HomeMy Public PortalAboutTENTH PL_3 1OF2.pdfBOSWELL DESIGNSERVICES, INC. 103 NASSAU DRIVE SAVANNAH, GEORGIA 3141 O 912-897-6932 LA HBOSPBELLSOUTH. NET February 28, 2014 Diane Otto City of Tybee Island P.O. Box 2749 Tybee Island, Georgia 31328 RE: 10 th Place Drainage Issues 10 th Place Tybee Island, Georgia Diane, As per the meeting at 10 th Place with several in attendance on 2-25-14, it was decided that the existing pond needed to be cleaned and re-established to allow pond volume and conveyance to be restored to it's normally designed abilities. The lot owner where the pond is located has agreed to repair the pond and maintain it in the future. Also, it will most likely be necessary for the Swale originally designed to be on the south side of unit 2B to be re -installed. It may also be necessary for the inlet most near unit 2B to be lowered to allow for the re -installed swale to function properly. The City of Tybee Island should notify us if the swale is to be re- installed so that we may notify the owners and their representatives. It was also brought to the attention of Mr. Downer Davis and myself that Tybee has installed 2 inlets within the last few years, on 11 th street which were connected to our drainage system for the 10 th place project. These new inlets are draining areas to the east and south which were previously draining towards the dunes. These two inlets re-routed storm water to the 10`x' place project's outfall system. Our project was designed to be the conveyance of a finite area of the 10 th place project which was then appropriate and by adding the additional storm water to this system, it may be adding water which was not designed to be in our system. As a result, we think that this added flow to our system may have caused it not to function as intended and may be one of the factors for the flooding that the neighbors are having complaints about in this area. We think that it may be possible that there could be 50% or more storm water added to our system and that the entire system should be evaluated or re-evaluated to determine how adequate the entire system now is. This letter only reflects my opinion in these matters and we do not have calculations to accompany these opinions. Please verify these determinations with your review engineer and get his opinions and/or concurrence. Thank you for your assistance and should you require more information please feel free to contact us at Boswell Design Services, Inc. 897-6932, e-mail to lahbos(a)bellsouth.net or fax to 897-2287. Sincerely, Mark Boswell N10.5 S�a y�� { ��� Dianne Otto From: Bubba Hughes <BHughes@cbrhlaw.com> Sent: Monday, February 24, 2014 12:25 PM To: Diane Schleicher; Dianne Otto Cc: Downer K. Davis Jr. Subject: RE: drainage plan for Tenth Place IF the city knows the drainage plan implemented does not comply with what was approved, the remedy could be against the developer & not the owners. I assume there is no owner association for the group & maybe there should be or maybe there should be one required in instances like this. If the drainage plan would have worked & was implemented, but maintenance is required, then I think notice to the owners is the way to go. I am reluctant to include the city going onto private property & doing the work in these circumstances & would prefer to issue a citation & have the court order compliance as it is hopefully less likely to end up in a dispute the city caused damage to other property or something... The notice could say that if the situation is not rectified within a certain time limit, the city will take steps it deems best including citation to court or having maintenance performed at the owner's expense.. I would want to review the notice letter before it goes. Bubba From: Diane Schleicher [ma !Ito:dschleicher@cityoftybee.orq] Sent: Monday, February 24, 2014 12:07 PM To: Dianne Otto; Bubba Hughes Cc: Downer K. Davis Jr, Subject: RE: drainage plan for Tenth Place Bubba, In lieu of citations, can the city notify the owners to do the maintenance, and if they don't do it within a set amount of time, can the city do the work and charge the owners? Thanks, Diane From: Dianne Otto Sent; Monday, February 24, 2014 12:05 PM To: Bubba Hughes Cc: Diane Schleicher; Downer K. Davis Jr. Subject: drainage plan for Tenth Place Bubba, Attached is a 2005 drainage plan for 3 lots on Tenth Place. This area was developed by Howard Reeve. The oceanfront lot is a subdivided duplex so there are 4 owners. I understand the maintenance of the private system is the responsibility of the property owners. If there are issues with drainage, does the City leave it to the owners to work out who will pay for what? Or does the City direct each property owner to maintain the part of the system that is on their property? In this case, we have a complaint from a property owner adjacent to the 3 lots. Dianne Otto From: Bubba Hughes <BHughes@cbrhlaw.com> Sent: Wednesday, June 04, 2014 3:34 PM To: Dianne Otto Cc: Tommy Branch; Diane Schleicher; Downer K. Davis Jr. Subject: Re: 10th place Detention Dianne, I guess the city could be brought in but should not have liability in my opinion . I think all should cooperate to solve the problem. Sent from my !Phone On Jun 4, 2014, at 10:29 AM, "Dianne Otto" <Dotto@cityoftybee.or > wrote: > Please review the email below and the attachments regarding issues with the Tenth Place subdivision drainage. The email below states, "the owner is not out to seek legal action at this time." Bubba, since this is a private subdivision drainage system, would legal action be between the property owners and the engineer, not the city? Or could the city be drawn in if they attempt to contend the calculations were incorrect when the project was permitted by the city for Howard Reeve to install? > Dianne Otto, CFM > City of Tybee Island > Planning & Zoning Manager > Office: 912.472.5031 > Fax: 912.786.9539 > -----Original Message----- > From: Michael C Johnson[mailto:michael@shaharchitecture.com] > Sent: Wednesday, June 04, 2014 9:38 AM > To: Downer Davis; Dianne Otto > Cc: AIA LEED A. P. Reshma Shah Johnson > Subject: 10th place Detention > Downer & Dianne, > For both of your information the owner is planning on entering into a contract with a separate and independent engineering company. I will be meeting Tom Havens (coastal Engineering) on site tomorrow at 1:30. We feel this is in our best interest as we believe the as -built falsely represented the actual condition. The owner is not out to seek legal action at this time, but on our advice it seemed prudent to Involve a independent engineer if the cost of the pond remediation gets out of hand and legal action is required. My intent is to contract a design solution that meets the detention requirements and submit to you for approval. > Downer > Can you clarify the detention volume requirement? The as built and Marks calculation from this morning seamed to be different. 1971c.f. vs. 1884 c.f. > Michael C Johnson, AIA > Principal > Shah Architecture, P. C. Dianne Otto From: Downer Davis <dkdbus@gmail.com> Sent: Wednesday, June 04, 2014 9:19 AM To: Michael C Johnson Cc: Mark Boswell; Dianne Otto Subject: Re: 10th place volume calculations letter On Wednesday, June 4, 2014, Downer Davis <dkdbus(cb, gmail.com> wrote: Based on the Enguneer's certification, the asbuilts the Enguneer submitted and the supporting calculations the required volume (in the design submittal by the Engineer) was represented to be provided in the pond when it was completed. City Code does not provide an option for me to set this requirement aside. As for this being a maintenance issue, if the pond had been maintained to the condition reoresented in the asbuilts currently in file, this matter would not be under such scrutiny now. At this time I'm not aware if there being a flaw in the asbuilts submittal. I request concurrence or correction on my understanding if this frim the Engineer. Downer Davis 912-695-7262 I'd planned to be at City Hall by now, but I've run late. I now koan ti be there frim around 9:45-10:15am to look at another file. I'm available to look into this further if requested anytime today frim 1:30prn on. However, I'm unsure of how the volume requirements can be waived. On Wednesday, June 4, 2014, Michael C Johnson<michael(a7shaharchitecture.com> wrote: That being said, this appears not to be a maintenance issue. It appears this detention area was not constructed to accommodate the design load. This is not apparent on the as -built, as they do not actually reflect the as -built condition. Is this correct? Michael C Johnson, AIA Principal Shah Architecture, P. C. P: 912.373.6108 D: 912.658.2577 On Jun 4, 2014, at 8:24 AM, Mark Boswell <lahbos@bellsouth.net> wrote: the original design showed a pond bottom of 350 sf. near as I can tell, the current pond bottom is 210 sf I'm not sure if the pond was ever confirmed for size during the as built phase of the project. the i.e.'s, pipe sizes, etc. was obviously picked up on the as-builts. U.S. DEPARTMENT OF HOMELAND SECURITY ELEVATION CERTIFICATE OMB No. 1660-0008 Federal Emergency Management Agency Expires February 28. 2009 National Flood Insurance Program Important: Read the instructions on pages 1-8. SECTION A - PROPERTY INFORMATION For Insurance Company Use. Al. Building Owners Name A2, Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.I Company NAIC Number I 5-B Tenth Place City Tybee Island, State GA ZIP Code 31328 A3. Property Description (Lot and Block Numbers, Tax Parcel Number, Legal Description, etc.) Lot C-2 of a subdivision of the eastern 225' of front lot 65, ward no. 4, Tybee Island A4. Building Use (e.g., Residential, Non -Residential, Addition, Accessory, etc.) residentia.l A5. Latkude/Longilude: Lat. W31 deg 59.969 min Long. W 60 deg 50.686 min Horizontal Datum: ❑ NAD 1927 ® NAD 1983 A6. Attach at least 2 photographs of the building if the Certificate is being used to obtain flood insurance. A7. Building Diagram Number 6 A6. For a building with a crawl space or enclosure(s), provide A9. For a building with an attached garage, provide: a) Square footage of crawl space or enclosure(s) 17$ sq ft a) Square footage of attached garage t>/a, sq ft b) No. of permanent flood openings in the crawl space or b) No. of permanent flood openings in the attached garage enclosure(s) walls within 1.0 foot above adjacent grade 2 walls within 1.0 foot above adjacent grade c) Total net area of flood openings in A9.b sq in c) Total net area of flood openings in A8.b �_ sq in SECTION B - FLOOD INSURANCE RATE MAP (FIRM) INFORMATION B1. NFIP Community Name & Community Number B2. County Name B3. State TYbee Island 135164 1 Chatham I GA B4. Map/Panet Number B5. Suffix B6, FIRM Index 87. FIRM Panel B8. Flood B9. Base Flood Elevation(s) (Zone ® feet ❑ meters (Puerto Rico only) Date Effective/Revised Dale Zone(s) AO, use base flood depth) 135164 0002 C 6117186 6/17/86 V9 16 B10. Indicate the source of the Base Flood Elevation (BFE) data or base flood depth entered in Item 89. ❑ FIS Profile ® FIRM ❑ Community Determined ❑ Other (Describe) 511. Indicate elevation datum used for BFE in Item B9: ® NGVD 1929 ❑ NAVD 1988 ❑ Other (Describe) B12. Is the building located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area (OPA)? ❑Yes ®No Designation Date ❑ CBRS ❑ OPA SECTION C - BUILDING ELEVATION INFORMATION (SURVEY REQUIRED) Cl. Building elevations are based on: ❑ Construction Drawings* ❑ Building Under Construction` ® Finished Construction *A new Elevation Certificate will be required when construction of the building is complete. C2. Elevations -Zones Al -A30, AE, AH, A (with BFE), VE, V1 -V30, V (with BFE), AR, ARIA, ARAE, AR/Al -A30, AR/AH, ARIAO. Complete Items C2.a-g below according to the building diagram specified in Item A7, Benchmark Utilized j4Sr?l Vertical Datum NGVD 1929 Conversion/Comments a) Top of bottom floor (including basement, crawl space, or enclosure floor)_ b) Top of the next higher floor c) Bottom of the lowest horizontal structural member (V Zones only) d) Attached garage (top of slab) e) Lowest elevation of machinery or equipment servicing the building (Describe type of equipment in Comments) f) Lowest adjacent (finished) grade (LAG) g) Highest adjacent (finished) grade (HAG) SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized by law to certify elevation information. I certify that the information on this Certificate represents my best efforts to interpret the data available. / understand that any false statement may be punishable by fine or imprisonment under 18 U.S. Code, Section 1001. ® Check here if comments are provided on back of form. Certifier's Name J. Whitiey Reynolds License Number 2249 Title Land Surveyor Company Name J. Whitley Reynolds, Land Surveying Address 636 StepkdI5sdn Ave.-SuMC City Savannah, State GA ZIP Date 8/31107 V,ORG44 Cy1y S TE�� No. 2249 A a S UIR -(TLE' 4 Check the measurement used. 9.5 ® feet ❑ meters (Puerto Rico only) 18.7 ® feet ❑ meters (Puerto Rico only) 17.6 ® feet ❑ meters (Puerto Rico only) n/a. ® feet ❑ meters (Puerto Rico only) 18.3 ® feet ❑ meters (Puerto Rico only) �.8 ® feet ❑ meters (Puerto Rico only) $. ® feet ❑ meters (Puerto Rico only) SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized by law to certify elevation information. I certify that the information on this Certificate represents my best efforts to interpret the data available. / understand that any false statement may be punishable by fine or imprisonment under 18 U.S. Code, Section 1001. ® Check here if comments are provided on back of form. Certifier's Name J. Whitiey Reynolds License Number 2249 Title Land Surveyor Company Name J. Whitley Reynolds, Land Surveying Address 636 StepkdI5sdn Ave.-SuMC City Savannah, State GA ZIP Date 8/31107 V,ORG44 Cy1y S TE�� No. 2249 A a S UIR -(TLE' 4 Building Photographs See Instructions for Item A6. For Insurance Company Use: Building Street Address (including Apt., Unit, Suite, andfor Bldg. No.) or P.O. Route and Box No. Policy Number 5-A Tenth Place City Tybee Island, State GA ZIP Code 31328 CflrnpenyNAIC Number If using the Elevation Certificate to obtain NFIP flood insurance, affix at least two building photographs below according to the instructions for Item A8. Identify all photographs with: date taken; "Front View" and "Rear View"; and, if required, "Right Side View' and "Left Side View.- if submitting more photographs than will fit on this page, use the Continuation Page, following. ^^P% -Y (1, 2) INTEGRATED DUCTILE IRON FRAME & GRATE TO MATCH BASIN O.D. (3) VARIABLE INVERT HEIGHTS AVAILABLE (ACCORDING TO PLANS/TAKE OFF) NYLOPLAST 24" DRAIN BASIN: 2824AG X MINIMUM PIPE BURIAL DEPTH PER PIPE MANUFACTURER RECOMMENDATION (MIN. MANUFACTURING REQ. SAME AS MIN. SUMP) (4) VARIOUS TYPES OF INLET & OUTLET ADAPTERS AVAILABLE: 4" - 24" FOR CORRUGATED HDPE (ADS N-12/HANCOR DUAL WALL, ADS/HANCOR SINGLE WALL), N-12 HP, PVC SEWER (EX: SDR 35), PVC DWV (EX: SCH 40), PVC C9OO/C905, CORRUGATED & RIBBED PVC WATERTIGHT JOINT (CORRUGATED HDPE SHOWN) 1 - GRATESlSOLID COVER SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05. 2 - FRAMES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05. 3 - DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS. RISERS ARE NEEDED FOR BASINS OVER 84" DUE TO SHIPPING RESTRICTIONS. SEE DRAWING NO. 7001-110-065. 4 - DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO ASTM D3212 FOR CORRUGATED HDPE (ADS N-121HANCOR DUAL WALL), N-12 HP & PVC SEWER. 5 -ADAPTERS CAN BE MOUNTED ON ANY ANGLE 0° TO 360°. TO DETERMINE MINIMUM ANGLE BETWEEN ADAPTERS SEE DRAWING NO. 7001-110-012. 18" MIN WIDTH GUIDELINE 8" MIN THICKNESS GUIDELINE THIS PRINT DISCLOSES SUBJECT MATTER IN WHICH NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT OR POSSESSION OF THIS PRINT DOES NOT CONFER, TRANSFER, OR LICENSE THE USE OF THE DESIGN OR TECHNICAL INFORMATION SHOWN HEREIN REPRODUCTION OF THIS PRINT OR ANY INFORMATION CONTAINED HEREIN, OR MANUFACTURE OF ANY ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN PERMISSION FROM NYLOPLAST. oto -a NYLOPLAST (3) VARIABLE SUMP DEPTH ACCORDING TO PLANS (6" MIN. BASED ON MANUFACTURING REQ.) 4" MIN THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHER GRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS I OR CLASS II MATERIAL AS DEFINED IN ASTM D2321. BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BE PLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321. GRATE OPTIONS TRAFFIC LOADS: CONCRETE SLAB DIMENSIONS ARE FOR (5) ADAPTER GUIDELINE PURPOSES ONLY. ACTUAL CONCRETE SLAB MUST BE ANGLES DESIGNED TAKING INTO CONSIDERATION LOCAL SOIL CONDITIONS, VARIABLE o° - TO ACCORDING TO TRAFFIC LOADING, & OTHER APPLICABLE DESIGN FACTORS. PLANS SEE DRAWING NO. 7001-110-111 FOR NON TRAFFIC INSTALLATION. THIS PRINT DISCLOSES SUBJECT MATTER IN WHICH NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT OR POSSESSION OF THIS PRINT DOES NOT CONFER, TRANSFER, OR LICENSE THE USE OF THE DESIGN OR TECHNICAL INFORMATION SHOWN HEREIN REPRODUCTION OF THIS PRINT OR ANY INFORMATION CONTAINED HEREIN, OR MANUFACTURE OF ANY ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN PERMISSION FROM NYLOPLAST. oto -a NYLOPLAST (3) VARIABLE SUMP DEPTH ACCORDING TO PLANS (6" MIN. BASED ON MANUFACTURING REQ.) 4" MIN THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHER GRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS I OR CLASS II MATERIAL AS DEFINED IN ASTM D2321. BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BE PLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321. GRATE OPTIONS LOAD RATING PART # DRAWING # PEDESTRIAN MEETS H-10 2499CGP 7001-110-216 STANDARD MEETS H-20 2499CGS 7001-110-217 SOLID COVER MEETS H-20 2499CGC 7001-110-218 DOME WA 2499CGD 7001-110-219 DROP IN GRATE LIGHT DUTY 2401DI 7001-110-075 DRAWN BY EBC MATERIAL DATE 04-03-06 REVISED BY CCA PROJECT NOJNAME DATE 08.27.13 DWG SIZE A I SCALE 1:40 SHEET 1 OF 1 I DWG NO. 7001-110.192 REV D 3130 VERONA AVE BUFORD, GA 30518 r� Nylo I< t PHN (770) 932-2443 FAX (770) 932-2490 lS www.ny l oplast-us.coi TITLE 24 IN DRAIN BASIN QUICK SPEC INSTALLATION DETAIL DWG SIZE A I SCALE 1:40 SHEET 1 OF 1 I DWG NO. 7001-110.192 REV D SC -310 Cumulative Storage Volumes Per Chamber Assumes 40% Stone Porosity. Calculations are Based Upon a 6"(152 mm) Stone Base Under the Chambers. Depth of System Chamberin I t t , Storage 28 (711) 14,70 (0,416) 31.00 (0.878) 27 (686) 14.70 (0.416) 30.21 (0.855) 26l Stone 14.70 (0.416) 29.42 (0.833) 25(l Cover 14.70 (0.416) 28.63 (0.811) 24l 14.70 (0.416) 27.84 (0.788) 23 (584) 14.70 0.416 27.05 (0.766) 22l 14.70 (0.416) 26.26 (0.748) 21l 14.64 (0.415) 25.43 (0.720 20l 14.49 0.410) 24.54 0.695) 19l 14.22 1.403 23.58 0.668 18l 13.68 0,387 22.47 (0.636) 17 (432) 12.99 1 21.25 (0.602) 16 (406) 12.17 (0.345) 19.97 0.566 15l 11.25 (0.319) 18.62 (0.528) 14l 10.23 (0.290) 17.22 (0.488) 13 (330) 9.15 (0.260) 15.78 (0.447) 12 (305) 7.99 (0.227) 14.29 0.425) 11 (279) 6.78 (0.192) 12.77 (0.362) 10 (254) 5.51 (0.156) 11.22 (0.318) 9 (229) 4.19 (0.119) 9.64 0.278 8 (203) 2.83 (0.081) 8.03 (0.227 7 (178) 1.43 0.041 6.40 (0.181) 6 (152) 0 4.74 (0.134) 5 (127) 0 3.95 (0.112 4 (102) Stone Foundation 0 3.16 (0.090) 31 0 2.37 (0.067) 21 0 1.58 (0.046) 1(25) 0 0.79 (0.022) Note: Add 0.79 cu. ft. (0.022 m 3) of storage for each additional inch (25 mm) of stone foundation. Storage Volume Per Chamber Note: Storage volumes are in cubic feet per chamber. Assumes 40% porosity for the stone plus the chamber volume. Amount of Stone Per Chamber ENGLISH TONS (CUBIC YARDS) Bare Chamber and Stone StormTech SC -310 Chamber Stone Foundation depth METRIC KILOGRAMS (METERS) Storage in. (mm) 61 12 (305) 18 (460) ft, (ma) StormTech SC -310 14.7 (0.4) 31.0l 35.7(l.0) 40.4 (1.1) Note: Storage volumes are in cubic feet per chamber. Assumes 40% porosity for the stone plus the chamber volume. Amount of Stone Per Chamber ENGLISH TONS (CUBIC YARDS) Stone Foundation Depth 6" 12" is" StormTech SC -310 2.1 (1.5 yd3) 2.7 (1.9 yd') 3.4 (2.4 yd') METRIC KILOGRAMS (METERS) 150 mm 305 min 460 mm StormTech SC -310 1830 (1.1 nl3) 2490 (1.5 m3) 2990 (1.8 m3) Note: Assumes 6'(150 mm) of stone above, and between chambers. Volume of Excavation Per Chamber Note: Volumes are in cubic yards (cubic meters) per chamber. Assumes 6'(150 mm) of separation between chamber rows and 18'(460 mm) of cover. The volume of excavation will vary as the depth of the cover increases. STANDARD LIMITED WARRANTY OF STORMTECH LLC ("STORMTECH"): PRODUCTS (A) This Limited Warranty applies solely to the StormTech chambers and endplates manufactured by StcrmTech and sold to the original purchaser (the "Purchaser'). The chambers and endplates are collectively referred to as the "Products," (B) The structural integrity of the Products, when installed strictly in accordance with StormTech's written installation instructions at the time of installation, are warranted to the Purchaser against defective materials and workmanship for one (1) year from the date of purchase. Should a de- fect appear in the Limited Warranty period, the Purchaser shall provide StormTech with written notice of the alleged defect at StormTech'; corporate headquarters within ten (10) days of the discovery of the defect. The notice shall describe the alleged defect in reasonable detail. StormTech agrees to supply replacements for those Products determined by StormTech to be defective and covered by this Limited Warranty, The supply of replacement products is the sole remedy of the Purchaser for breaches of this Limited Warranty. StormTech's liability specifically excludes the cost of removal andlor installation of the Products. (C) THIS LIMITED WARRANTY IS EXCLUSIVE. THERE ARE NO OTHER WARRANTIES WITH RESPECT TO THE PRODUCTS, INCLUDING NO IMPLIED WARRANTIES OF MERCHANT ABRITY OR OF FITNESS FOR A PARTICULAR PURPOSE. (0) This Limited Warranty or* applies to