HomeMy Public PortalAbout1992-46C Authorizing agreement with Driggs Construction for hurricane debris removalRESOLUTION NO.
92-1(0-0,
A RESOLUTION OF THE VILLAGE OF KEY BISCAYNE,
FLORIDA; AUTHORIZING THE VILLAGE MANAGER TO
EXECUTE AN AGREEMENT WITH DRIGGS CONSTRUCTION TO
LOAD, HAUL, AND DISPOSE OF ALL OF THE DEBRIS FROM
THE VILLAGE RIGHT-OF-WAY INCLUDING RAKING,
SWEEPING, BROOMING AND FINAL DRESSING OF SWALES,
STREETS AND SIDEWALKS; PROVIDING FOR AN EFFECTIVE
DATE.
BE IT RESOLVED BY THE MAYOR AND THE BOARD OF TRUSTEES OF THE
VILLAGE OF KEY BISCAYNE, DADE COUNTY, FLORIDA, AS FOLLOWS:
Section 1. The Village Manager is hereby authorized to enter
into an agreement with Driggs Construction to load, haul, and
dispose of all of the debris from the Village right-of-way. Also
includes raking, brooing and final dressing of swales, streets and
sidewalks. A copy of the agreement is attached hereto as Exhibit A.
Section 2. This Resolution shall take effect immediately upon
adoption.
PASSED AND ADOPTED this 14 day of Se te be 1992.
RAFAEL H CONTE, MAYOR
T EST:
VILLAGE CLE
AP ROVED AS TO FORM AND LEGAL SUFFICIENCY
'
r`Gglot:0‘
E Amy
VIL ATTORNEY
)CT -16-92 FRI 10:11
6678484
CONTR4CT
30E223
september 13, 1992
Ti4TS CONTRACT, made and entered into on the 14 day of September
1992, by and between the Village of Key Biscayne, Dade County, Florida,
party of the first part (hereinafter called "Owner"), and Driggs._--,
Conetrliction company, Diu. 5800. N. Bay Road, Miami acach, Fl. 33140
party of the s= FIc:nnd part (hereinafter called "Contractor");
W I TN&S SETH
That the partials hereto, for and in consideration of the covenants and
agreements hereinafter set forth, mutually agree as follows, to wit:
1. That the Contractor shall furnish all labor, materials, and
equipment and perform all work in the manner And form provided by
the Contract Documents covering the Project of the Owner known and
identified as
Owner: village of Key Biscayne
Job Numbest: 30E223
Job Name: rash and Debris_Remuval from the Streets and Beaches of
the Village ofKev Biscayne.
for the Unit Price amount reflected by the Proposal, said Unit Price
amount being Six Dollars and Ninety - Five Cents.
( $ 6.95 ) Per Cubic Yard.
2. That the Contractor shall begin the work to be performed under this
Contract on a day to be specified in a written order issued by the
Engineer, and shall fully complete all work hereunder within the
time or times stated in the Proposal.
3. That the Owner shall pay to the Contractor for the faithful
performance of this Contract, in lawful money of the United States,
and subject to additions and deductions as provided in the Contract
Documents, the total amount of his bid as set forth above at the
times and in a manner stated in the General Covenants and
Conditions of the Contract Documents.
4. It ia further mutually agreed that if at any time after the
execution of this Contract and Contract Bond, the Owner shall deem
the surety upon such bonds to be unsatisfactory, or if for any
reason such bond shall become inadequate to cover the performance
of the work, thA Contractor shall at his do so, furnish an
additional bond or bonds in such form and amount and with such
surety or sureties as shall he satisfactory to thA Owner. In such
event, no further payment to the Contractor shall be deemed to be
due under this Contract until such new or additional security shall
have been furnished in a manner and form satisfactory to the Owner.
C-1
OCT-lb-92 FRI 10:11
6678484 P.89
30E223
September 13, 1992
S. Tho "Contract Documents" are hereby cletiued as the Proposal, the
Bid Items, the Contract, the Notice to Proceed, the Waiver of Lien,
the General Conditions and any Addenda which may be issued. The
terms and conditions of said Contract Documents are incorporated
herein by reference tiitd made a part hereof as though fully set
forth herein. The Contract Documents are complementary, so that a
LeciL.a1 in one is tantamount to a recital in all, and the
Contractor specifically acknowledges that he has read and
undeL otaiads all of said contract Documents.
6. The various indemnities of the Contractor contained in the Contract
Documents indemnifying the Owner from liability for damages to
persons or property caused by acts, omissions, or defaults in the
performance of the Contract Documents shall have a monetary
limitation of the larger of the following: $1,000,000.00 , or the
entire amount of the Contract.
