $380,000
10794 Design Services WEBSTER GROVES TRUNK E SANITARY
RELIEF (SKME-628)
Brentwood $1,700,000
24 February 2020
Page 7 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12280 Construction WHITE PLAINS SANITARY RELIEF
(SALTBOX DR TO CEDAR CREEK RD)
Chesterfield $1,986,000
12302 Construction WW-2 AND WW-3 WARSON WOODS
SANITARY RELIEF
Various $5,000,000
FUND TOTAL: $430,639,000
GRAND TOTAL:$451,299,000
24 February 2020
Page 1 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
12804 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2023)
Various $3,000,000
12908 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
(2023)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
13078 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
Various $3,000,000
12801 Vendor
Services
FLOW METERING AND MONITORING (2022) Various $2,500,000
13096 GSA - (Design)
Operating
Funds
GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2022)
Various $200,000
13091 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT A
Various $75,000
13092 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT B
Various $75,000
13093 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT C
Various $75,000
13094 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT D
Various $75,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $420,000
12006 Vendor
Services
RADAR RAINFALL DATA (2020)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$605,000
12806 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2023)
Various $350,000
FUND TOTAL: $18,475,000
5590 - MO RIVER BONFIL SUBD #448 OMCI FUND
12353 Construction MISSOURI RIVER BONFILS SANITARY
SEWER REHABILITATION PHASE III
Hazelwood $1,492,000
24 February 2020
Page 2 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $1,492,000
6660 - SANITARY REPLACEMENT FUND
12079 Construction ARV ELLEN SANITARY RELIEF (TESSON
CREEK ESTATES DR TO MADAFORD LN)
Unincorporated $380,000
12847 Construction
(Supplemental
Appropriation)
BADEN CITYSHED MITIGATION BASINS
(CALVARY, FREDERIK, PARTRIDGE AND
TILLIE) - SEPARATION SEWERS
St. Louis City $2,300,000
12090 Design Services BC-01 PHASE III AND BC-02 PHASE II
SANITARY RELIEF (I-170 TO
HEATHERWOOD DR)
Ladue $1,175,000
12565 Engineering
During
Construction
Services
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $15,600,000
12565 Construction,
Design-Build
(Supplemental
Appropriation)
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $156,000,000
11847 Construction
(Supplemental
Appropriation)
BLACK CREEK - HADDINGTON COURT
RELIEF SEWERS
Ladue $5,200,000
13439 Design Services BONFILS PUMP STATION (P-784)
REHABILITATION
Unincorporated $500,000
12106 Design Services BUCKHURST DR TO OAK HILL DR
SANITARY RELIEF
Ellisville $181,000
12107 Construction BUCKLEY SANITARY RELIEF (DACE LN TO
POPLAR DR)
Unincorporated $572,000
12108 Construction BURNING TREE INFRASTRUCTURE REPAIR
(N. WATERFORD DR TO FOX RUN DR)
Florissant $448,000
12122 Construction CLARK AVE SANITARY RELIEF (LACLEDE
STA RD TO YEATMAN AVE)
Webster Groves $469,000
12550 Design Services COLDWATER CREEK WWTF REPLACEMENT
SLUDGE FORCEMAIN
Various $1,700,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $50,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $2,300,000
13224 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
SLUDGE TRANSFER FORCEMAINS
Various $350,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $500,000
12129 Design Services CONWAY MEADOWS SANITARY RELIEF
(CONWAY RD TO I-64)
Chesterfield $111,000
24 February 2020
Page 3 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12130 Construction CONWAY ROAD SANITARY RELIEF
(CONWAY LN TO DWYER AVE)
Ladue $1,410,000
12132 Construction CONWOOD LN SANITARY RELIEF (CONWAY
RD TO WESTWOOD CT)
Westwood $120,000
12133 Design Services COUNTRY HOME DR SANITARY RELIEF
(SUMMITT TREE CT TO AUTUMN PEAK DR)
Unincorporated $343,000
12134 Construction COWMIRE CREEK SANITARY
REPLACEMENT I-70 CROSSING (ST.
CHARLES ROCK RD TO MARK TWAIN LN)
Bridgeton $426,000
12139 Construction
(Supplemental
Appropriation)
CSO - BRENTWOOD AND RED BUD AVE CSO
INTERCEPTOR (I-118)/OUTFALL (L-111)
ELIMINATION AND SEWER SEPARATION
Richmond Heights $6,000,000
12140 Construction
(Supplemental
Appropriation)
CSO - MARY AVENUE SOUTH OF
MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION PHASE
II
Brentwood $10,500,000
12141 Construction CSO - SHREWSBURY AVE CSO
INTERCEPTOR (I-293)/OUTFALL (L-166)
SEWER SEPARATION
Shrewsbury $1,604,000
12143 Construction DANIEL BOONE I/I REDUCTION
(SHACKELFORD RD AND MULLANPHY LN)
Florissant $72,000
12145 Construction DC-04 DEER CREEK SANITARY RELIEF
PHASE III (LAKESHORE DR TO NEW BALLAS
RD)
Creve Coeur $730,000
11833 Construction DELCREST SANITARY RELIEF Various $2,065,000
12147 Design Services DIETRICH GLEN PUMP STATION (P-525)
IMPROVEMENTS
Unincorporated $100,000
12151 Design Services DUBRAY SANITARY RELIEF (S. BALLAS RD
TO DUBOIS CT)
Kirkwood $312,000
12821 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2024)
Various $2,000,000
11737 Construction
(Supplemental
Appropriation)
ELTORA WET WEATHER STORAGE
FACILITY
Pagedale $4,000,000
12167 Construction FENTON CREEK EAST I/I REDUCTION (OLD
TOWN FENTON)
Fenton $1,039,000
12170 Construction FENTON WASTEWATER TREATMENT
FACILITY ELIMINATION
Fenton $7,138,000
13046 Construction FILLMORE PUMP STATION (P-308)
REHABILITATION
St. Louis City $2,500,000
12178 Construction
(Supplemental
Appropriation)
FLORISSANT/DUNN SANITARY RELIEF (ST.
ANTHONY LN TO I-270)
Florissant $2,122,000
12182 Construction FOX BRIDGE PUMP STATION (P-484)
STORAGE
Sunset Hills $295,000
24 February 2020
Page 4 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12387 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2022)
Various $3,500,000
13100 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2024)
CONTRACT A
Various $450,000
13101 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2024)
CONTRACT B
Various $450,000
13105 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT A
Various $75,000
13106 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT B
Various $75,000
13107 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT C
Various $75,000
13095 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2023) CONTRACT A
Various $200,000
13113 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT A
Various $50,000
13114 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT B
Various $50,000
13115 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT C
Various $50,000
13116 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT D
Various $50,000
13117 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT E
Various $50,000
13221 Construction GRAND GLAIZE WWTF REPAIRS AND
IMPROVEMENTS (2024)
Valley Park $400,000
12334 Construction
(Supplemental
Appropriation)
HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
Various $8,100,000
11798 Construction
(Supplemental
Appropriation)
HARLEM BADEN RELIEF PHASE IV
(HEBERT) - HODIAMONT TO CHERRY
TRUNK SEWER B
Various $2,500,000
12942 Construction HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX) - SEPARATION
SEWERS
Various $5,000,000
13337 Construction HARMONY-ACORN SEWER SEPARATION
AND I/I REDUCTION PHASE II
Unincorporated $2,000,000
12299 Construction HAWTHORNE ESTATES SANITARY RELIEF
(RANCH LN TO CLAYTON HILLS LN)
Town And Country $350,000
12312 Construction HUNTLEIGH TRAILS LN SANITARY RELIEF
(TWO MILE CREEK TRUNK SEWER TO N
GEYER RD)
Huntleigh $2,067,000
24 February 2020
Page 5 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12998 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2024)
Various $3,000,000
13020 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2024) CONTRACT A
Various $5,000,000
13021 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2024) CONTRACT B
Various $5,000,000
12990 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2024)
Various $7,000,000
12313 Design Services JEFFERSON BARRACKS CREEK SANITARY
RELIEF (N. KINSWOOD LN TO S. FRANRU
LN)
Unincorporated $575,000
13227 Construction L51 PUMP STATION FORCEMAIN
IMPROVEMENTS
Various $3,600,000
12371 Construction LAUMEIER PARK (P-469) STORAGE Various $300,000
11817 Construction
(Supplemental
Appropriation)
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $24,440,000
11943 Construction LINDBERGH SANITARY RELIEF
(MEADOWSIDE DR TO N LINDBERGH BLVD)
Unincorporated $960,000
12332 Construction LITTLETON CT. SANITARY RELIEF (OLD
SMIZER MILL RD AND 141 TO LA PALMA
DR)
Fenton $770,000
11820 Design Services LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $2,000,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
11746 Engineering
During
Construction
Services
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $1,000,000
11746 Construction
(Supplemental
Appropriation)
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $57,000,000
12255 Construction
Management
Services During
Construction
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $1,200,000
12255 Construction
(Supplemental
Appropriation)
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $20,000,000
12255 Engineering
During
Construction
Services
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $750,000
24 February 2020
Page 6 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12337 Construction MAIN SANITARY RELIEF (VANCE RD TO
INEZ AVE)
Valley Park $832,000
13442 Design Services MANORS OF CLARKSON PUMP STATION (P-
727) REHABILITATION
Clarkson Valley $100,000
12483 Design Services MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $1,000,000
12485 Construction, D
esign-Build
MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION PHASE III
St. Louis City $5,000,000
12359 Design Services NOONING TREE PARK SANITARY RELIEF
(WHITREE LN TO BRIGHTFIELD MANOR DR)
Chesterfield $300,000
12360 Construction NORMANDIE SANITARY RELIEF (PAGE AVE
TO SAINT CHARLES ROCK ROAD)
Unincorporated $2,935,000
13467 Construction
(Supplemental
Appropriation)
SCADA SYSTEM UPGRADE Various $3,000,000
12204 Design Services SOUTH COUNTY RELIEF PUMP STATION (P-
419) IMPROVEMENTS
Unincorporated $500,000
12628 Construction
(Supplemental
Appropriation)
SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-
809 TO P-750)
Chesterfield $4,783,000
12206 Construction SPIRIT OF ST. LOUIS 1 PUMP STATION (P-
735) REPLACEMENT
Chesterfield $494,000
12214 Construction ST. JOACHIM'S SANITARY RELIEF (ST.
GENEVIEVE LN TO LYNROS DR)
St. Ann $1,181,000
12216 Construction ST. JOACHIM'S SANITARY RELIEF (ST.
GENEVIEVE LN TO MARMARY DR)