the Products when the Products are installed in a single layer. UNDER NO CIRCUMSTANCES, SHALL THE PRODUCTS BE INSTALLED INA MULTI -LAYER CONFIGURATION. (E) No representative of StormTech has the authority to change this Limited Warranty in any manner or to extend this Limited Warranty. This Limited Warranty does not apply to any person other than to the Purchaser, (F) Under no circumstances shall StormTech be liable to the Purchaser or to any third party for prod- uct liability claims; claims arising from the design, shipment, or installation of the Products, or the cost of other goods or services related to the purchase and installation of the Products. For this Limited Warranty to apply, the Products must be installed in accordance with all site condi- tions required by state and local codes; all other applicable laws; and StormTech+; written in- stallation instructions - (G} THE LIMITED WARRANTY DOES NOT EXTEND TO INCIDENTAL, CONSEQUENTIAL, SPE- CIAL OR INDIRECT DAMAGES. STORMTECH SHALL NOT BE LIABLE FOR PENALTIES OR LIQUIDATED DAMAGES, INCLUDING LOSS OF PRODUCTION AND PROFITS; LABOR AND MATERIALS; OVERHEAD COSTS; OR OTHER LOSS OR EXPENSE INCURRED BY THE PURCHASER OR ANY THIRD PARTY. SPECIFICALLY EXCLUDED FROM LIMITED WAR- RANTY COVERAGE ARE DAMAGE TO THE PRODUCTS ARISING FROM ORDINARY WEAR AND TEAR; ALTERATION, ACCIDENT, MISUSE, ABUSE OR NEGLECT, THE PRODUCTS BEING SUBJECTED TO VEHICLE TRAFFIC OR OTHER CONDITIONS WHICH ARE NOT PERMITTED BY STORMTECH'S WRITTEN SPECIFICATIONS OR INSTALLATION INSTRUC- TIONS; FAILURE TO MAINTAIN THE MINIMUM GROUND COVERS SET FORTH IN THE INSTALLATION INSTRUCTIONS; THE PLACEMENT OF IMPROPER MATERIALS INTO THE PRODUCTS; FAILURE OF THE PRODUCTS DUE TO IMPROPER SITING OR IMPROPER SIZING; OR ANY OTHER EVENT NOT CAUSED BY STORMTECH. THIS LIMITED WAR- RANTY REPRESENTS STORMTECH'S SOLE LIABILITY TO THE PURCHASER FOR CLAIMS RELATED TO THE PRODUCTS, WHETHER THE CLAIM IS BASED UPON CON- TRACT, TORT, OR OTHER LEGAL THEORY, 20 Beaver Road, Suite 104 I Wethersfield I Connecticut 106109 860.529.8188 1888.892.2694 I fax 866.328.8401 I fax 860-529-8040 I www.sti)rFntech.com Printed in U.S.A. (P Copyright. All rights reserved. StormTech LLC, 2007 Printed on recycled paper g S15-090508 Stone Foundation Depth 6" (150 mm) 12" (305 mm) 18" (460 mm) StormTech SC -310 2.9 (2.2) 3.4 (2.6) 3.8 (2.9) Note: Volumes are in cubic yards (cubic meters) per chamber. Assumes 6'(150 mm) of separation between chamber rows and 18'(460 mm) of cover. The volume of excavation will vary as the depth of the cover increases. STANDARD LIMITED WARRANTY OF STORMTECH LLC ("STORMTECH"): PRODUCTS (A) This Limited Warranty applies solely to the StormTech chambers and endplates manufactured by StcrmTech and sold to the original purchaser (the "Purchaser'). The chambers and endplates are collectively referred to as the "Products," (B) The structural integrity of the Products, when installed strictly in accordance with StormTech's written installation instructions at the time of installation, are warranted to the Purchaser against defective materials and workmanship for one (1) year from the date of purchase. Should a de- fect appear in the Limited Warranty period, the Purchaser shall provide StormTech with written notice of the alleged defect at StormTech'; corporate headquarters within ten (10) days of the discovery of the defect. The notice shall describe the alleged defect in reasonable detail. StormTech agrees to supply replacements for those Products determined by StormTech to be defective and covered by this Limited Warranty, The supply of replacement products is the sole remedy of the Purchaser for breaches of this Limited Warranty. StormTech's liability specifically excludes the cost of removal andlor installation of the Products. (C) THIS LIMITED WARRANTY IS EXCLUSIVE. THERE ARE NO OTHER WARRANTIES WITH RESPECT TO THE PRODUCTS, INCLUDING NO IMPLIED WARRANTIES OF MERCHANT ABRITY OR OF FITNESS FOR A PARTICULAR PURPOSE. (0) This Limited Warranty or* applies to the Products when the Products are installed in a single layer. UNDER NO CIRCUMSTANCES, SHALL THE PRODUCTS BE INSTALLED INA MULTI -LAYER CONFIGURATION. (E) No representative of StormTech has the authority to change this Limited Warranty in any manner or to extend this Limited Warranty. This Limited Warranty does not apply to any person other than to the Purchaser, (F) Under no circumstances shall StormTech be liable to the Purchaser or to any third party for prod- uct liability claims; claims arising from the design, shipment, or installation of the Products, or the cost of other goods or services related to the purchase and installation of the Products. For this Limited Warranty to apply, the Products must be installed in accordance with all site condi- tions required by state and local codes; all other applicable laws; and StormTech+; written in- stallation instructions - (G} THE LIMITED WARRANTY DOES NOT EXTEND TO INCIDENTAL, CONSEQUENTIAL, SPE- CIAL OR INDIRECT DAMAGES. STORMTECH SHALL NOT BE LIABLE FOR PENALTIES OR LIQUIDATED DAMAGES, INCLUDING LOSS OF PRODUCTION AND PROFITS; LABOR AND MATERIALS; OVERHEAD COSTS; OR OTHER LOSS OR EXPENSE INCURRED BY THE PURCHASER OR ANY THIRD PARTY. SPECIFICALLY EXCLUDED FROM LIMITED WAR- RANTY COVERAGE ARE DAMAGE TO THE PRODUCTS ARISING FROM ORDINARY WEAR AND TEAR; ALTERATION, ACCIDENT, MISUSE, ABUSE OR NEGLECT, THE PRODUCTS BEING SUBJECTED TO VEHICLE TRAFFIC OR OTHER CONDITIONS WHICH ARE NOT PERMITTED BY STORMTECH'S WRITTEN SPECIFICATIONS OR INSTALLATION INSTRUC- TIONS; FAILURE TO MAINTAIN THE MINIMUM GROUND COVERS SET FORTH IN THE INSTALLATION INSTRUCTIONS; THE PLACEMENT OF IMPROPER MATERIALS INTO THE PRODUCTS; FAILURE OF THE PRODUCTS DUE TO IMPROPER SITING OR IMPROPER SIZING; OR ANY OTHER EVENT NOT CAUSED BY STORMTECH. THIS LIMITED WAR- RANTY REPRESENTS STORMTECH'S SOLE LIABILITY TO THE PURCHASER FOR CLAIMS RELATED TO THE PRODUCTS, WHETHER THE CLAIM IS BASED UPON CON- TRACT, TORT, OR OTHER LEGAL THEORY, 20 Beaver Road, Suite 104 I Wethersfield I Connecticut 106109 860.529.8188 1888.892.2694 I fax 866.328.8401 I fax 860-529-8040 I www.sti)rFntech.com Printed in U.S.A. (P Copyright. All rights reserved. StormTech LLC, 2007 Printed on recycled paper g S15-090508 StormTech SC -310 Chamber Designed to meet the most stringent industry performance standards for superior structural integrity while providing designers with a cost-effective method to save valuable land and protect water resources. The StormTech system is designed primarily to be used under parking lots thus maximizing land usage for commercial and municipal applications. StormTech SC -310 Cl (not to scale) Nominal Chamber S priliDiva LIUIIJ Size (L x W x H) 85.4" x 34.0" x 16.0" (2170 x 864 x 406 mm) Chamber Storage 14.7 W (0.42 m3) Minimum Installed Storage` 31.0 ft3 (0.88 ma) Weight 37,0 lbs (16.8 kg) Shipping 41 chambers/pallet 108 end Gaps/pallet 18 pallets/truck 12" (305 mm) DIA. MAX (150 mm) SC -310 End Cap 16.0" (40m) 34.0" (864 mm .. —AAt.. 46 StormTech Detention •Retention"Recharge Subsurface Stormwater Management' ACCEPTS 4" (100 mm) SCH 40 PIPE FOR OPTIONAL INSPECTION PORT THE INSTALLED CHAMBER SYSTEM SHALL PROVIDE CHAMBERS SHALL MEET ASTM r 2922-12 "STANDARD THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD SPECIFICATION FOR POLYETHYLENE (PE) CORRUGATED BRIDGE DESIGN SPECIFICATIONS SECTION 12.12 FOR WALL S70RMWATER COLLECTION CHAMBERS." EARTH ANC LIVE LOADS, WITH CONSIDERATION FOR GRANULAR WELL GRADED SgL1AGGREGATE IMPACT AND MULTIPLE VEHICLE PRESENCE, MIXTURES,<35%FINES, COMPACT IN 6 I SC-310CHAMBER LIFTS TO 95% PROCTOR DENSITY. SEETHE TAHLE OF ACCEPTABLE FILL MATERIALS. Typical Cross 314 -2 -INCH CLEAN. Section Detail CRUSHED. ANGULAR STONE SC -310 END CAP AASHTO M288 CLASS (riot to Scale) l NON -WOVEN GEOTEXTILE -PAVLMLNI -III FIR IINPn DIN51 LLATKYIYRRRE - Rl1TTNG FROK E CLESMAYO R, IIIIII NrREFrC—TO N NGIES Ir(48Omm) -. (2440mm) MIN. MAX. -I 6'(1513 mm) MIN, 16" (406 mm) DEPTHTO BE DETERMINED BY DESIGN ENGINEER `III e" (i50 mm) MIN_ I I -I I -1 I TI 11=1 I Ir l i 11=11111 tI I I -I I, 111=1 DESIGN LNG{NEER IS RESPONSIBLE FOR W (150 mm} MIN 34' (864 mm) 12'(M5 mmj MIN, TYR ENSURING THE REQUIRED 9LARING CAPACITY OF - -- -. . SUBGRADE SOILS- MADE IN THE USA THIS CROSS SECTION DETAILS THE REQUIREMENTS NECESSARY TO SATISFY THE LOAD FACTORS SPECIFIED IN THE AASHIO LRFO BRIDGE ULSIGN SPECIFICATIONS SECTION 12.12 FOR EARTH AND LIVE LOADS USING STORM I'LCH CHAMBERS TYBEE ISLAND POLICE DEPARTM 'T GA0250600 P.O. BOX 1340 Tybes Island, GA 81928 Incident Report Printed vate: 07/01 /200g Printed Time: 1-22 OM Page 1 of I ... - 4 Incident No: onnekn1600-f Primary LoWon: Secondary Location: 6 loth Place' CftV state 21P county _Typse Island GA 31328 Chiftharn Zone Sub Zone j Location Sub Lavation Business Nornip- South Incident Data Time Data TIme R;06rt Oats TIrne PC Strangir Type Promise 07/01/2000 13,23 to 07/01/2000 113:30 0;/01/2009 161:14 No 8- OTHER Case Type Case statue NeIghborhood Compl. Seq. No. IName: (Leat, First, Middle) Hame Ph Work Phone Other Phone Schleicher Diane Denson Address SSN Tybee 11118no 0 - 31328 Race Sex Date of Birth Age ift Employer School —. HeightnWe'gt Nair Eyes Brown 061t Entry M Requested M Warrant 0. Missing Person In Vqhlcle C] Article Q ftat 0 Gun 0 securities Additiorligil E3 A& 5 aSupplerneryteQ3 PlWon L] 4cc1d0nt[3VMM Bill of Rights OVehicle Impound[] Inv. RptoEvidshoe Forff Clearance Active Clearance Date: I was dispatched to I Oth Place to meat with City Manager Diane Schleicher, and to bring the noise meter with me. I met her there, and she instructed me to stand in the driveway of number 6 10th Place, which I identified as the Rosenzweig residence. She then drove by Me in hat petsofiAl vi)hIcIs while I measured the level of sound produced by the gravel In the roadway. On the first pass I did not have the meter set high enough to register correctly. On the second pass, the meter went to 87 decibels She thanked me, requested a copy of the report when It was done, and we both left the scene. Reporting Officer Badge, Suffix Signature Mayor Christopher E Case 302 Approving Officer Badge Suffix signature I T/I C00V99LFT6 juawlapdaa 93LI-Od pup Lsl a&qX_L Wd WCO 600e-tnr-Z0 Dianne Otto From: davisenginc@bellsouth.net Sent: Thursday, July 02, 2009 8:12 AM To: Dianne Otto; Diane Schleicher; Joe Wilson Cc: Allen, Brannyn Subject: FW: 10th Place My electronic file search turned up this correspondence (still in my sent folder). I have only vague memory of this as my services were not further requested at that time. As it is my understanding that this is a private drive, I beleive this is my first involvement in waranty type efforts on properties not maintained by the City. While my concerns remain the same, I am receptive to considering repair options. Downer -------------- Forwarded Message: -------------- From: davisengincO)bellsouth.net To: "Allen, Brannyn G." <bgallen(a,cityoft. b�g> Subject: 10th Place Date: Mon, 22 Sep 2008 00:04:16 +0000 Brannyn It is my understanding that residents of 10th Place are experiencing the porous open graded rock drive shifting to the extent their vehicles are getting stuck. The Engineer who designed this project has used this design before with satisfactory results. I cannot identify any design defects. During the inspection, following receipt of the Engineer's certification, nether Joe Wilson or I noticed gradation of the stone being different than the Engineer had specified. Not having observed the installation of this roadway, I cannot state whether the proper sequence of procedures was followed. The increased density by this minor subdivision created increased runoff with insufficient outfall. The approved design was based on the drive remaining porous, stormwater detention and other conditions. am concerned that any repairs maintain this feature. If the drive becomes impervious, greater drainage related problems may be created. Unfortunately, the only way I am aware of to restore stability to the porous rock drive is complete removal and replacement. Please advise as you need my further involvement in this issue. Downer DAVIS ENGINEERING, INC. 636 Stephenson Avenue, Suite C Savannah, Georgia 31405 Tel. (912) 355-7262 Fax (912) 352-7787 October 5, 2005 davisenizinc@bellsouth.net Dee Anderson, Zoning Administrator City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 Phone (912)786-4573 Fax: (912)786-9539 RE: Lot 65 10'b Place Dear Mr. Anderson: We have reviewed the revised Sheet C2 by Boswell Design Services, Inc., the Owner's current Engineer for this subdivision. Our review is limited to engineering issues. We have not attempted to duplicate the work of the Planning Commission or City staff with regard to setbacks, density or other zoning or subdivision regulation issues. This project was first approved on September 20, 2004. It was later approved on February 27, 2005 with a revised storm outfall down I Ph Street. This current submittal shows revised storm water routing and storage areas within the Iots. We offer the following comments: 1) Lot #'s need to be shown on all sheets. 2) Drainage easements need to be shown on all swales and storm lines where receiving runoff from other lots. Clarification shall be provided on which features will be privately maintained. 3) For clarification the plan shall be revised to not indicate placement of a structure over the storm line at the rear of the middle lot. 4) Proposed elevations of any ground level floors shall be shown. 5) Storm water storage is shown in the drainage calculations to be partially accounted for in a gravel road. The plans call for crushed stone. Calculations shall show how this storage volume was accounted for. (area of stone x depth x % voids considered_) Stone type of stone clearly on the plan to not conflict with gradation shown in drainage calculations. 6) Show 25 year pond storage height and limits of surface storage on plans. As this project has undergone so many changes, I prefer to meet with the Engineer and representatives of Tybee at City Hall. This meeting should be brief but should allow for resolution of outstanding issues more expeditiously. Please contact me if you have any questions on this matter. Sincerely, Downer K. Davis, Jr., P.E. President 2040300h cc: DAVIS ENGINEERING, INC. 636 Stephenson Avenue, Suite C Savannah, Georgia 31405 Tel. (912) 355-7262 Fax (912) 352-7787 February 27, 2005 davisenginc@bellsouth.net Dee Anderson, Zoning Administrator City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 Phone (912)786-4573 Fax: (912)786-9539 RE: Lot 65 10`h Place Dear Mr. Anderson: This project was previously approved on September 20, 2005. We have reviewed the revised plans by Boswell Design Services, Inc., the Owner's current Engineer for this subdivision. Our review is limited to engineering issues. We have not attempted to duplicate the work of the Planning Commission or City staff with regard to setbacks, density or other zoning or subdivision regulation issues. To the best of my knowledge and belief, these pians meet the requirements of the Land Development Code of the City of Tybee Island. Any recommendations do not relieve the project of the requirement to obtain any other required permits, approvals, etc... by the Georgia Department of Transportation or any other governmental body or authority having jurisdiction over any portion of this project. The Director of Public Works has requested that the proposed new storm line be televised to minimize interruptions to traffic in the lane. Televising would allow for pipe joints to be backfilled without inspection by the City of every joint. Please contact me if you have any questions on this matter. Sincerely, Downer K. Davis, Jr., P.E. President 2040300g cc: DarbyBank Request of Original Letter of Credit September 5, 2008 City of Tybee P.O. Box 2749 Tybee Island, GA 31328 RE: Letter of Credit No. 238 for $10,000.00 i/n/o Howard D Reeve Gentlemen: (r-'20FIV weMOW It has come to our attention that the above mentioned Letter of Credit has expired and is no longer required. We request that you forward the original Letter of Credit #238 to our office if you acknowledge that this Letter of Credit no longer required. If you should find this to be incorrect or if you should need additional information, please contact me 912-238-1074 or Trelawney Powell at 912-277-2361. Sincerely, Patrick L. Brodmann Vice President Darby Bank & Trust Co cc: Howard D Reeve ©q�oS LoCLc 4- l� 1L�Q 300 Bull Street, Suite A (3 140 1) • P.O. Box 13687 • Savannah, GA 31416 • 912.238.1699 • Fax 912.232.9668 - www.DarbyBaiik.com III Illy � illllll '000000000001364710147009262007" � O IRREVOCABLE LETTER OF CREDIT Borrower: Howard D Reeve (SSN: 260-74-5161) Lender: Darby Bank & Trust Co. PO Box 15844 DeSoto Profit Center Savannah, GA 31416 300 Bull St. Suite A P. 0. Box 13687 Savannah, GA 31401 Beneficiary: City of Tybee P.O. Box 2749 Tybee Island, GA 31328 NO.: 238 EXPIRATION DATE. This letter of credit shall expire upon the earlier of the close of business on 09-26-2008 and all drafts and accompanying statements or documents must be presented to Lender on or before that time, or the day that Lender honors a draw under which the full amount of this Letter of Credit has been drawn (the "Expiration Date"). AMOUNT OF CREDIT. Lender hereby establishes at the request and for the account of Borrower, an Irrevocable Letter of Credit in favor of Beneficiary for a sum of Ten Thousand & 00/100 Dollars ($10,000.00) (the "Letter of Credit"). These funds shall be made available to Beneficiary upon Lender's receipt from Beneficiary of sight drafts drawn on Lender at Lender's address indicated above (or other such address that Lender may provide Beneficiary in writing) during regular business hours and accompanied by the signed written statements or documents indicated below. WARNING TO BENEFICIARY: PLEASE EXAMINE THIS LETTER OF CREDIT AT ONCE, IF YOU FEEL UNABLE TO MEET ANY OF ITS REQUIREMENTS, EITHER SINGLY OR TOGETHER, YOU SHOULD CONTACT BORROWER IMMEDIATELY TO SEE IF THE LETTER OF CREDIT CAN BE AMENDED, OTHERWISE, YOU WILL RISK LOSING PAYMENT UNDER THIS LETTER OF CREDIT FOR FAILURE TO COMPLY STRICTLY WITH ITS TERMS AS WRITTEN. DRAFT TERMS AND CONDITIONS. Lender shall honor drafts submitted by Beneficiary under the following terms and conditions: LETTER OF CREDIT: Darby Bank & Trust Co. ("Issuer") hereby establishes this standby letter of credit ("Letter of Credit") in favor of Beneficiary in the Amount above. Beneficiary may draw on this Letter of Credit by presenting a Draft (or Drafts, if the maximum number of drawings is greater than one) together with the documents described below to Issuer at the address above. Each Draft shall be signed by the Beneficiary and marked: "Drawn under Darby Bank & Trust Co. Letter of Credit No. 238 dated September 26, 2007." Drafts must be presented at Issuer's address on or before the Expiration Date. The presentation of any Draft shall reduce the amount available under the Letter of Credit by the amount of the Draft. DRAWINGS: (check one) Partial Drawings shall not be permitted under this Letter of Credit. _X_ Partial Drawings are permitted. DOCUMENTS: For payment, Beneficiary must deliver an original and two (2) copies of a sight draft drawn by Beneficiary on Issuer. In addition, the sight draft must be accompanied by an original and two (2) copies of the following: _X_ The original Letter of Credit, together with any amendments. A signed statement by Beneficiary including the following statement: ` Other documents, as follows: ISSUER SHALL BE ENTITLED TO ACCEPT A DRAFT AND THE DOCUMENTATION DESCRIBED ABOVE FROM ANY PERSON PUPORTING TO BE AN AUTHORIZED OFFICER OR REPRESENTATIVE OF BENEFICIARY WITHOUT ANY OBLIGATION OR DUTY ON THE PART OF ISSUER TO VERIFY THE IDENTITY OR AUTHORITY OF THE PERSON PRESENTING THE DRAFT AND SUCH INFORMATION. SPECIAL INSTRUCTIONS: EXPIRATION DATE: THIS LETTER OF CREDIT EXPIRES: (check one) _N/A_ AT 5:00 PM EST ON _N/A_, AND THIS LETTER OF CREDIT IS IRREVOCABLE PRIOR TO SUCH DATE. _X_ AT 5:00 PM EST ON _SEPTEMBER 26 , 2008_, AND THIS LETTER OF CREDIT IS IRREVOCABLE PRIOR TO SUCH DATE; PROVIDED, HOWEVER, THAT IF BENEFICIARY HAS NOT DRAWN THE FULL AMOUNT PRIOR TO SUCH DATE, THEN THIS LETTER OF CREDIT SHALL AUTOMATICALLY RENEW FOR SUCCESSIVE PERIODS OF _12 _ MONTHS/YEARS, UNLESS ISSUER NOTIFIES BENFICIARY IN WRITING AT LEAST 30 DAYS PRIOR TO EXPIRATION THAT ISSUER OR APPLICANT ELECTS NOT TO EXTEND OR RENEW THIS LETTER OF CREDIT. ON THE 30TH DAY FOLLOWING WRITTEN NOTICE OF CANCELLATION FROM ISSUER OR SUCH LATER DATE INDICATED IN THE CANCELLATION NOTICE. Issuer agrees to honor all Drafts submitted in strict compliance with this Letter of Credit on or before the Expiration Date. Issuer will not honor Drafts submitted after the Expiration Date. TRANSFERABILITY: THIS LETTER OF CREDIT IS (check one) TRANSFERABLE X NON -TRANSFERABLE. APPLICABLE LAW: This Letter of Credit shall be governed by the Uniform Customs and Practice Credits, 1993 Revision, International Chamber of Commerce Publication No. 500 (UCP), or any later version or amendment, and the laws of the State of Georgia, as applicable. Upon Lender's honor of such drafts, Lender shall be fully discharged of Lender's obligations under this Letter of Credit and shall not be obligated to make any further payments under this Letter of Credit once the full amount of credit available under this Letter of Credit has been drawn. If a non -conforming demand is made, Lender shall notify Beneficiary of Lender's dishonor on or before the time specified in the "Timing of Dishonor" paragraph below. Beneficiary shall have no recourse against Lender for any amount paid under this Letter of Credit once Lender has honored any draft or other document which complies strictly with this Letter of Credit, and which on