Loading...
HomeMy Public PortalAboutResolution 1694 k sz)/1,( 7 on i D. 10 Illinois Department Resolution for Improvement by Municipality Under the Illinois of Transportation Highway Code BE IT RESOLVED, by the President and Board of Trustees of the Council or President and Board of Trustees Village of Plainfield Illinois City,Town or Village that the following described street(s)be improved under the Illinois Highway Code: Name of Thoroughfare Route From To 135`"Street FAU 0282 At Wisconsin Central RR Xing BE IT FURTHER RESOLVED, 1. That the proposed improvement shall consist of the preliminary engineering required for the construction of an at-grade pedestrain crossing on the south side of 135`h Street at the Wisconsin Central Ltd. Railroad crossing. and shall be constructed wide and be designated as Section 12-00054-00-SP 2. That there is hereby appropriated the (additional ® Yes 0 No)sum of seven thousand seven hundred and 00/100 Dollars( $7,700.00 )for the improvement of said section from the municipality's allotment of Motor Fuel Tax funds. 3. That work shall be done by Contract ; and, Specify Contract or Day Labor BE IT FURTHER RESOLVED,that the Clerk is hereby directed to transmit two certified copies of this resolution to the district office of the Department of Transportation. Approved I, Michelle Gibas Clerk in and for the Village of Plainfield City,Town or Village \12-1/11 County of Will , hereby certify the D to foregoing to be a true, perfect and complete copy of a resolution adopted by the President and Board of Trustees Co dl or Presioent an Board of Trustees Dep. " ent of Tr sportation at a meeting on Mijj ST ii, 1 Date e INTESTIMONYWHEREOF, I have hereunto set my hand and seal this 'u1JS 1 14b- day of 4 l4 id 4" t -) Regional Engineer ( AL) / - / f4,,d4.4.., 1) City,Town,or Village Clerk Printed 7/24/2014 BLR 09111(Rev. 11/06) Municipality L Name Village of Plainfield O (61 Illinois Department C Baxter&Woodman, Inc. C of Transportation O Township A S Address Plainfield L8840 West 192ndStreet Preliminary Engineering U A Services Agreement L County G For T City Will E Motor Fuel Tax Funds A Mokena N N Section C AMENDMENT#1 T State 12-00054-00-SP Illinois 60448 THIS AGREEMENT is made and entered into this day of , 2014 between the above Local Agency(LA)and Consultant(ENGINEER)and covers certain professional engineering services in connection with the improvement of the above SECTION. Motor Fuel Tax Funds, allotted to the LA by the State of Illinois under the general supervision of the State Department of Transportation, hereinafter called the"DEPARTMENT",will be used entirely or in part to finance ENGINEERING services as described under AGREEMENT PROVISIONS. Section Description Name 135'"Street and Wisconsin Central Ltd. Railroad Crossing Pedestrian Safety Improvements Route FAU 0282 Length 0.066 Mi. 350.00 FT (Structure No. Termini 135th Street at the Wisconsin Central Ltd. Railroad Crossing Description: Amendment No. 1 for preliminary engineering services for at-grade pedestrian safety improvements. See Exhibits A&B. ENGINEER's Proiect No. 110221.40. Agreement Provisions The Engineer Agrees, 1. To perform or be responsible for the performance of the following engineering services for the LA, in connection with the proposed improvements herein before described, and checked below: a. El Make such detailed surveys as are necessary for the preparation of detailed roadway plans b. ❑ Make stream and flood plain hydraulic surveys and gather high water data,and flood histories for the preparation of detailed bridge plans. c. ❑ Make or cause to be made such soil surveys or subsurface investigations including borings and soil profiles and analyses thereof as may be required to furnish sufficient data for the design of the proposed improvement. Such investigations are to be made in accordance with the current requirements of the DEPARTMENT. d. ❑ Make or cause to be made such traffic studies and counts and special intersection studies as may be required to furnish sufficient data for the design of the proposed improvement. e. ❑ Prepare Army Corps of Engineers Permit, Department of Natural Resources-Office of Water Resources Permit, Bridge waterway sketch,and/or Channel Change sketch, Utility plan and locations, and Railroad Crossing work agreements. f. ❑ Prepare Preliminary Bridge design and Hydraulic Report, (including economic analysis of bridge or culvert types) and high water effects on roadway overflows and bridge approaches. g. ® Make complete general