St. Ann $1,046,000
12217 Construction ST. MATTHIAS SANITARY RELIEF (ST.
SHAWN LN TO STONEHARD DR)
St. Ann $842,000
12219 Design Services STRASSNER AVE SANITARY RELIEF (BLACK
CREEK TRUNK TO SWALLOW DR)
Brentwood $667,000
12220 Design Services SUB-TRUNK #11 SANITARY RELIEF
(BELGROVE DR TO LOTHIAN CIR)
Unincorporated $78,000
12224 Construction SUNSET COUNTRY CLUB PUMP STATION (P-
408) REPLACEMENT AND STORAGE
Sunset Hills $907,000
12231 Construction TM-01 TWO MILE CREEK OUTFALL
SANITARY RELIEF
Various $6,000,000
12233 Construction TM-04 TWO MILE SANITARY RELIEF PHASE
II (LOCKETT RD TO MEIER RD)
Des Peres $204,000
12241 Construction UPPER BADEN SANITARY RELIEF
(JENNINGS STATION RD TO OAKRIDGE
BLVD)
Northwoods $2,974,000
12242 Construction UPPER FISHPOT EAST SANITARY RELIEF
(FIELD AVE TO WOLFF LN)
Ellisville $1,213,000
12245 Construction UPPER LAWNVIEW CREEK SANITARY
RELIEF (RHAPSODY LN TO MILLVALLEY
DR)
Unincorporated $1,672,000
12249 Construction UPPER MATTESE TRUNK SANITARY RELIEF
(THEISS RD TO LIBERTY TRAIL RD)
St. Louis County $6,000,000
24 February 2020
Page 7 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12263 Design Services VILLE PATRICIA SANITARY RELIEF (VILLE
ROSA LN TO CAMPUS PARKWAY DR)
Hazelwood $305,000
12270 Design Services WATKINS CREEK SANITARY RELIEF
(KENRAN INDUSTRIAL BLVD TO FARM
POND CT)
Unincorporated $2,080,000
12277 Construction WEIDMAN I/I REDUCTION (HWY 141 AND
DUTCH MILL DR)
Unincorporated $237,000
12279 Construction WESTON PLACE PUMP STATION (P-771)
IMPROVEMENTS
Town And Country $276,000
12284 Construction WILSON AVE SANITARY RELIEF (HARRISON
AVE TO CLEVELAND AVE)
Kirkwood $271,000
12287 Construction WILSON SANITARY RELIEF (WILD HORSE
CREEK RD TO CLARKSON RD)
Chesterfield $3,010,000
12288 Construction WILTON PUMP STATION (P-412)
REPLACEMENT AND STORAGE
Kirkwood $400,000
12300 Construction WOODSON SANITARY RELIEF (FLORA AVE
TO LACKLAND RD)
Overland $1,680,000
12302 Construction
(Supplemental
Appropriation)
WW-2 AND WW-3 WARSON WOODS
SANITARY RELIEF
Various $4,062,000
FUND TOTAL: $443,018,000
GRAND TOTAL:$462,985,000
24 February 2020
Page 1 of 5
WASTEWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
12804 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2023)
Various $3,000,000
12908 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
(2023)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
13078 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
Various $3,000,000
12801 Vendor
Services
FLOW METERING AND MONITORING (2022) Various $2,500,000
13091 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT A
Various $75,000
13092 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT B
Various $75,000
13093 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT C
Various $75,000
13094 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT D
Various $75,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $435,000
12816 Vendor
Services
RADAR RAINFALL DATA (2025)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$605,000
12806 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2023)
Various $350,000
FUND TOTAL: $18,290,000
6660 - SANITARY REPLACEMENT FUND
12076 Design Services AFFTON I/I REDUCTION (WANDA, LEONA
CROSBY, AND POEPPING TESSON)
Unincorporated $414,000
13051 Design Services ALSWELL PUMP STATION (P-422)
REHABILITATION
Sunset Hills $150,000
13050 Design Services ANITA LANE PUMP STATION (P-464)
REHABILITATION
Unincorporated $100,000
24 February 2020
Page 2 of 5
WASTEWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13052 Design Services BADEN SANITARY PUMP STATION (P-118)
REHABILITATION
St. Louis City $100,000
12565 Engineering
During
Construction
Services
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $15,000,000
12565 Construction,
Design-Build
(Supplemental
Appropriation)
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $159,000,000
12567 Design Services BISSELL POINT WWTF TRICKLING FILTER
PUMP REPLACEMENT
St. Louis City $2,000,000
12105 Construction BRUNSTON SANITARY RELIEF (BRUNSTON
DR TO MATTESE VILLA DR)
St. Louis City And
County
$447,000
12117 Design Services CELLA SANITARY RELIEF (ROLLING ROCK
LN TO CLAYTON RD)
Ladue $540,000
12851 Design Services CHATHAM MANOR PUMP STATION (P-520)
ELIMINATION
Unincorporated $250,000
13441 Design Services CHRISTOPHER HILLS PUMP STATION (P-468)
REHABILITATION
Unincorporated $100,000
13239 Design Services COLDWATER CREEK WWTF DEMOLITION
ABANDONED GRIT AND PRIMARY
CLARIFIERS TANKS
Unincorporated $100,000
11724 Construction COLDWATER SANITARY RELIEF SECTION B,
C & D - SECTION B REHABILITATION
Unincorporated $9,000,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $50,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $500,000
13224 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
SLUDGE TRANSFER FORCEMAINS
Various $2,800,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $1,000,000
12822 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2025)
Various $2,000,000
12845 Design Services FRIENDSHIP VILLAGE PUMP STATION (P-
516) ELIMINATION
Sunset Hills $510,000
11137 Construction,
Phase II
GASLIGHT SQUARE SEWER
IMPROVEMENTS
St. Louis City $9,000,000
13057 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2025)
Various $1,100,000
13100 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2024)
CONTRACT A
Various $450,000
24 February 2020
Page 3 of 5
WASTEWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13101 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2024)
CONTRACT B
Various $450,000
13105 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT A
Various $75,000
13106 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT B
Various $75,000
13107 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT C
Various $75,000
13113 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT A
Various $50,000
13114 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT B
Various $50,000
13115 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT C
Various $50,000
13116 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT D
Various $50,000
13117 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT E
Various $50,000
12603 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT
ENGINEERING SERVICES 2025 PLUS
BUDGET
Various $1,800,000
12174 Construction GEYER SANITARY RELIEF (W. MONROE AVE
TO W. ESSEX AVE)
Kirkwood $2,060,000
12176 Design Services GLEN ECHO SANITARY RELIEF
(ENGELHOLM AVE TO HENDERSON AVE)
Normandy $495,000
12246 Design Services GRAND GLAIZE WET WEATHER PUMP
STATION
Valley Park $671,000
13240 Design Services GRAND GLAIZE WWTF GENERATOR AND
SWITCHGEAR REPLACEMENT
Valley Park $250,000
12281 Construction GRAND NATIONAL SANITARY RELIEF
(GRAND NATIONAL DR TO KNEELAND RD)
Unincorporated $545,000
12261 Land Purchase GRAVOIS CREEK WATERSHED
DOWNSTREAM SANITARY STORAGE
FACILITY
Unincorporated $2,000,000
12261 Design Services GRAVOIS CREEK WATERSHED
DOWNSTREAM SANITARY STORAGE
FACILITY
Unincorporated $8,015,000
11799 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - SEWER SEPARATION CHERRY
TO 68TH STREET
Various $3,850,000
12942 Construction
(Supplemental
Appropriation)
HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX) - SEPARATION
SEWERS
Various $2,900,000
13053 Design Services HARLEM LIFT PUMP STATION (P-104)
REHABILITATION
St. Louis City $100,000
24 February 2020
Page 4 of 5
WASTEWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12846 Construction HEIMOS PUMP STATION (P-503) FORCEMAIN
REPLACEMENT
Unincorporated $1,110,000
12999 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2025)
Various $3,000,000
13022 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2025) CONTRACT A
Various $5,000,000
13023 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2025) CONTRACT B
Various $5,000,000
12991 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2025)
Various $8,000,000
11817 Construction
(Supplemental
Appropriation)
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $4,260,000
12589 Design Services LEMAY PUBLIC I/I REDUCTION (2026)
CONTRACT A
Various $100,000
11820 Design Services LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $1,000,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
12251 Design Services MACKENZIE CREEK WATERSHED
DOWNSTREAM SANITARY STORAGE
FACILITY
Unincorporated $3,230,000
12344 Construction MARTIGNEY SANITARY RELIEF (KOCH RD
TO WOOD HILL DR)
Unincorporated $6,200,000
13048 Design Services MASTER LIFT 1 PUMP STATION (P-717)
REHABILITATION
Creve Coeur $1,000,000
12346 Construction MCCUTCHEON RD AND THORNDELL
SANITARY RELIEF
Richmond Heights $195,000
12850 Design Services MERAMEC BLUFFS (RIVER RIDGE P-501,
PINE TREE ESTATES P-466, AND SUNSET
RIDGE P-504) PUMP STATION ELIMINATIONS
Unincorporated $300,000
10869 Construction MERAMEC BOTTOMS PUMP STATION (P-489)
INTERCEPTOR SEWER
Unincorporated $1,580,000
12483 Design Services MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $1,000,000
12556 Design Services MISSOURI RIVER WWTF ENGINE
GENERATOR REPLACEMENT
Maryland Heights $1,200,000
12355 Construction MULBERRY CREEK SANITARY RELIEF
(HARWICH DR TO S LINDBERGH BLVD)
Crestwood $1,305,000
12356 Design Services NEW ENGLAND VILLAGE 2 PUMP STATION
(P-496) IMPROVEMENTS
Unincorporated $195,000
12460 Construction OAKLAND COMBINED SEWER DETENTION
AND STORAGE (CLAYTON AVE AND
OAKLAND AVE)
St. Louis City $1,000,000
24 February 2020
Page 5 of 5
WASTEWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11877 Work Order
Repair Costs
(Capital)
PRIVATE INFLOW AND INFILTRATION
REDUCTION PROGRAM
Various $500,000
13406 Design Services ROYAL ARMS CT SANITARY RELIEF Unincorporated $100,000
12196 Construction S GORE AVE SANITARY RELIEF (GRAY AVE
TO OAK TERR)
Webster Groves $550,000
12198 Design Services SALZMAN SANITARY RELIEF (PAGE AVE TO
SALZMAN AVE)
Wellston $210,000
13077 Construction SLUDGE TRANSFER FORCEMAIN - GRAND
GLAIZE WWTF TO FENTON
Various $6,000,000
13076 Construction SLUDGE TRANSFER FORCEMAIN - LOWER
MERAMEC WWTF TO LEMAY WWTF
Various $14,000,000
12202 Construction SMITH CREEK LADUE ROAD SANITARY
RELIEF (ROYAL MANOR DR TO HEWLETT
CT)
Creve Coeur $1,441,000
13314 Design Services SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-
736 TO P-809)
Champ $1,200,000
13339 Design Services SUN VALLEY SANITARY RELIEF Unincorporated $350,000
12231 Construction
(Supplemental
Appropriation)
TM-01 TWO MILE CREEK OUTFALL
SANITARY RELIEF
Various $3,469,000
13215 Design Services TOWER GROVE MANCHESTER TUNNEL AND
COLLECTOR SEWERS
St. Louis City $9,600,000
11992 Construction UNIVERSITY CITY SANITARY STORAGE
FACILITY
University City $50,000,000
12249 Construction
(Supplemental
Appropriation)
UPPER MATTESE TRUNK SANITARY RELIEF
(THEISS RD TO LIBERTY TRAIL RD)
St. Louis County $3,540,000
12440 Design Services UPPER RDP (UNIVERSITY CITY) CSO
STORAGE TUNNEL
University City $4,000,000
12266 Design Services WARSON TERRACE SANITARY RELIEF
(FOXBORO RD TO CONWAY RD)
Ladue $70,000
12271 Construction WATKINS-SPANISH SANITARY RELIEF
(MALAGA ST TO TRAMPE AVE)
Unincorporated $1,150,000
10794 Construction WEBSTER GROVES TRUNK E SANITARY
RELIEF (SKME-628)
Brentwood $5,000,000
12375 Design Services WHITE PLAINS SANITARY RELIEF (CEDAR
CREEK RD TO E CHESTERFIELD PKY)
Various $335,000
12305 Design Services WINDMOOR PUMP STATION (P-710)
ELIMINATION
Town And Country $250,000
FUND TOTAL: $374,932,000
GRAND TOTAL:$393,222,000
24 February 2020
Page 1 of 1
STORMWATER ENGINEERING PROJECTS - FY21
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12842 GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2021)
$100,000 166
10282 MAINTENANCE YARD VEHICLE STORAGE
BUILDING (MINTERT)
$150,000 167
13193 OMCI STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (2021)
$115,000 168
13193 OMCI STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (2021)
$140,000 169
13193 OMCI STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (2021)
$492,000 170
13193 OMCI STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (2021)
$63,000 171
13189 OMCI STORMWATER STREAMBANK
STABILIZATION DESIGN (2021)
$134,000 172
13189 OMCI STORMWATER STREAMBANK
STABILIZATION DESIGN (2021)
$691,000 173
13189 OMCI STORMWATER STREAMBANK
STABILIZATION DESIGN (2021)
$90,000 174
TOTAL:$1,975,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - WATERQUALITY SUPPORT SERVICES (2021)
GSA - (Planning)Operating Fund
5110 - StormwaterRegulatory Fund
WATER QUALITY EXPERTISE IS NEEDED TO SUPPORT THE DISTRICT'SREGULATORY AND LEGAL EFFORTS.