its face appears otherwise in order but which is signed, issued, or presented by a party or under the name of a party purporting to act for Beneficiary, purporting to claim through Beneficiary, or posing as .REVOCABLE LETTER OF CREDI Loan No: 1364710 (Continued) Page 2 Beneficiary without Beneficiary's authorization. By paying an amount demanded in accordance with this Letter of Credit, Lender makes no representation as to the correctness of the amount demanded and Lender shall not be liable to Beneficiary, or any other person, for any amount paid or disbursed for any reason whatsoever, including, without limitation, any nonapplication or misapplication by Beneficiary of the proceeds of such payment. By presenting upon Lender or a confirming bank, Beneficiary certifies that Beneficiary has not and will not present upon the other, unless and until Beneficiary meets with dishonor. Beneficiary promises to return to Lender any funds received by Beneficiary in excess of the Letter of Credit's maximum drawing amount, USE RESTRICTIONS. All drafts must be marked "DRAWN UNDER Darby Bank & Trust Co. IRREVOCABLE LETTER OF CREDIT NO. 238 DATED 09-26-2007," and the amount of each draft shall be marked on the draft. Only Beneficiary may complete a draft and accompanying statements or documents required by this Letter of Credit and make a draw under this Letter of Credit. This original Letter of Credit must accompany any draft drawn hereunder. Partial draws are permitted under this Letter of Credit. Lender's honor of a partial draw shall correspondingly reduce the amount of credit available under this Letter of Credit. Following a partial draw, Lender shall return this original Letter of Credit to Beneficiary with the partial draw noted hereon; in the alternative, and in its sole discretion, Lender may issue a substitute Letter of Credit to Beneficiary in the amount shown above, less any partial drawls). PERMITTED TRANSFEREES. The right to draw under this Letter of Credit shall be nontransferable, except for: A. A transfer (in its entirety, but not in part) by direct operation of law to the administrator, executor, bankruptcy trustee, receiver, liquidator, successor, or other representative at law of the original Beneficiary; and B. The first immediate transfer (in its entirety, but not in part) by such legal representative to a third party after express approval of a governmental body (judicial, administrative, or executive). TRANSFEREES REQUIRED DOCUMENTS. When the presenter is a permitted transferee (i) by operation of law or (ii) a third party receiving transfer from a legal representative, as described above, the documents required for a draw shall include a certified copy of the one or more documents which show the presenter's authority to claim through or to act with authority for the original Beneficiary. TIMING OF DISHONOR. Lender may rely upon any reason for dishonor which it communicates to Beneficiary or the presenter within three (3) Banking Days after Lender has received the last document forming Beneficiary's presentment (the "Three -Day Period"), Lender shall be entitled to rely upon such reason without regard to either (i) the timing of any presentment made before the Expiration Date, or iii) the timing inside the Three -Day Period of any preliminary communicationis) from Lender concerning the dishonor decision or any reason for dishonor. For any reason for dishonor given during the Three -Day Period, Lender shall be conclusively deemed to have met the "reasonable time", "without delay", and other timing requirements as the 2006 Revision of the Uniform Customs and Practice for Documentary Credits of the International Chamber of Commerce, ICC Publication No. 600 (the "UCP") may impose. The Expiration Date shall not be extended to accommodate a presentment made less than three (3) Banking Days before the Expiration Date, and Beneficiary shall not be entitled to submit a draw request or provide Lender with any documents in support of a draw after the Expiration Date. Lender shall not be required to communicate a dishonor decision or its reasons within a time less than the Three -Day Period. "Banking Day" means any day, except Saturday, on which commercial banks located in Georgia are open. COMPLIANCE BURDEN. Lender is not responsible for any impossibility or other difficulty in achieving strict compliance with the requirements of this Letter of Credit precisely as written. Beneficiary understands and acknowledges: (i) that unless and until the present wording of this Letter of Credit is amended with Lender's prior written consent, the burden of complying strictly with such wording remains solely upon Beneficiary, and (ii) that Lender is relying upon the lack of such amendment as constituting Beneficiary's initial and continued approval of such wording. NON -SEVERABILITY. If any aspect of this Letter of Credit is ever declared unenforceable for any reason by any court or governmental body having jurisdiction, Lender's entire engagement under this Letter of Credit shall be deemed null and void ab initio, and both Lender and Beneficiary shall be restored to the position each would have occupied with all rights available as though this Letter of Credit had never occurred, This non -severability provision shall override all other provisions in this Letter of Credit, no matter where such provision appears within this Letter of Credit. GOVERNING LAW, This Agreement will be governed by federal law applicable to Lender and, to the extent not preempted by federal law, the laws of the State of Georgia without regard to its conflicts of law provisions, and except to the extent such laws are inconsistent with the UCP. This Agreement has been accepted by Lender in the State of Georgia. EXPIRATION. Lender hereby agrees with Beneficiary that drafts drawn under and in compliance with the terms of this Letter of Credit will be duly honored if presented to Lender on or before the Expiration Date unless otherwise provided for above. Dated: September 26, 2007 LENDER: DARBY & TRUST CO. By: -Patrick L Brodmann, Vice a rdent OrENDORSEMENT OF DRAFTS DRAWN: Amount Amount Date Negotiated By In Words In Figures LASER PPG L.nd.g. Ver. 5.77.00.003 Lop,. HO—d F-6.1 Sol -Ii-" Inc. 1997, 2007. All Rignb R... 4d. - GA [ALFA MC4.7LOC.FC TR -21254 PR 52 c1 e YYu-w`V S rv, v S� 6t, up OL� 111 mC,k -� c n Q up J 4r h ,S It a (s-0o34Q) 4} oc�n�r C12Q� oj�L37J 1. 1 gr-CZAa) l n leo �u4,ns In WX'Dre— (r% 4--�e-r i n +Ga') p r; gra-+e) 6vs+e,r%r\. MAYOR Jason Buelterman CITY COUNCIL Shirley Sessions, Mayor Pro Tem Wanda D. Doyle Bill Garbett Frank Schuman, Sr. Kathryn Williams Paul Wolff July 24, 2011 Ms. Joy Strickland Assistant Vice President The Savannah Bank P.O. Box 188 Savannah, GA 31402-0188 Dear Ms. Strickland, CITY OF TYBEE ISLAND CITY MANAGER Diane Schleicher ACTING CLERK OF COUNCIL Jan LeViner CITY ATTORNEY Edward M. Hughes via email only Joy. StricklandSAVB.com The City of Tybee Island releases letter of credit 215, Neptune Lane, on Mr. Howard Reeve. The City of Tybee Island also releases letter of credit 244, 3 Tenth Place, on Mr. Howard Reeve. Please let me know if I can be of further assistance. Sincerely, A(uee6 Dianne K. Otto Zoning Specialist cc: Alan Harper Alan. Harper(a)SAVB.com Elizabeth Schubert Elizabeth. Schubert SAVB.com P.O. Box 2749 -- 403 Butler Avenue, Tybee Island, Georgia 31328-2749 (912) 786-4573 — FAX (912) 786-5737 www.cityoftybee.org VM/),S--� 1, 3<eo m . Joyce- --FKje- L 6Z 9- Gs1.3 .51\. e. rdLp � j re I zags 4 r- eLx c � of +-%,S Wka:i ose. 44,,.0 ke4ki- ( I e4 v')Y� '1/1-7/r1 b:��PM� .v-) e;-�- ✓N1 THE BAND June 28, 2006 City of Tybee Island City Hall Tybee Island, Ga 31328 RE: Letter of Credit #215 Gentlemen: We hereby establish our Irrevocable Letter of Credit #215 in your favor for the account of Howard Reeve and Sylvia Reeve available by your drafts drawn on us and payable at sight for any sum of money not to exceed a total of Ten Thousand and no/100 US Dollars ($10,000.00), when accompanied by this original letter of credit and the following document(s): Signed letter stating that such monies are due and owing to The City of Tybee Island for drainage work not completed properly for Neptune Lane. All drafts must state "Drawn under Letter of Credit 9215 dated June 28, 2006". This Letter of Credit is subject to the "Uniform Customs and Practice for Documentary Credits (1983 Revision), International Chamber of Commerce Publication 400." We hereby agree with you all drafts drawn in compliance with the terms of this letter of credit will be duly honored upon presentation and delivery of the documents specified above to our office at 25 Buil Street Savannah, Ga 31401 on or before June 28, 2007. This letter shall renew automatically until final drainage is approved unless beneficiary is notified 30 prior to the renewal date. Sincerely, R. Stephen Stramm Executive Vice President kk� TteE SAVA_VNAH BANK, N.A. - POST 0mca Box 188 • SAVANNAH. GEORGIA 31402-0188 - TELE VIONG (912) 629-6500 - 14AX (912) 232-3733 MEMBPR FDIC TIS SAVANNAH BANK RECEIVED September 6, 2007 City of Tybee Island City Hall Tybee Island, Ga 31328 RE: Letter of Credit 4244 Gentlemen: We hereby establish our Irrevocable Letter of Credit #244 in your favor for the account of Howard Reeve and Sylvia Reeve available by your drafts drawn on us and payable at sight for any suln of money not to exceed a total of Ten Thousand and no/100 US Dollars ($10,000.00), when accompanied by this original letter of credit and the following document(s): Signed letter stating that such monies are due and owing to The City of Tybee Island for drainage work not completed properly for #3 10"' Place. All drafts must state "Drawn under Letter of Credit #244 dated September 6, 2007". This Letter of Credit is subject to the "Uniform Customs and Practice for Documentary Credits (1983 Revision), International Chamber of Commerce Publication 400." We hereby agree with you all drafts drawn in compliance with the terms of this letter of credit will be duly honored upon presentation and delivery of the documents specified above to our office at 25 Bull Street Savannah, Ga 31401 on or before March 6, 2008. This letter shall renew automatically until final drainage is approved unless beneficiary is notified 30 prior to the renewal date. Sinc ely, Christopher A. Brown Assistant Vice President THE SAVANNAH BANK, N.A. • DOST OFFICE BOX 188 • SAVANNAH, GEORGIA 31402-0188 • TELEPHONE (912) 629-6500 • FAX (912) 232-3733 MEMBER FDIC Brannyn G. Allen From: davisenginc@bellsouth.net Sent: Monday, November 19,2007 12-13 PM To: Brannyn G. Allen Cc: Joe Wilson Subject: Re: Reeves plat The final plat is acceptable. I am still waiting on the final asbuilts. Downer Page 1 of 1 RECEIVED II - -------------- Original message from 'Brannyn G. Allen" <bgallen@cityoftybee.org>:------------- Downer — Will you please send me a quick email verifying that the revised plat for Howard Reeve's 10th Place project is acceptable? Thanks - Brannyn G. Allen Planning, Zoning and Economic Development Director City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, Georgia 31328 Phone: 912.786.4573 ext. 107 Fax: 912.786.9539 htW://www.c4oftybee.orp,/ This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of The City of Tybee Island. The recipient should check this email and any attachments for the presence of viruses. The City of Tybee Island accepts no liability for any damage caused by any virus transmitted by this email. City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 11/19/2007 Page 1 of 2 Dianne Otto From: Dianne Otto Sent: Thursday, November 08, 2007 12:51 PM To: 'davisenginc@bellsouth.net' Cc: Brannyn G. Allen; Joe Wilson Subject: RE: 10th Reeves YES! Dianne K. Otto Administrative Assistant Building & Zoning dotto@cityoftybee.org Phone: (912) 786-4573 ext. 114 Fax: (912) 786-9539 -----Original Message ----- From: davisenginc@bellsouth.net [mailto:davisenginc@bellsouth.net] Sent: Thursday, November 08, 2007 11:33 AM To: Dianne Otto Cc: Brannyn G. Allen; Joe Wilson Subject: 10th Reeves I have printed out he exhibits from Boswell you emailed to me mid day. Please have the site plans out and the drainage calculations. I plan to be in your office around 7:30 and review both prior to Sam. Based on Mark's summation of the results in his call to me 30 minutes ago, I should find them acceptable. Mark advised me he has not been back to the site since we all left last Friday morning. Please advise if Joe and I are to revisit this site tomorrow. From: "Dianne Otto" <Dotto@cityoftybee.org> ' Save Address To: <davisenginc@bellsouth.net>,"Joe Wilson"<jwilson@cityoftybee.org>,"Brannyn G. Allen" <bgallen@cityoftybee.org> Subject: Howard Reeve - Tenth Pl. Date: Thursday, November 08, 2007 10:20:46 AM [View Source] Attached are two scanned documents from Mark Boswell related to Howard Reeve's project on Tenth Plac 11/08/2007 Page 2 of 2 Dianne K. Otto Administrative Assistant Building & Zoning dotto@cityoftybee.org Phone: (912) 786-4573 ext. 114 Fax: (912) 786-9539 This email and any files transmitted with it are confidential and intended solely for the use of the are not the named addressee you should not disseminate, distribute or copy this e-mail. Please no received this e-mail by mistake and delete this e-mail from your system. Please note that any vies the author and do not necessarily represent those of The City of Tybee Island. The recipient shou of viruses. The City of Tybee Island accepts no liability for any damage caused by any virus tran Tybee Island, GA 31328 Attachment 1: 07110811500t.= (image/jpeg) Attachment 2: 071108115001500 2.ipu (image/jpeg) 11/08/2007 i0'd %SG Zb:80 LOW-BO-nON C► ��j c v����nS �-Z , z _ a gj �.)3ns A 1 L L I1 = ct b C� 1+�7'"tl Q 1 SN � 1}?ri O b G!i' r � 7i�►�+ 3'��z `z z -�41+ QZgt z � i.t;z -4 S+ S Z. t� z zed S e0b 80 LO 20 ^aN Nov 08 07 08,46a NOV-08-2007 08:43 P.1 96% P_R4 Dianne Otto � q-oiz 4 From: Dianne Otto Sent: Monday, November 17, 2014 11:14 AM To: Tom Havens Cc: Downer K. Davis Jr. Subject: FW: 10th place review Attachments: FW: 10th place review Tom — Below are comments from Downer Davis for the project at 5 Tenth Place, Dianne Otto, CFM City of Tybee Island Planning & Zoning Manager Office: 912.472.5031 Fax: 91:4.786.9539 From: Downer Davis [mailto:dkdbus(&gmail.com] Sent: Monday, November 17, 2014 11:05 AM To: Dianne Otto Subject: Re: 10th place review After reviewing the files briefly this morning, I offer the following response: The Applicant's Engineer has chosen to not submit a new drainage report for the subdivision. The submittal intent is to demonstrate the volume requirements of the approved drainage design is met. I find where others have referenced varying volume requirements but the latest approved document on file at the City is 1,971CF. How this volume requirement was met is explained in the volume exhibit dated 11-08-07 for the subdivision asbuilts in the City files. I need an exhibit demonstrating 1,971CF to concur. Michael Johnson's 06-10-14 asbuilt presented an opinion of differing benchmarks used, even with differing datums presented. The current submittal by Tom Havens needs to be on the same datum as the approved grading plans and clearly state that datum is '88. Conversions in parenthesis of the inlet and outlet inverts to the prior '29 datum would be helpful. The current plan does not show enough topographis and invert information. The previously approved design was accepted prior to the groundwater study in 2012. All elevations must be at or higher than the minimum invert from the approved design. Please advise if you have any questions. Downer On Nov 14, 2014 8:16 AM, "Downer Davis" <dkdbusC&mail.com> wrote: Diane, ro i o7n, U1anne Tom, The asbuilts are the latest documentation of required pond volume. The referenced required volume shown on the attached calcs is 1,971 CF. Please note that no storage will be allowed below the lowest elevation shown on the approved plans. Due to the Architect's desire to avoid standing water at any time, this should not be an issue. Downer Davis 912 695-7262 Downer Davis (912) 695-7262 dkdbusCu� mail.com Dianne Otto From: Dianne Otto Sent: Friday, November 14, 2014 11:38 AM To: Tom Havens Subject: FW: 10th place review Hello, Tom. Below are comments from Downer Davis for the Tenth Place pond. Downer is going to review the older files on Monday to refresh his memory. You may want to partially respond now or wait until Downer is able to respond further. Dianne Otto, CFM City of Tybee Island Planning & Zoning Manager Office: 912.472.5031 Fax: 912.786.9539 From: Downer Davis [mailto:dkdbus mail.com] Sent: Friday, November 14, 2014 8:16 AM To: Dianne Otto Subject: 10th place review Diane, In checking I find the following email and prior emails where I sent the copy of the calcs from the file, also showing 1,971 required. I need documentation of 1,884 being the required volume from the files. Otherwise I'll be looking for 1,971cf. The pond grading and drainage plan mentions adjusting the invert to 5.23 but doesn't mention from what elevation. I'd like the datum and benchmark shown. If this is on another sheet that's referenced, that will suffice. This submittal doesn't have some needed invert elevations, datum, etc... I know they're attached to an email somewhere but I'll have less time using City files. I'd like to come by your office Monday morning to use the following items in completing my review: C O A S T A L CIVIL ENGINEERING 210 EAST BAY STREET TEL 912. 232.9402 SAVANNAH, GA 31401 FAX 912.232.9403 Transmittal Attn: Dianne Otto From: TTam Havens Firm: City of T bee Island Address: 403 Butler Avenue City/State/Zip: T bee Island, GA Date: 11/06/14 Job No: Copy to: Michael Johnson, Shah Architecture Regarding: #5 -10th Place Detention Pond Modification Copies Date Description 3 911$114 24x36 copies of site improvement plans Dear Diane: Please find attached the above referenced plans which indicate a revision to the pond. This revision represents one of the options that was discussed at our site meeting about six weeks ago, and includes filling the bottom of the pond (below the pipe inverts) with drain rock. Calculations on the left hand side of the sheet indicate that this modification still provides the detention volume as requested by the City. It you have any questions regarding the project, or require any additional materials, please contact me at 912-232- 9402 or tomhavens coastalcivii.com at your convenience. We appreciate your assistance with this matter. Sincere , Tom avens, PE Principal c �araVar*sVransmAtal Dianne Otto From: Tom Havens <tomhavens@coastalcivil.com> Sent: Monday, July 07, 2014 10:56 AM To: Downer Davis Cc: Dianne Otto Subject: Re: #5 10th Place Thanks for the info Downer, I will try to be clear and detailed in approach with this one - Your assistance is appreciated! Sincerely, Tom On Mon, Jul 7, 2014 at 10:32 AM, Downer Davis <dkdbus(&aail.com> wrote: It included the entire drainage basin, which was mostly, if not entirely, this minor subdivision. and I believe it was for the 25 year, but I'll have to confirm that later when I have to revisit the file. Tom, the last engineer came up around 150cf of less shy. He didn't use the configuration of the pond extending fully east as shown on the approved plans nor did he count the storage in the 3 upstream drainage boxes. With inclusion of those and minor reshaping along the rear, the volume can be reached. I'd anticipated this exercise would be simply as just volume design for modification of the maintenance neglected detention pond. It appears you're going forward with a new design report. I understand the constraints of a construction budget. As you mentioned budget, the first review was more time consuming than most. I'll be open to your design or that of any other engineer. However, with the drainage complaint of neighbors and the information available in the groundwater study, found on Tybee's website (not available during the prior study review) that must be reference now (unless you provide a site specific groundwater study), the reduction of required stormwater volume from existing conditions, the latest asbuilt or the approved design, will require very detailed and clear documentation. Please feel free to call me as you proceed. Downer 912 695-7262 On Mon, Jul 7, 2014 at 10:08 AM, Torn Havens <tomhavens(a,)coastalcivil.com> wrote: Good Morning Downer - Hope you had a nice 4th of July weekend! I'm starting to work on the #5 10th Place project (again... I was working on a new concept and had a construction budget setback). I'd like to know what the criteria was to set the detention amount on the site .... was it the difference in the 25 year before and after? Did it include just the home and driveway on #5, or the other two homes towards the dune as well? Thanks! Tom Dianne Otto From: Michael C. Johnson <michael@shaharchitecture.com> Sent: Tuesday, June 10, 2014 10:03 AM To: Mark Boswell Cc: Dianne Otto Subject: RE: 214014 Levy on 10th Place As noted below the as -built submitted indicated the inverts for the 18" storm drain at 5.9 and the 12" outfall drains at 7.05 & 7.09. The survey conducted on this property in Dec. of 2012 indicated the 18" storm drain at 5.23 & the 12" outfall drains at 5.80 & 5.81 Assuming the original as -built was NGVD 29 and the new survey was NAVD88 5.9 = 4.949. 7.05 = 6.09; 7.09 = 6.139 AS -Built 2012 Survey Difference (corrected for NAVD88) 4.949' 5.23' +.281' _ +3.3" 6.09' 5.80' -.29' - -3.5" 6.139' 5.81' -.329 = -4" Regardless this does not seem to have bearing on the volume of the detention. The detention size per the as-built/design and survey is as follows: Toe Bank of pond is approx.. 