and detailed plans, special provisions, proposals and estimates of cost and furnish the LA with five(5)copies of the plans, special provisions, proposals and estimates. Additional copies of any or all documents, if required, shall be furnished to the LA by the ENGINEER at his actual cost for reproduction. h. ® Furnish the LA with survey and drafts in quadruplicate of all necessary right-of-way dedications, construction easement and borrow pit and channel change agreements including prints of the corresponding plats and staking as required. Note: Four copies to be submitted to the Regional Engineer Printed 7/24/2014 Page 1 of 4 BLR 05510(Rev. 11/06) El Assist the LA in the tabulation and interpretation of the contractors' proposals j. ❑ Prepare the necessary environmental documents in accordance with the procedures adopted by the DEPARTMENT's Bureau of Local Roads&Streets. k. ❑ Prepare the Project Development Report when required by the DEPARTMENT. (2) That all reports, plans, plats and special provisions to be furnished by the ENGINEER pursuant to the AGREEMENT, will be in accordance with current standard specifications and policies of the DEPARTMENT. It is being understood that all such reports, plats, plans and drafts shall, before being finally accepted, be subject to approval by the LA and the DEPARTMENT. (3) To attend conferences at any reasonable time when requested to do so by representatives of the LA or the Department. (4) In the event plans or surveys are found to be in error during construction of the SECTION and revisions of the plans or survey corrections are necessary, the ENGINEER agrees that he will perform such work without expense to the LA, even though final payment has been received by him. He shall give immediate attention to these changes so there will be a minimum delay to the Contractor. (5) That basic survey notes and sketches, charts, computations and other data prepared or obtained by the Engineer pursuant to this AGREEMENT will be made available, upon request, to the LA or the DEPARTMENT without cost and without restriction or limitations as to their use. (6) That all plans and other documents furnished by the ENGINEER pursuant to this AGREEMENT will be endorsed by him and will show his professional seal where such is required by law. The LA Agrees, 1. To pay the ENGINEER as compensation for all services performed as stipulated in paragraphs 1a, Ig, 1 i, 2, 3, 5 and 6 in accordance with one of the following methods indicated by a check mark: a. ❑ A sum of money equal to percent of the awarded contract cost of the proposed improvement as approved by the DEPARTMENT. b. ►i A sum of money equal to the percent of the awarded contract cost for the proposed improvement as approved by the DEPARTMENT based on the following schedule: Schedule for Percentages Based on Awarded Contract Cost Awarded Cost Percentage Fees Under $50,000 Cost Plus Fixed Fee (see note) Not To Exceed $7,700 (See Exhibit C) Note: Not necessarily a percentage. Could use per diem, cost-plus or lump sum. 2. To pay for services stipulated in paragraphs 1 b, lc, 1 d, le, 1 f, lh, 1] & 1k of the ENGINEER AGREES at actual cost of performing such work plus 152 percent to cover profit, overhead and readiness to serve-"actual cost" being defined as material cost plus payrolls, insurance, social security and retirement deductions. Traveling and other out-of-pocket expenses will be reimbursed to the ENGINEER at his actual cost. Subject to the approval of the LA, the ENGINEER may sublet all or part of the services provided under the paragraph 1 b, lc, 1 d, 1 e, 1f, 1 h, 1 j& 1 k. If the ENGINEER sublets all or part of this work, the LA will pay the cost to the ENGINEER plus a five (5)percent service charge. "Cost to Engineer" to be verified by furnishing the LA and the DEPARTMENT copies of invoices from the party doing the work, The classifications of the employees used in the work should be consistent with the employee classifications for the services performed. If the personnel of the firm, including the Principal Engineer, perform routine services that should normally be performed by lesser-salaried personnel, the wage rate billed for such services shall be commensurate with the work performed. Printed 7/24/2014 Page 2 of 4 BAR 05510(Rev.11/06) 3. That payments due the ENGINEER for services rendered in accordance with this AGREEMENT will be made as soon as practicable after the services have been performed in accordance with the following schedule: a. Upon completion of detailed plans, special provisions, proposals and estimate of cost-being the work required by paragraphs la through 1g under THE ENGINEER AGREES -to the satisfaction of the LA and their approval by the DEPARTMENT,90 percent of the total fee due under this AGREEMENT based on the approved estimate of cost. b. Upon award of the contract for the improvement by the LA and its approval by the DEPARTMENT, 100 percent of the total fee due under the AGREEMENT based on the awarded contract cost, less any amounts paid under"a" above. By Mutual agreement, partial payments, not to exceed 90 percent of the amount earned, may be made from time to time as the work progresses. 