HomeMy Public PortalAboutLTC 172-2016 The Brickman Group Semi-Monthly Collins Avenue Report for the Dates of September 1, 2016 to September 15, 2016COLLINS CORRIDOR Mowing
Hedge
Trimming/Ann
uals
Irrigation Wet Check Palm Pruning Fert/Pest Control Weed
Control
Additional/Replacement Work
Perfomed
(See Below)
EAST COLLINS 9/1,9/8 9/1, 9/5 9/5,9/8
WEST COLLINS 9/1,9/8 9/5,
CENTER MEDIAN 9/1,9/8 9/14,9/13,
96TH ST 9/1,9/8 9/12 9/12
HAULOVER BRIDGE 9/1,9/8 9/9
FOUNDERS CIRCLE 9/1,9/8 9/5,9/15
REPLACEMENT/ADDITIONAL DATE WORK PERFORMED
EAST COLLINS 9/5,9/8 REPAIR SOD IN FRONT OF THE ST REGIS DAMAGED BY HOTWIRE CONNECTIONS.
HAULOVER BRIDGE 9/9,INSTALLED 6 DEMO POTHOS PLANTERS UNDER THE BRIDGE.
HAULOVER BRIDGE 9/9,FILLED IN 12 MOONLIGHT PHILODENDRONS UNDER THE BRIDGE.