7.0 for design drawing and as built. NGVD 7.0 = NAVD88 6.049 Top of Bank +/- 9.1' = 8.15'(NAVD88) Toe Bank of Pond on 2012 Survey is between 5.7 to 6.o. Top of Bank +/- 8.3 All of these numbers indicate the Pond top and bottom has remained relatively the same with both the inverts on the inlet side moved up 3.3" and the outlet inverts moving down 3.5-4". The 2032 Survey indicates the Toe Bank of the Pond being appox 45' long and the top of the bank being approx.. 60' end to end. 1 do not have a scale on the design drawing but it visually matches the design drawing and could not be off more than 24 overall based on the location of setback and property lines. The approved as -built calculation indicated a pond length of 55'. Assuming the 2/5 slope this is unlikely as this would require the top bank of the pond run from the west property line to the eastern drainage easement line with 0' tolerance. The submitted design and as -built does not reflect this condition, so 1 assume this calculation used the length of the top bank to top bank which is more in line with the graphic. Based on these numbers 1 do not see the pond has decreased in depth or -Length and no substantial siltation has occurred. However based upon the above information and the attached survey's assuming a 2/5 slope Calculated Vol. should be SECTIONAL AREA = 2.7'x12' = 32.4 sq.ft. + sloped ends - (2) t?a 5 sq.ft. = 42.4 sq.ft. TOTAL CALCULATION = 45'X 42.4 sq.ft. = 1,908 CU. FT. + LONGMDiNAL ENDS((2) Caa7 5FT. X 12') = 120 CU.FT. _ 2,028 CU.FT.* This does not include the volume of any storage capacity in the drainage structures but also does not solve the issue related to the inlet pipe being set below the detention pond bottom. To: Dianne Otto Subject: 214014 Levy on 10th Place RE: 214014 Levy C-2 stamped in by the City for the subdivision showed the dual 12"PVC discharge pipes from the detention area set at E I ev.6.00. Revised Sheet C-2 of the approved site development plans, stamped in 11-14-05 by the City, showed the 18" storm line discharging into the detention area at 6.00. The dual 12" PVC lines were shown as existing with no inverts shown on either of them. The "STORM DRAIN, AS -BUILT" for the subdivision, stamped in by the City on 11-14-07, showed the 18" storm line discharging into the detention area at Elev. 5.92 and the dual 12" PVC outfall having a discharge inverts of Elev. 7.05 & 7.09. Both the original and revised C -2's showed the pond bottom at Elev. 6.00. The asbuilt showed an invert of 6.5 on the side of the pond furthest to the rear of the lot (the south side) with the bottom sloping up to around 7,0 at the north side of the bottom of the detention basin. Neither the above referenced STORM DRAIN AS -BUILT or the Boundary & Topographic Survey by Yawn Land Surveys, LLC, for the Levy's, show the detention basin extending as far east as shown on C-2 of the approved design on which the permit was based. As the Engineer for the subdivision, Mark Boswell, previously stated the required volume was provided, the exact shape was not required. However, with the shortage now reported, I'm puzzled by why completing the pond at the east end is not an option. It appears to me the pond can be extended an additional 3', based on the drawing by Yawn." Review of drawings shows that the developed lot at the east end of the detention basin is raised next to the basin higher than proposed on the development drawings but this should not be an obstacle. On November 8`h, 2007 around 8; 45am, Tybee received 2 letter sized exhibits from Boswell. One showed AS -BUILT volumes and the other showed the same basin topographic formation as on the asbuilt except for contours being added. The asbuilt volume calculations showed the required storage to be 1971 cf and 2,234cf provided for a surplus of 263cf. Boswell's evaluation on June 3`d, 2014, stated that the current basin was 56cf short of the required storage as it provided only 1,828cf. However, 1,971 cf — 1,828cf = 143cf. I recommend Boswell be given the opportunity to address what I believe is a need for mathematical revision or advise me of my misunderstanding. I'll offer two other possible sources for verifying required storage is provided. The calculations considering the volume of the 3 storm structures rather than simply the cross-section of the pipe cross-section through them would document additional storage are currently provided. Both Boswell's asbuilt for the subdivision and the topo by Yawn for the Levy's indicates that the pond back slopes near the property line could be adjusted slightly further southward. I see no benefit for the City to pursue further review of this matter until submittals on behalf of the Applicant are further proofed by the Applicant's consultant and resubmitted. In response to comments by others: • I am not aware of any basis to support the notion that required storage was not provided. • To date, I have concurred with the data submitted by the Engineer for the subdivision and for the Levy's. I will not independently state such data as I'm not part of the design team. • I am not aware of any reason the required storage reported by Boswell cannot be provided. I'll await further direction from the City before expending further effort in this matter. This is not the clearest Downer Davis (912) 695-7262 dkdbus maii.com This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of The City of Tybee Island. The recipient should check this email and any attachments for the presence of viruses. The City of Tybee Island accepts no liability for any damage caused by any virus transmitted by this email. City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 Dianne Otto From: Mark Boswell <lahbos@bellsouth.net> Sent: Tuesday, June 10, 2014 8:06 AM To: Dianne Otto; Downer Davis Subject: Fw: 214014 Levy on 10th Place On , Mark Boswell <lahbos@bellsouth.net> wrote: ok, who is the new engineer? On Monday, June 9, 2014 6:52 PM, Michael C. Johnson <michael9shaharchitecture.com> wrote: Mark, We are not under contract with you to re -design this detention and the owner has chosen to use another engineer. However, we do expect that you will correct any information submitted to the city to clarify the existing detention structures. Michael C. Johnson, AIA Principal P: 912.447-3601 F:912-447-3602 C:912.658.2577 Michael@shaharchitecture.com 10 ' Ld" From: Mark Boswell [mailto:lahbos@bel[south.net] Sent: Monday, June 09, 2014 2:51 PM To: Dianne Otto; Downer Davis; MICHAEL@SHAHARCHITECTURE.COM Subject: Re: 214014 Levy on 10th Place after re -checking the dates on the information in the file, I concur with downer that the volume deficit is now 143 cf. the difference in the original as -built and present time is most likely due to siltation. Mark On Monday, June 9, 2014 11:41 AM, Mark Boswell <IahbosCcDbellsouth.net> wrote: I may need to go over the hydrology report with downer. when I read the other day In your office I got a required storage of 1,884 cf and downer says 1,971 cf. we just need to decide which is right before I revise my newest calcs and shortages. Dianne Otto From: Dianne Otto Sent: Friday, June 06, 2014 1:40 PM To: 'Michael C Johnson'; Mark Boswell Cc: Downer K. Davis Jr. Subject: FW: 214014 Levy on 10th Place Below are comments Downer prepared after reviewing the records stored in permit 05-0508, the 2005 permit file for the Tenth Place drainage. Please review. Has the 29 versus 88 datum shift been accounted for? Let us know if you have any questions. Dianne Otto, CFM City of Tybee Island Planning & Zoning Manager Office: 912.472.5031 Fax: 912.786.9539 From: Downer Davis [mailto:dkdbus@gmail.com] Sent: Friday, June 06, 2014 10:22 AM To: Dianne Otto Subject: 214014 Levy on 10th Place RE: 214014 Levy C-2 stamped in by the City for the subdivision showed the dual 12"PVC discharge pipes from the detention area set at Elev.6.00. Revised Sheet C-2 of the approved site development plans, stamped in 11-14-05 by the City, showed the 18" storm line discharging into the detention area at 6.00. The dual 12" PVC lines were shown as existing with no inverts shown on either of them. The "STORM DRAIN, AS -BUILT" for the subdivision, stamped in by the City on 11-14-07, showed the 18" storm line discharging into the detention area at Elev. 5.92 and the dual 12" PVC outfall having a discharge inverts of Elev. 7.05 & 7.09. Both the original and revised C -2's showed the pond bottom at Elev. 6.00. The asbuilt showed an invert of 6.5 on the side of the pond furthest to the rear of the lot (the south side) with the bottom sloping up to around 7.0 at the north side of the bottom of the detention basin. Neither the above referenced STORM DRAIN AS -BUILT or the Boundary & Topographic Survey by Yawn Land Surveys, LLC, for the Levy's, show the detention basin extending as far east as shown on C-2 of the approved Dianne Otto From: tybeemiller@aol.com Sent: Friday, February 21, 2014 2:42 PM To: Dianne Otto Cc: Diane Schleicher Subject: from Mary Ann and Jim Miller Diane, Thanks again for your input into our drainage problem As you know, we had a meeting with Diane Schleicher and she also suggested we meet with you to discuss this issue of the drainage plan for 5 Tenth Place. Diane has asked that she be included in the meeting. We will be out of town from next Thursday through the following Tuesday (2/27/14-3/4/14). Please let us know when it is convenient to meet. M O �� as W CA-, We appreciate your expertise and assistance. Mary Ann & Jim Miller p�vn� TJ6s -3 awe, �. JVLnS�N 4 M "Y r, e (` � y n J .-�-e. cam/' `� I a ' VVI � S � r r, Savannah Area GIS 1:2,400 W Feet 0 100 200 s A11;A15 L"7 Chatham u County A21: A25 Interstates A30;A31;A35; Labels A85; A81 Free Ways A63 Labels US Highways 0 A40;A41; A44; Labels A45 State/US A50; A51 Highways\ Labels r� A60; A61; A6 2; C A64 State Highways Labels A70; A71; Parcels 1 tljG v�Z� Zt� 921-7 Parcels Shaded Zv 7, LT Owner: B2LT LLC PIN: 4-0006 -18-019 Property Address: 3 10TH PL Zoning: R-2 Flood Zone: AE Aldermanic Code: ►,D r Unincorporated Chatham County Commissioner Code: 4 Patrick K. FarrelleJ S J Phone: 912-355-6699 _D°n Voting Precinct: 4-11C gt2 - to So-8�8 Elementary School: HOWARDgtZ, 3 S2, Middle School: COASTAL High School: ISLANDS -- Zip Code: 20015 Neighborhood Code: 20213 .� Calculated Acreage: 0.12444587 Land Value: 217000 Building Value: 369100 ��,�-3 t b. 9 943' Real-estate Value: 586100 Sale Price: 705000 Sale Month: 03 Sale Day: 31 Sale Year: 2010 Legal Description: LOT B SUB OF THE F PT OF LOT Property Card: Board of Assessors . _7� ♦ 4 r, Savannah Area GIS 1:2,400 W Feet 0 100 200 s A11;A15 L"7 Chatham u County A21: A25 Interstates A30;A31;A35; Labels A85; A81 Free Ways A63 Labels US Highways 0 A40;A41; A44; Labels A45 State/US A50; A51 Highways\ Labels r� A60; A61; A6 2; C A64 State Highways Labels A70; A71; Parcels 1 tljG v�Z� Zt� 921-7 Parcels Shaded Zv 7, LT Owner: B2LT LLC PIN: 4-0006 -18-019 Property Address: 3 10TH PL Zoning: R-2 Flood Zone: AE Aldermanic Code: ►,D r Unincorporated Chatham County Commissioner Code: 4 Patrick K. FarrelleJ S J Phone: 912-355-6699 _D°n Voting Precinct: 4-11C gt2 - to So-8�8 Elementary School: HOWARDgtZ, 3 S2, Middle School: COASTAL High School: ISLANDS -- Zip Code: 20015 Neighborhood Code: 20213 .� Calculated Acreage: 0.12444587 Land Value: 217000 Building Value: 369100 ��,�-3 t b. 9 943' Real-estate Value: 586100 Sale Price: 705000 Sale Month: 03 Sale Day: 31 Sale Year: 2010 Legal Description: LOT B SUB OF THE F PT OF LOT Property Card: Board of Assessors Dianne Otto From: Patty Robertson <patty_robertson@comcast.net> Sent: Tuesday, March 04, 2014 10:20 AM To: Dianne Otto Cc: Stacye@oceanfrontcottage.com; BRobertson@rsui.com; 'Downer K. Davis Jr.'; 'Mark Boswell' Subject: RE: 1B 10th Place Thank you, Diane. Please continue to keep me updated on your findings. I will be in town on March 13th and 14th, if needed. From: Dianne Otto [mai Ito: Dotto(a)cityoftybee.org] Sent: Monday, March 3, 2014 6:45 PM To: 'Patty Robertson' Cc: Stade@oceanfrontcottage.com; BRobertsonCa>rsui.com; Downer K. Davis Jr.; Mark Boswell Subject: RE: 1B 10th Place Dear Ms. Robertson, Thank you for your email. Attached is a chain of emails with attachments regarding Tenth Place that I was involved with today. The meeting discussed for tomorrow at 3 pm on Eleventh Street will be attended by Mark Boswell, engineer for prior owner Howard Reeve; Downer Davis, the city's consulting engineer; and Joe Wilson, Director of the Public Works Department. Please use the application attached to the email to apply for an infrastructure permit to reinstall the drainage swale when you are ready to move forward with this project. If you have any questions please let me know. Thank you and have a nice evening, Dianne Otto, CFM City of Tybee Island Planning & Zoning Manager Office: 912.472.5031 Fax: 912.786.9539 From: Patty Robertson [mailto•patty robertson@comcast.net] Sent: Monday, March 03, 2014 6:28 PM To: Dianne Otto Cc: Stacye@oceanfrontcottage.com; BRobertsonO)rsui.com Subject: RE: 1B 10th Place Diane, please include my husband and me on any new communication on this matter that affects our home. I asked Stacye to attend the meeting since we could not attend on such short notice, but we do want to be included on any communication now that the meeting has occurred. Thank you. From: Patty Robertson [mailto:patty robertson@comcast.net] Sent: Monday, February 24, 2014 5:10 PM To: 'dotto@cityoftybee.org' Cc: StacyeC�oceanfrontcottage.corn; 'BRobertson@rsui.com' Subject: 1B 10th Place Page 1 of 1 Dianne Otto From: davisenginc@bellsouth.net Sent: Friday, November 16, 2007 7:10 AM To: Brannyn G. Allen Cc: Joe Wilson; Dianne Otto Subject: 10th Place Howard Reeves Joe and I are meeting at City Hall 10: am. Our first item is 10th Place to inspect the stabilization of the bottom of the detention basin. I beleive this was the only remaining item. Howard had advised he was going to see if Boswell could accept the adjacent lot on I Ith so we could insect it then. The purpose of my email is to advise you that I heard that Howard has said that he was going to the CM and the Mayor to present his argument on why he should be allowed to record his plat. Briefly; We have not yet received a complete asbuilt. This 20' detention easement was not presented on a plat to me until yesterday (an electronic file by his surveyor). Yesterday in an email Joe expressed concern that the basin may not be enclosed in the 20' detention easement as shown on the approved plans. I then hand scaled in the easement on the unsigned unsealed asbuilts we had at that time. At that point I contacted you and advised a 25' detention easement across the rear of the west lot would be required to enclose the detention basin. I beleive the City is acting properly in not releasing the plat for recording until the easement is properly platted to enclose the detention basin as installed. Please feel free to forward this email to the CM and Mayor as a heads up and an explanation. Downer 11/16/2007 APPROVED BY THE TYBEE ISLAND PLANNING COMMISSION -- — L =-- ZONING ADMINISTRATOR DATE APPRO�VED�BY'THHE TYBXE ISIANII MAYOR AND COUNCIL MAYTH DATE --E • - .. �a� 'SOS CLERK OF COUNC DATE WTH. PLACE TO BUTLER AVE 15' ROADWAY rn 3 70.30'00"E 186.00' - _ s� PT. LOT 65 �� IeLOAi f 4dlYA z THE PRIVATE D81"AY ACCESS ARB UITILTY rAE90iNT A HEREBY DWCArED PERPMUALY IBE THE USE BY WE ONNERN AND IW9DH11W Or ALL LOW In TNL4 9{SSOMSIOx ANo rill, IWNTAURO BY THE cm Or TYEEE tDIAND. B ER BATE Ult rENTR 31THtEl' [Q'i •@ i. ECOR(} 3g11:tp py , )INS SPA. #L/IrPMrI ga TDNTH TEREACE / 5 ! TENTH PLACE srrE / VICINITY YAP INOt 7U eCAlll I / / ZONE AN. OPE L3 I ZONE Ax. BFE 14 I ZONE Ax. BRE 15 ! ZONE VB, BPE 1e / / eexcnNAR¢ 2 —a? HOUS¢ I NAIL IN AEY 1111 !/ / 56E' r0 WPARENT IIIBiI VA _ _ uLr oAlrA _ S70-30,00- - TACK IND 1 les AIAa'r �� 2. PRIVATE BRIVE ACCO a :TIL � Oil / oxN ruc Al LOT A LOT B .� ��.. I LOT C� a cl AAPA 4m EF AREA - RAM 2P b AREA - 7265 9F / 7A may, RMCBn Toc or ovxr. L&NR NAB ' — TACK PHo 7. 7 .00' S e• I o N 7O'SO.0o'• 2 BTDRY NOUIE M V1 pA ~ I e S'➢BIIY}ElUse 2 3rORY ROUSE ZONE AN BYE 13 I ZONE AB, BYE 14 I ZONE , BFE 15 OI SANE VB, BFE IW REVISED SUBDIVISION THE EASTERN 225' OF FRONT LOT 65, WARD NO. 4, TYBE£ ISLAND, CHATHAM COUNTY, GEORGIA FOR: IMA REEVE ND'PE: THIS PLAT REVISED JULY 27. 2005 BY MOVING ACcORDINC TO THE r.LLIL BARD E LT/ee INTERIOR LOT LINES TRIS 'M Te ■NNHf TILE 100 TEAR D EONL CQUIPMEN NOTE: RELOCATED HOUSE ON LOT B IS HOT SHOWN. fliPCE[NCL PRH B 050 70PCON AP-L1A BD 14e a 581 awn a CLOSURE: l. 11ii1173Y REYNOLDS y5�'�T NGLE RAIANCID BC: -REPLseo ruxE I1, xoo0 LAND SURVEYOR i P D I/INTNUKIT 836 SSEPHENSON AVENUE cq o 0 2 2D 0 20 40 BO r� SUITE c s salt- L• . M SAVAHNAH. GEORGIA 31405 �j 'TEfEP 0 - 912-152-0464 EY UM SEPTEMBER LA, 2000 WRYEY DAM WAY e, 2048 PUT GRAPHIC SCALE - I= FAX: 912-952-7787 4 L Jaz W. m-aIc REVISED SUBDIVISION THE EASTERN 225' OF FRONT LOT 65, WARD NO. 4, TYBE£ ISLAND, CHATHAM COUNTY, GEORGIA FOR: IMA REEVE Page 1 of 1 Dianne Otto From: davisenginc@bellsouth.net Sent: Thursday, November 08, 2007 11:22 PM To: Brannyn G. Allen Cc: Joe Wilson; Dianne Otto Subject: 10th Place I plan to review the asbuilt info of the detention area against the plans in the morning. Diane left them out for me. Attached is a cop of the plat I pulled tonight on 10th Place. As we have discussed, in the past others with the City determined they did not need an engineer for the City reviewing the plans. This plat is an example of the mistakes, errors and omissions a review engineer can help avoid. There are no easements for any of the drainage lines or detention basin. I imagine there is no easement fot the outfall line from the detention basin through the lot to the south on 11 th Street. Additionally, to the best of my knowledge, the City has not received any asbuilts on this project. The punch list given to Howard was for items related to the site improvements. The issue of no easeents or asbuilts should probably be addressed before Joe and I go to the site tomorrow for another final inspection. 11/15/2007 Dianne Otto From: Joe Wilson Sent: Friday, November 09, 2007 7:23 AM To: davisenginc@bellsouth.net; Brannyn G. Allen Cc: Dianne Otto Subject: RE: 10th Place I concur. -----Original Message ----- From: davisenginc@bellsouth.net [mailto:davisenginc@bellsouth.net] Sent: Thu 11/8/2007 11:21 PM To: Brannyn G. Allen Cc: Joe Wilson; Dianne Otto Subject: 10th Place I plan to review the asbuilt info of the detention area against the plans in the morning. Diane left them out for me. Attached is a cop of the plat I pulled tonight on 10th Place. As we have discussed, in the past others with the City determined they did not need an engineer for the City reviewing the plans. This plat is an example of the mistakes, errors and omissions a review engineer can help avoid. There are no easements for any of the drainage lines or detention basin. I imagine thereis no easement fot the outfall line from the detention basin through the lot to the south on 11th Street. Additionally, to the best of my knowledge, the City has not received any asbuilts on this project. The punch list given to Howard was for items related to the site improvements. The issue of no easeents or asbuilts should probably be addressed before Joe and I go to the site tomorrow for another final inspection. Dianne Otto From: Brannyn G. Allen Sent: Friday, November 09, 2007 7:27 AM To: Joe Wilson; 'davisenginc@bellsouth.net' Cc: Dianne Otto Subject: RE: 10th Place The only issue I would add to the 10th Place project is one of maintenance to the detention pond. Bubba and I have had a series of conversations about how to handle this and similar situations... I think that we are all on the same page when it comes to plan/plat review. Hopefully, the new development review procedures will help in this area... We are on the right path... Brannyn G. Allen Planning, Zoning and Economic Development Director City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, Georgia 31328 Phone: 912.786,4573 ext. 107 Fax: 912.786.9539 http://www.cityoftybee.org/ -----Original Message ----- From: Joe Wilson Sent: Friday, November 09, 2007 7:23 AM To: davisenginc@bellsouth.net; Brannyn G. Allen Cc: Dianne Otto Subject: RE: 10th Place I concur. -----Original Message ----- From: davisenginc@bellsouth.net[mailto:davisenginc@bellsouth.net] Sent: Thu 11/8/2007 11:21 PM To: Brannyn G. Allen Cc: Joe Wilson; Dianne Otto Subject: 10th Place I plan to review the asbuilt info of the detention area against the plans in the morning. Diane left them out for me. Attached is a cop of the plat I pulled tonight on 10th Place. As we have discussed, in the past others with the City determined they did not need an engineer for the City reviewing the plans. This plat is an example of the mistakes, errors and omissions a review engineer can help avoid. There are no easements for any of the drainage lines or detention basin. I imagine there is no easement fot the outfall line from the detention basin through the lot to the south on 11th Street. Additionally, to the best of my knowledge, the City has not received any asbuilts on this project. The punch list given to Howard was for items related to the site improvements. The issue of no easeents or asbuilts should probably be addressed before Joe and I go to the site tomorrow for another final inspection. Page 1 of 1 Dianne Otto From: davisenginc@bellsouth.net Sent: Thursday, November 15, 2007 5:30 PM To: Brannyn G. Allen Cc: Joe Wilson; Dianne Otto Subject: Reeves Asbuilt on 10th Brannyn Attached is a portion of the asbuilt I reviewed to make my previous comments. In blue you will see the 20' detention basin easement drawn in as well as a 25'. Over to the right on the rear of Lot B you will see the label 10' easement. There is no 10' easement at the rear of Lot B. The label for the 10' easement on Lot B was for one of the prior designs in this project and the label was not removed with the easement when plans were revised. The presence of the 10' label is a drafting error. In looking at the line the 10' note is beside, it appears that twice that depth would be enough. After Joe questioned it and I scaled it in, it was clear a 20' detention easement would not cover the entire detention basin. I agree with you that the basin should be entirely included in the easement. 