4. That, should the improvement be abandoned at any time after the ENGINEER has performed any part of the services provided for in paragraphs la, through 1h and prior to the completion of such services, the LA shall reimburse the ENGINEER for his actual costs plus 152 percent incurred up to the time he is notified in writing of such abandonment-"actual cost" being defined as in paragraph 2 of THE LA AGREES. 5. That, should the LA require changes in any of the detailed plans, specifications or estimates except for those required pursuant to paragraph 4 of THE ENGINEER AGREEs, after they have been approved by the DEPARTMENT, the LA will pay the ENGINEER for such changes on the basis of actual cost plus 152 percent to cover profit, overhead and readiness to serve-"actual cost"being defined as in paragraph 2 of THE LA AGREES. It is understood that"changes"as used in this paragraph shall in no way relieve the ENGINEER of his responsibility to prepare a complete and adequate set of plans and specifications. It is Mutually Agreed, 1. That any difference between the ENGINEER and the LA concerning their interpretation of the provisions of this Agreement shall be referred to a committee of disinterested parties consisting of one member appointed by the ENGINEER, one member appointed by the LA and a third member appointed by the two other members for disposition and that the committee's decision shall be final. 2. This AGREEMENT may be terminated by the LA upon giving notice in writing to the ENGINEER at his last known post office address. Upon such termination, the ENGINEER shall cause to be delivered to the LA all surveys, permits, agreements, preliminary bridge design &hydraulic report, drawings, specifications:partial and completed estimates and data, if any from traffic studies and soil survey and subsurface investigations with the understanding that all such material becomes the property of the LA. The ENGINEER shall be paid for any services completed and any services partially completed in accordance with Section 4 of THE LA AGREES. 3. That if the contract for construction has not been awarded one year after the acceptance of the plans by the LA and their approval by the DEPARTMENT, the LA will pay the ENGINEER the balance of the engineering fee due to make 100 percent of the total fees due under this AGREEMENT, based on the estimate of cost as prepared by the ENGINEER and approved by the LA and the DEPARTMENT. 4. That the ENGINEER warrants that he/she has not employed or retained any company or person, other than a bona fide employee working solely for the ENGINEER, to solicit or secure this contract, and that he/she has not paid or agreed to pay any company or person, other than a bona fide employee working solely for the ENGINEER, any fee,commission, percentage, brokerage fee, gifts or any other consideration, contingent upon or resulting from the award or making of this contract. For Breach or violation of this warranty the LA shall have the right to annul this contract without liability. Printed 7/24/2014 Page 3 of 4 BLR 05510(Rev.11/06) • IN WITNESS WHEREOF, the parties have caused the AGREEMENT to be executed in quadruplicate counterparts, each of which shall be considered as an original by their duly authorized officers. Executed by the LA: Village of Plainfield of the (Municipality/Township/County) ATTEST: State of Illinois, acting by and through its By ` `'moi_ � � President an ,Boar of Tr es Village Clerk By ,'fi (/ (Sea!) Title resident Executed by the ENGINEER: Baxter&Woodman, Inc. 8840 West 192nd Street ATTEST:---. Mokena, Illinois 60448 reitBy By !.. Title Deputy Secretary Title Vice President/COO Approved Date Department of Transportation Regional Engineer Printed 7/24/2014 Page 4 of 4 SLR 05510(Rev. 11/06) t • \\ ` 1 • • • 1 • \ VILLAGE OF PLAINFIELD, ILLINOIS 135TH STREET AND WISCONSIN CENTRAL L ID RAILROAD