HomeMy Public PortalAbout14244ORDINANCE NO. 14244
AN ORDINANCE, appropriating Two Hundred Ten Thousand Dollars
($210,000.00) from the Operations, Maintenance and Construction Improvement Fund of the
Seminary Branch of River Des Peres to be used for the design of storm sewers in Big Bend to
Papin Storm Sewer Phase I (10035) in the City of Webster Groves, Missouri; and authorizing the
Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer
District to enter into Contract No. 20340 with Hart Engineering, LLC for the aforesaid storm
sewer design.
WHEREAS, the Director of Finance has certified that there is an unencumbered
balance in the above-named fund sufficient to pay the obligation authorized herein.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Two Hundred Ten Thousand Dollars ($210,000.00) is
hereby appropriated from the Operations, Maintenance and Construction Improvement Fund of
the Seminary Branch of River Des Peres for the design of storm sewers in Big Bend to Papin
Storm Sewer Phase I (10035) in the City of Webster Groves, Missouri.
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No.
20340 with Hart Engineering, LLC for the design of storm sewers in Big Bend to Papin Storm
Sewer Phase I (10035) in the City of Webster Groves, Missouri.
Section Three. This ordinance, being an appropriation ordinance, shall take effect
immediately upon its enactment.
The foregoing ordinance was adopted on October 8, 2015.