IN WITNESS WHEREOF, the parties hereto have executed thin Contract in
two counterparts, each of which shall be deemed an original Contract,
all as of the day and year hereinafter written in the Owner's part.
OWNER' S PART
(PARTY OF THE FIRST PART)
Signat1i rA of Owner's (Witness Signature)
Authorized Representative
Date:
�
(Witness Signature)
CONTRACTOR'S PART
(PARTY OF TIE SECOND PART)
NAME OP CORPORATION: Driggs Construction Company, Inc.
Address; 5800 N. Bay Road, Miami Beach, Fl. 13140
Siyciat re of Contractor's
Authorized Representative
Print Name: Henry Keel
Official Title: Partner
(Witness Signature)
(Witness Signature)
Date:
JUI -lb-mod I -I i 110:U
r-- . 101 D
30E223
es/Amber 16, 1992
t'CNTRACT!
THIS CONTRACT, made ana entered into on the 14 day of Scptambar
1992, by anti between the Village of Key Biscayne, Dade County, Florida,
party of the first part (hereinafter called "Owner") , and Driggs
gonstructiof. ompany1 Inc. 5800 N. Bay -Rc d j _Miami Beach, F1. 33 0
party of the second part (hereinafter called "contractor") ;
WITNESSL_ ,
That the parties hereto, for and in consideration of tine covenants and
agreements hereinafter set forth, mutually agree as follows, to wit:
1. That the Contractor shall furnish all labor, materials, and
equipment and perform all work in the manner and form provided by
the Contract Documents covering the Project of the Owner known and
identified as:
Owner: Village of Key Biscay
Job Number: 30E223,
Job Name: Trash and Debris_ Removal from the Streets_ and Beaches of
the Village of Key Biscay,
for tho Unit Price amount reflected by the Proposal, said Unit Price
amount being Six Dollars and , Ninety. - _Fiye _. . . Cents.
(_ $_ 6.95 ,) per Cubic Yar4.
2. That the Contractor shall begin the work to be performed under this
Contract on a day to be specified in a written order issued by the
Enyinee , and shall fully complete all work hereunder within the
time or times stated in the Proposal.
3. That the Owner shall pay to the Contractor for the faithful
performance of this Contract, in lawful money of the United States,
and subject to additions and deductions as provided in the Contract
Documents, the total amount of his bid as set forth above at the
times and in a manner stated in the General Covenants and
Conditions of the contract uocuments.
4. It is further mutually agreed that it at any time after the
execution of this Contract and Contract Bond, the Owner shall deem
the surety upon such bonds to be unsatisfactory, or if for any
reason such bond shall become inadequate to cover the performance
of the work, the Contractor shall at his do so, furnish an
additional bond or bonds in such form and amount and with such
surety or sureties as shall be satisfactory to the Owner. In such
event, no further payment to the Contractor shall be deemed to be
due under this Contract until such new or additional security shall
have been furnished in a manner and form satisfactory to the Owner.
G' 1
OCT-16-92 FRI 10:10
r•
6678484
P.06
34223
SCitcpt er 16, 1942
5. The "Contract Documents" are hereby defined as the Proposal, the
Bid Items, the Contract, the Notice to proceed, the Waiver of Lien,
the General Conditions and any Addenda which may be issued. The
terms and conditions of said Contract Documents are incorporated
herein by reference and made a part hereof as though fully set
forth herein. The Contract Documents are complementary, so that a
recital in one is tantamount to a recital in all, and the
Contractor specifically acknowledges that he has read and
understands all of said Contract Documents,
6. The various indemnities of the Contractor contained in the Contract
Documents indemnifying the Owner from liability for damages to
persons or property caused by acts, omissions, or defaults in the
performance of the Contract nocuments shall have a monetary
limitation of the larger of the following: $100,000.00 , or the
entire amount of the Contract. A ,_fur. thy, described in the
September l , 1992 letter .
IN WITNESS WHEREOF, the parties hereto have executed this Contract in
two uvunterparts, each of which oha11 be deemed an original Contract,
all as of the day and year hereinafter written in the Owner's part.
OWNER' S, PART
(PARTY OF THE FIRST PART)
Signature of Owner's
Authorized Representative
Date:
(Witness Signature)
(Witness Signature)
CONTRACTOlila PART
(PARTY OF THE SECOND PART)
NAME OF CORPORATION: Driggs Construction Company, Inc.
Address: 5RnoU. Ray Road. Miami Beach. Fl. 33140
Signature of Cont actor's
Authorized Repre ntative
Print Name: Steve Reece
e,/P
Official Title: vice Presides
C-2
(witness Signature)
(WitnPc, Signature)