HomeMy Public PortalAboutLTC 090-2016 The Brickman Group Semi-Monthly Collins Avenue Report for the Dates of April 16, 2016 to April 30, 2016COLLINS CORRIDOR Mowing
Hedge
Trimming/Ann
uals
Irrigation Wet Check Weed
Control Mulch
Leaf Removal
(BLOW
COLLINS)
Additional/Replacement Work
Perfomed
(See Below)
EAST COLLINS 4/20,4/28 4/25-4/29 4/18
WEST COLLINS 4/20,4/28 4/25-4/29
CENTER MEDIAN n/a 4/18,4/19,4/20 4/22 4/20
96TH ST 4/20,4/28 4/22
HAULOVER BRIDGE 4/20,4/28 22-Apr 4/29
FOUNDERS CIRCLE 4/22 20-Apr 4/22 4/25-4/29 4/26-4/29
REPLACEMENT/ADDITIONAL DATE WORK PERFORMED
EAST COLLINS 4/18 CHANGE OUT BATTERY OPERATED TIMER IN FRONT OF THE ST REGIS
CENTER MEDIAN 4/20 INSTALL GREEN ISLAND AND ODORATA IN END CAPS IN FRONT OF THE PALACE
96TH ST 4/22 INSTALL SOD PATCHES IN 96TH THAT WAS DAMAGED BY ROAD WORKS.
FOUNDERS CIRCLE 4/26-4/29
HAULOVER 4/29 INSTALL 4 IMEPRIALIS UNDER HAULOVER BRIDGE.
The Brickman Group Semi-Monthly Report APR 16 2016- APR 30
REMOVE GREEN BUTTONWOODS IN PUMP STATION AND INSTALL 14 20 FT CALOPHYLLUMS. RETROFIT IRRIGATION IN THE AREA
TO PROVIDE COVERAGE FOR NEW PLANT MATERIAL.