25' should be adequate/ The purpose of my email is to provide insight as to why I did not pick up on it earlier and more importantly, to clarify my understanding going forward that I am to have complete documents and review them before I give a prediction of their being satisfactory. As the asbuilts had not been totally accepted, I had not approved a flawed doument prepared by others. However, in responding to a Developer's constant requests, I contributed to confusion in your office. I will not review the plat or asbuilts further until this has been addressed. Joe and I are still scheduled to inspect the basin bottom in the morning. Downer 11/16/2007 Page 1 of 2 Dianne Otto From: davisenginc@bellsouth.net Sent: Thursday, November 15, 2007 3:04 PM To: Joe Wilson; Brannyn G. Allen; Dianne Otto Subject: RE: 10th Place "You can't make chicken soup out of chicken bones. " I was not anticipating the easement area issue Joe identified. As I had not yet received the complete asbuilts with certification and the remaining easement, I should not have predicted either compliance or noncompliance with incomplete asbuilts. I will not repeat this extension of faith. I acknowledge my role is to review and then comment. Not assume results. . I agree with you that the plat should be revised to enclose the constructed detention area. Downer -------------- Original message from davisenginc@bellsouth.net:-------------- The platted dimension matches the dimensions on the construction plans. I have not yet seen the detention pond easement on the asbuilt. Upon receiving your email I scaled it on. It appears a portion of the bottom and all of the north slope are outside of the easement. Tybee can reject the plat based on this which is not recommended. Or the City could allow Howard to bond it. Alternately, the plat and asbuilts can reflect the 20' detention pond easement enlarged to a 25' easement. Again these comments are based on my work and not that of Howard's consultants. Downer 11/16/2007 Page 2 of 2 -------------- Original message from "Joe Wilson" <jwilson@cityoftybee-org>: is the easement for the retention basin the correct deminsions ? -----Original Message ----- From: davisenginc@bellsouth.net[mailto:davisengincCabellsouth.net] Sent: Thu 11/15/2007 1:36 PM To: Brannyn G. Allen; Joe Wilson; Dianne Otto Subject: 10th Place I have reviewed an electronic copy of the final plat. It appears all easements have been added as shown on the approved construction plans. The easement for the detention basin should be shown on the asbuilt as are the other easements. Maintenance responsibility as stated on the plat to be the lot owner's and not the City's. My review of the asbuilts, construction plans and final plat did not reveal any conflicts. I will sign off on the asbuilt and plat once the Engineer places his seal and signature on the asbuilts with a statement acknowledging that to the best of his belief the information shown on t he asbuilts is in substantial accordance with the approved plans. That leaves only the punch list check of the site in the morning. To the best of my knowledge looking at the basin bottom stabilization is the only item. Downer This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of The City of Tybee Island. The recipient should check this email and any attachments for the presence of viruses. The City of Tybee Island accepts no liability for any damage caused by any virus transmitted by this email. City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 11/16/2007 Page 1 of 3 Dianne Otto From: davisenginc@bellsouth.net Sent: Thursday, November 15, 2007 2:58 PM To: Brannyn G. Allen; Joe Wilson; Dianne Otto Subject: RE: 10th Place MY RESPONSE IS INSERTED INTO YOUR MESSAGE IN CAPS. -------------- Original message from "Brannyn G. Allen" <bgallen@cityoflybee.org>:------------- > Downer - > I think you and I discussed Joe's question... because I had the same > one... > > Because I will not be here tomorrow, I have already signed the plat; > however, Dianne will not release it for recording until you and Joe give > your approval. > AS A RESULT OF JOE'S WORD OF CAUTION, I BELEIVE WE HAVE IDENTIFIED A DEFECT IN THE EASMENT SIZE FOR THE POND. SEE MY PRIOR EMAIL. The same holds true for the CO. > Battery Row: What is or is not happening tomorrow? I believe that the > lift station start-up is still scheduled for 10:00. What other > inspections can/should be performed in light of the fact that we have > not received as-builts or decent a plat? STORM & PAVEMENT AR EAMONG THE ITEMS THAT CAN BE INSPECTED. I STILL DO NOT HAVE A FULL UNDERSTANDING OF WHAT INSPECTIONS AND TESTS FOR WATER & SEWER ARE STILL OUTSTANDING. THE ENGINEER IS IN DISAGREEMENT OF SOME TESTS AND INSPECTIONS. ON OTHERS HIS INTENT IS NOT TO REPEAT THEM FOR CITY OBSERVATION. ASBUILTS ARE NOT NORMALLY REQUIRED FOR A FINAL INSPECTION. {POOLER IS THE ONLY PLACE I KNOW THAT REQUIRES ASBUIOLTS BE GROUGHT TO THE 11/16/2007 Page 2 of 3 FINAL INSPECTION.) HOWEVER, AS THE OWNER AND ENGINEER HAVE NOT ACKNOWLEDGED THEY AGREE WITH OUR AUTHORITY TO ANY FURTHER INSPECTIONS OTHER THAN THE LIFT STATION, DO WE WANT TO PROCEDE WITH ANY? I still have not heard from > Ann, but will call her again from the car. I will let you know as soon > as I hear something. > I am available by cell for the rest of today and all day tomorrow. > Thanks - > Brannyn G. Allen > Planning, Zoning and Economic Development Director > City of Tybee Island > 403 Butler Avenue > P.Q. Box 2749 > Tybee Island, Georgia 31328 > Phone: 912.786.4573 ext. 107 > Fax: 912.786.9539 > bttp://www.cityoftybee.org/ > -----Original Message----- > From: Joe Wilson > Sent: Thursday, November 15, 2007 2:20 PM > To: davisenginc@bellsouth.net; Brannyn G. Allen; Dianne Otto > Subject: RE: 10th Place > Is the easement for the retention basin the correct deminsions ? > -----Original Message----- > From: davisenginc@bellsouth.net [mailto:davisenginc@bellso uth.net] > Sent. Thu 11/15/2007 1:36 PM > To: Brannyn G. Allen; Joe Wilson; Dianne Otto > Subject: 10th Place > I have reviewed an electronic copy of the final plat. It appears all > easements have been added as shown on the approved construction plans. > The easement for the detention basin should be shown on the asbuilt as > are the other easements. > Maintenance responsibility as stated on the plat to be the lot owner's 11/16/2007 Page 3 of 3 > and not the City's. > My review of the asbuilts, construction plans and final plat did not > reveal any conflicts. > I will sign off on the asbuilt and plat once the Engineer places his > seal and signature on the asbuilts with a statement acknowledging that > to the best of his belief the information shown on the asbuilts is in > substantial accordance with the approved plans. > That leaves only the punch list check of the site in the morning. To > the best of my knowledge looking at the basin bottom stabilization is > the only item. > Downer > > This email and any files transmitted with it are confidential and intended > solely for > the use of the individual or entity to whom they are addressed. If you are not > the > named addressee you should not disseminate, distribute or copy this e-mail. > Please > notify the sender immediately by e-mail if you have received this e-mail by > mistake > and delete this e-mail from your system. Please note that any views or opinions > presented in this email are solely those of the author and do not necessarily > represent > those of The City of Tybee Island. The recipient should check this ema it and any > attachments for the presence of viruses. The City of Tybee Island accepts no > liability > for any damage caused by any virus transmitted by this email. > > City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 > 11/16/2007 Page I of 2 Dianne Otto From: davisenginc@bellsouth.net Sent: Thursday, November 15, 2007 2:39 PM To: Joe Wilson; Brannyn G. Allen; Dianne Otto Subject: RE: 10th Place The platted dimension matches the dimensions on the construction plans. I have not yet seen the detention pond easement on the asbuilt. Upon receiving your email I scaled it on. It appears a portion of the bottom and all of the north slope are outside of the easement. Tybee can reject the plat based on this which is not recommended. Or the City could allow Howard to bond it. Alternately, the plat and asbuilts can reflect the 20' detention pond easement enlarged to a 25' easement. Again these comments are based on my work and not that of Howard's consultants. Downer -------------- Original message from "Joe Wilson" <jwilson@cityoftybee.org>:-------------- Is the easement for the retention basin the correct deminsions ? -----Original Message ----- Prom: davisenginc@bellsouth.net [mailto:davisen inc bellsouth.net] Sent: Thu 11/15/2007 1:36 PM To: Brannyn G. Allen; Joe Wilson; Dianne Otto Subject: 10th Place I have reviewed an electronic copy of the final plat. It appears all easements have been added as shown on the approved construction plans. The easement for the detention basin should be shown on the asbuilt as are the other easements. Maintenance responsibility as stated on the plat to be the lot owner's and not the City's. My review of the asbuilts, construction plans and final plat did not reveal any conflicts. I will sign off on the asbuilt and plat once the Engineer places his seal and signature on the asbuilts with a statement acknowledging that to the best of his belief the information shown on t he asbuilts is in substantial accordance with the approved plans. That leaves only the punch list check of the site in the morning. To the best of my knowledge looking at the basin bottom stabilization is the only item. Downer 11/16/2007 Dianne Otto From: Brannyn G. Allen Sent: Thursday, November 15, 2007 2:35 PM To: Joe Wilson; 'davisenginc@bellsouth.net'; Dianne Otto Subject: RE: 10th Place Downer - I think you and I discussed Joe's question... because I had the same one... Because I will not be here tomorrow, I have already signed the plat; however, Dianne will not release it for recording until you and Joe give your approval. The same holds true for the CO. Battery Row: What is or is not happening tomorrow? I believe that the lift station start-up is still scheduled for 10:00, What other inspections can/should be performed in light of the fact that we have not received as-builts or decent a plat? I still have not heard from Ann, but will call her again from the car. I will let you know as soon as I hear something. I am available by cell for the rest of today and all day tomorrow. Thanks- Brannyn hanks- Brannyn G. Allen Planning, Zoning and Economic Development Director City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, Georgia 31328 Phone: 912.786.4573 ext. 107 Fax: 912.786.9539 http://www.cityoftybee.org/ -----Original Message ----- From: Joe Wilson Sent: Thursday, November 15, 2007 2:20 PM To: davisenginc@bellsouth.net; Brannyn G. Allen; Dianne Otto Subject: RE: 10th Place Is the easement for the retention basin the correct deminsions ? -----Original Message ----- From: davisenginc@bellsouth.net [mailto:davisenginc@bellsouth.net] Sent: Thu 11/15/2007 1:36 PM To: Brannyn G. Allen; Joe Wilson; Dianne Otto Subject: 10th Place I have reviewed an electronic copy of the final plat. It appears all easements have been added as shown on the approved construction plans. The easement for the detention basin should be shown on the asbuilt as are the other easements. Maintenance responsibility as stated on the plat to be the lot owner's and not the City's. My review of the asbuilts, construction plans and final plat did not reveal any conflicts. I will sign off on the asbuilt and plat once the Engineer places his seal and signature on the asbuilts with a statement acknowledging that to the best of his belief the information shown on the asbuilts is in substantial accordance with the approved plans. That leaves only the punch list check of the site in the morning. To the best of my knowledge looking at the basin bottom stabilization is the only item. Downer Dianne Otto From: Joe Wilson Sent: Thursday, November 15, 2007 2:20 PM To: davisenginc@bellsouth.net; Brannyn G. Allen; Dianne Otto Subject: RE: 10th Place Is the easement for the retention basin the correct deminsions ? -----Original Message ----- From: davisenginc@bellsouth.net [mailto:davisenginc@bellsouth.net] Sent: Thu 11/15/2007 1:36 PM To: Brannyn G. Allen; Joe Wilson; Dianne Otto Subject: 10th Place I have reviewed an electronic copy of the final plat. It appears all easements have been added as shown on the approved construction plans. The easement for the detention basin should be shown on the asbuilt as are the other easements. Maintenance responsibility as stated on the plat to be the lot owner's and not the City's. My review of the asbuilts, construction plans and final plat did not reveal any conflicts. I will sign off on the asbuilt and plat once the Engineer places his seal and signature on the asbuilts with a statement acknowledging that to the best of his belief the information shown on the asbuilts is in substantial accordance with the approved plans. That leaves only the punch list check of the site in the morning. To the best of my knowledge looking at the basin bottom stabilization is the only item. Downer Page 1 of 1 RECEIVED Dianne Otto it -IS -0-1 From: davisenginc@bellsouth.net Sent: Thursday, November 15, 2007 1:36 PM To: Brannyn G. Allen; Joe Wilson; Dianne Otto Subject: 10th Place I have reviewed an electronic copy of the final plat. It appears all easements have been added as shown on the approved construction plans. The easement for the detention basin should be shown on the asbuilt as are the other easements. Maintenance responsibility as stated on the plat to be the lot owner's and not the City's. My review of the asbuilts, construction plans and final plat did not reveal any conflicts. I will sign off on the asbuilt and plat once the Engineer places his seal and signature on the asbuilts with a statement acknowledging that to the best of his belief the information shown on the asbuilts is in substantial accordance with the approved plans. That leaves only the punch list check of the site in the morning. To the best of my knowledge looking at the basin bottom stabilization is the only item. Downer 11/15/2007 �a mos we -1` Nov 12 07 01:53p Cla�jto Digital TD } 912352PR81 P.1 LL CA �s i F- 40 ANVI. A is, 4 Nov 12 07 01:54p C 1 a�jton Digital. 912352"'981 P.2 November 11, 2007 Brannyn Allen City of Tybee Island Planning, Zoning, and Economic Devel P.O. Box 2749 403 Butler Avenue Tybee Island, Ga. 31328-2749 RE. C.Q. for 5b Tenth Place I apologize for being upset last F: Five B Tenth Place with will not close w carrying costs as I have stated several tin This may not be a large sum to you, Dove the lenders and real estate agents call fie After leaving your office on the I sure that I understood the requirements tl items. I wrote these down in my pda at I 1. Rock @ site 2. As builts, 3_ Paint pipe The rock over the empty lot has l pipes have been completed. Downer's first letter that I receive October 26th inspection, references the a refers to the retention pond. On Chatham that I was required to do were for the thri survey the tenth place retention pond onl had from Downer was when he asked Di pond and the drainage system, last Thurs elevation for the inverts and the tops of t] a drawing of the pipe system. I want to v you require pertaining to as built drawing of the storm system from the retention pc Mark Williams for the acceptance of the copy. In reference to the standing water Downer the water table is very high. The since the 100 year and 25 year rains we I the site that I should clearly think thru lai desired to build an underground retention place is receding and the bottoms are ,alrr Boswell on the basic design of the under; Director y.. The party that I have a sales contract on I have a certificate of occupancy. The is greater than $300/day or $2100/week -, or Joe but it is to me. To add to the stress, evious Friday (11/02/07), I returned to make at you required. You stated that there were three :36 am on 11/2. They are as follows. completed. AIso, the painting of the output J on Tuesday October 30th from his Friday built drawings. The next sentence following Ave or Neptune Lane the only as built drawings e retention ponds_ I had Whitely Reynolds The first reference to the drainage system I ne Ott to leave out the as built for the retention lay. I have requested Whitley to shoot the e three storm inlets and indicated the values on rify that this is the only other information that >. I have a dvd produced by coastal pipe survey ad to Bulter.A,venue. This was arequirement by ystern. If you would like it I will produce a In the bottom of the retention pond, I agree with main retention pond on Neptune has been wet Ed in September. Downer stated when we met at dscaping the pond. He understands that I area. The ground water at Neptune and Tenth )st dry. Leo Peloquin and I have met with Mark round retention. I have the forming material for Nov 12 07 01:54p claytc• Digital 912352"g81 p.3 the underground box stored under Three Tenth Place. Mark Boswell should not have a difficult time calculating the volume for he underground retention after calculating the volume for the as built. Downer's other olution was to raise the bottom of the retention area. This would not be possible because the input was designed to be lower that the output. If you now require that I landsca a the retention pond with water absorbing plants before I build an underground storage please state so as soon as possible. I would also appreciate the name again of the local bip retention landscape designer. I met Downer and Joe at the sate on. Friday morning. This was the first time that the utility easements in favor of the city, ere a concern. I understand the importance of recording the utility easements on the fo r lots on Tenth Place and 6 Eleventh Street. This is to protect both the city and me. I will eet with Whitley tomorrow to start him on the drawings and have my attorney record m when they are available. In conclusion, you are the party t at has the authority to approve the issuance of the certificate of occupancy. I need the C.O. for just 5B Tenth Place. I have truthfully tried to fulfill your requirements. I get di turbed when I am required to do additional work, not because of the costs or time of the work but the costs of the carry of the construction loan. Installation of plants, few minutes of a surveyor time and recording fees are nominal compared to weeks of ii iterest carry. I have issued a letter of credit -in e favor of the City of Tybee Island for the drainage (the retention stone on 3 and 1 enth Place). The second item on your fast the as built drawings, the additional work of recording the utility easements, and the underground storage are in motion. I wil do my best to finish the first two this week. The underground will take months. I have al ays tried to ,work with the City of Tybee in the past and plan on doing so in the future. ease issue the C.O. for only 5b Tenth Place. tI"'I e e e Cc: Diane Schleicher J. Curtis Lewis III Nov 12 07 01:54p claytc- Digital II, h Dianne Otto From. _ Dianne Otto Sent: Tuesday, October 30, 2007 12:24 To: Brannyn G. Allen; lahbos@bellsou ne, Cc: Howard Reeve ; '1eocraft43@corn st.n Subject: FW: 10th Place - _ See below . -- -- - -- - Dianne K. Otto Administrative Assistant Building & Zoning dotto@cityoftybee-org Phone: (912) 786-4573 ext. 114 Fax: (912) 786-9539 -----Original Message ----- From: davisenginc@bellsouth.net [mailto:davi nc Sent: Tuesday, October 30, 2007 10:47 AM To: Dianne Otto Cc: smarshall@cityoftybee.org; smarshall@ci fty Subject: 10th, -Place On Thursday I visited the site with Branny �S-rT-'v-i�vte••i rv�cz�vii-vii liib- �v �nciii�:- . 1) 3 10th Place (the lot bordering the dune section on the north side lot line. This is C previous Friday. This lot cannot be appro, 2) The silt fence around the detention area the silt fence was clearing the ground and and the ground. This is not acceptable. T1 3) There was a sheen on the water indicati storm drains. 4) The lot on which the detention pond is work area stone may be more appropriate 5) The failure of the driveway to be porou 6) We need to review the asbuilts. As the they cannot be prepared at this time. 7) The end treatments of the double line fi YiFut. 8) The bottom of the pond is holding wau invert of the double outfall line. It has be and trees as he addresses this item. - I discussed these items briefly on Friday y knowledge there are no new issues. It Engineer assist him in the above matters. Downer 10/30/2007 912352"481 p.4 1 Page 1 df i bellsouth.net] .org; Joe Wilson Joe. water standing in the area of the missing sidewalk a that Joe and I cautioned Leo and Howard on the itil the downstream improvements are approved. ailed in 3 places along the east side. In the NE comer had been placed between the bottom of the silt fen e fent:e is to be properly installed and maintained. ztirniance of improper disposal of materials into the ,atc d needs to be stabilized. As it is a parking, staging and an assing. as of yet been addressed. ' e lopes of the pond have been sodded there is no rea�on ithe outfall of the detention pond need to be according to I So rne of this may be due to the bottom being below t su aest�ed to Howard he -consider using. Bound cover,�"s g -it y driveway as I was leaving town. To the best of )e i�.': the best interest of all for Howard to have his call if you.have any questions. AW_ Nov 12 07 01:55p Clayto- Digital Brannyn G. Allen From: davisenginc@bellsouth.net Sent: Friday, November 09, 2007 1:47 PM To: Brannyn G. Allen; Joe Wilson Cc: Dianne Otto Subject: RE: 10th Place My intent was to respond by l Oam. Due to from this mornings review: 1) The volume computations are accepted by 912352?g81 p.5 Page 1 of 3 conditions, I am just completing my comments Owner's Engineer. 