RETAIN ENGINEERING FIRM FOR AS NEEDED WATER QUALITY SUPPORTSERVICES. SERVICES MAY BE RENEWED THROUGH FY2023 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12842
Stormwater
11
$100,000
Various
Various
Various
Asset Management
166Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MAINTENANCE YARD VEHICLE STORAGEBUILDING (MINTERT)
Engineering DuringConstruction Services
5120 - DistrictwideStormwater Fund
ADDITIONAL STORM SEWER CLEANING VEHICLES ARE BEINGORDERED TO BE STORED AT THIS FACILITY.
CONSTRUCT A NEW TRUCK STORAGE BUILDING AND MODIFICATIONSTO AN EXISTING BUILDING AT THE MINTERT CONSTRUCTION YARD.BERMUDAROWLES
MINTERT INDUSTRI
A
L
FERG
U
S
O
N
NORF
O
L
K
S
O
U
T
H
E
R
N
MINTE R TMANORBEHLEPAYNE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10282
Stormwater
11
$150,000
St. Louis County
Various
Various
Capital
167Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
OMCI STORMWATER INFRASTRUCTUREIMPROVEMENT DESIGN (2021)
Professional Services
5584 - University CityOMCI Fund
FLOODING AT VARIOUS LOCATIONS THROUGHOUT THE DISTRICT DUETO INADEQUATE STORM SEWER INFRASTRUCTURE.
DESIGN STORM SEWERS, INLETS, AND OTHER STRUCTURALENGINEERING SOLUTIONS IN VARIOUS OMCIS.
CONSTRUCTION IS BUDGETED SEPARATELY UNDER INDIVIDUALPROJECT NUMBERS IN FUTURE FISCAL YEARS. SERVICES MAY BERENEWED BASED ON PERFORMANCE.
§¨¦64
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13193
Stormwater
16
$115,000
Various
Various
Various
Asset Management
168Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
OMCI STORMWATER INFRASTRUCTUREIMPROVEMENT DESIGN (2021)
Professional Services
5576 - Maline CreekOMCI Fund
FLOODING AT VARIOUS LOCATIONS THROUGHOUT THE DISTRICT DUETO INADEQUATE STORM SEWER INFRASTRUCTURE.
DESIGN STORM SEWERS, INLETS, AND OTHER STRUCTURALENGINEERING SOLUTIONS IN VARIOUS OMCIS.
CONSTRUCTION IS BUDGETED SEPARATELY UNDER INDIVIDUALPROJECT NUMBERS IN FUTURE FISCAL YEARS. SERVICES MAY BERENEWED BASED ON PERFORMANCE.
§¨¦64
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13193
Stormwater
16
$140,000
Various
Various
Various
Asset Management
169Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
OMCI STORMWATER INFRASTRUCTUREIMPROVEMENT DESIGN (2021)
Professional Services
5566 - Deer CreekOMCI Fund
FLOODING AT VARIOUS LOCATIONS THROUGHOUT THE DISTRICT DUETO INADEQUATE STORM SEWER INFRASTRUCTURE.
DESIGN STORM SEWERS, INLETS, AND OTHER STRUCTURALENGINEERING SOLUTIONS IN VARIOUS OMCIS.
CONSTRUCTION IS BUDGETED SEPARATELY UNDER INDIVIDUALPROJECT NUMBERS IN FUTURE FISCAL YEARS. SERVICES MAY BERENEWED BASED ON PERFORMANCE.
§¨¦64
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13193
Stormwater
16
$492,000
Various
Various
Various
Asset Management
170Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
OMCI STORMWATER INFRASTRUCTUREIMPROVEMENT DESIGN (2021)
Professional Services
5564 - Coldwater CreekOMCI Fund
FLOODING AT VARIOUS LOCATIONS THROUGHOUT THE DISTRICT DUETO INADEQUATE STORM SEWER INFRASTRUCTURE.
DESIGN STORM SEWERS, INLETS, AND OTHER STRUCTURALENGINEERING SOLUTIONS IN VARIOUS OMCIS.
CONSTRUCTION IS BUDGETED SEPARATELY UNDER INDIVIDUALPROJECT NUMBERS IN FUTURE FISCAL YEARS. SERVICES MAY BERENEWED BASED ON PERFORMANCE.
§¨¦64
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13193
Stormwater
16
$63,000
Various
Various
Various
Asset Management
171Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
OMCI STORMWATER STREAMBANKSTABILIZATION DESIGN (2021)
Professional Services
5584 - University CityOMCI Fund
EROSION AT VARIOUS LOCATIONS THROUGHOUT THE DISTRICTTHREATENING STRUCTURES AND ROADWAYS, AND DEGRADINGWATER QUALITY.
DESIGN STREAMBANK STABILIZATION ENGINEERING SOLUTIONS INVARIOUS OMCI WATERSHEDS.
CONSTRUCTION IS BUDGETED SEPARATELY UNDER INDIVIDUALPROJECT NUMBERS IN FUTURE FISCAL YEARS. SERVICES MAY BERENEWED BASED ON PERFORMANCE.
§¨¦64
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13189
Stormwater
16
$134,000
Various
Various
Various
Asset Management
172Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
OMCI STORMWATER STREAMBANKSTABILIZATION DESIGN (2021)
Professional Services
5566 - Deer CreekOMCI Fund
EROSION AT VARIOUS LOCATIONS THROUGHOUT THE DISTRICTTHREATENING STRUCTURES AND ROADWAYS, AND DEGRADINGWATER QUALITY.
DESIGN STREAMBANK STABILIZATION ENGINEERING SOLUTIONS INVARIOUS OMCI WATERSHEDS.
CONSTRUCTION IS BUDGETED SEPARATELY UNDER INDIVIDUALPROJECT NUMBERS IN FUTURE FISCAL YEARS. SERVICES MAY BERENEWED BASED ON PERFORMANCE.
§¨¦64
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13189
Stormwater
16
$691,000
Various
Various
Various
Asset Management
173Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
OMCI STORMWATER STREAMBANKSTABILIZATION DESIGN (2021)
Professional Services
5564 - Coldwater CreekOMCI Fund
EROSION AT VARIOUS LOCATIONS THROUGHOUT THE DISTRICTTHREATENING STRUCTURES AND ROADWAYS, AND DEGRADINGWATER QUALITY.
DESIGN STREAMBANK STABILIZATION ENGINEERING SOLUTIONS INVARIOUS OMCI WATERSHEDS.
CONSTRUCTION IS BUDGETED SEPARATELY UNDER INDIVIDUALPROJECT NUMBERS IN FUTURE FISCAL YEARS. SERVICES MAY BERENEWED BASED ON PERFORMANCE.
§¨¦64
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13189
Stormwater
16
$90,000
Various
Various
Various
Asset Management
174Page
2021
24 February 2020
Page 1 of 2
STORMWATER CONSTRUCTION PROJECTS - FY21
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11623 BRUNSTON DR. #4875 BANK STABILIZATION $460,000 175
10391 CARL AVE., AVIS ST., AND MAIN ST. STORM
SEWER
$315,000 176
13488 COLDWATER CREEK OMCI REIMBURSEMENTS
PROGRAM
$956,598 177
13487 DEER CREEK OMCI REIMBURSEMENTS
PROGRAM
$1,865,563 178
11418 DRURY - SWITZER STORM SEWER $145,000 179
11474 GLEASON #656 STORM SEWER $95,000 180
11432 LARKWOOD - JAYWOOD - SPARROWWOOD
BANK STABILIZATION (CRE-07)
$808,000 181
10282 MAINTENANCE YARD VEHICLE STORAGE
BUILDING (MINTERT)
$2,000,000 182
11481 MARTIGNEY CREEK STREAMBANK
STABILIZATION - FAIRWICK AND GOLDEN
VALLEY BANK STABILIZATION (MGMB-150)
$1,898,000 183
11481 MARTIGNEY CREEK STREAMBANK
STABILIZATION - FAIRWICK AND GOLDEN
VALLEY BANK STABILIZATION (MGMB-150)
$282,000 184
11536 NOTTINGHAM ESTATES DR. #5217 STORM
SEWER
$120,000 185
11506 RAFORD CT. STORM SEWER SEPARATION $175,000 186
11630 REYNOSA - MELITTA STREAMBANK
STABILIZATION
$1,200,000 187
13491 SEMINARY OMCI REIMBURSEMENTS
PROGRAM
$118,000 188
10880 SIMS AVE STORM BUYOUT $200,000 189
11442 STANWOOD DR. AND BELWOOD DR. STORM
SEWER AND BANK STABILIZATION
$400,000 190
13004 STORMWATER INFRASTRUCTURE REPAIRS
(2021)
$3,000,000 191
24 February 2020
Page 2 of 2
STORMWATER CONSTRUCTION PROJECTS - FY21
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
13352 STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
$200,000 192
13490 SUGAR CREEK OMCI REIMBURSEMENTS
PROGRAM
$138,931 193
13489 UNIVERSITY CITY OMCI REIMBURSEMENTS
PROGRAM
$442,785 194
13385 WATER QUALITY STORMWATER BMP PARK
ALONG DEER CREEK (HANLEY RD TO SOUTH
BRENTWOOD BLVD)
$800,000 195
11396 WEATHERBY DRIVE STORM SEWER $180,000 196
11430 WILBORN DRIVE #5361 STORM SEWER $120,000 197
TOTAL:$15,919,877
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BRUNSTON DR. #4875 BANK STABILIZATION
Construction
5120 - DistrictwideStormwater Fund
MODERATE RISK STRUCTURAL EROSION.
CONSTRUCT 71 FEET OF MODULAR BLOCK RETAINING WALL, 13 FEETOF 60-INCH STORM SEWER, AND 215 FEET OF CHANNEL STABILIZATION.
BRUNSTONAMBS MUSICTO
W
N
E
C
E
N
T
R
E VALMEYERFUCHSAM
B
S
D
A
L
E
FOUL
K
SHARLANE
STON
E
H
I
L
L
CROWNOVER§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11623
Stormwater
15
$460,000
Unincorporated
Meramec
Mattese Creek
Capital
175Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CARL AVE., AVIS ST., AND MAIN ST. STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
STRUCTURE AND YARD FLOODING.
CONSTRUCT 595 FEET OF 12-INCH TO 21-INCH STORM SEWER, 40 FEETOF 12-INCH COMBINED SEWER, AND 50 FEET OF BIOSWALE.
ADA
M
A
I
N
AVIS
CARLSHIRLEY
AV
I
E
N
O
R
F
O
L
K
S
O
U
T
H
E
R
N
MCLARAN
SWITZER
COLLEGETE
R
R
A
C
E
KI
N
A
M
O
R
E
OAK
C
R
E
S
T
MCLARANCARL§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10391
Stormwater
15
$315,000
Jennings
Bissell
Baden
Capital
176Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COLDWATER CREEK OMCI REIMBURSEMENTSPROGRAM
Construction
5564 - Coldwater CreekOMCI Fund
STORMWATER ISSUES IN THE COLDWATER CREEK OMCI TAXINGSUBDISTRICT.
OFFER STORMWATER GRANTS TO MUNICIPALITIES WITHIN THECOLDWATER CREEK OMCI.
THIS PROGRAM WILL OFFER GRANT REIMBURSEMENTS TOMUNICIPALITIES TO PROMOTE RESOLUTION OF STORMWATER ISSUES.
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13488
Stormwater
15
$956,598
Various
Coldwater
Coldwater Creek
Non-recurring
177Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK OMCI REIMBURSEMENTS PROGRAM
Construction
5566 - Deer CreekOMCI Fund
STORMWATER ISSUES IN THE DEER CREEK OMCI TAXING SUBDISTRICT.
OFFER STORMWATER GRANTS TO MUNICIPALITIES WITHIN THE DEERCREEK OMCI.
THIS PROGRAM WILL OFFER GRANT REIMBURSEMENTS TOMUNICIPALITIES TO PROMOTE RESOLUTION OF STORMWATER ISSUES.
§¨¦270
§¨¦64
§¨¦170
§¨¦64
§¨¦170 OLIVE BLVD
M A N C H E S T E R R DS LINDBERGH BLVDWATSONRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13487
Stormwater
15
$1,865,563
Various
Lemay/RDP
Deer Creek
Non-recurring
178Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DRURY - SWITZER STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD EROSION AND FLOODING, AND OVERLAND FLOODING OFHOMES.
