Loading...
HomeMy Public PortalAboutAddendum No. 1 to Contract No. 92-2012 - Airport - Butler FairmADDENDUM THIS ADDENDUM (Number 1 to Contract No. 92-2012) is made and entered into this '-7 day of K , 2013, by and between Richmond, Indiana, a municipal corporation acting through its Board of Aviation Commissioners, 50 North 5 h Street, Richmond, Indiana, (hereinafter referred to as "City"), and Butler, Fairman and Seufert, Inc., 8450 Westfield Boulevard, Suite 300, Indianapolis, Indiana, 46240 (hereinafter referred to as "Contractor"). WHEREAS, City and Contractor entered into Contract No. 92 2012 on August 9, 2012, which contract is incorporated by reference; and WHEREAS, City wishes to retain Contractor to provide additional services required to include new electrical vault for taxiway lighting as part of the scope of Contract No..92-2012. NOW, THEREFORE, in consideration of the. mutual promises and covenants herein contained, including the above stated recitals, City and Contractor hereby agree as follows: The additional services and compensation are set forth in the attachment provided by Contractor and such services shall be performed in a manner consistent with Contract No. 92-2012, which attachment provided. by Contractor is hereby incorporated by reference, is made a part of: this Addendum to said Contract, and is attached hereto as Exhibit A. 2. City and Contractor expressly agree that all other terms, conditions, and covenants contained .in Contract No. 92-2012, shall be applicable to the work performed pursuant to this Addendum, unless such term, condition or covenant conflicts with this Addendum, in which case this Addendum shall be controlling. .3. Both parties agree that in accordance with Indiana Code 5-22-16.5-1 et seq., contracts with municipal units entered into or renewed after June 30, 2012, must include the Iran Investment Activities certification, which certification is set forth and incorporated into Contract Number 92-2012 as follows: SECTION VI, 22, IRAN INVESTMENT ACTIVITIES Pursuant to Indiana Code (IC) 5-22-16.5, ENGINEER certifies that ENGINEER is not engaged in investment activities in Iran. In the event OWNER determines during the course of this Agreement that this certification is no longer valid, OWNER shall notify ENGINEER in writing of said determination and shall give ENGINEER ninety (90) days within which to respond to the written notice. In the event ENGINEER fails to demonstrate to the OWNER that the ENGINEER has ceased investment activities in Iran within ninety (90) days after the written notice is given to the ENGINEER, the OWNER may proceed with any remedies it may have pursuant to IC 5-22-16.5. In the event the OWNER determines during the course of this Agreement that this certification is no longer valid and said determination is not refuted by ENGINEER in the manner set forth in IC 5-22-16.5, the OWNER reserves the right to consider the ENGINEER to be in breach. of this Agreement and terminate the agreement upon the expiration of the ninety (90) day period set forth above. Addendum No. 1 to Contract No. 92-2012 Page 1 of 2 4. Both parties agree that with the exception of the changes set forth in Exhibit A and the addition of the Iran investment Activities Certification, Contract No. 92-2012 shall remain intact and unchanged. 5. Both parties agree that any person executing this Contract in a representative capacity hereby warrants that he or she has been duly authorized by his or her principal to execute this Addendum. THIS ADDENDUM is executed and approved by the undersigned 'representatives of the City and Contractor this jn day of &c -- , 2013. "CITY" THE CITY OF RICHMOND, INDIANA by and through its Board of Aviation Commissioners By: Darlene Fleming President Date: 31i 113 APPROVED: Sarah L. Hutton, Mayor Date: "CONTRACTOR" BUTLER, FAIRMAN and SEUFERT, INC. 8450 Westfield Boulevard, Suite 300 Indianapolis, IN 46240 By: — , �— radley D. Watson _ -- Executive Vice President Date: 3 1 L if 3 Page 2 of ffHIBITA_ PAGE ,�Q AMENDMENT NUMBER 1 TO AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES THIS AMENDMENT, made.and entered into this day of 2013, by and between the CITY OF RICHMOND BOARD OF AVIATION COMMISSIONERS (OWNER) and BUTLER, FAIRMAN and SEUFERT, INC. (ENGINEER) shall be attached to and made a part of the AGREEMENT made on August 9", 2012, between OWNER and ENGINEER providing for professional engineering services. WHEREAS, the OWNER requires to amend the Design Phase and Bidding and .Negotiating Phase of the Basic Services to include additional professional engineering services in connection with the Taxiway "A" Lighting Design (hereinafter called the PROJECT). WHEREAS, the PROJECT requires additional design services to include an electrical vault; WHEREAS, the OWNER desires the preparation of bidding and construction documents for the purposes of including an electrical vault to the PROJECT; and WHEREAS, the OWNER wishes to engage the ENGINEER to provide certain services pertaining thereto. NOW THEREFORE, pertaining to the required basic services for the PROJECT,. the OWNER and ENGINEER in consideration of their mutual covenants and purposes of completing the PROJECT herein agree to amend or supplement the AGREEMENT as set forth below. UNDER APPENDIX "A "SERVICE OF ENGINEER" Under the Airport Design Phase replace paragraph 4.1.h with the following: h. Design lighting and signage system, including a new standalone electrical vault, per FAA standards indentified in various Advisory Circulars, in particular:but not limited to . Advisory .Circular 150/5340-30 "Design. and Installation Details for Visual Aids", 1.50/5345-10, "Specification for Constant Current Regulators" and 150/5340-18, "Standards for Airport Sign Systems". UNDER APPENDIX "D", "COMPENSATION" Under the Amount_ of Payment Section modify the following categories under section 2 with the following: Increase Study and Report from $7,000.00 to $9,000.00 Increase Specifications from $5,000.00 to $6,000.00 Increase Plan Set Development from $29,750.00:to $33,750.00 f Under the Amount:of Payment Section modify the following categories under section 4 with the following: For Travel increase from $374,00 to $674.00 Electrical Sub Increase $5,000.00 to $10,000.00 Page 1.of 2