Loading...
HomeMy Public PortalAboutLTC 090-2016 The Brickman Group Semi-Monthly Collins Avenue Report for the Dates of April 16, 2016 to April 30, 2016COLLINS CORRIDOR Mowing Hedge Trimming/Ann uals Irrigation Wet Check Weed Control Mulch Leaf Removal (BLOW COLLINS) Additional/Replacement Work Perfomed (See Below) EAST COLLINS 4/20,4/28 4/25-4/29 4/18 WEST COLLINS 4/20,4/28 4/25-4/29 CENTER MEDIAN n/a 4/18,4/19,4/20 4/22 4/20 96TH ST 4/20,4/28 4/22 HAULOVER BRIDGE 4/20,4/28 22-Apr 4/29 FOUNDERS CIRCLE 4/22 20-Apr 4/22 4/25-4/29 4/26-4/29 REPLACEMENT/ADDITIONAL DATE WORK PERFORMED EAST COLLINS 4/18 CHANGE OUT BATTERY OPERATED TIMER IN FRONT OF THE ST REGIS CENTER MEDIAN 4/20 INSTALL GREEN ISLAND AND ODORATA IN END CAPS IN FRONT OF THE PALACE 96TH ST 4/22 INSTALL SOD PATCHES IN 96TH THAT WAS DAMAGED BY ROAD WORKS. FOUNDERS CIRCLE 4/26-4/29 HAULOVER 4/29 INSTALL 4 IMEPRIALIS UNDER HAULOVER BRIDGE. The Brickman Group Semi-Monthly Report APR 16 2016- APR 30 REMOVE GREEN BUTTONWOODS IN PUMP STATION AND INSTALL 14 20 FT CALOPHYLLUMS. RETROFIT IRRIGATION IN THE AREA TO PROVIDE COVERAGE FOR NEW PLANT MATERIAL.