CONSTRUCT 550 FEET OF 12-INCH TO 15-INCH STORM SEWER.PARKTARASWITZER
DRURYMORAMELRO
S
E
GLADY
S
ETON
MCLARA
N
NORFO
L
K
S
O
U
T
H
E
R
N
PAMPLINGIESEKI
N
GTRAFFORD
SUMMIT§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11418
Stormwater
15
$145,000
St. Louis City
Bissell
Baden
Capital
179Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GLEASON #656 STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD FLOODING.
CONSTRUCT 260 FEET OF 12-INCH TO 18-INCH STORM SEWER.
C
A
L
U
M
E
T
KELVIN
SCENICGLOUCESTERBAGNELLGLEASONKARESS
FARLOHAYWARD
BURLINGTON NORTHERN SANTA FE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11474
Stormwater
15
$95,000
Bellefontaine Neighbors
Bissell
Maline Creek
Capital
180Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LARKWOOD - JAYWOOD - SPARROWWOOD BANKSTABILIZATION (CRE-07)
Construction
5120 - DistrictwideStormwater Fund
CREEK EROSION NEAR LARKWOOD DR. AND JAYWOOD DR.
CONSTRUCT 360 FEET OF 12 FOOT HIGH MODULAR BLOCK RETAININGWALL.ROSSHYANNISLARKWOOD
SPARROW
W
O
O
D
SUNVIEW BELWYN
ROS S R ID G E
JAYWOOD
SPARROWHAWK
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11432
Stormwater
15
$808,000
Unincorporated
Missouri
Creve Coeur Creek
Capital
181Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MAINTENANCE YARD VEHICLE STORAGEBUILDING (MINTERT)
Construction
5120 - DistrictwideStormwater Fund
ADDITIONAL STORM SEWER CLEANING VEHICLES ARE BEINGORDERED TO BE STORED AT THIS FACILITY.
CONSTRUCT A NEW TRUCK STORAGE BUILDING AND MODIFICATIONSTO AN EXISTING BUILDING AT THE MINTERT CONSTRUCTION YARD.BERMUDAROWLES
MINTERT INDUSTRI
A
L
FERG
U
S
O
N
NORF
O
L
K
S
O
U
T
H
E
R
N
MINTE R TMANORBEHLEPAYNE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10282
Stormwater
15
$2,000,000
St. Louis County
Various
Various
Capital
182Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MARTIGNEY CREEK STREAMBANKSTABILIZATION - FAIRWICK AND GOLDEN VALLEYBANK STABILIZATION (MGMB-150)
Construction
5120 - DistrictwideStormwater Fund
HIGH RISK EROSION TO EIGHT MISCELLANEOUS STRUCTURES.
CONSTRUCT 850 FEET OF 6 FOOT TO 12 FOOT HIGH MODULAR BLOCKWALL BANK STABILIZATION, AND 916 FEET OF 12-INCH TO 18-INCHSANITARY SEWER.KYMAQ
U
A
R
I
D
G
E
G
O
L
D
E
N
V
A
L
L
E
Y
F
A
I
R
W
I
C
K
FOR
D
E
R HEINLEROSYMCL
A
U
G
H
L
I
N
IVY
G
A
T
E
WOODHILL§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11481
Stormwater
15
$1,898,000
Unincorporated
Lemay/RDP
Martigney Creek
Non-recurring
183Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MARTIGNEY CREEK STREAMBANKSTABILIZATION - FAIRWICK AND GOLDEN VALLEYBANK STABILIZATION (MGMB-150)
Construction
6660 - SanitaryReplacement Fund
HIGH RISK EROSION TO EIGHT MISCELLANEOUS STRUCTURES.
CONSTRUCT 850 FEET OF 6 FOOT TO 12 FOOT HIGH MODULAR BLOCKWALL BANK STABILIZATION, AND 916 FEET OF 12-INCH TO 18-INCHSANITARY SEWER.KYMAQ
U
A
R
I
D
G
E
G
O
L
D
E
N
V
A
L
L
E
Y
F
A
I
R
W
I
C
K
FOR
D
E
R HEINLEROSYMCL
A
U
G
H
L
I
N
IVY
G
A
T
E
WOODHILL§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11481
Stormwater
15
$282,000
Unincorporated
Lemay/RDP
Martigney Creek
Non-recurring
184Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NOTTINGHAM ESTATES DR. #5217 STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD FLOODING.
CONSTRUCT 243 FEET OF 15-INCH TO 16-INCH STORM SEWER.
BUTLER HILL
ROUNDTABLE
NOTTINGHAM ESTAT
E
S
CAMELOTESTATESCORNWALLESTATES§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11536
Stormwater
15
$120,000
Unincorporated
Meramec
Mattese Creek
Capital
185Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RAFORD CT. STORM SEWER SEPARATION
Construction
5120 - DistrictwideStormwater Fund
OVERLAND FLOODING, AND STORMWATER OVERCHARGES THE12-INCH VCP COMBINED SEWER CAUSING BUILDING BACKUPS INSEVERAL DUPLEX BUILDINGS.
CONSTRUCT 360 FEET OF 15-INCH STORM SEWER, TO SEPARATE THESTORM AND SANITARY SYSTEMS.
FONTAINE
RAFORD
CHAIN OF ROCKS
RIVER RUN
RIVER TRAIL
JENNINGSSTATION
MAKALU
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11506
Stormwater
15
$175,000
Bellefontaine Neighbors
Bissell
Baden
Capital
186Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
REYNOSA - MELITTA STREAMBANKSTABILIZATION
Construction
5120 - DistrictwideStormwater Fund
MODERATE RISK STRUCTURAL EROSION AT FOUR HOMES.
CONSTRUCT 340 FEET OF 4 TO 12 FEET HIGH MODULAR BLOCKRETAINING WALL, 800 FEET OF 4 TO 12 FEET HIGH HEAVY STONEREVETMENT, AND BIOSTABILIZATION.OLD TESSONR
E
Y
N
O
S
A LANGTREEPRI
V
A
T
E
TO
W
N
E
C
E
N
T
R
E
TO
W
N
E
S
O
U
T
H
BROAD OAKMELIT TAL
A
M
P
L
I
G
H
T
E
R
S
Q
KE
N
N
E
R
L
Y
P
I
N
E
S
KE
N
N
E
R
L
Y
P
L
A
C
E
RED CEDARBR
O
A
D
O
A
KPRIVATE §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11630
Stormwater
15
$1,200,000
Unincorporated
Meramec
Mattese Creek
Capital
187Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SEMINARY OMCI REIMBURSEMENTS PROGRAM
Construction
5593 - Sem Br Of RiverDes Peres OMCI Fund
STORMWATER ISSUES IN THE SEMINARY OMCI TAXING SUBDISTRICT.
OFFER STORMWATER GRANTS TO MUNICIPALITIES WITHIN THESEMINARY OMCI.
THIS PROGRAM WILL OFFER GRANT REIMBURSEMENTS TOMUNICIPALITIES TO PROMOTE RESOLUTION OF STORMWATER ISSUES.
§¨¦44ELM
MACKENZIEHEEGE
WEIL
WEBERLACLEDE STATIONGRAYROCK HILLLOCKWOOD
EDGARGOREP
A
R
D
E
E VALCOURGLENDALE
LANSDOWNE
GRANT CHESHIRERIV
ERDESPERESUNIONPACIFICMAPLEMURDOCH
ELTONTULIP LILACMATHILDAIVY
JACKSON
STAELYOLDWATSONSELMAGRAMONDBURLINGTONNORTHERNSANTAFEBANCROFT
M
C
C
A
USLANDPLANTKITJOYVAUK
LUCIADANAVASELVITA
ROSEJEFFERSONOAK
GENESTAWELLSSUN
R
A
Y PRIVATE
ACORNTU R FS U T HERLAND
FLORENCE
RADIOCOLLEEN PILOTSOUTHSIDEFORESTLANVALE
EDENCLARA
HEATHERELGINS A V IO
BRUNSWICK
ALMANEIERKIDDERPHILOYALE
FLAMINGOBU
L
L
R
U
NFERNALDDOBBIN JOELIDAMORLAKEBRIDLE HAZEL
HOSMER
BUSCHTYLER
CHIVVISMENOLALOCKSLEYBURNTOAKLACEYNORMALLOUKIRKY
EWERS RABETHWEIL
ELMSELMAVA
SELGRANT
WATSON RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13491
Stormwater
15
$118,000
Various
Lemay/RDP
Seminary Branch
Non-recurring
188Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SIMS AVE STORM BUYOUT
Land Purchase
5584 - University CityOMCI Fund
STRUCTURE CONSTRUCTED WITHIN OVERLAND FLOW PATH, ANDEXISTING SEWER UNDER STRUCTURE IS DETERIORATING.
BUYOUT AND DEMOLISH STRUCTURE TO REESTABLISH THEOVERLAND FLOW PATH.WISMERFLORASIMSNIBLIC
EASTBROOK
LACKLAND
TRESCOTT
DRIVER
LULLABY
NORTHFIELDRHYTHM HUNTINGTONCLARESTEDMANHUNTINGTON§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10880
Stormwater
13
$200,000
Overland
Lemay/RDP
University City Branch
Non-recurring
189Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STANWOOD DR. AND BELWOOD DR. STORMSEWER AND BANK STABILIZATION
Construction
5120 - DistrictwideStormwater Fund
CHANNEL EROSION.
CONSTRUCT 190 FEET OF 12-INCH TO 30-INCH STORM SEWER, AND 139SQUARE YARDS OF HEAVY STONE REVETMENT.
§¨¦70
§¨¦70
STANWO
O
D
B
E
R
M
U
D
A
B
E
L
W
O
O
D
COLTONOLENEKIRKLANDN
O
R
W
A
L
K
SAN
T
A
M
O
N
I
C
A WINSLOWBERMUDA §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11442
Stormwater
15
$400,000
Normandy
Bissell
Baden
Capital
190Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER INFRASTRUCTURE REPAIRS (2021)
Work Order Repair Costs(Capital)
5120 - DistrictwideStormwater Fund
AGING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR OR REPLACEMENT OF STORMWATERINFRASTRUCTURE THROUGHOUT THE DISTRICT.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13004
Stormwater
17
$3,000,000
Various
Various
Various
Asset Management
191Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER QUALITY GREENINFRASTRUCTURE - SMALL GRANT RAINSCAPINGPROGRAM
Construction
5110 - StormwaterRegulatory Fund
RAINSCAPING NEEDED TO ADDRESS WATER QUALITY OF STORMWATERRUNOFF THROUGH PUBLIC PARTICIPATION.
SMALL GRANT PROGRAM TO FUND CONSTRUCTION AND ENCOURAGETHE USE OF RAINSCAPING TECHNIQUES BY INDIVIDUALLANDOWNERS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13352
Stormwater
15
$200,000
Various
Various
Various
Non-recurring
192Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SUGAR CREEK OMCI REIMBURSEMENTSPROGRAM
Construction
5583 - Sugar CreekOMCI Fund
STORMWATER ISSUES IN THE SUGAR CREEK OMCI TAXINGSUBDISTRICT.
OFFER STORMWATER GRANTS TO MUNICIPALITIES WITHIN THE SUGARCREEK OMCI.
THIS PROGRAM WILL OFFER GRANT REIMBURSEMENTS TOMUNICIPALITIES TO PROMOTE RESOLUTION OF STORMWATER ISSUES.
§¨¦270
GEYERBALLASADAMS
UNIONPACIFIC CLAYESSEX
DES PERESDOUGHER TYFE R R Y
TAYLORHARRISONCOUCHC R A IG
ANN
ROSE HILL
WOODBINE
NIRK
BURLINGTON NORTHERN SAN T A F EBARRETTS
T
ATION
BOAZ RUTHB
O
P
P
LARK EVANSEDNAWAY
PEEKESIMMONSWILSON
LE M P
LEE
MA R S H A LLVAN BURENHIG
H
L
A
N
DPIN G R Y
SARAH
THORNHILL
IRISMONROEWOODGATE
FRIEDANANABA
C
HTALLIERAYN E R
LINWOOD
JE WEL
SPINDLE
S
TGILES
ARGONNE
G ABRIELGRAND
KIRKSHIRE
JANET
WESTVIEWGRUPPSARALA LI
NDEMA
N FOLGEROGEPAMELA
KNIERIMBONROYALFRANCES
PRIVATE
WINSLOW
NICHOLAS
WINDSORMOZARTLYNKIRK
CLINTON
JEWEL
PRIVATEBALLASU N IO N P A C IF IC CLAYHARRISONPRIVATE TAYLORJEWEL
TAYLORM A NCHESTER RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13490
Stormwater
15
$138,931
Various
Meramec
Sugar Creek
Non-recurring
193Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY OMCI REIMBURSEMENTSPROGRAM
Construction
5584 - University CityOMCI Fund
STORMWATER ISSUES IN THE UNIVERSITY CITY OMCI TAXINGSUBDISTRICT.