2) The stone in place appears to be somewh4t impervious. This violates the condition of the permit regarding drainage and increased runoff volume storage. There is a $10,000 temporary bond from the Owner to the City for related corrections, therefore this item is not a requirement for a CO on the first building to be issued. 3) The bottom of the pond has shallow pondingmater. I realize this is a ondition of the apparently higher than normal ground water level. The gro d water level does not allow for a dry pond as shown on the plans. Joe and I have had repeated conve sations with the Owner on alternatives to eliminate the undesirable condition of the existing pond bdttoi n. To date no progress on this matter has been made. 4) The Owner understands that Tybee needs all determine if the detention pond and outfall pipe understands this is a requirmeent. ige features to be in easements. He is trying to platted easeemnts we are not aware of. He 5) I have not seen the storm drainage asbilts on tis project. All other issues previously noted appeared to be satisfactorily addressed. Downer Original message from 'Brannyn q. Allen" <bgallen@cityofybee.org>: > The only issue I would add to the 10th Place roject is one of > maintenance to the detention pond. Bubba an I I have had a series of > conversations about how to handle this and s lar situations... > I think that we are all on the same page whi it comes to plan/plat 11/9/2007 Pagel of 3 Dianne Otto From: davisenginc@bellsouth.net Sent: Friday, November 09, 2007 1:47 PM To: Brannyn G. Allen; Joe Wilson Cc: Dianne Otto Subject: RE: 10th Place My intent was to respond by l0arn. Due to unforeseen conditions, I am just completing my cornments from this mornings review: 1) The volume computations are accepted by the Owner's Engineer. 2) The stone in place appears to be somewhat impervious. This violates the condition of the permit regarding drainage and increased runoff volume storage. There is a $10,000 temporary bond from the Owner to the City for related corrections, therefore this item is not a requirement for a CO on the first building to be issued. 3) The bottom of the pond has shallow ponding water. I realize this is a ondition of the apparently higher than normal ground water level. The ground water level does not allow for a dry pond as shown on the plans. Joe and I have had repeated conversations with the Owner on alternatives to eliminate the undesirable condition of the existing pond bottom. To date no progress on this matter has been made. 4) The Owner understands that Tybee needs all drainage features to be in easements. He is trying to determine if the detention pond and outfall pipe have platted easeemnts we are not aware of. He understands this is a requirmeent. 5) I have not seen the storm drainage asbilts on this project. All other issues previously noted appeared to be satisfactorily addressed. Downer Original message from "Brannyn G. Allen" <bgallen@cityoftybee.org>:------------- > The only issue I would add to the 10th Place project is one of > maintenance to the detention pond. Bubba and I have had a series of > conversations about how to handle this and similar situations... > I think that we are all on the same page when it comes to plan/plat 11/15/2007 Page 2 of 3 > review. Hopefully, the new development review procedures will help in > this area... > We are on the right path... > Brannyn G. Allen > Planning, Zoning and Economic Development Director > City of Tybee Island > 403 Butler Avenue > P.Q. Box 2749 > Tybee Island, Georgia 31328 > Phone: 912.786.4573 ext. 107 > Fax: 912.786.9539 > http://www.cityoftybee.org/ > -----Ori ginal Message----- > From: Joe Wilson > Sent: Friday, November 09, 2007 7:23 AM > To: davisenginc@bellsouth.net; Brannyn G. Allen > Cc: Dianne Otto > Subject: RE: 10th Place > I concur. > -----Original Message----- > From: davisenginc@bellsouth.net[mailto:davisenginc@bellsouth.net] > Sent: Thu 11/8/2007 11:21 PM > To: Brannyn G. Allen > Cc: Joe Wilson; Dianne Otto > Subject: 10th Place > I plan to review the asbuilt info of the detention area against the > plans in the morning. > Diane left them out for me. > Attached is a cop of the plat I pulled tonight on 10th Place. As we have > discussed, in the past others with the City determined they did not need > an engineer for the City reviewing the plans. This plat is an example > of the mistakes, errors and omissions a review engineer can help avoid. > There are no easements for any of the drainage lines or detention basin. > I imagine there is no easement fot the outfall line from the detention > basin through the lot to the south on 11 th Street. > Additionally, to the best of my knowledge, the City has not received any > asbuilts on this project. The punch list given to Howard was for items > related to the site improvements. > The issue of no easeents or asbuilts should probably be addressed before > Joe and I go to the site tomorrow for another final inspection. 11/15/2007 Page 3 of 3 > > This email and any files transmitted with it are confidential and intended > solely for > the use of the individual or entity to whom they are addressed. If you are not > the > named addressee you should not dissem inate, distribute or copy this e-mail. > Please > notify the sender immediately by e-mail if you have received this e-mail by > mistake > and delete this e-mail from your system. Please note that any views or opinions > presented in this email are solely those of the author and do not necessarily > represent > those of The City of Tybee Island. The recipient should check this email and any > attachments for the presence of viruses. The City of Tybee Island accepts no > liability > for any damage caused by any virus transmitted by this email. > City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 > 11/15/2007 Pagel of 2 Dianne Otto From: davisenginc@bellsouth.net Sent: Wednesday, November 07, 2007 2:28 PM To: Joe Wilson; Dianne Otto Cc: Brannyn G. Allen Subject: RE: Tybrisa / Strand project; Howard Reeve Joe, If Boswell has a letter advising the items have all been addressed, I suggest we go early morning. No new pundch list was issued. Last Friday's meeting was at Howard's request to go over the punch list he had been sent a few days earlier (that contained no new items). I still have not seen asbuilts of the storm drain and the pond. Downer Original message from "Joe Wilson" <jwilson@cityoftybee.org>:-------------- I can meet on the Reeves project on Friday a.m. -----Original Message ----- From: Dianne Otto Sent: Wed 11/7/2007 11:56 AM To: 'davisenginc@bellsouth.net' Cc: Brannyn G. Allen; Joe Wilson Subject: Tybrisa / Strand project; Howard Reeve Downer: Bill Lovett is going to have delivered from his office to your office the plans for the Tybrisa / Strand project as they relate to drainage and soil erosion and sedimentation control. Please review them ASAP as we are playing catch up on permitting. Also, there are forms here in the office that we need your assistance completing for the Land Disturbing Permit. Also, Howard Reeve left a voicemail requesting that his site at Tenth Place be revisited ASAP. Dianne K. Otto 11/07/2007 Page 2 of 2 Administrative Assistant Building & Zoning dotto@cityoftybee.org Phone: (912) 786-4573 ext. 114 Fax: (912) 786-9539 This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of The City of Tybee Island. The recipient should check this email and any attachments for the presence of viruses. The City of Tybee Island accepts no liability for any damage caused by any virus transmitted by this email. City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 11/07/2007 Dianne Otto From: Dianne Otto Sent: Friday, November 02, 2007 2:48 PM To: lahbos@bellsouth.net Subject: FW: 10th Howard Reeves See below. Dianne K. Otto Administrative Assistant Building & Zoning dotto@cityoftybee.org Phone: (912) 786-4573 ext. 114 Fax: (912) 786-9539 -----Original Message ----- From: Joe Wilson Sent: Friday, November 02, 2007 11:26 AM To: davisenginc@bellsouth.net; Brannyn G. Allen Cc: Dianne Otto Subject: RE: 10th Howard Reeves I concur -----Original Message ----- From: davisenginc@bellsouth.net [mailto:davisenginc@bellsouth.net] Sent: Fri 11/2/2007 11:25 AM To: Brannyn G. Allen Cc: Joe Wilson; Dianne Otto Subject: 10th Howard Reeves It is my understanding the outstanding issues were: 1) Erosion and stabilization. Maintenance of the silt fence and stabilization of the vacant lot were the main two items. 2) Verifying the volume of storage could be provided in the detention basin without considering the standing ground water. 3) Satisfactory review of asbuilts on all of the infrastructure improvements approved for this project. We all agreed determining detention basin volume was the item most critical to allowing Howard to close out the subdivision project. Individual lot approvals will be sequential. -rn N\%vh (�sSws ' fJ�t-EC IDI 1 Q7 � - o -�1 �• C. C - j I, 1 14cC� V=ocl� +-� S i�cw� cLvC Cc�vvcc.rioKs 2, F� 1�`�I�Q��, w � s o �� -t a��� S a � Y a S Y �+�tv s•`+1 -�0 1'3_�. do �c �cC., 4i b*� c Mr q �► *�y?j- tLp � 5 LO G I Otis yah ' -- �j cA. � V, D W j . � err T'� � �C,�1 S 0.+ � ei ?'� C•C � hy,[J� A �• tJ� �, •�� � � �• 1` D G� Ilei r L fes' ;-- TI( Page I of 1 Dianne Otto From. Dianne Otto Sent: Tuesday, October 30, 2007 12:24 PM To: Brannyn G. Allen; lahbos@bellsouth.net Cc: Howard Reeve; 'leocraft43@comcast.net' Subject: FW: 10th Place See below. Dianne K. Otto Administrative Assistant Building & Zoning dotto@cityoftybee.org Phone: (912) 786-4573 ext. 114 Fax: (912) 786-9539 -----Original Message ----- from: davisenginc@bellsouth.net [mailto:davisenginc@bellsouth.net] Sent: Tuesday, October 30, 2007 10:47 AM To: Dianne Otto Cc: smarshall@cityoftybee.org; smarshall@cityoftybee.org; Joe Wilson Subject: 10th Place On Thursday I visited the site with Brannyn and Joe. We noted the following deficiencies: 1) 3 10th Place (the lot bordering the dunes) has water standing in the area of the missing sidewalk section on the north side lot line. This is the area that Joe and I cautioned Leo and Howard on the previous Friday. This lot cannot be approved until the downstream improvements are approved. 2) The silt fence around the detention area had failed in 3 places along the east side. In the NE corner the silt fence was clearing the ground and straw had been placed between the bottom of the silt fence and the ground. This is not acceptable. The silt fence is to be properly installed and maintained. 3) There was a sheen on the water indicating continuance of improper disposal of materials into the storm drains. 4) The lot on which the detention pond is located needs to be stabilized. As it is a parking, staging and work area stone may be more appropriate than grassing. 5) The failure of the driveway to be porous has not yet been addressed. 6) We need to review the asbuilts. As the side slopes of the pond have been sodded there is no reason they cannot be prepared at this time. 7) The end treatments of the double line for the outfall of the detention pond need to be according to plan. 8) The bottom of the pond is holding water. Some of this may be due to the bottom being below the invert of the double outfall line. It has been suggested to Howard he consider using gound cover, shrubs and trees as he addresses this item. I discussed these items briefly on Friday morning in my driveway as I was leaving town. To the best of y knowledge there are no new issues. It would be in the best interest of all for Howard to have his Engineer assist him in the above matters. Please call if you have any questions. Downer 10/30/2007 Dianne Otto From: davisenginc@bellsouth.net Sent: Tuesday, August 28, 2007 7:30 AM To: Brannyn G. Allen Cc: Dianne Otto Subject: Re: Tenth Place Howard Reeves began this project with KC and later switched to Boswell. I believe all design submittals were approved but I do not recall ever closing this project out. Friday was the first time Joe and I had been to this site together and as you remember, it was not ready for closeout. It was my understanding Joe was inspecting a specific issue on a duplex. I do not believe Howard's Engineer, Boswell, has issued a concurrence letter as the basin slopes are not graded or stabilized. Nor have we received asbuilts to the best of my knowledge. As we are nearing the end of a very similar process on Chatham Avenue, Howard is aware of the process. I will advise you further of my progress on this matter when we meet later today. Downer ---------- From: "Brannyn G. Allen" <bgallen@cityoftybee.org> Date: 2007/08/27 Mon PM 05:10:23 EDT To: <davisenginc@bellsouth.net> Subject: Tenth Place Downer - I need your assistance to wrap up Howard Reeve's project on Tenth Place. I am unable to locate a letter from you approving the drainage plan. Additionally, I cannot find a letter from you approving what was constructed (drainage). If you could provide me with these letters and a final invoice, I would greatly appreciate it. I know that you are trying to minimize your billing... because this house received a Temp CO (that has long since expired) the only leverage that I have to ensure that things are constructed properly is the final plat. I am not signing the plat until I have the three documents identified above. Thanks for your help with this - Brannyn Brannyn G. Allen Planning, Zoning and Economic Development Director City of Tybee Island Oct 24 07 08:42a 6OSW.ELL DESIGN SERVICES, INC. 70-7 NASSAU L)RIVE SAVANNAH, GEORGIA 3 7 4 7 D 697 - 6 932 _--_ LAM+BCS BELL=LJTH. NCT }}y y October 23. 2007 Diane Otto Planning and Zoning Tybee Island, Georgia Re: Howard Reeves Project Lot Number 5 10 th_ Place Tybee Island, Georgia Diane, P.1 04143 RECEIVED iQ-2.1- o7 At the request of the Owner, we have inspected the project referenced above for compliance with the approved drainage plan. After a brief inspection of the project, it is our opinion that the project is in substaatial compliance with the approved drainage plan except the following deficiencies were noticed : 1. The gutters and downspouts were not installed at the request of the owner. Upon inspection of the roof and as per a brief conversation with the uwner, it is our belief that absence of the gutters and downspouts should not cause a probtern to the adjacent property owners_ If in the future, roof run-off causes problems with the adjacent property owners, flutters and downspouts -Arill be installed at that time. 2. It should be noted that the adjacent detention area has been sodded. Thank you for your assistance and please do not hesitate to contact us if you should require more information- We may be reached at 897-6932, fax to 897-2287 or e-mail to 1 ahbos �,belIsouth.net, Sincerely, 00 Mark Boswell CCT -24-2007 29:37 96% P.R1 MAYOR 7ason Buelterman CI'I•Y COUNCIL Shirley Sessions, Mayor Pro Teitti Eddie Crone wands Doyle Mallory Pearce Kath7i Williams Paul Wolff October 1, 2007 Mr. Howard Reeves P.O. Box 15844 Tybec Island, Georgia, 31328 RE; 5 Tenth Place Dear Mr. Reeves: � • gra' - ', I�lW t -o �+ �� "K�c✓ [ C1TY MANAGER Diane Schleicher CITY CLERK "Ale _Cicl--� b Vivian Woods CITY ATTORNEY Edward M. Hughcs CITY OF TYBEE ISLAND This letter is to inform you that the final building inspection for the referenced property has been completed. While the structure has passed the final inspection, the fire sprinkler system did not pass due a dispute over that notification alarm. The City of Tybee Island will not issue a Certificate of Occupancy of any kind for this residence until the fire sprinkler system passes inspection. Should you have any questions, please feel free to contact me. Y, annyn Allen Planning, Zoning and Economic Development Director CC. Mr. Chuck Bargeron Ms. Dianne Otto F.O. Box 2749 -- 403 Butler Avenue, Tybee Island, Georgia 31328-2749 (866) 786-4573 - FAX (866) 786-5737 www.cityoftybee.org ****** -6256 93L ET6 - ***** - 33gA1 dO Al IJ- ' -1S I 3331.1 EO A1I9- TE:00:00 TOO/TCO 9�66eE;6 a >10 TOO 'ON bHHd 'ON NOIlkiNna S35dd 'ON 3NOHd3_131/SSMIQQd -)1dW3/3WdN NO]1diS /HDnOi-3NO WOO N1S 6L3='ON 3-11-4 60:VT T0--i3O=QN3 SO:bT TO-110=ladls NOISSIWSNU8i AdUW3W = 3QOW ******** 60:bT 3WI1 ***** 600E -T0-190 31UG ***********x*******-iwdn0r 'WW03- *************** Dianne Otto Page 1 of 1 AA -1. TI t I From: Dianne Otto Sent: Tuesday, June 26, 2007 3:00 PM To: lahbos@bellsouth.net; 'davisenginc@bellsouth.net'; Joe Wilson; Diane Schleicher Subject: Howard Reeve Dear All: Howard Reeve left a voice mail this morning — . 3 & 4 Neptune Ln. — the sizes of the retention areas have been increased and the areas have been sodded. Whitley Reynolds will shoot the elevations next week. . 3 Tenth PI. - Whitley Reynolds is working on the re -plat for this site. Dianne K. Otto Administrative Assistant Building & Zoning dotto@cityottybee.org Phone: (912) 786-4573 ext. 114 E'ax: (912) 786-9539 06/26/2007 BellSouth - Web E-mail Print Message Page 1 of 2 Close this window From: <davisenginc@ bellsouth. net> Add to Address Book Date: 2007/06/29 Fri AM 07:47:25 EDT To: "Dianne Otto" <Dotto@cityoftybee,org>, <lahbos@bellsouth.net>, "Joe Wilson" <jwilson@cityoftybee.org>, "Diane Schleicher" <dsch leicher@cityoftybee. org> Subject: 204095 CHATHAM AVE & 204029 IOT #65 10TH PLACE D OTTO RESPONSE IN CAPS > From: "Dianne Otto" <Dotta citxo bee.or > > Date: 2007/06/26 Tue PM 02:59:34 EDT > To: <lahbos belisouth.net>, <davisenginc _bellsouth.net>, "Joe Wilson" �jwilson@cityoftybee.arg>, "Diane Schleicher" <dschleicher@ ityoftybee.org> > Subject: Howard Reeve > Dear All; > Howard Reeve left a voice mail this morning - > * 3 & 4 Neptune Ln. - the sizes of the retention areas have been > increased and the areas have been sodded. Whitley Reynolds will shoot > the elevations next week. LET ME KNOW WHEN ASBUILTS AND MARKS LETTER ARE IN. JOE AND I WILL SCHEDULE A FIELD REVIEW WHEN WE HAVE THEM. > * 3 Tenth Pl. - Whitley Reynolds is working on the re -plat for > this site. I DO NOT BELIEVE I EVER SIGNED OFF ON THE DRAINAGE IMPROVEMENTS FOR THIS SITE. ADDITIONALLY, HOWARD TOLD ME HE WAS CONSIDERING REVISING THE DRAINAGE TO A SUBSURFACE SYSTEM, IF THE DRAINAGE IS TO BE REVISED IT NEEDS TO BE IMPLEMENTED AT THIS TIME. IF NOT, WE NEED ASBUILTS REFLECTING COMPLIANCE WITH THE APPROVED DRAINAGE PLAN SO THAT THIS PROJECT CAN BE CLOSED OUT. > Dianne K. Otto > Administrative Assistant > > Building & Zoning > dotto@cityoftybee.org > Phone: (912) 786-4573 ext. 114 > Fax: (912) 786-95539 > This email and any files transmitted with it are confidential and intended solely for > the use of the individual or entity to whom they are addressed. If you are not the > named addressee you should not disseminate, distribute or copy this e-mail. Please > notify the sender immediately by e-mail if you have received this e-mail by mistake > and delete this e-mail from your system. Please note that any views or opinions > presented in this email are solely those of the author and do not necessarily http://webmail.bellsouth.net/agent/mobmain?msgvw=AGkAPAAQAAOAEAAoAAQAJA... 6/29/2007 BOSWELL DESIGN SERVICES, INC. 103 NASSAU DRIVE SA VANAA H, GEORGIA 3141 O 912-897-6932 December 8, 2004 To: Mr. Dee Anderson Zoning Administrator Tybee Island, Georgia 31328 From: Mark Boswell Re: Howard Reeve Project 10 th. Street Tybee Island, Georgia 31416 Dee, RECEIVED Please find enclosed two copies of the concept drainage plan for the project referenced above for your consideration. The original plans call for drainage to run down 10 th. Street but is meeting with much opposition. The owner is talking to residents effected by this concept and has so far obtained their cooperation. Sincerely, Mark Boswell, P.E. Sep 20 04 04:07p J V' i t:ley Reynolds 912 '52 7787 P.1 DAVIS ENGINEERING, INC, 636 Stephenson Avenue, Suite C Savannah, Georgia 31405 Tel.(912)355-7262 Fax (912) 352-7787 davi_sen *inc _bellsoutta.net September 20, 2004 Dee Anderson, Zoning Administrator City of Tybee Island P.O. Box 2.749 Tybee Island, GA 31328 Phone (912)7861573 Fax: (912)786-9539 RE: Lot 65 10's Place Dear M-, Anderson: We have reviewed the revised plans for this subdivision, Our review is limited to engineering issues. We have not attempted to duplicate the work of the Planning Commission or City staff with regard to setbacks, density or other zoning or subdivision regulation issues. To the best of my knowledge and belief, these plans meet the requirements of the Land Development Codc of the City of Tybee Island. Any recommendations do not relieve the project of the requirement to obtain any other required permits, approvals, etc... by any other governmental body or authority having jurisdiction over any portion of this project_ The Director of Public Works has requested that the proposed new storm line be televised to minimize interruptions to traffic in the lane. Televising would allow for pipejoints to be backfilled without inspection by the City of every joint. Please contact me if you have any questions on this matter. Sincerely, Downer K. +Davi, Jr., P_E_ President 2040300e cc: DATE ISSUED: 11-18-2005 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION QEOaG1P CITY OF TYBEE ISLAND BUILDING PERMIT DRAINAGE SYSTEM REWORK 3 TENTH PL HOWARD REEVE P.O. BOX 15844 SAVANNAH GA 31416 FIDELITY CONSTRUCTION, INC. PO BOX 15844 SAVANNAH GA 31416 P $ 111.00 $12,000.00 PERMIT #: 050508 TOTAL BALANCE DUE: $ 111.00 It is understood that if this permit is granted the builder will at all times comply with tite zoning, SlLbdiVlSlOn, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. if this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786.5737 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT TVBEF 4Fpp({tP Location: 1 D -}� PIN # ►f�:y,"JI annu F.q,q TFT FPunXTx' Owner „Dw � U . e ' • �- �70 l S 6 i-1 �1 �%�' 7 Architect �n j ❑ Repairs or Engineer Building Contractor (Check all that apply) New Construction Duplex ❑ Residential ❑ Footprint Changes ❑ Other ❑ Renovation ❑ Single Family ❑ Commercial ❑ Repairs Estimated cost of Construction: $ j'. , p o p J Construction Type (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: Remarks: (Enter appropriate number) (4) Masonry (5) Steel & Masonry ❑ Minor Addition ❑ Substantial Addition ❑ Multi -Family ❑ Demolition (6) Other (please specify) ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units Lot Area # Off-street parking spaces Trees located & listed on site plan Access: Driveway Setbacks: Front # Bedrooms Living space (total sq. ft.) With culvert? Rear # Bathrooms With swale? Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On-site restroom facilities will be provided through po' a On-site waste and debris containers will be provided by Construction debris will be disposed by W+iic W-otluat by means of k - .- I understand that I must comply with zoning flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to rore jymp�paired by this permitted construction. Date: 1) 11 V o r Signature of Applican Note: A permit normally takes 7 to 10 days to process. --------------------------------------------------------------------------------------------- The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site _ Water meter size Storm drainage Approvals: Zoning Administrator Code Enforcement Officer Water/Sewer Storm/Drainage Inspections City Manager Signature Date nom--- u � s FEES Permit 1 S., J Inspections Water Tap Sewer Stub Aid to Const. TOTAL 1 o REQUIRED FOR: Building Permits Relocation Permits Sign Permits Demolition Permits Land Clearing, Disturbance or Excavation Permits Tree Removal Permits Relocation Permits Special Review Permits Site Plan Approval Subdivision of Land Sketch Plan Approval Preliminary Plan Approval Final Plat Approval Minor Subdivision Plat Approval Major Subdivision Plat Approval In addition to specific requirements for the above permits and approvals, applicants must demonstrate that they are in compliance with the City of Tybee Island Storm Water Management requirements as outlined in Chapter 5-4, Code of Ordinances. Section 5-4-9 Prohibition provides, in part, as follows: (4.) It is unlawful for any person to cause or permit any storm water to flow from their property onto the property of another person, unless such storm water naturally flowed thereon prior to any development activity. (5.) It is unlawful for any person to interrupt the flow of any storm water runoff from adjacent property onto their property by any development activity. As part of the City's approval process applicants must illustrate how these storm water management prohibitions will be met, including a showing of how storm water naturally flowed on the affected property (prior to any development activity), and what changes in storm water flow have occurred or are expected to occur, as attachments to this form. The City's approval or permit does not guarantee that the applicant's plans will result in meeting requirements. The final product must actuall meet t e C' y Or ance requirements. Applicant name: o w a� a C%A Project I. D.: Attachments approved by: Date: DAVIS ENGINEERING, INC. 636 Stephenson Avenue, Suite C Savannah, Georgia 31405 Tel. (912) 355-7262 Fax (9I2) 352-7787 davisenginc@bellsouth.net October 5, 2005 Dee Anderson, Zoning Administrator City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 Phone (912)786-4573 Fax: (912)786-9539 RE: Lot 65 10'x' Place Dear Mr. Anderson: We have reviewed the revised Sheet C2 by Boswell Design Services, Inc., the Owner's current Engineer for this subdivision. Our review is limited to engineering issues. We have not attempted to duplicate the work of the Planning Commission or City staff with regard to setbacks, density or other zoning or subdivision regulation issues. This project was first approved on September 20, 2004. It was later approved on February 27, 2005 with a revised storm outfall down 11`i' Street. This current submittal shows revised storm water routing and storage areas within the lots. We offer the following comments: 1) Lot #'s need to be shown on all sheets. 2) Drainage easements need to be shown on all swales and storm lines where receiving runoff from other lots. Clarification shall be provided on which features will be privately maintained. 3) For clarification the plan shall be revised to not indicate placement of a structure over the storm line at the rear of the middle lot. 4) Proposed elevations of any ground level floors shall be shown. 5) Storm water storage is shown in the drainage calculations to be partially accounted for in a gravel road. The plans call for crushed stone. Calculations shall show how this storage volume was accounted for. (area of stone x depth x % voids considered.) Stone type of stone clearly on the plan to not conflict with gradation shown in drainage calculations. 6) Show 25 year pond storage height and limits of surface storage on plans. As this project has undergone so many changes, I prefer to meet with the Engineer and representatives of Tybee at City Hall. This meeting should be brief but should allow for resolution of outstanding issues more expeditiously. Please contact me if you have any questions on this matter. Smcerel , Woear K.'Davjs, r., President cc; 2040300h N] BOSWELL. DESIGN SERVICES, INC. 103 NASSAU DRIVE SAVANNAH, GEORGIA 3141 O 912-897-6932 June 30, 2005 To: Mr. Dee Anderson Zoning Administrator Tybee Island, Georgia 31328 From: Mark Boswell Re: Howard Reeve Project Tenth Place Tybee Island, Georgia Dee, As per your request, we have inspected the project referenced above for compliance with the approved drainage plan. After a brief inspection of the project, it is our opinion that the project grading seems to be in substantial compliance with the approved drainage plan. New structures have not been constructed at this time. Sincerely, %),;4j Mark Boswell, P.E. DAVIS ENGINEERING, INC. 636 Stephenson Avenue, Suite C Savannah, Georgia 31405 Tel. (912) 355-7262 Fax (912) 352-7787 davisen inc a,bellsouth.net February 27, 2005 Dee Anderson, Zoning Administrator City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 Phone (912)786-4573 Fax: (912)786-9539 RE: Lot 65 10b Place Dear Mr. Anderson: This project was previously approved on September 20, 2004 We have reviewed the revised plans by Boswell Design Services, Inc., the Owner's current Engineer for this subdivision. Our review is limited to engineering issues. We have not attempted to duplicate the work of the Planning Commission or City staff with regard to setbacks, density or other zoning or subdivision regulation issues. To the best of my knowledge and belief, these plans meet the requirements of the Land Development Code of the City of Tybee Island. Any recommendations do not relieve the project of the requirement to obtain any other required permits, approvals, etc... by the Georgia Department of Transportation or any other governmental body or authority having jurisdiction over any portion of this project. The Director of Public Works has requested that the proposed new storm line be televised to minimize interruptions to traffic in the lane. Televising would allow for pipe joints to be backfilled without inspection by the City of every joint. Please contact me if you have any questions on this matter. Sincer y, e;D owner K. , Jr., President 2040300g cc: Brannyn G. Allen From: davisenginc@bellsouth.net Sent: Sunday, September 21, 2008 8:04 PM To: Brannyn G. Allen Subject: 10th Place Brannyn It is my understanding that residents of I Oth Place are experiencing the porous open graded rock drive shifting to the extent their vehicles are getting stuck. The Engineer who designed this project has used this design before with satisfactory results. I cannot identify any design defects. During the inspection, following receipt of the Engineer's certification, nether Joe Wilson or I noticed gradation of the stone being different than the Engineer had specified. Not having observed the installation of this roadway, I cannot state whether the proper sequence of procedures was followed. The increased density by this minor subdivision created increased runoff with insufficient outfall. The approved design was based on the drive remaining porous, stormwater detention and other conditions. I am concerned that any repairs maintain this feature. If the drive becomes impervious, greater drainage related problems may be created. Unfortunately, the only way I am aware of to restore stability to the porous rock drive is complete removal and replacement. Please advise as you need my further involvement in this issue. Downer 66 4 � 0 1n TT 5 [r ro BB 64 n o �Q NOTE, PROPERTY w POINTS DEttf' 8Y CIRCLES. LOT LINE 44 I ' STRAND r LOT: ILI �d V r� 5 !9 30 'W GENiER b GF C4A'GRETE EAWA A TIC AN rIC OCEAN a STATE OF GEORGIA COUNTY OF 014ATHAM 4 RECEIVE HYDROLOGY REPORT FOR A Minor Subdivision Tenth Place Tybee Island, Georgia FOR Mr. Howard Reeve P.O. Box 15544 Savannah, Georgia 31416 February, 2005 BOSWEL.L. DESIGN SERVICES, INC. 103 NASSAU DRIVE SAVANNAH, GEORGIA 912-897-6932 HYDROLOGY REPORT For A Minor Subdivision Tenth Place Tybee Island, Georgia PRE AND POST DEVELOPMENT SITE CONDITIONS The existing site is a residential neighborhood with residences, paving, water, sewer, and strom drain systems. The ground is generally flat with slopes between 0 percent and 2 percent. The proposed project is to be a minor subdivision and will have two small detention basins and storm pipes to route new run off to the existing Butler Avenue drainage system. Part of the proposed storm system will have a drop inlet to intercept some of the existing run off from the existing curb and gutter on eleventh street. The total site drainage basin size is 2.05 acres with the proposed subdivision being 0.40 acres. The soils in this area have been classified by the Chatham County Soil Survey Map as being Cue (Chipley-Urban Land Complex). The soils on this site have not been field verified. ANALYSIS METHOD The Rational method was utilized for the analysis of the pre -development and post -development runoff for this site. Hydroflow Hydrographs software was utilized to perform these analyses and for the purpose of sizing pipes, inlets, ditches and detention. DRAINAGEAREA PRE -DEVELOPMENT RUN-OFF COEFFICIENT WEIGHTED AVERAGE — SEE EXHIBIT POST -DEVELOPMENT RUN-OFF COEFFICIENT WEIGHTED AVERAGE -- SEE EXHIBIT IDF CURVES -- SAVANNAH HYDROGRAPH GENERATION METHOD = RATIONAL PRE -DEVELOPMENT SLOPE - 2 % POST DEVELOPMENT SLOPE W 2 % TIME OF CONCENTRATION PRE -DEVELOPMENT = 10 MINUTES TIME OF CONCENTRATION POST -DEVELOPMENT = 10 MINUTES The proposed project is to be cleared of necessary trees and stumps to make way for the new structures. The resulting increased runoff, which is encountered due to new impervious area is displayed below: RUN-OFFRATE (25 YEAR STORM> PRE -DEVELOPMENT RUN-OFF = 6.28 CFS POST -DEVELOPMENT RUN-OFF = 8.56 CFS TOTAL INCREASE IN RUN-OFF = 2.28 CFS Storm water will be directed by existing conditions but will also be routed by swales and gutters and downspouts to the proposed drainage system. Storm water run off will be limited to the pre - construction run-off rates by the proposed basins and pipes. Storm water will then be directed toward the existing Butler Avenue storm drainage system. ti Project: HR - 10 TH - HYQRO.GPIMF: SAVANNAHADF 1 10 hyd's 1 02-14-2005 Hydrograph Summary Report Page 1 Hyd. No. Hydrograph type (origin) Peak flow (cis) Time interval (min) Time to peak (min) Volume (tuft) Return period (yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 Rational 4.29 1 10 2,572 25 --- --- — - HR -10TH -DA -1 -25 -YR 2 Rational 4.68 1 10 2,809 25 ------ ------ HR -10TH -DA -1 -25 -YR 3 Rational 1.99 1 10 1,193 25 -- — HR -10TH -DA -2 -25 -YR 4 Rational 2,11 1 10 1,264 25 — ---- ----- HR -10TH -DA -2 -25 -YR 5 Reservoir 1.95 1 11 1,264 25 4 0.63 199 6 Combine 6.28 1 10 3,765 25 1+3 --- ------ 7 Combine 6.51 1 10 4,074 25 2+5 - - 8 Reservoir 6.03 1 11 4,074 25 7 1.24 493 9 Rational 2.81 1 10 1,686 25 ---- ----- HR -10TH -DA -3 -25 -YR 10 Combine 8.56 1 11 5,759 25 8+9 ----- Proj. file: HR - 10 TH - HYDRO. PWF file: SAVANNAH.IDF Run date: 02-15-2005 Hydrograph Plot English Hyd. No. 1 HR -10TH -DA -1 -25 -YR -PRE Hydrograph type Storm frequency Drainage area Intensity I -D -F Curve 1 a = Rational = 25 yrs - 1.0 ac = 6.59 in = SAVANNAH.IDF Peak discharge = 4.29 cfs Time interval = 1 min Runoff coeff. = 0.65 Time of cone. (Tc) = 10 min Reced. limb factor= 1 Total Volume = 2,572 cult 1 - Rational - 25 Yr - QP = 4.29 ds 0 5 10 15 20 25 Time (min) ® Hyd. 1 Hydrograph Plot Hyd. No. 3 H R-10TH-DA-2-25-YR-PRE Hydrograph type Storm frequency Drainage area ntensity I -D -F Curve = Rational = 25 yrs = 0.4 ac = 6.59 in = SAVANNAH.IDF Peals discharge = 1.99 cfs Time interval = 1 min Runoff coeff. = 0.67 Time of cone. (Tc) = 10 min Reced. limb factor= 1 3 - Rational - 25 Yr - QP =1.99 ds English Total Volume = 1.193 tuft 1A re1t 0.0 0 5 10 15 20 25 Time (min) ® Hyd. 3 Hydrograph Plot Hyd. No. 6 Hydrograph type = Combine Storm frequency = 25 yrs 1 st inflow hyd. No.= 1 ME v CY English Peak discharge = 6.28 cfs Time interval = 1 min 2nd inflow hyd. No.= 3 Total Volume = 3,755 cult 6 - Combine - 25 Yr - QP = 6.28 ds 0 0 5 Hyd. 1 10 Time (min) / Hyd. 3 / Hyd. 6 15 20 25 0 5 Hyd. 1 10 Time (min) / Hyd. 3 / Hyd. 6 15 20 25 Hydrograph Plot CY 2 - Rational - 25 Yr - QP = 4.68 ds 5 Total Volume = 2,809 cult English Hyd, No. 2 I HR -10TH -DA -1 -25 -YR -POST Hydrograph type = Rational Peak discharge = 4.68 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 1.0 ac Runoff coeff. = 0.71 Intensity = 6.59 in Time of conc. (Tc) = 10 min I -D -F Curve = SAVANNAH.IDF Reced. limb factor = 1 CY 2 - Rational - 25 Yr - QP = 4.68 ds 5 Total Volume = 2,809 cult 0 5 10 15 20 25 Time (min) Hyd. 2 I 0 5 10 15 20 25 Time (min) Hyd. 2 Hydrograph Plot English Hyd. No. 4 HR -10TH -DA -2 -25 -YR -POST Hydrograph type = Rational Storm frequency = 25 yrs Drainage area = 0.4 ac Intensity = 6.59 in I -D -F Curve = SAVANNAH.IDF Peak discharge = 2.11 cfs Time interval = 1 min Runoff coeff. = 0.71 Time of conc. (Tc) = 10 min Reced. limb factor= 1 Total Volume = 1,264 cuff 4 - Rational - 25 Yr - QP = 2.11 ds 5 10 15 20 25 Time (min) ® Hyd. 4 Hydrograph Plot Hyd. No. 5 Hydrograph type = Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 4 Max. Elevation = 0.63 ft Storage Indication method used. car Peale discharge Time interval Reservoir name Max. Storage English = 1.96 cfs = 1 ruin = HR -POND -1 = 182 cult Total Volume = 1,264 cult 5 - Reservoir - 25 Yr - QP =1.96 cfs 0 10 20 30 40 Time (min) / Hyd. 4 / Hyd. 5 Hydrograph Plot Hyd. No. 5 Hydrograph type = Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 4 Max. Elevation = 0.63 ft Storage Indication method used. IPA 1. Peak discharge Time interval Reservoir name Max. Storage English = 1.96 cfs = 1 min = HR -POND -1 = 182 cult Total Volume = 1,264 cuft 5 - Reservoir - 25 Yr - Max. EI, = 0.63 ft H 10 20 30 40 Time (min) Hydrograph Plot Hyd. No. 7 Hydrograph type = Combine Storm frequency = 25 yrs 1st inflow hyd. No.= 2 42 0 CF English Peak discharge = 6.54 cfs Time interval = 1 min 2nd inflow hyd. No.= 5 Total Volume = 4,074 tuft 7 - Combine - 25 Yr - QP = 6.54 ds 0 5 10 15 20 25 Time (min) ® Hyd. 2 / Hyd. 5 / Hyd. 7 Hydrograph Plot Hyd. No. 8 Hydrograph type = Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 7 Max. Elevation = 1.25 ft Storage Indication method used. Peak discharge Time interval Reservoir name Max_ Storage English = 6.09 cfs = 1 min = HR -POND -1 = 459 cuff Total Volume = 4,074 cult 8 - Reservoir - 25 Yr - QP = 6.09 ds 0 10 20 30 40 Time (min) / Hyd. 7 / Hyd. 8 Hydrograph Plot Hyd. No. 8 Hydrograph type = Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 7 Max. Elevation = 1.25 ft Storage Indication method used. 2. 1. Peak discharge Time interval Reservoir name Max. Storage English 6.09 cfs = 1 min = HR -POND -1 = 459 cuft Total Volume = 4,074 cuft 8 - Reservoir - 25 Yr - Max. El. =1.25 ft 1 J 0 10 20 30 40 Time (min) Hydrograph Plot English Hyd. No. 9 HR-10TH-DA-3-25-YR-PREANDPOST Hydrograph type = Rational Storm frequency = 25 yrs Drainage area = 0.6 ac Intensity = 6.59 in -D-F Curve = SAVANNAHADF Peak discharge = 2.81 cfs Time interval = 1 min Runoff coeff. = 0.71 Time of cont. (Tc) = 10 min Reced. limb factor= 1 Total Volume = 1,686 tuft 9 - Rational - 25 Yr - QP = 2,81 ds 5 10 15 20 25 Time (min) Hyd. 9 Hydrograph Plot Hyd. No. 10 Hydrograph type = Combine Storm frequency = 25 yrs 1 st inflow hyd. No. = 8 1 N CY English Peak discharge = 8.56 cfs Time interval = 1 min 2nd inflow hyd. No.= 9 Total Volume = 5,759 cutt 10 -Combine -25 Yr-Qp=8.56 ds 0 5 10 15 20 25 30 Time (min) /� Hyd. 8 / Hyd. 9 / Hyd. 10 U -----------------------r--1 DA -2 PRC-DCVCLOPCD i DA -1 PRG-DCVGLOPCO 5OX IMPCRV - 0.23 AV 6OX IMPCRV - 0.60 AC I 50X PCRV TOTAL • .40 0.25 AC/ ACS 5OX PCRV 0.50 AC S I CwRC- OI67A TOTAL • 1, mwqm wr 1 PNCE Cw PRC 0"lS6— -- -t° i I DA -2 POST -C �1OPGD 1160X IMPCRV�- ,27 AC DA -1 POST-DCVCLOPCD 40X PCRV : O. AG 6OX IMPCRV - 0.60 AC I ,,,� ,j�q� 0.�6/ C t� ar I a alm arae • rr- aoow 40% PCRV 0.40 AC a' to I tom u I I `�w PZSS IO.'7 aos'aaw e t TOATL 1, OAC�� Ou"POST • 0.71 dwr p , I-- . tate r ,• I EI . taae<tts '� � -- ' � d• i , J J ,• � N�� " !1.u. LC A ,LOT C • , II ::w:: ?• !I 'Tv "W s I �a - ewni I PI I ;SII, � Ilia I I i d 1 I-- MI.IRIOM �qO 1 oA 3 Iv I I �V.- r% ..�.. �. 0 IMPCRV 0.36 AC ■atmttto� dd d F' 1110%PCRV - 4e.24 AC I s I I -•� �laa I ' I TOTAL - 0.60 AC w e°s "r :. a'01O.reu I �' I I �' I aaa ^• t� u Cw PRE ��D d ST - 0.71 t+r-ml I d i I Ili a i tm op lop - - ----ov---------- -�-` --- 111 -------- ------------ ''------------------ --------------- # 1 W Ai OM f s ,p arc o aro.r•n aAll �f � F aw l------------- --^------I-------------A----� -'�"-------- —'—�_.__ YL--- -- at- ---- -�+-----�--- --------�------------- ---- --------t-i nr 0 r Worksheet for HR 12" P1 Project Description Flow Element: Circular Pipe Friction Method: Manning Formula Salve For: Discharge Input Data Roughness Coefficient: 0.013 ft Channel Slope: 0.00300 ft/ft Normal Depth: 1.00 ft Diameter: 1.00 ft Results 0.00 % Discharge: 1.95 fNls Flow Area: 0.79 ft2 Wetted Perimeter: 3.14 ft Top Width: 0.00 ft Critical Depth: 0.60 ft Percent Full: 100.0 % Critical Slope: 0.00679 ftlft Velocity: 2.48 flus Velocity Head: 0.10 ft Specific Energy: 9.10 ft Froude Number: 0.00 Maximum Discharge: 2.10 ft?ls Discharge Full: 1.95 ft'!s Slope Full: 0.00300 ft/ft Flow Type: SubCritical GVF Input Data Downstream Depth: 0.00 ft Length: 0.00 ft Number Of Steps: 0 GVF Output Data Upstream Depth: 0.00 ft Profile Description: NIA Profile Headloss: 0.00 ft Average End Depth Over Rise: 0.00 % Normal Depth Over Rise: 0.00 % Downstream Velocity: 0.00 ft/s Worksheet for HR 18" P2 Project Description Flow Element: Circular Pipe Friction Method_ Manning Formula Solve For: Discharge Input Data Roughness Coefficient: 0.013 It Channel Slope: 0.00150 ft/ft Normal Depth: 1.50 ft Diameter: 1.50 ft Results 0.00 % Discharge: 4.07 ft' /s Flow Area: 1.77 ft2 Wetted Perimeter: 4.71 ft Top Width: 0.00 ft Critical Depth: 0.77 It Percent Full, 100.0 % Critical Slope: 0.00544 ft/ft Velocity: 2.30 ft/s Velocity Head: 0.08 ft Specific Energy: 1.58 ft Froude Number: 0.00 Maximum Discharge: 4.38 ft'!s Discharge Full: 4.07 ft'/s Slope Full: 0.00150 ft/ft Flow Type: SubCritical GVF Input Data Downstream Depth: 0.00 ft Length: 0.00 ft Number Of Steps: 0 GVF Output Data Upstream Depth: 0.00 It Profile Description: NIA Profile Headloss: 0.00 ft Average End Depth Over Rise: 0.00 % Normal Depth Over Rise: 0.00 % Downstream Velocity: 0.00 ft/s CA 0 5 NFrate v pepth on � D'Scb°age Q 70 60 50 v W A0 o� W 30 0. r uo 20 V W M -- 9 t� •`� 5 4 A 17' ,5 ,0 9 6 7 6 5 r 4 , .v 3 ~a d Z � 7 0 r a 1 W 9� .8%0 7 rQ. j--- 6or. �r i 5 v� 2 1 J , �ort+PanY oc 1�, Negnah Fo�ndnf 11 HYDROLOGY REPORT FOR A Minor Subdivision Tenth Place Tybee Island, Georgia FOR Mr. Howard Reeve P.O. Box 15844 Savannah, Georgia 31416 February, 2005 KNI wNo. 28372 PRI SSIONAL � RECEIVED BOSWELL DESIGN SERVICE'S, INC. 103 NASSAU DRIVE SAVANNAH, GEORGIA 912-897-6932 HYDROLOGY REPORT For Tenth Place Subdivision and Drainage Project Tenth Place and Eleventh Street Tybee Island, Georgia PRE AND POST DEVELOPMENT SITE CONDITIONS The existing site is a residential neighborhood with residences, paving, water, sewer and no storm drain systems. The ground is generally flat with slopes between 0 percent and 2 percent. The proposed project is to be a minor subdivision and will have two small detention basins and storm pipes to route new run off to the existing Butler Avenue drainage system. Some of the pipes have been sized for future Tybee Island Drainage upgrades. The total site drainage basin size is 1.45 acres with the proposed subdivision being 0.40 acres. The soils in this area have been classified by the Chatham County Soil Survey Map as being Cue (Chipley-Urban Land Complex). The soils on this site have not been field verified. ANALYSIS METHOD The Rational method was utilized for the analysis of the pre -development and post -development runoff for this site. Hydroflow Hydrographs software was utilized to perform these analyses and for the purpose of sizing pipes, inlets, ditches and detention. DRAINAGEAREA PRE -DEVELOPMENT RUN-OFF COEFFICIENT WEIGHTED AVERAGE - SEE EXHIBIT POST -DEVELOPMENT RUN-OFF COEFFICIENT WEIGHTED AVERAGE -- SEE EXHIBIT IDF CURVES SAVANNAH HYDROGRAPH GENERATION METHOD = RATIONAL PRE -DEVELOPMENT SLOPE = 2 Flo POST DEVELOPMENT SLOPE = 2 % TIME OF CONCENTRATION PRE -DEVELOPMENT = 10 MINUTES TIME OF CONCENTRATION POST -DEVELOPMENT = 10 MINUTES The proposed project is to be cleared of necessary trees and stumps to make way for the new structures. The resulting increased runoff, which is encountered due to new impervious area is displayed below: RUN OFFRATE (25 YEAR sroRM) PRE -DEVELOPMENT RUN-OFF = 4.78 CFS POST -DEVELOPMENT RUN-OFF = 6.22 (RESTRICTED TO 3.88 CFS) RUN-OFF IS DECREASED 0.9 CFs BY RESTRICTING FLOW Storm water will be directed by existing conditions but will also be routed by swales, gutters and downspouts, ponds and storm pipes towards the existing Butler Avenue drainage system. Storm water run off will be limited by the proposed basins and pipes. The drainage patterns which exists may and sometimes do cause flooding to some of the property owners in the area. The drainage portion of this project will correct some drainage issues in a neighborhood which presently does not have positive drainage. POND DATA ALL DRAINAGE CALCULATIONS ARE BASED ON STORM EVENTS AND DO NOT TAKE INTO ACCOUNT COASTAL FLOODING DUE TO TIDAL INFLUENCE. 25 YR PRE -DEVELOPED STORM VOLUME = 2,869 CF 25 YR POST -DEVELOPED STORM VOLUME = 3,729 CF POND VOLUME REQ'D = 1,884 Cr (25 YEAR = 1.84 FEET DEEP) TOTAL POND VOLUME AVAILABLE = 2,1 18 CF (AT 2.0 FEET DEET) EXCESS POND VOLUME = 234 CF (25 YEAR BETWEEN 1.84 FEET AND 2.0 FEET) ADDITIONAL VOLUME 106 CF (PIPE BETWEEN PONDS) 149 CF (IN THE TWO PIPES FROM POND TO ELEVENTH STREET) TOTAL AVAILABLE VOLUME = 2,373 CF TOTAL. EXCESS VOLUME = 489 CF (INCLUDING PIPE STORAGE) ADDITIONAL PROJECT INFORMATION In its' current state as a single family residential lot, detention is not required to develop the lot and the property owner has the right to provide positive drainage to the City of Tybee Island drainage system. By subdividing this property, the developer is by-passing his right to provide positive drainage to the property without detention. The developer of this project is providing positive drainage, which should be available to all lots, and was not required of the previous developers/subdividers. The developer is providing required detention with outfall pipes to the existing storm system. The ponds and pipes act as a restrictor and therefore limit the storm water release to the existing storm system at a rate lower than the pre -developed rate. The project proposed grading is such that the storage volume above the ponds is greater than the existing storage volume. Project: HR-10TH-HYDR4_G N r IDF: SAVANNAHJDF 1 17 hyd's 1 02-27-2005 Hydrograph Summary Report Page 1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Return period (yrs) inflow hyd(s) Maximum elevation (ft) Maximum Hydrograph storage description (curt) 1 Rational 3.30 1 10 1,978 25 --- — ---- HR -10TH -DA -1 -25 -YR 2 Rational 4.29 1 10 2,572 25 — - — HR -10TH -DA -1 -25 -YR 3 Rational 1.48 1 10 890 25 — — lift -10TH -DA -2 -25 -YR 4 Rational 1.93 1 10 1,157 25 ---- --- -- HR -10TH -DA -2 -25 -YR 5 Combine 4.78 1 10 2,869 25 1+3 -- — 6 Combine 6.22 1 10 3,729 25 2+4 — ---- 7 Reservoir 3.88 1 14 3,349 25 6 1.83 1,864 8 Rational 2.57 1 10 1,543 25 — ------ --- HR -10TH -DA -3 -25 -YR 9 Rational 8.57 1 10 5,144 25 ---- --- - HR -10TH -DA -4 -25 -YR 10 Rational 4.69 1 10 2,816 50 - — - — HR -10TH -DA -1 -50 -YR 11 Rational 2.11 1 10 1,267 50 — - - - - HR -10TH -DA -2 -50 -YR 12 Combine 6.81 1 10 4,084 50 10+11 - 13 Reservoir 4.27 1 14 3,703 50 12 1.92 1,994 14 Rational 4.99 1 10 2,993 100 -- -- ---- HR -10TH -DA -1-100-Y 15 Rational 2.25 1 10 1,347 100 -- — - - HR -10TH -DA -2-100-Y 16 Combine 7.23 1 10 4,340 100 14+15 ------ -- - 17 Reservoir 4.54 1 14 3,960 100 16 1.98 2,091 Proj_ file: HR-10TH-HYDRO.GP OF file: SAVANNAH.IDF Run date: 02-27-2005 Reservoir Report Reservoir No. 1 - HR -POND -1 Pond Data Bottom area = 675.0 sgft Stage 1 Storage Table Stage Elevation ft ft 0.00 0.00 020 0.20 0.40 0.40 0.60 0.60 0.80 0.80 1.00 1.00 1.20 1.20 1.40 1.40 1.60 1.60 1.80 1.80 2.00 2.00 Side slope = 3.0:1 Bottom elev. = 0.00 ft Contour area Incr. Storage Total storage sgft tuft cuft 675 0 0 739 141 141 805 155 296 875 169 465 947 184 649 1,023 200 849 1,101 217 1,066 1,182 234 1,300 1,266 253 1,553 1,353 272 1,825 1,443 292 2,118 Culvert I Orifice Structures Weir Structures [A] Crest Len ft [A] [B] [C] [D] Rise in = 0.0 12.0 0.0 0.0 Span in = QO 12.0 0.0 0.0 No. Barrels = 0 2 0 0 Invert El. ft = 0.00 0.50 0.00 0.00 Length ft = 0.0 95.0 0.0 0.0 Slope % = 0.00 0.10 0.00 0.00 N -Value = .000 .013 .000 _000 Orif. Coeff. = 0.00 0.40 0.00 0.00 Multi -Stage = --- No No No Weir Structures [A] Crest Len ft = 0.00 Crest EI. ft = 0.00 Weir Coeff. = 0.00 Eqn. Exp. = 0.00 Multi -Stage = No Page 1 English Depth = 2.00 ft [Bl [C] [D] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 No No No Tailwater Elevation = 0.00 ft Continues on next page. Note: All outflows have been analyzed under inlet and outlet control. Stage 1 Storage 1 Discharge Table Stage Storage Elevation Civ A Clv B Civ C Civ D Wr A Wr B Wr C Wr D Discharge ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 0.00 --- 0.00 -- --- -- --- -- --- 0.00 0.02 14 0.02 -- 0.00 - - - --- --- --- 0.00 0.04 28 0.04 - - 0.00 - --- __- _-- -- --- 0.00 0.06 42 0.06 -- 0.00 -- -- - - -- --- 0.00 0.08 57 0.08 --- 0.00 - -- --- - - -- 0.00 0.10 71 0.10 --- 0.00 --- -- --- - --- -- 0.00 0.12 85 0.12 - 0.00 --- -- --- --- --- -- 0.00 0.14 99 0.14 -- 0.00 --- - - - --- -- 0.00 0.16 113 0.16 -- 0.00 --- - - - --- --- 0.00 0.18 127 0.18 - 0.00 -- - - --- -- - 0.00 020 141 0.20 - 0.00 - -- - --- --- --- 0.00 Continues on next page. HR -POND -1 Page 2 Stage 1 Storage 1 Discharge Table Stage Storage Elevation Clv A Civ B Civ C Civ D Wr A Wr B Wr C Wr D Discharge ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cis 0.22 157 022 --- 0.00 - - - -- -- --- -- 0.00 024 172 0.24 -- 0.00 --- --- --- -- --- --- 0.00 0.26 188 0.26 --- 0.00 -- --- --- --_ ___ -- 0.00 028 203 0.28 --- 0.00 --- --- --- --- --- 0.00 0.30 219 0.30 -- 0.00 --- --- --- -- - -- 0.00 0.32 234 0.32 - 0.00 -- -- --- --- --- --- 0.00 0.34 250 0.34 -- 0.00 -- -- -- --- --- -- 0.00 0.36 265 0.36 - 0.00 - -- - -- -- --- 0.00 0.38 281 0.38 --- 0.00 --- -- --- --- --- --- 0.00 0.40 296 0.40 --- 0.00 -- --- -- --- --- --- 0.00 0.42 313 0.42 --- 0.00 -- --- - - --- -- --- 0.00 0.44 330 0.44 - 0.00 -- --- --- --- --- -- 0.00 0.46 347 0.46 --- 0.00 -- -- -- --- --- --- 0.00 0.48 364 0.48 --- 0.00 --- --- --- - - - -- 0.00 0.50 381 0.50 --- 0.00 - -- - -- --- -- 0.00 0.52 397 0.52 --- 0.00 --- -- --- -- --- -- 0.00 0.54 414 0.54 --- 0.01 _- -_ _ _ __ -- -- 0.01 0.56 431 0.56 -- 0.02 --- -- -- --- --- --- 0.02 0.58 448 0.58 --- 0.03 --_ --- --- --- - 0.03 0.60 465 0.60 -- 0.05 -- --- --- --- -- --- 0.05 0.62 483 0.62 -- 0.08 --- --_ ___ -- --- --- 0.08 0.64 502 0.64 --- 0.10 --- --- --_ -_ _ _ __ 0.10 0.66 520 0.66 - 0.12 - - -- - --- -- 0.12 0.68 539 0.68 --- 0.17 --- --- --- --- -- --- 0.17 0.70 557 0.70 --- 0.19 --- --- --- --- - -- 0.19 0.72 575 0.72 --- 0.22 --- -_ -- --- --- --- 0.22 0.74 594 0.74 -- 0.29 - -- -- --- -- --- 0.29 0.76 612 0.76 - 0.33 - - - -- - --- --- 0.33 0.78 631 0.78 --- 0.37 -- --- -- -- --- --- 0.37 0.80 649 0.80 -- 0.41 -- -- - -- --- -- 0.41 0.82 669 0.82 - 0.45 --- -- -- -- -- --- 0.45 0.84 689 0.84 --- 0.50 - _-- -- -- --- -- 0.50 0.86 709 0.86 --- 0.55 -- -- -- --- --- -- 0.55 0.88 729 0.88 --- 0.60 --- - -- --- --- --- 0.60 0.90 749 0.90 -- 0.65 - -- -- -- -- --- 0.65 0.92 769 0.92 - - 0.70 -- _- --- --- --- --- 0.70 0.94 789 0.94 -- 0.76 --- -- - -- -- --- 0.76 0.96 809 0.96 --- 0.81 -- - -- -- -- --- 0.81 0.98 829 0.98 --- 0.87 -- -- --- -- --- --- 0.87 1.00 849 1.00 -- 0.98 --- --- --- --- --- --- 0.98 1.02 871 1.02 -- 1.03 -- -- - -- -- - 1.03 1.04 892 1.04 -- 1.09 -- -- -- -- --- -- 1.09 1.06 914 1.06 -- 1.15 - -- -- -- -- - 1.15 1.08 936 1.08 --- 1.20 - -- -- --- --- --- 120 1.10 957 1.10 --- 1.26 -- -- - --- --- -- 1.26 1.12 979 1.12 -- 1.31 -- -- -- --- -- --- 1.31 1.14 1,001 1.14 -- 1.36 -- --- -- -- --- --- 1.36 1.16 1,022 1.16 -- 1.41 -- -- -- --- - -- 1.41 1.18 1,044 1.18 --- 1.46 -- - -- - --- -- 1.46 1.20 1,066 1.20 - 1.50 - -_ --- - - -- 1.50 1.22 1,089 122 --- 1.55 --- _ - --- -- - - 1.55 1.24 1,112 1.24 - 1.59 --- --- --- --- 1.59 1.26 1,136 1.26 --- 1.63 --- -- -- --- -- --- 1.63 Continues on next page... HR -POND -1 Stage 1 Storage 1 Discharge Table Page 3 Stage Storage Elevation Civ A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 1.28 1,159 1.28 -- 1.70 -_- - - -- --- --- 1.70 1.30 1,183 1.30 - 1.74 - --- _-- --- --- --- 1.74 1.32 1,206 1.32 --- 1.77 -- --- --- - --- --- 1.77 1.34 1,230 1.34 --- 1.82 --- --- -- -- --- --- 1.82 1.36 1,253 1.36 --- 1.84 --- --- -- -- -- --- 1.84 1.38 1,276 1.38 -- 1.86 -- --- -- -- --- 1.86 1.40 1,300 1.40 - 1.89 --_ -- -- -- --- -- 1.89 1.42 1,325 1.42 --- 1.91 - -- --- --- -- --- 1.91 1.44 1,350 1.44 -- 1.92 --- -- --- --- - - 1.92 1.46 1,376 1.46 --- 1.92 _- -- --- --- --- --- 1.92 1.48 1,401 1.48 -- 1.91 --- --- - -- --- -- 1.91 1.50 1,426 1.50 --- 1.84 -- -- -- --- --- --- 1.84 1.52 1,452 1.52 --- 2.03 -- -- -- --- --- --- 2.03 1.54 1,477 1.54 - 2.20 --- --- --- -- --- --- 2.20 1.56 1,502 1.56 --- 2.35 - - -- _- --- --- 2.35 1.58 1,528 1.58 - 2.50 --- -- -- -- --- --- 2.50 1.60 1,553 1.60 - 2.64 - --- -- -- - -- 2.64 1.62 1,580 1.62 --- 2.77 --- --- --- --- --- --- 2.77 1.64 1,607 1.64 --- 2.90 -- -- --- --- --- -- 2.90 1.66 1,634 1.66 --- 3.02 - --- --- - -- -- 3.02 1.68 1,662 1.68 - 3.14 --- --- - --- --- ---- 3.14 1.70 1,689 1.70 -- 3.25 --- --- -- --- --- --- 3.25 1.72 1,716 1.72 --- 3.36 - - --- - --- --- 3.36 1.74 1,743 1.74 --- 3.46 - --- --- -- -- -- 3.46 1.76 1,771 1.76 -- 3.56 -- -- -- --- --- --- 3.56 1.78 1,798 1.78 - 3.66 - --- --- --- - -- 3.66 1.80 1,825 1.80 --- 3.76 - -- --- --- --- - 3.76 1.82 1,854 1.82 - 3.85 --- --- --- --- --- --- 3.85 1.84 1,884 1.84 -- 3.94 - - --- -- --- --- 3.94 1.86 1,913 1.86 --- 4.03 -- --- -- -- --- -- 4.03 1.88 1,942 1.88 --- 4.12 --- -- -- -- --- - - 4.12 1.90 1,971 1.90 - 4.21 - -- --- -- -- - 4.21 1.92 2,001 1.92 --- 4.29 --- --- -- -- --- --- 4.29 1.94 2,030 1.94 - 4.37 -- --- --- --- --- -- 4.37 1.96 2,059 1.96 --- 4.46 -- --- -- - --- - 4.46 1.98 2,088 1.98 -- 4.54 -- - --- - --- --- 4.54 2.00 2,118 2.00 --- 4.61 -- --- --- - --- --- 4.61 ... End no aw I I J' a a DA -4 50X IMPERV - .95 AC 50% PERU - 0.95 AC TOTAL - 1.9 AC C. PRE AND POST - 0.55 OA -2 Dii� DA -1 PRE -DEVELOPED SOA IMPERV - 0.50 AC SOX IMPERV r 0.23 AC J PE .2 AC % 50% PERU - 0.50 ACAC TOTAL 4.45 TOTAL.1.00 >� 0. LY PRE . 0. 7 1 p� PRE - O. DA -2 POST -0 - RV 0. AC I 8TO0XT DA -1 POST-OEVELOPW =MM i + .1C SOX IMPERV 0.80 4OX 0.45 a�.a. PERW- 0 TOAn- 1. AC . POMSPTE 0 ..6rw 0n.POST - .71 �•• Aws f6 T I � r rr.. r •ar ■ PIL DA-3 BOX IMPERV - 0.38 AC rr ! 40% PERV - 0.24 AC IaLa TOTAL . AC � � � � s n, ■. �a Cw PRE ANOND POST - 0.71 � I Worksheet for HR 18" P1 Project Description Flow Element: Circular Pipe Friction Method: Manning Formula Solve For: Discharge Input Data Roughness Coefficient: 0.013 in Channel Slope: 0.30000 % Normal Depth: 16.00 in Diameter: 18.00 in Results 0.00 % Discharge: 5.75 fNls Flow Area: 1.77 ft2 Wetted Perimeter: 4.71 ft Top Width: 0.00 ft Critical Depth: 0.93 ft Percent Full: 100.0 % Critical Slope: 0.00610 ft/ft Velocity: 3.26 flus Velocity Head: 0.16 ft Specific Energy: 1.66 ft Froude Number: 0.00 Maximum Discharge: 6.19 ft'Is Discharge Full: 5.75 ft'Is Slope Full: 0.00300 fUft Flow Type: SubCritical GVF Input Data Downstream Depth: 0.00 in Length: 0.00 ft Number Of Steps: 0 GVF Output Data Upstream Depth: 0.00 in Profile Description: NIA Profile Headloss: 0.00 ft Average End Depth Over Rise: 0.00 % Normal Depth Over Rise: 0.00 % Downstream Velocity: 0.00 ft/s Worksheet for HR 18" BETWEEN PONDS Project Description Flow Element: Circular Pipe Friction Method: Manning Formula Solve Far: Discharge Input Data Roughness Coefficient: 0.013 ft Channel Slope: 0.30000 % Normal Depth: 1.50 ft Diameter: 1.50 ft Results 0.00 % Discharge: 5.75 ft3/s Flow Area: 1.77 ftz Wetted Perimeter: 4.71 ft Top Width: 0.00 ft Critical Depth: 0.93 ft Percent Full: 100.0 % Critical Slope: 0.00610 ft/ft Velocity: 3.26 fUs Velocity Head: 0.16 ft Specific Energy: 1.66 ft Froude Number. 0,00 Maximum Discharge: 6.19 f 3/s Discharge Full: 5.75 ft'Is Slope Full: 0.00300 ft/ft Flow Type: SubCritical GVF Input Data Downstream Depth: 0.00 ft Length: 0.00 ft Number Of Steps: 0 GVF Output Data Upstream Depth: 0.00 ft Profile Description: NIA Profile Headioss: 0.00 ft Average End Depth Over Rise: 0.00 % Normal Depth Over Rise: 0.00 % Downstream Velocity: 0.00 ft)s Worksheet for HR 24" DOWN 11 TH Project Description Flow Element: Circular Pipe Friction Method: Manning Formula Solve For: Normal Depth input Data Roughness Coefficient: 0.013 ft Channel Slope: 0.22000 % Diameter: 2.00 ft Discharge: 3.88 ft'Is Results 0.00 % Normal Depth: 0.84 ft Flow Area: 1.25 ft2 Wetted Perimeter: 2.81 ft Top Width: 1.97 ft Critical Depth: 0.69 ft Percent Full: 41.8 % Critical Slope: 0.00448 ftlft Velocity: 3.12 fus Velocity Head: 0.15 It Specific Energy: 0,99 ft Froude Number: 0.69 Maximum Discharge: 11.41 ft'/s Discharge Full 10.61 ft'!s Slope Full: 0.00029 fuft Flow Type: SubCritical GVF Input Data Downstream Depth: 0.00 ft Length: 0.00 ft Number Of Steps: 0 GVF Output Data Upstream Depth: 0.00 ft Profile Description: N/A Profile Headloss: 0.00 ft Average End Depth Over Rise: 0.00 % Normal Depth Over Rise: 0.00 % Downstream Velocity: 0.00 ft/s DAVIS ENGINEERING, INC. 636 Stephenson Avenue, Suite C Savannah, Georgia 31405 Tel, (912) 355-7262 Fax (912) 352-7787 davisengi nena.bel lsouth. net February 20, 2005 Dee Anderson, Zoning Administrator City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 Phone (912)786-4573 Fax: (912)786-9539 RE: Lot 65 10a' Place Dear Mr. Anderson: We have reviewed the proposed changes to this project. This redesign shows storm water outfall routed south across a lot on the north side of 11 h Street. Last September I provided a letter to Tybee advising the plans proposed at that time appeared to meet the requirements of the Land Development Code of the City of Tybee Island. The comments offered below are for this proposed redesign and are not intended to be added to the previous plans. Any recommendations do not relieve the project of the requirement to obtain any other required permits, approvals, etc... by any other governmental body or authority having jurisdiction over any portion of this project. Mark Boswell has advised that following approval by the City of this preliminary drainage routing plan, he intends to submit complete construction plans showing grading details, erosion control measures, utility crossings and adjustments (if necessary), etc... Information I will be looking for on those plans will include but not be limited to: Easement rights allowing the storm water line to be installed across the property of others. Permission by the governing authorities & storm water system owners to tie into the system within the Butler/Hwy 80 R.O.W. Ownership of the proposed system (private or public?). Maintenance responsibilities for the proposed drainage system. The following additional comments are offered: I ) Addresses and lot #'s for the lots on each side of the pipe crossing would be helpful. 2) Using the same drafting style for the curb in Butler and on 111' Street would be consistent. 3) How is the grate inlet to match the gutter when it is offset from it? 4) Show easements on water and sewer services in 1& Place. 5) Provide top and invert elevations on upstream and downstream SS manholes in 10th Place. 6) Mark Williams advised that prior to City concurrence the DOT is to be notified of the proposed connection to the existing drainage system in Butler Avenue. 7) A property owner's association will be required to maintain the detention areas and storm drain pipe upstream of 11th Street. 8) Additional fire hydrants appear to be needed. 9) Storm crossing over sanitary sewer main in Butler needs to provide protection to the existing sanitary main due to lack of adequate separation. Are any other utilities being crossed in Butler Ave? 10) Spec the pavement replacement in Butler to match existing composition or provide equal alternative. 11) Additional detailing of the replacement of existing services in I Ph Street will be needed. C Worksheet for HR 24" P3 Project Description Flow Element: Circular Pipe Friction Method: Manning Formula Solve For: Normal Depth Input Data Roughness Coefficient: 0.013 ft Channel Slope: 0.00150 Tuft Diameter: 2.00 ft Discharge: 6.12 ft'!s Results 0.00 % Normal Depth: 1.23 ft Flow Area: 2.03 ft2 Wetted Perimeter: 3.61 ft Top Width: 1.95 ft Critical Depth: 0.88 ft Percent Full; 61.5 % Critical Slope: 0.00466 Rift Velocity: 3.02 itis Velocity Head: 0.14 ft Specific Energy: 1.37 ft Froude Number: 0.52 Maximum Discharge: 9.42 ft'!s Discharge Full: 8.76 ft'Is Slope Full: 0.00073 fuft Flow Type: SubCritical GVF Input Data Downstream Depth: 0.00 ft Length: 0.00 ft Number Of Steps: 0 GVF Output Data Upstream Depth: 0.00 ft Profile Description: NIA Profile Headloss: 0.00 ft Average End Depth Over Rise: 0.00 % Normal Depth Over Rise: 0.00 % Downstream Velocity: 0.00 ft/s Worksheet for HR 24" P4 Project Description Flow Element: Circular Pipe Friction Method: Manning Formula Solve For: Normal Depth Input Data Roughness Coefficient: 0.013 ft Channel Slope: 0.00150 ft/ft Diameter: 2.00 ft Discharge: 6.12 ft'/s Results 0.00 % Normal Depth: 1.23 ft Flow Area: 2.03 ftz Wetted Perimeter: 3.61 ft Top Width: 1.95 ft Critical Depth: 0.88 ft Percent Full: 61.6 % Critical Slope: 0.00466 ft/ft Velocity: 3.02 ft/s Velocity Head: 0.14 ft Specific Energy: 1.37 ft Froude Number: 0.52 Maximum Discharge: 9.42 fts/s Discharge Full: 8.76 ft;/s Slope Full: 0.00073 ft/ft Flow Type: SubCritical GVF Input Data Downstream Depth: 0.00 ft Length: 0.00 ft Number Of Steps: 0 GVF Output Data Upstream Depth: 0.00 ft Profile Description: NIA Profile Headloss: 0.00 ft Average End Depth Over Rise: 0.00 Normal Depth Over Rise: 0.00 % Downstream Velocity: 0.00 ft/s Worksheet for HR EXT'G 18" P5 Project Description Flow Element: Circular Pipe Friction Method: Manning Formula Solve For: Discharge Input Data Roughness Coefficient: 0.013 ft Channel Slope: 0.01350 Tuft Normal Depth: 1.23 ft Diameter: 1.50 ft Results 0.00 % Discharge: 12.21 ft'Is Flow Area: 1.55 ft2 Wetted Perimeter: 3.40 ft Top Width: 1.15 ft Critical Depth: 1.32 ft Percent Full: 82.0 % Critical Slope: 0.01213 ft/ft Velocity: 7.87 ft/s Velocity Head: 0.96 ft Specific Energy: 2.19 ft Froude Number: 1.20 Maximum Discharge: 13.13 f l/s Discharge Full: 12.20 ftl/s Slope Full: 0.01351 Wft Flow Type: SuperCritical GVF Input Data Downstream Depth: 0.00 ft Length: 0.00 ft Number Of Steps: 0 GVF Output Data Upstream Depth: 0.00 ft Profile Description: NIA Profile Headloss: 0.00 ft Average End Depth Over Rise: 0.00 Normal Depth Over Rise: 0.00 % Downstream Velocity: 0.00 flus /AR7F GRATE—SQ. FT. OPEN AREA _ U O, V Go ;o w 10 C � r r N N � G / � � n o Q N W th. 0. VOo 100 0 a ra (A o, v oo .o o 0 0 0 0 0 0 000 LiCL 0 DIS ARGE THROUGH GRATE -- CU; FT. PER SEC. H 0`2 : q d i.- oZ os G� N b, b'v bo ;o N w A LA C> V w •o o WATER DEPTH OVER GRATE -- FT. -t APPROVED BY THE TY13YE ISLAND PLANNING COMMISSION ZONING ADMINISTRATOR DATE APPROVED V'IHL' TYBEE ISLAND MAYOR AND COUNCIL MA DAIS, 7� "� LOTH. PLACE 15' ROADWAY S 70°30'00`°E —165.00' N FT. LOT 65 R D. B IID 8 b24 D. 11 111 P 403 P. R. B. Dw P. R. D. D 2E8 _ �... TENTH sTRELT T err{! ��uJjqn '_ TENTH COURT L3i]!'::( ::' ` ' ,_. jE13NR SPA 11/12"P" I,Sfy / _ TENTFI TERRACE u ! TENTH PLACE a ! — ----- ----- SITE � -- ELEVENTH STREET _- — V / VICINITY IdAP / (NAT TO SCALE) / ZONE A8, I3FE 13 LONE A6, BFE 14 LONE 118, BPG 15 / ZONE V9, BFE 16 I _8_NU,{ 2 STORY ROUSE NAIL IN P/P / EL@V 11.71 /! / N 555' TO PARENT HIGH WATER _ —�aals rx S iq°30'00"LDa fiI00, 7004AY TACK FND Ii �.._.—....._ _. _. 'LACK THE PRIVATE DRIVEWAY ACCESS AND UITILTY EASEMENT 15 HEREBY DEDICATED PERPHTrUALY FOR THE USE BY THE OWNERS AND RESIDENTS OF ALL LATS IN THIS SUBDIVISION AND 11711, No E MAINTAINED By THE CITY OF TY'BEE ISLAND. 1 Z OWNER DATE ACCORDING TO THE F.1216. DATED c/17/ BB THIS 5rM IS WITHIN THE 100 YEAR FLOOD TONE. EQLIIPI(ENT: PRD 13 356 TOPCON AP-L1A DO 148 U 524 ERROR OF CLOSURE: ORG 1.LNFAR: 1/- 1ST1rR ANC: /ANGLE •• Co1[C. TALK 94,00' aLocK txla. - 80' PRIVATE llRIVE ACCESS 74 TI[,1'I�r F'SAITC NR PUG ! / 15.6• Q5L BSL I -...� 0 1�T A JI) Ln Q/ f[ GST DEMCLJTIJN) LOT A a �Ell LOT B ! e4 LOT C� a AREA = 4727 SF � rl ?vvI AREA = 7285 SF Cb +, AREA - 6425 SP TOE OF i7ti1NE LiHIC 81.00' r 1• 7 .00,_ 6/0" RBS` -- Q4.00' x 70.30'00" _ m 225.00' N � 2 STORY HOU E jI PaM7 4 of IAT ca 1 I U1$ 1 M3I :; STONY "",502 STORY }LOUSE LONE A8, BF8 13 'LONE A8, 13F'E 14 ( ZONE BFE 15 ZOITE V9, BFE la DECK NOTE: THIS PLAT REVISED JULY 27, 2005 BY MOVING INTERIOR LOT LINES. NOTE: RELOCATED ROUSE ON IAT B IS NOT SHOWN. J. xM'i't r•'Y R, ,moi OLDS • �BALANCED BY: - REVHM JUNE 14. 2000 �. LAND SURVEYOR 46 PLAT: I/ MWINFN � 636 STEPHENSON AVENUE ° �! p 0 0 20 0 20 40 60 SUITE C 1, i° ' SCA14. I` m M' rrT-r SAVRN.NA}}��.. GEORGIA 3140a g 0� DATE: SLPTPi(HeLt 14, 2000 stiRvEY-- - ' :?—: 'IELEPHON>:: 912-352-0484 GRAPHIC SCALE - FEET FAX: 912-352--7787 EY �.1 M E: o. 0 9. ,-mc AIAT "NR FLAG F DNR FLAG 1R rum ll� A R FLAG m t� R FLAG I FLAG Q~ t FLAG FLAG �5� b PORCH RrjV1SED SUBDIVISION THE EASTERN 225' OF FRONT LOT 65, WARD NO. 4, TYLEE ISLAND, CHATHAM COUNTY, GEORGIA FOTO_ IjQWA ,) REM w : 11