CROSSING PEDESTRIAN SAFETY IMPROVEMENTS SECTION: 12-00054-00-SP AMENDMENT NO. 1 EXHIBIT A PROJECT DESCRIPTION This PROJECT will consist of the engineering services required to prepare Final Contract Documents for the pedestrian safety improvements on the south side of 135th Street at the Wisconsin Central Ltd. Railroad Crossing in the Village of Plainfield, Illinois. The work will include providing hot-mix asphalt pavement and an at-grade crossing pad at the railroad crossing to connect existing pedestrian facilities located east and west of the crossing and installation of a raised concrete median in the center of the existing roadway pavement. The PROJECT length is 0.066 miles(350 feet). 1:\Crystal Lake'PFLUV1110221 ICC CN EJECContraceAinendment*11Amendmentl_Exhibit A.doc - - BAXTER OODMAN Cansu tine Env:.eers VILLAGE OF PLAINFIELD, ILLINOIS 135TH STREET AND WISCONSIN CENTRAL LTD RAILROAD CROSSING PEDESTRIAN SAFETY IMPROVEMENTS SECTION: 12-00054-00-SP AMENDMENT NO. 1 EXHIBIT B SCOPE OF SERVICES The following scope of services are in addition to the scope of services approved as part of the Preliminary Engineering Services Agreement approved April 16, 2012. • AGENCY COMPLIANCE • MEETINGS AND COMMUNICATIONS Attend additional meetings with LA staff in person or via conference call to discuss the PROJECT. Coordinate the PROJECT with the LA, LA Attorney, Illinois Commerce Commission (ICC), Wisconsin Central Ltd. Railroad (WCL), and the DEPARTMENT. Prepare and submit quarterly reports to ICC for Federal Railroad Administration Mitigation Funding. • JURISDICTIONAL TRANSFER — Assist the LA in coordination with Plainfield Township, Wheatland Township, and the DEPARTMENT to complete a jurisdictional transfer of public road right-of-way on 135th Street in the vicinity of the railroad crossing from the Townships to the LA. Prepare and submit exhibits and forms to all parties for execution and to DEPARTMENT for approval. • COMED LEASE. AGREEMENT — Prepare and submit exhibits, forms, and other documentation to ComEd Real Estate to request a lease of premises for installation of the proposed asphalt path across ComEd property. Coordinate the PROJECT with ComEd Real Estate and make any revisions to the plans as required by ComEd to facilitate a lease agreement with the LA. • RAILROA.D CROSSING PROTECTION FUND APPLICATION — Prepare an application and exhibits and submit required materials to the ICC to request funding assistance for the proposed pedestrian gates from the ICC's Railroad Crossing Protection Fund. • PEDESTRIAN GATES — Add pedestrian railroad crossing gates to the plans meeting ICC requirements. Research information provided by ICC explaining the need for the gates. I:\Crystal Lake\PFLDVJ110221 fCC CN EJI;IContraet,Amendment#1Wnendmentl_Exhibit B.doc - 1 - BAXTElikMOODMAN ConstAt rg !ng"-eers PRELIMINARY ENGINEERING 135TH STREET AND WISCONSIN CENTRAL LTD RAILROAD CROSSING PEDESTRIAN SAFETY IMPROVEMENTS AMENDMENT NO.1-EXHIBIT C ROUTE: 135TH STREET(FAU 0282) `FIRM'S APPROVED RATES ON FILE WITH!DOTS LOCAL AGENCY: VILLAGE OF PLAINFIELD BUREAU OF ACCOUNTING AND AUDITING: (Municipality) SECTION: 12-00054-00-SP OVERHEAD RATE(OH) 152% PROJECT: COMPLEXITY FACTOR(R) 3 JOB NO.: 110221.40 CALENDAR DAYS METHOD OF COMPENSATION: COST PLUS FIXED FEE 1 14.5%((DL+R(DL)+OH(DL)+IHDC] COST PLUS FIXED FEE 2 14.5%((DL+R(DL)+1,4(DL)+IHDC] COST PLUS FIXED FEE 3 14,5%1(2.3+R)DL+IHDC] SPECIFIC RATE X LUMP SUM COST ESTIMATE OF ADDITIONAL CONSULTANT SERVICES IN DOLLARS EMPLOYEE MAN- PAYROLL PAYROLL SERVICES IN-HOUSE ELEMENT OF WORK CLASSIFICATION HOURS RATE COSTS(DL) OVERHEAD* BY OTHERS DIRECT COSTS PROFIT TOTAL (IHDC) 'AGENCY COMPLIANCE MEETINGS AND COMMUNICATIONS PRINCIPAL 5 $70.00 $350.00 $532.00 $19.00 $901,00 ENGINEER III 9 $37,92 $341.00 $518.00 $859.00 ENGINEER I 2 $24.95 $50.00 $76.00 $126.00 CADD TECH II 2 $32.11 $64.00 $97.00 $161.00 JURISDICTIONAL TRANSFER PRINCIPAL 3 570.00 $210.00 $319.00 --- $529,00 ENGINEER III 9 $37.92 $341,00 $518.00 $859.00 CADD TECH II 7 $32.11 $225,00 $342.00 $567.00 COMED LEASE AGREEMENT ENGINEER III 14' $37.92- $531,00 $807,00 $1,338.00 CADD TECH II 5 $32.11 $161.00 $245.00 $406.00 RAILROAD CROSSING PROTECTION FUND APPLICATION + ENGINEER III 10 $37.92 $379.00 $576.00' $8.00 $963.00 PEDESTRIAN GATES ENGINEER III 7 $37.92 $265.00 $403.00 $668.00 CADD TECH II 4 $32.11 $128.00 $195.00 $323,00 TOTALS 77 $3,045 $4,628 $0 $27 $0 $7,700.00 IN-HOUSE DIRECT COSTS(INCLUDED IN TOTAL COST): VEHICLE EXPENSES-TRAVEL,34 MI©$0,561MILE $19.00 POSTAGE $8.00 BAXTER- --,WOODMAN