OFFER STORMWATER GRANTS TO MUNICIPALITIES WITHIN THEUNIVERSITY CITY OMCI.
THIS PROGRAM WILL OFFER GRANT REIMBURSEMENTS TOMUNICIPALITIES TO PROMOTE RESOLUTION OF STORMWATER ISSUES.
§¨¦170
§¨¦64
§¨¦70
§¨¦170OLIVE BLVDNLINDBERGHBLVDST
C
H
A
R
L
E
S
R
O
C
K
R
D
NATURALBRIDGERD
S LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13489
Stormwater
15
$442,785
Various
Lemay/RDP
University City Branch
Non-recurring
194Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WATER QUALITY STORMWATER BMP PARKALONG DEER CREEK (HANLEY RD TO SOUTHBRENTWOOD BLVD)
Construction
5110 - StormwaterRegulatory Fund
REGULAR STORMWATER FLOODING ALONG DEER CREEK. FLOODMITIGATION PROJECT PROVIDES OPPORTUNITY FOR PUBLICOUTREACH AND EDUCATION.
CONSTRUCT STORMWATER QUALITY BMPS SUCH AS BIORETENTION,PERMEABLE PAVERS, AND EDUCATIONAL SIGNAGE, FOR PUBLICDEMONSTRATION AND EDUCATION.
PROJECT WILL BE IMPLEMENTED BY BRENTWOOD, AS PART OF THEBRENTWOOD BOUND FLOOD MITIGATION PROJECT ALONG DEERCREEK.GLENPACIFIC
FOREST
MARSHALL
UNION
P
A
C
I
F
I
CLOUISBRENTWOODMARYSALEMFLORENCECECELIAHANLEY
SUMMITEUNICEPRIVATEMELVINBRAZEAURUTHJOSEPH
J
AGUARHELEN
MASON
FAWN
MAGDALEN
BOMPARTKENTLANDMADGE
B R E N T W O O D INDUSTRIAL
JAMESONHANLEYGLENBOMPARTFLORENCEMELVINMARY
PRIVATE
GLENHELENFAWN
MANCHESTER RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13385
Stormwater
15
$800,000
Brentwood
Lemay/RDP
Deer Creek
Non-recurring
195Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WEATHERBY DRIVE STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
ROADWAY FLOODING ON CRIMSON, AND YARD FLOODING/EROSION AT1401,1407, AND 1415 WEATHERBY, AND 1101 CRIMSON.
CONSTRUCT 485 FEET OF 12-INCH TO 18-INCH STORM SEWER.PEM
D
A
U
T
E
L
PATTY ANN
M
I
R
A
N
D
Y
WEAT
H
E
R
B
Y
C
R
I
M
S
O
N
S
C
H
U
L
T
E
CHIEFTAIN
QUIET
G
R
E
Y
S
T
O
N
E
E
S
T
A
T
E
S FARMI
NGT
O
N TIVERTONOXBRIDGE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11396
Stormwater
15
$180,000
Unincorporated
Missouri
Fee Fee Creek
Capital
196Page
2021
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WILBORN DRIVE #5361 STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
BASEMENT AND YARD FLOODING.
CONSTRUCT 250 FEET OF 12-INCH TO 18-INCH STORM SEWER.WILBORNGAR
E
S
C
H
E
HAMILTONHODIAMONTLALI
T
EHELENTHEO
D
O
R
E
LUCI
L
L
E
GOODFELLOWSHE
R
R
Y
GAR
E
S
C
H
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11430
Stormwater
15
$120,000
Jennings
Bissell
Baden
Non-recurring
197Page
2021
25 February 2020
Page 1 of 1
STORMWATER CONTINUED PROJECTS - FY21
PROJECT
NUMBER
PROJECT NAME REASON PROJECT CONTINUED COST
ESTIMATE
10209 CHERRY TREE LANE
STORM IMPROVEMENT
PROJECT CONTINUED DUE TO COORDINATION WITH THE
CITY OF ST. LOUIS. ANTICIPATE BOARD INTRODUCTION
IN AUGUST 2020.
$730,000
11224 TIMBER TRAIL - BRIAR
RIDGE CHANNEL
IMPROVEMENTS
PROJECT CONTINUED DUE TO COORDINATION WITH THE
CITY OF FRONTENAC. ANTICIPATE BOARD
INTRODUCTION IN OCTOBER 2020.
$249,000
10366 UNION ROAD 100 BLOCK
STORM IMPROVEMENTS
PROJECT CONTINUED DUE TO COORDINATION WITH
PROPERTY OWNERS. ANTICIPATE BOARD INTRODUCTION
IN AUGUST 2020.
$550,000
12938 WILLOW HILL STORM
SEWER (LADUE 1614A)
PROJECT CONTINUED DUE TO COORDINATION WITH THE
CITY OF LADUE. ANTICIPATE BOARD INTRODUCTION IN
NOVEMBER 2020.
$500,000
TOTAL: $2,029,000
24 February 2020
Page 1 of 1
STORMWATER CONTINGENCY PROJECTS - FY22
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11408 BROADHEAD #921 STORM SEWER $220,000 198
13285 CLAYTON CITY HALL STORM SEWER $1,590,000 199
11535 DEKAMAY DRIVE STORM SEWER (MGJB-130)$615,000 200
11558 GENTLE COURT CHANNEL IMPROVEMENT
(WILL-06)
$180,000 201
10070 HALL STREET STORM SEWERS $50,000 202
11598 ORCHARD AND WINDSOR LANE STORM
SEWER
$509,000 203
10266 ST. SIMON CT. #10023 STORM CHANNEL
(GCMB-250)
$122,000 204
10351 WC-33 LA PADERA - EL CAMARA STORM
IMPROVEMENT
$405,000 205
10351 WC-33 LA PADERA - EL CAMARA STORM
IMPROVEMENT
$495,000 206
TOTAL:$4,186,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BROADHEAD #921 STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
CHANNEL EROSION AT END OF 30-INCH CMP.
CONSTRUCT 235 FEET OF 30-INCH STORM SEWER.
LAREDO
FARMVIEW DEL REOTRAMPE
RIO GRANDEBROADHEAD §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11408
Stormwater
15
$220,000
Unincorporated
Bissell
Spanish Lake
Capital
198Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CLAYTON CITY HALL STORM SEWER
Construction
5563 - Clayton CentralOMCI Fund
STORM SEWER SURCHARGING AND FLOODING OF A CITY OF CLAYTONPARKING GARAGE UNDERGROUND LEVEL.
CONSTRUCT 360 FEET OF 12-INCH TO 36-INCH STORM SEWER.
PROJECT MAY BE CONSTRUCTED BY THE CITY OF CLAYTON UNDER AFUNDING AGREEMENT WITH THE DISTRICT, DUE TO THE IMPACT ONCITY FACILITIES.HANLEYFORSYTHCENTRAL MARYLAND
BEMISTONMERAMECCARONDELET LINDENLYLE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13285
Stormwater
15
$1,590,000
Clayton
Lemay/RDP
Deer Creek
Capital
199Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEKAMAY DRIVE STORM SEWER (MGJB-130)
Construction
5120 - DistrictwideStormwater Fund
FREQUENT STRUCTURAL FLOODING FROM OVERLAND FLOW.
CONSTRUCT 1,050 FEET OF 12-INCH TO 24-INCH STORM SEWER.RINGERLIN
D LIN TELDEKAMAYDA
M
A
S
C
U
S
BRIDGERIDGEMILISSASAPPINGTON BARRACKS
BRID G ETR
INGFIELD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11535
Stormwater
15
$615,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
200Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENTLE COURT CHANNEL IMPROVEMENT(WILL-06)
Construction
5120 - DistrictwideStormwater Fund
CREEK EROSION NEAR #39 GENTLE COURT.
CONSTRUCT 90 FEET OF 6 FEET HIGH HEAVY STONE REVETMENT BANKSTABILIZATION AND ONE GRADE CONTROL STRUCTURE.
S
M
I
Z
E
R
M
I
L
L
PRAISE
GE
N
T
L
E
S A LVATIONRID G E
AVA
L
O
N
R
ID
G
E HUMBLELANCEEND
AVALONVALL E Y
APOSTLE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11558
Stormwater
15
$180,000
Unincorporated
Meramec
Williams Creek
Non-recurring
201Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HALL STREET STORM SEWERS
Design Services
5120 - DistrictwideStormwater Fund
STREET FLOODING ALONG HALL STREET FROM RIVERVIEW TO GRAND.
CONSTRUCT 10,350 FEET OF 12-INCH TO 36-INCH STORM SEWER, 2MILES OF CURB AND GUTTER, AND 130 FEET OF 60-INCH TUNNEL,ALONG HALL STREET.
§¨¦70
§¨¦70
H
A
L
L
TERMINALSWITZ
E
R
UNIONMCLARAN
BIRCHER CHURCHTARASHREVEPARKRUSKINLEE CARRIET
H
E
K
L
A
H
A
R
N
E
Y
CART
E
R TAYLORR
O
S
A
LIE
M
C
K
IS
S
OC
K
EUCLIDCANAAN
HORNSBY
LI
L
L
I
A
N CALVARYEMERSONPENROSE ADELAIDEPOPETHRUSHNEWBYM
O
R
A
GLADY
S
HARLAN
LOWELLGRAPE
B
U
L
W
E
RBLASE
CALV
I
N THATCHERORCHID
AUBERTP
R
E
S
C
O
T
T
ATHLONEHARRISCARRIE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10070
Stormwater
11
$50,000
St. Louis City
Bissell
Various
Capital
202Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ORCHARD AND WINDSOR LANE STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD AND GARAGE FLOODING.
CONSTRUCT 765 FEET OF 18-INCH TO 36-INCH STORM SEWER AND 1RAIN GARDEN.GEYERFORESTORCHARDWINDSOR
BOXWOOD
LEMP
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11598
Stormwater
15
$509,000
Kirkwood
Meramec
Meramec Tributary Areas
Capital
203Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ST. SIMON CT. #10023 STORM CHANNEL (GCMB-250)
Construction
5571 - Gravois CreekOMCI Fund
YARD EROSION AFFECTS #10023 ST. SIMON CT. LOCATED OFF TESSONFERRY RD.
CONSTRUCT 40 FEET OF 42-INCH STORM SEWER AND BANKSTABILIZATION.LAVINIASOLAR
SLE
V
I
N
MUS
I
C
K
FIT
E
ST S
I
M
O
N
JAN JUNIPERBROOKIN
GS
FAR
A
D
A
YCATHY
CONCORDCIRCLEGAIL
WALCHSHAUSER TESSON FERRY RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10266
Stormwater
15
$122,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
204Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WC-33 LA PADERA - EL CAMARA STORMIMPROVEMENT
Construction
5587 - Watkins CreekOMCI Fund
CREEK BANK EROSION ALONG PROPERTIES BETWEEN LA PADERALANE AND EL CAMARA DRIVE.
CONSTRUCT 1,160 LINEAR FEET OF ROCK LINING ANDBIOSTABILIZATION.
PROJECT TO BE SPLIT FUNDED BETWEEN FUNDS 5587 AND 5120.EL CAMARALA PADERASHEFFIELD
RED BARNEL SOMO
D A L LAVISSTRAND
ALTOZA
N
O
LAS SOMBRIAS
E LSERRANO FOXSHIRE
EL CAMPOFARM PON
D
GLASGOW
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10351
Stormwater
15
$405,000
Unincorporated
Bissell
Watkins Creek
Non-recurring
205Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WC-33 LA PADERA - EL CAMARA STORMIMPROVEMENT
Construction
5120 - DistrictwideStormwater Fund
CREEK BANK EROSION ALONG PROPERTIES BETWEEN LA PADERALANE AND EL CAMARA DRIVE.
