HomeMy Public PortalAboutVILLAGE PLACE_2A.pdfCity of Tybee island - Community Development Dept.
Inspection Report
403 Butler Ave. - P.O. Box 2749 - Tybee Island, GA 31328
Phone 912.472-5032 • Fax 912.786.9539
Permit No. 2-0
Owner's Name
Gen. Contractor
Contact Information
Project Address
Date Requested
Date Needed _ 71//113
Subcontractor
V I L LAF9t }moi
Scope of Work l) t, A) Po T7f
JTERt;A" ,; JAC
CODE COUNCIL
MEMBER
Inspector Date of Inspection _ -7/,
Inspection Pass r-1 Fail Fee ~
Inspection
Inspection
Inspection
4 �
1+,-4e43I A):�! -- t3 P-4A�
Pass ❑ Fail ❑ Fee
Pass ❑ Fail ❑ Fee
Pass ❑ Fail ❑ Fee
DATE ISSUED: 06-18-2013
WORK DESCRIPTION
WORK LOCATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
R&R ROTTEN PICKETS AND NEWELS
2 VILLAGE PL A
PERMIT #: 130392
OWNER NAME KIM SOBERICK
ADDRESS 2A VILLAGE PL
CITY, ST, ZIP TYBEE ISLAND GA 31328
PHONE NUMBER
CONTRACTOR NAME CHARLES J SPALDING
MrI1�+iDRiA11$tEQUIRED.
ADDRESS PO BOX 1962 ■ with ar&NjOW
CITY STATE ZIP TYBEE ISLAND GA 31328 1d_Fft.,.P.rtj�
FLOOD ZONE AW .8f*, so fels
BUILDING VALUATION P� � �Q ��
SQUAREFOOTAGE more �� 30 �bovd
etc
OCCUPANCY TYPE P RESIDENTIAL than 0 i ochmeft r Wade:
TOTAL FEES CHARGED $ 0,00 AL — minimum height
COMMERCIAL —minimum height
PROPERTY IDENTIFICATION # PIN #4-0003-12-025 3rgest Open ;Inq'Permittod 'a 4"
PROJECT VALUATION $ 200.00
TOTAL BALANCE DUE: $ 0,00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must he posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786-4573 - FAX (912) 786-9539
www.cityoftybee.org
Propertyperty Address:
City of Tybee Island, Georgia
912-472-5033 or 912-472-5031 - Fax 912-786-9539
APPLICATION FOR BUILDING PERMIT
�451
ane
QC
(Check all that apply)
❑ gle Family ❑ Discovery/Tearout ❑ Demolition of Structure
Duplex ❑ Footprint Changes — ❑ Other
❑ Multi -Family units new _ square feet
❑ Commercial units heated/cooled
Details of Project: -o_ ('d �-" a.>J o-o—w
Estimated Cost of Construction: $ 2-06 x_ -)U (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
* Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
* Also see the Tybee Island Land Development Code Article 14: Historic Preservation
Durina construction:
On-site restroom facilities will be provided through ■ p,"yLao"J"0A . Construction debris will be disposed
by 1 locate rjwykv_A by means of e,t, jovvi-2 . in I understand that I must comply with tonflood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that
may be necessary to restore drainage impaired by this permitted construction.
Date: , • t- .. nw Signature of Applicant:. c
Printed Name S ►✓1
Note: A permit normally takes 7 to 10 days to process
Approvals.-
Planning
pprovals:Planning & Zoning Manager
Building Official
Water/Sewer
Storm/Drainage
City Manager
FEES
Name
Mailing Address
Telephc
Owner
Water Tap
Home:
Cell:
Architect or
.Sa 5ERr-k
En ineer
TOTAL
Office:
Contractor
1--�>6 _i3o J;73 T .e�e
Cell: 2 _►4
ane
QC
(Check all that apply)
❑ gle Family ❑ Discovery/Tearout ❑ Demolition of Structure
Duplex ❑ Footprint Changes — ❑ Other
❑ Multi -Family units new _ square feet
❑ Commercial units heated/cooled
Details of Project: -o_ ('d �-" a.>J o-o—w
Estimated Cost of Construction: $ 2-06 x_ -)U (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
* Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
* Also see the Tybee Island Land Development Code Article 14: Historic Preservation
Durina construction:
On-site restroom facilities will be provided through ■ p,"yLao"J"0A . Construction debris will be disposed
by 1 locate rjwykv_A by means of e,t, jovvi-2 . in I understand that I must comply with tonflood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that
may be necessary to restore drainage impaired by this permitted construction.
Date: , • t- .. nw Signature of Applicant:. c
Printed Name S ►✓1
Note: A permit normally takes 7 to 10 days to process
Approvals.-
Planning
pprovals:Planning & Zoning Manager
Building Official
Water/Sewer
Storm/Drainage
City Manager
FEES
Perm it
Inspections
Cap Cost Rec
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL