Loading...
HomeMy Public PortalAbout20140424 PW&P packet4/18/2014 1 Cole Junction Pump Station Startup •Scheduled startup week of April 28, 2014 •Proposed Open House week of May 19, 2014 Benefits of New Pump Station •Eliminate a Forcemain that leaked on seven occasions –2 MDNR letters-of-warning –MDNR Notice-of-Violation – $80,000 spent on repairs •Eliminate a constructed wet weather overflow on Jaycee Drive •Eliminate intermittent odor problems in downstream sewers (Metro, Jaycee Drive) CURRENT STATION NEW STATION Pump Rating (GPM) 1900 3,000-10,000 Pump Horsepower 150 Normal operation: 85 Wet weather: 483 Peak Flow Storage (Gallons) 5,000 270,000 Forcemain Length (miles) 1.8 4.5 Station Comparisons Investing in the pump station in this manner will allowed savings of $4.5M in future downstream sewer upgrades . New station Cost: Construction $11.6M Engineering $1.1M