CONSTRUCT 1,160 LINEAR FEET OF ROCK LINING ANDBIOSTABILIZATION.
PROJECT TO BE SPLIT FUNDED BETWEEN FUNDS 5587 AND 5120.EL CAMARALA PADERASHEFFIELD
RED BARNEL SOMO
D A L LAVISSTRAND
ALTOZA
N
O
LAS SOMBRIAS
E LSERRANO FOXSHIRE
EL CAMPOFARM PON
D
GLASGOW
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10351
Stormwater
15
$495,000
Unincorporated
Bissell
Watkins Creek
Non-recurring
206Page
2022
24 February 2020
Page 1 of 3
STORMWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
12842 GSA -
(Planning)
Operating Fund
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2021)
Various $100,000
13352 Construction STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
13385 Construction WATER QUALITY STORMWATER BMP PARK
ALONG DEER CREEK (HANLEY RD TO
SOUTH BRENTWOOD BLVD)
Brentwood $800,000
FUND TOTAL: $1,100,000
5120 - DISTRICTWIDE STORMWATER FUND
11623 Construction BRUNSTON DR. #4875 BANK STABILIZATION Unincorporated $460,000
10391 Construction CARL AVE., AVIS ST., AND MAIN ST. STORM
SEWER
Jennings $315,000
11418 Construction DRURY - SWITZER STORM SEWER St. Louis City $145,000
11474 Construction GLEASON #656 STORM SEWER Bellefontaine
Neighbors
$95,000
11432 Construction LARKWOOD - JAYWOOD - SPARROWWOOD
BANK STABILIZATION (CRE-07)
Unincorporated $808,000
10282 Engineering
During
Construction
Services
MAINTENANCE YARD VEHICLE STORAGE
BUILDING (MINTERT)
St. Louis County $150,000
10282 Construction MAINTENANCE YARD VEHICLE STORAGE
BUILDING (MINTERT)
St. Louis County $2,000,000
11481 Construction MARTIGNEY CREEK STREAMBANK
STABILIZATION - FAIRWICK AND GOLDEN
VALLEY BANK STABILIZATION (MGMB-150)
Unincorporated $1,898,000
11536 Construction NOTTINGHAM ESTATES DR. #5217 STORM
SEWER
Unincorporated $120,000
11506 Construction RAFORD CT. STORM SEWER SEPARATION Bellefontaine
Neighbors
$175,000
11630 Construction REYNOSA - MELITTA STREAMBANK
STABILIZATION
Unincorporated $1,200,000
11442 Construction STANWOOD DR. AND BELWOOD DR. STORM
SEWER AND BANK STABILIZATION
Normandy $400,000
13004 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2021)
Various $3,000,000
10366 Construction UNION ROAD 100 BLOCK STORM
IMPROVEMENTS
Unincorporated $550,000
24 February 2020
Page 2 of 3
STORMWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11396 Construction WEATHERBY DRIVE STORM SEWER Unincorporated $180,000
11430 Construction WILBORN DRIVE #5361 STORM SEWER Jennings $120,000
FUND TOTAL: $11,616,000
5564 - COLDWATER CREEK OMCI FUND
13488 Construction COLDWATER CREEK OMCI
REIMBURSEMENTS PROGRAM
Various $956,598
13193 Professional
Services
OMCI STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (2021)
Various $63,000
13189 Professional
Services
OMCI STORMWATER STREAMBANK
STABILIZATION DESIGN (2021)
Various $90,000
FUND TOTAL: $1,109,598
5566 - DEER CREEK OMCI FUND
13487 Construction DEER CREEK OMCI REIMBURSEMENTS
PROGRAM
Various $1,865,563
13193 Professional
Services
OMCI STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (2021)
Various $492,000
13189 Professional
Services
OMCI STORMWATER STREAMBANK
STABILIZATION DESIGN (2021)
Various $691,000
11224 Construction TIMBER TRAIL - BRIAR RIDGE CHANNEL
IMPROVEMENTS
Frontenac $249,000
12938 Construction WILLOW HILL STORM SEWER (LADUE
1614A)
Ladue $500,000
FUND TOTAL: $3,797,563
5576 - MALINE CREEK OMCI FUND
13193 Professional
Services
OMCI STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (2021)
Various $140,000
FUND TOTAL: $140,000
5583 - SUGAR CREEK OMCI FUND
13490 Construction SUGAR CREEK OMCI REIMBURSEMENTS
PROGRAM
Various $138,931
FUND TOTAL: $138,931
5584 - UNIVERSITY CITY OMCI FUND
10209 Construction CHERRY TREE LANE STORM
IMPROVEMENT
Olivette $730,000
24 February 2020
Page 3 of 3
STORMWATER PROJECTS - FY21
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13193 Professional
Services
OMCI STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (2021)
Various $115,000
13189 Professional
Services
OMCI STORMWATER STREAMBANK
STABILIZATION DESIGN (2021)
Various $134,000
10880 Land Purchase SIMS AVE STORM BUYOUT Overland $200,000
13489 Construction UNIVERSITY CITY OMCI REIMBURSEMENTS
PROGRAM
Various $442,785
FUND TOTAL: $1,621,785
5593 - SEM BR OF RIVER DES PERES OMCI FUND
13491 Construction SEMINARY OMCI REIMBURSEMENTS
PROGRAM
Various $118,000
FUND TOTAL: $118,000
6660 - SANITARY REPLACEMENT FUND
11481 Construction MARTIGNEY CREEK STREAMBANK
STABILIZATION - FAIRWICK AND GOLDEN
VALLEY BANK STABILIZATION (MGMB-150)
Unincorporated $282,000
FUND TOTAL: $282,000
GRAND TOTAL:$19,923,877
24 February 2020
Page 1 of 3
STORMWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
12842 GSA -
(Planning)
Operating Fund
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2021)
Various $100,000
13352 Construction STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $300,000
5120 - DISTRICTWIDE STORMWATER FUND
11416 Construction BOXFORD COURT BANK STABILIZATION Chesterfield $267,000
11408 Construction BROADHEAD #921 STORM SEWER Unincorporated $220,000
11535 Construction DEKAMAY DRIVE STORM SEWER (MGJB-
130)
Unincorporated $615,000
11558 Construction GENTLE COURT CHANNEL IMPROVEMENT
(WILL-06)
Unincorporated $180,000
10070 Engineering
During
Construction
Services
HALL STREET STORM SEWERS St. Louis City $100,000
10070 Design Services HALL STREET STORM SEWERS St. Louis City $50,000
10070 Construction HALL STREET STORM SEWERS St. Louis City $7,000,000
11598 Construction ORCHARD AND WINDSOR LANE STORM
SEWER
Kirkwood $509,000
13005 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2022)
Various $3,000,000
10351 Construction WC-33 LA PADERA - EL CAMARA STORM
IMPROVEMENT
Unincorporated $495,000
FUND TOTAL: $12,436,000
5563 - CLAYTON CENTRAL OMCI FUND
13285 Construction CLAYTON CITY HALL STORM SEWER Clayton $1,590,000
FUND TOTAL: $1,590,000
5564 - COLDWATER CREEK OMCI FUND
13488 Construction COLDWATER CREEK OMCI
REIMBURSEMENTS PROGRAM
Various $956,598
24 February 2020
Page 2 of 3
STORMWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $956,598
5566 - DEER CREEK OMCI FUND
13487 Construction DEER CREEK OMCI REIMBURSEMENTS
PROGRAM
Various $1,865,563
13474 Property Rights
Acquisition
EASEMENT ACQUISITION FOR DEER CREEK
OMCI PROJECTS (2021)
Various $350,000
FUND TOTAL: $2,215,563
5571 - GRAVOIS CREEK OMCI FUND
10266 Construction ST. SIMON CT. #10023 STORM CHANNEL
(GCMB-250)
Unincorporated $122,000
FUND TOTAL: $122,000
5576 - MALINE CREEK OMCI FUND
13476 Property Rights
Acquisition
EASEMENT ACQUISITION FOR MALINE
OMCI PROJECTS (2021)
Various $80,000
FUND TOTAL: $80,000
5583 - SUGAR CREEK OMCI FUND
13490 Construction SUGAR CREEK OMCI REIMBURSEMENTS
PROGRAM
Various $138,931
FUND TOTAL: $138,931
5584 - UNIVERSITY CITY OMCI FUND
13475 Property Rights
Acquisition
EASEMENT ACQUISITION FOR UNIVERSITY
CITY OMCI PROJECTS (2021)
Various $75,000
13489 Construction UNIVERSITY CITY OMCI REIMBURSEMENTS
PROGRAM
Various $442,785
FUND TOTAL: $517,785
5587 - WATKINS CREEK OMCI FUND
10351 Construction WC-33 LA PADERA - EL CAMARA STORM
IMPROVEMENT
Unincorporated $405,000
FUND TOTAL: $405,000
5593 - SEM BR OF RIVER DES PERES OMCI FUND
24 February 2020
Page 3 of 3
STORMWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13491 Construction SEMINARY OMCI REIMBURSEMENTS
PROGRAM
Various $118,000
FUND TOTAL: $118,000
GRAND TOTAL:$18,879,877
24 February 2020
Page 1 of 3
STORMWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
12842 GSA -
(Planning)
Operating Fund
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2021)
Various $100,000
13352 Construction STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $300,000
5120 - DISTRICTWIDE STORMWATER FUND
10070 Construction
(Supplemental
Appropriation)
HALL STREET STORM SEWERS St. Louis City $3,920,000
11530 Construction LARIMORE STORM SEWER Unincorporated $2,870,000
13006 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2023)
Various $3,000,000
FUND TOTAL: $9,790,000
5564 - COLDWATER CREEK OMCI FUND
13488 Construction COLDWATER CREEK OMCI
REIMBURSEMENTS PROGRAM
Various $956,598
11179 Construction EVERMAN AVE 9518 STORM SEWER Overland $333,000
10895 Construction FAIRWAY CT 3901 BANK STABILIZATION St. Ann $209,000
11325 Construction NORTH NEW FLORISSANT - FOX RUN
STORM SEWER
Florissant $532,000
11273 Construction REASOR DRIVE STORM SEWER Calverton Park $560,000
11133 Construction SHERWOOD DR. #2790 STORM SEWER Unincorporated $146,000
FUND TOTAL: $2,736,598
5566 - DEER CREEK OMCI FUND
12911 Construction BALLAS MEADOWS DR 12403 STORM
SEWER IMPROVEMENTS
Des Peres $121,000
12469 Construction BEAUCAIRE DR STORM SEWER (WARSON
WOODS 3-10 3-12)
Warson Woods $255,000
11472 Construction BILTMORE DR AND BEMISTON AVE STORM
SEWER
Clayton $218,000
24 February 2020
Page 2 of 3
STORMWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12703 Construction DANIEL ROAD STORM SEWER RELIEF Ladue $440,000
11205 Construction DEARBORN DR STORM SEWER Warson Woods $201,000
13487 Construction DEER CREEK OMCI REIMBURSEMENTS
PROGRAM
Various $1,865,563
10587 Construction EAST ESSEX AVE 802 - 804 STORM SEWER Glendale $239,000
11226 Construction FIRETHORN DR 2050 STORM
IMPROVEMENTS
Frontenac $346,000
10340 Construction KIRKHAM AND THORNTON - SHADY GROVE
CREEK BANK STABILIZATION
Webster Groves $525,000
12900 Construction LITZSINGER #10412 STORM SEWER
IMPROVEMENTS
Frontenac $164,000
12757 Construction MARK DRIVE - MONACO DRIVE STORM
SEWER
Warson Woods $233,000
11972 Construction MEADOW CREEK LN 508 STORM SEWER Warson Woods $100,000
11034 Construction OUTER LADUE AND CHIPPER STORM
SEWER
Frontenac $537,000
13293 Construction WARSON ROAD SOUTH 2000 STREAMBANK
STABILIZATION
Ladue $154,000
11161 Construction WHITEHALL CT - PINE AVE STORM SEWER Brentwood $180,000
12971 Construction WOODCLIFFE ROAD #1-36 STREAMBANK
STABILIZATION (LADUE 1625.03)
Ladue $1,093,000
FUND TOTAL: $6,671,563
5576 - MALINE CREEK OMCI FUND
11286 Construction BALLMAN DRIVE 300 BLOCK STORM
SEWER
Ferguson $360,000
10394 Construction DENNIS AND KAPPEL STORM SEWER Unincorporated $415,000
11277 Construction LONGFORD DRIVE 1851 STORM SEWER Unincorporated $85,000
FUND TOTAL: $860,000
5583 - SUGAR CREEK OMCI FUND
13490 Construction SUGAR CREEK OMCI REIMBURSEMENTS
PROGRAM
Various $138,931
FUND TOTAL: $138,931
5584 - UNIVERSITY CITY OMCI FUND
11314 Construction GLENMARY TO WHITE ROSE STORM
IMPROVEMENTS
Olivette $380,000
24 February 2020
Page 3 of 3
STORMWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11313 Construction TRENTON AVE 9400 BLOCK CHANNEL
IMPROVEMENTS
Overland $386,000
13489 Construction UNIVERSITY CITY OMCI REIMBURSEMENTS
PROGRAM
Various $442,785
FUND TOTAL: $1,208,785
5593 - SEM BR OF RIVER DES PERES OMCI FUND
11466 Construction HURSTGREEN LANE BANK STABILIZATION Unincorporated $185,000
13491 Construction SEMINARY OMCI REIMBURSEMENTS
PROGRAM
Various $118,000
FUND TOTAL: $303,000
GRAND TOTAL:$22,008,877
24 February 2020
Page 1 of 1
STORMWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
13299 GSA -
(Planning)
Operating Fund
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2024)
Various $100,000
13352 Construction STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $300,000
5120 - DISTRICTWIDE STORMWATER FUND
13007 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2024)
Various $5,000,000
13129 Construction STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2024)
Various $4,000,000
FUND TOTAL: $9,000,000
GRAND TOTAL:$9,300,000
24 February 2020
Page 1 of 2
STORMWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
13299 GSA -
(Planning)
Operating Fund
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2024)
Various $100,000
13352 Construction STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $300,000
5120 - DISTRICTWIDE STORMWATER FUND
13008 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2025)
Various $5,000,000
13130 Construction STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2025)
Various $4,000,000
FUND TOTAL: $9,000,000
5564 - COLDWATER CREEK OMCI FUND
12745 Construction N WATERFORD 2735 STORM
IMPROVEMENTS
Florissant $84,000
FUND TOTAL: $84,000
5576 - MALINE CREEK OMCI FUND
11185 Construction KATHLYN AND LEITH STORM SEWERS Berkeley $78,000
11289 Construction KINCAID AVENUE STORM SEWER St. John $68,000
11296 Construction NEWELL AND NOAH DRIVE STORM SEWER Ferguson $101,000
11294 Construction TIFFIN AVE TO WESLEY AVE STORM
IMPROVEMENTS
Ferguson $90,000
FUND TOTAL: $337,000
5583 - SUGAR CREEK OMCI FUND
11332 Construction CULLODEN ROAD 819 - 827 STORM SEWER Kirkwood $111,000
10872 Construction NORTH GEYER AND VILLA GARDEN STORM
SEWER
Kirkwood $39,000
FUND TOTAL: $150,000
24 February 2020
Page 2 of 2
STORMWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
GRAND TOTAL:$9,871,000
24 February 2020
Page 1 of 14
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY21
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12088 BAXTER - MERAMEC BOTTOMS - VALLEY PARK
PRIVATE I/I REDUCTION
WASTEWATER BALLWIN 3
11474 GLEASON #656 STORM SEWER STORMWATER BELLEFONTAINE
NEIGHBORS
180
11506 RAFORD CT. STORM SEWER SEPARATION STORMWATER BELLEFONTAINE
NEIGHBORS
186
12185 FRIEDENS (PARTIAL) I/I REDUCTION (CHAIN OF
ROCKS DR AND FONTAINE PL)
WASTEWATER BELLEFONTAINE
NEIGHBORS
26
11212 WHITE AND ROSALIE I/I REDUCTION AND
BRIDGEPORT SEWER SEPARATION
WASTEWATER BRENTWOOD 137
12140 CSO - MARY AVENUE SOUTH OF MANCHESTER
CSO INTERCEPTOR (I-132)/OUTFALL (L-106)
ELIMINATION PHASE II
WASTEWATER BRENTWOOD 19
13385 WATER QUALITY STORMWATER BMP PARK
ALONG DEER CREEK (HANLEY RD TO SOUTH
BRENTWOOD BLVD)
STORMWATER BRENTWOOD 195
13404 CSO - MARY AVENUE SOUTH OF MANCHESTER
CSO INTERCEPTOR (I-132)/OUTFALL (L-106)
ELIMINATION PHASE I
WASTEWATER BRENTWOOD 90
13405 HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE IA
WASTEWATER BRENTWOOD 104
13480 DEER CREEK TRUNK SEWER RELOCATION
(BRECKENRIDGE INDUSTRIAL CT TO MARY
AVE)
WASTEWATER BRENTWOOD 97
12114 CAULKS CREEK PUMP STATION B (P-751)
RELOCATION
WASTEWATER CHESTERFIELD 11
12207 SPIRIT OF ST. LOUIS 2 PUMP STATION (P-736)
REPLACEMENT
WASTEWATER CHESTERFIELD 129
12248 CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
WASTEWATER CHESTERFIELD 89
24 February 2020
Page 2 of 14
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY21
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12280 WHITE PLAINS SANITARY RELIEF (SALTBOX DR
TO CEDAR CREEK RD)
WASTEWATER CHESTERFIELD 82
12628 SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-809 TO
P-750)
WASTEWATER CHESTERFIELD 75
12507 VALLEY PUBLIC I/I REDUCTION (CLARKSON RD
AND KEHRS MILL RD)
WASTEWATER CLARKSON
VALLEY
133
12195 S BRENTWOOD BLVD SANITARY RELIEF
(DAYTONA DR TO WALINCA TERRACE)
WASTEWATER CLAYTON 73
12325 LANG ROYCE SANITARY RELIEF (FARGO DR TO
FLORIDALE CT)
WASTEWATER DELLWOOD 113
12840 RIVERSIDE AND YARNELL SANITARY RELIEF
REPLACEMENT
WASTEWATER FENTON 128
12077 AMBLEWOOD SANITARY RELIEF (WATERFORD
DR TO BIRCHBARK DR)
WASTEWATER FLORISSANT 1
12178 FLORISSANT/DUNN SANITARY RELIEF (ST.
ANTHONY LN TO I-270)
WASTEWATER FLORISSANT 24
12330 LINDSAY - ST. ALBERT PRIVATE I/I REDUCTION WASTEWATER FLORISSANT 57
12583 WHITE BIRCH PUMP STATION (P-725)
ELIMINATION
WASTEWATER HAZELWOOD 138
12753 CAREY CT 1664 SANITARY AND STORM SEWER
REPLACEMENT
WASTEWATER HAZELWOOD 87
12753 CAREY CT 1664 SANITARY AND STORM SEWER
REPLACEMENT
WASTEWATER HAZELWOOD 88
12312 HUNTLEIGH TRAILS LN SANITARY RELIEF
(TWO MILE CREEK TRUNK SEWER TO N GEYER
RD)
WASTEWATER HUNTLEIGH 52
10391 CARL AVE., AVIS ST., AND MAIN ST. STORM
SEWER
STORMWATER JENNINGS 176
24 February 2020
Page 3 of 14
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY21
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11430 WILBORN DRIVE #5361 STORM SEWER STORMWATER JENNINGS 197
13432 HATHAWAY DRIVE SANITARY RELIEF WASTEWATER JENNINGS 50
12472 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD
BLVD TO CONWAY RD) PHASE III AND PHASE
IV
WASTEWATER LADUE 94
12188 RIVERPORT 6 PUMP STATION (P-781)
REHABILITATION
WASTEWATER MARYLAND
HEIGHTS
127
13223 MISSOURI RIVER WWTF TUNNEL SERVICE
WATER PIPING REPLACEMENT
WASTEWATER MARYLAND
HEIGHTS
125
11442 STANWOOD DR. AND BELWOOD DR. STORM
SEWER AND BANK STABILIZATION
STORMWATER NORMANDY 190
12241 UPPER BADEN SANITARY RELIEF (JENNINGS
STATION RD TO OAKRIDGE BLVD)
WASTEWATER NORTHWOODS 79
12329 LINDLEY DRIVE SANITARY RELIEF (I-170 TO
ASHMONT DR) (UR-07)
WASTEWATER OLIVETTE 117
10880 SIMS AVE STORM BUYOUT STORMWATER OVERLAND 189
12352 MIDLAND SANITARY RELIEF (MIDLAND BLVD
TO SIMS AVE)
WASTEWATER OVERLAND 123
11737 ELTORA WET WEATHER STORAGE FACILITY WASTEWATER PAGEDALE 23
12615 DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP) - PUMP STATION
WASTEWATER SHREWSBURY 20
12615 DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP) - PUMP STATION
WASTEWATER SHREWSBURY 96
24 February 2020
Page 4 of 14
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY21
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11137 GASLIGHT SQUARE SEWER IMPROVEMENTS WASTEWATER ST. LOUIS CITY 27
11418 DRURY - SWITZER STORM SEWER STORMWATER ST. LOUIS CITY 179
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
WASTEWATER ST. LOUIS CITY 64
11769 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(GOODFELLOW TO HAMILTON)
WASTEWATER ST. LOUIS CITY 105
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY
TO RDP TUBES)
WASTEWATER ST. LOUIS CITY 58
12483 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION
WASTEWATER ST. LOUIS CITY 65
12484 MISSISSIPPI FLOODWALL ORS PUMP STATIONS
REHABILITATION PHASE II
WASTEWATER ST. LOUIS CITY 124
12489 LOUISA AND ARSENAL PUMP STATIONS (P-112
AND P-113) UPGRADES
WASTEWATER ST. LOUIS CITY 59
12489 LOUISA AND ARSENAL PUMP STATIONS (P-112
AND P-113) UPGRADES
WASTEWATER ST. LOUIS CITY 118
12494 BISSELL POINT WWTF MAIN SUBSTATION
SWITCHGEAR AND MCC REPLACEMENT
WASTEWATER ST. LOUIS CITY 85
12548 BISSELL POINT WWTF FINE SCREEN,
CONCRETE AND GATE IMPROVEMENTS
WASTEWATER ST. LOUIS CITY 9
12566 BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
WASTEWATER ST. LOUIS CITY 10
12566 BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
WASTEWATER ST. LOUIS CITY 86
12693 CITYSHED MITIGATION PROGRAM DESIGN
(CONTRACT A)
WASTEWATER ST. LOUIS CITY 13
24 February 2020
Page 5 of 14
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY21
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12695 HARLEM BADEN RELIEF SYSTEM
IMPROVEMENT DESIGN (CONTRACT A)
WASTEWATER ST. LOUIS CITY 49
12762 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (RAIN GARDEN)
WASTEWATER ST. LOUIS CITY 121
12922 WATKINS CREEK PUMP STATION (P-101)
FORCEMAIN REPLACEMENT (COAL BANK RD
TO SPRING GARDEN DR)
WASTEWATER ST. LOUIS CITY 134
13296 MARKET ST 2350 GREEN INFRASTRUCTURE -
ENTRANCE AND LANDSCAPING
IMPROVEMENTS
UNALLOCATED ST. LOUIS CITY 122
13386 NORTH POINTE DETENTION BASIN OPTI
RETROFIT
WASTEWATER ST. LOUIS CITY 126
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
UNALLOCATED ST. LOUIS CITY
AND COUNTY
76
10282 MAINTENANCE YARD VEHICLE STORAGE
BUILDING (MINTERT)
STORMWATER ST. LOUIS
COUNTY
167
10282 MAINTENANCE YARD VEHICLE STORAGE
BUILDING (MINTERT)
STORMWATER ST. LOUIS
COUNTY
182
12249 UPPER MATTESE TRUNK SANITARY RELIEF
(THEISS RD TO LIBERTY TRAIL RD)
WASTEWATER ST. LOUIS
COUNTY
80
12264 GLENFIELD SANITARY RELIEF (WATSON
WOODS CT TO S LINDBERGH BLVD)
WASTEWATER SUNSET HILLS 46
12296 WOODS MILL SANITARY RELIEF (I-64 TO
BROOK MILL LN)
WASTEWATER TOWN AND
COUNTRY
139
12308 HORTON PUMP STATION (P-814) ELIMINATION WASTEWATER TOWN AND
COUNTRY
51
24 February 2020
Page 6 of 14
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY21
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
10012 FF-07 FEE FEE CREEK SANITARY RELIEF
(MEADOWSIDE DR TO WILLOW BROOK DR)
WASTEWATER UNINCORPORAT
ED
101
10715 NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
WASTEWATER UNINCORPORAT
ED
66
11396 WEATHERBY DRIVE STORM SEWER STORMWATER UNINCORPORAT
ED
196
11432 LARKWOOD - JAYWOOD - SPARROWWOOD
BANK STABILIZATION (CRE-07)
STORMWATER UNINCORPORAT
ED
181
11481 MARTIGNEY CREEK STREAMBANK
STABILIZATION - FAIRWICK AND GOLDEN
VALLEY BANK STABILIZATION (MGMB-150)
STORMWATER UNINCORPORAT
ED
183
11481 MARTIGNEY CREEK STREAMBANK
STABILIZATION - FAIRWICK AND GOLDEN
VALLEY BANK STABILIZATION (MGMB-150)
STORMWATER UNINCORPORAT
ED
184
11536 NOTTINGHAM ESTATES DR. #5217 STORM
SEWER
STORMWATER UNINCORPORAT
ED
185
11623 BRUNSTON DR. #4875 BANK STABILIZATION STORMWATER UNINCORPORAT
ED
175
11630 REYNOSA - MELITTA STREAMBANK
STABILIZATION
STORMWATER UNINCORPORAT
ED
187
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
WASTEWATER UNINCORPORAT
ED
53
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
WASTEWATER UNINCORPORAT
ED
112
24 February 2020
Page 7 of 14
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY21
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11817 LEMAY NO. 3 PUMP STATION AND FORCE MAIN WASTEWATER UNINCORPORAT
ED
54
12085 BANFF SANITARY RELIEF (CAITHNESS RD TO
LANARK RD)
WASTEWATER UNINCORPORAT
ED
2
12142 DACEY BRANCH SANITARY RELIEF (BELLA
CLARE DR TO PRIOR DR)
WASTEWATER UNINCORPORAT
ED
93
12153 EARTH CITY EXPRESSWAY PUMP STATION (P-
708) REPLACEMENT
WASTEWATER UNINCORPORAT
ED
21
12153 EARTH CITY EXPRESSWAY PUMP STATION (P-
708) REPLACEMENT
WASTEWATER UNINCORPORAT
ED
99
12239 TULANE-WILBUR OUTFALL SANITARY RELIEF
SEWER (WEBER RD TO HILDESHEIM AVE)
WASTEWATER UNINCORPORAT
ED
131
12239 TULANE-WILBUR OUTFALL SANITARY RELIEF
SEWER (WEBER RD TO HILDESHEIM AVE)
WASTEWATER UNINCORPORAT
ED
132
12255 LOWER MERAMEC WWTF EXPANSION PHASE II WASTEWATER UNINCORPORAT
ED
63
12357 NEWPORT LANDING PUMP STATION (P-480)
ELIMINATION
WASTEWATER UNINCORPORAT
ED
67
12491 WATKINS CREEK PUMP STATION (P-101)
REPLACEMENT
WASTEWATER UNINCORPORAT
ED
135
12552 COLDWATER CREEK WWTF REPAIRS AND
IMPROVEMENTS (2022)
WASTEWATER UNINCORPORAT
ED
14
24 February 2020
Page 8 of 14
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY21
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12815 GRAVIOS CREEK SANITARY TRUNK
RELOCATION AND STREAM STABILIZATION
(AFFTON ATHLETIC COMPLEX TO GREEN PK
IND DR)
WASTEWATER UNINCORPORAT
ED
47
13153 LEMAY WWTF REPAIRS AND IMPROVEMENTS
(2023)
WASTEWATER UNINCORPORAT
ED
56
13164 LOWER MERAMEC TUNNEL I/I SOURCE
REDUCTION
WASTEWATER UNINCORPORAT
ED
120
13303 LEMAY WWTF AERATION BASIN GATES WASTEWATER UNINCORPORAT
ED
116
13336 LANGLEY AND PHILO SANITARY STORAGE WASTEWATER UNINCORPORAT
ED
114
10496 GRAVOIS TRUNK (WHITECLIFF TO RDP)
SANITARY REHABILITATION (FANNIE AVE TO
PARDEE LANE)
WASTEWATER VARIOUS 103
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
WASTEWATER VARIOUS 60
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
WASTEWATER VARIOUS 61
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 7
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 8
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
WASTEWATER VARIOUS 91
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
WASTEWATER VARIOUS 17
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
WASTEWATER VARIOUS 15
24 February 2020
Page 9 of 14
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY21
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER VARIOUS 71
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER VARIOUS 72
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP)
WASTEWATER VARIOUS 95
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
WASTEWATER VARIOUS 62
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
WASTEWATER VARIOUS 119
11796 HARLEM BADEN RELIEF PHASE IV (HEBERT) -
HAMILTON TO DARVER TRUNK SEWER
WASTEWATER VARIOUS 106
11800 HARLEM BADEN RELIEF PHASE IV (HEBERT) -
TRUNK SEWER REHABILITATION
WASTEWATER VARIOUS 107
11826 CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK TUNNELS
WASTEWATER VARIOUS 16
12000 CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS (2020)
WASTEWATER VARIOUS 12
12004 STREAM FLOW WATER QUALITY SAMPLING
(2020)
UNALLOCATED VARIOUS 77
12006 RADAR RAINFALL DATA (2020)WASTEWATER VARIOUS 70
12059 LEMAY PUBLIC I/I REDUCTION (2021)
CONTRACT A
WASTEWATER VARIOUS 115
12152 E. WATSON SANITARY RELIEF (RUDSON LN TO
RICHVIEW DR)
WASTEWATER VARIOUS 98
12157 GC-06 GRAVOIS CREEK TO BRIARSTONE AND
GATES SANITARY RELIEF PHASE II
WASTEWATER VARIOUS 28
24 February 2020
Page 10 of 14
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY21
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12175 GEYER SANITARY RELIEF AND WINDSOR
SPRINGS P-521 STORAGE (BIG BEND BLVD TO
WINDSOR SPRINGS DR)
WASTEWATER VARIOUS 102
12231 TM-01 TWO MILE CREEK OUTFALL SANITARY
RELIEF
WASTEWATER VARIOUS 78
12334 HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
WASTEWATER VARIOUS 48
12386 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2019)
WASTEWATER VARIOUS 29
12391 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT A
WASTEWATER VARIOUS 32
12392 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT B
WASTEWATER VARIOUS 33
12393 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2020) CONTRACT C
WASTEWATER VARIOUS 34
12397 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2020) CONTRACT A
WASTEWATER VARIOUS 30
12400 GENERAL SERVICES AGREEMENT - SEWER AND
CHANNEL DESIGN (2021) CONTRACT A
WASTEWATER VARIOUS 40
12413 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT A
WASTEWATER VARIOUS 41
12416 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT B
WASTEWATER VARIOUS 42
12417 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT C
WASTEWATER VARIOUS 43
12418 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT D
WASTEWATER VARIOUS 44
12419 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2020) CONTRACT E
WASTEWATER VARIOUS 45
24 February 2020
Page 11 of 14
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY21
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12433 NORTH FEE FEE CREEK PUBLIC I/I REDUCTION WASTEWATER VARIOUS 68
12508 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2021) CONTRACT A
WASTEWATER VARIOUS 83
12509 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2021) CONTRACT B
WASTEWATER VARIOUS 84
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
WASTEWATER VARIOUS 4
12584 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2022) CONTRACT A
WASTEWATER VARIOUS 5
12590 LEMAY PUBLIC I/I REDUCTION AND
REHABILITATION (2022) CONTRACT A
WASTEWATER VARIOUS 55
12699 PUMP STATION REPAIR AND IMPROVEMENT
DESIGN (CONTRACT C)
WASTEWATER VARIOUS 69
12759 FLOW METERING AND MONITORING (2017) WASTEWATER VARIOUS 25
12818 EASEMENT ACQUISITION FOR WASTEWATER
PROJECTS (2021)
WASTEWATER VARIOUS 100
12842 GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2021)
STORMWATER VARIOUS 166
12907 CRITICAL INFRASTRUCTURE ASSESSMENT AND
ASSET INVESTIGATION (2020)
WASTEWATER VARIOUS 18
12987 INFRASTRUCTURE REPAIRS (WASTEWATER)
(2021)
WASTEWATER VARIOUS 111
12995 INFRASTRUCTURE REPAIRS (FACILITIES) (2021) WASTEWATER VARIOUS 108
13004 STORMWATER INFRASTRUCTURE REPAIRS
(2021)
STORMWATER VARIOUS 191
24 February 2020
Page 12 of 14
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY21
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
13014 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2021) CONTRACT A
WASTEWATER VARIOUS 109
13015 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2021) CONTRACT B
WASTEWATER VARIOUS 110
13031 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2022) CONTRACT B
WASTEWATER VARIOUS 6
13044 GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2019)
UNALLOCATED VARIOUS 35
13059 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2020) CONTRACT B
WASTEWATER VARIOUS 31
13078 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
WASTEWATER VARIOUS 92
13087 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT A
UNALLOCATED VARIOUS 36
13088 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT B
UNALLOCATED VARIOUS 37
13089 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT C
UNALLOCATED VARIOUS 38
13090 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT D
UNALLOCATED VARIOUS 39
13189 OMCI STORMWATER STREAMBANK
STABILIZATION DESIGN (2021)
STORMWATER VARIOUS 172
13189 OMCI STORMWATER STREAMBANK
STABILIZATION DESIGN (2021)
STORMWATER VARIOUS 173
13189 OMCI STORMWATER STREAMBANK
STABILIZATION DESIGN (2021)
STORMWATER VARIOUS 174
13193 OMCI STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (2021)
STORMWATER VARIOUS 168
24 February 2020
Page 13 of 14
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY21
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
13193 OMCI STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (2021)
STORMWATER VARIOUS 169
13193 OMCI STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (2021)
STORMWATER VARIOUS 170
13193 OMCI STORMWATER INFRASTRUCTURE
IMPROVEMENT DESIGN (2021)
STORMWATER VARIOUS 171
13352 STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
STORMWATER VARIOUS 192
13436 WET WEATHER OPTIMIZATION STUDY WASTEWATER VARIOUS 81
13467 SCADA SYSTEM UPGRADE WASTEWATER VARIOUS 74
13487 DEER CREEK OMCI REIMBURSEMENTS
PROGRAM
STORMWATER VARIOUS 178
13488 COLDWATER CREEK OMCI REIMBURSEMENTS
PROGRAM
STORMWATER VARIOUS 177
13489 UNIVERSITY CITY OMCI REIMBURSEMENTS
PROGRAM
STORMWATER VARIOUS 194
13490 SUGAR CREEK OMCI REIMBURSEMENTS
PROGRAM
STORMWATER VARIOUS 193
13491 SEMINARY OMCI REIMBURSEMENTS PROGRAM STORMWATER VARIOUS 188
11679 WEST LOCKWOOD SANITARY RELIEF WASTEWATER WEBSTER
GROVES
136
12208 SPRING AVE SANITARY RELIEF (YEATMAN AVE
TO DALE AVE)
WASTEWATER WEBSTER
GROVES
130
24 February 2020
Page 14 of 14
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY21
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12159 EDMUNDSON SANITARY RELIEF (EDMUND AVE
TO BATAAN DR)
WASTEWATER WOODSON
TERRACE
22
MSD Project Clear (MSDPC) is two utilities in
one - responsible for 9,000+ miles of public
wastewater and stormwater sewer systems in the
St. Louis region. MSDPC is investing billions of
dollars over a generation to improve water quality
and minimize wastewater and stormwater issues
by maintaining regulatory compliance, planning,
designing, and building community rainscaping
& system improvements, and an ambitious
program of maintenance and repair.