Loading...
HomeMy Public PortalAboutVILLAGE PLACE_2A.pdfCity of Tybee island - Community Development Dept. Inspection Report 403 Butler Ave. - P.O. Box 2749 - Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 Permit No. 2-0 Owner's Name Gen. Contractor Contact Information Project Address Date Requested Date Needed _ 71//113 Subcontractor V I L LAF9t }moi Scope of Work l) t, A) Po T7f JTERt;A" ,; JAC CODE COUNCIL MEMBER Inspector Date of Inspection _ -7/, Inspection Pass r-1 Fail Fee ~ Inspection Inspection Inspection 4 � 1+,-4e43I A):�! -- t3 P-4A� Pass ❑ Fail ❑ Fee Pass ❑ Fail ❑ Fee Pass ❑ Fail ❑ Fee DATE ISSUED: 06-18-2013 WORK DESCRIPTION WORK LOCATION CITY OF TYBEE ISLAND BUILDING PERMIT R&R ROTTEN PICKETS AND NEWELS 2 VILLAGE PL A PERMIT #: 130392 OWNER NAME KIM SOBERICK ADDRESS 2A VILLAGE PL CITY, ST, ZIP TYBEE ISLAND GA 31328 PHONE NUMBER CONTRACTOR NAME CHARLES J SPALDING MrI1�+iDRiA11$tEQUIRED. ADDRESS PO BOX 1962 ■ with ar&NjOW CITY STATE ZIP TYBEE ISLAND GA 31328 1d_Fft.,.P.rtj� FLOOD ZONE AW .8f*, so fels BUILDING VALUATION P� � �Q �� SQUAREFOOTAGE more �� 30 �bovd etc OCCUPANCY TYPE P RESIDENTIAL than 0 i ochmeft r Wade: TOTAL FEES CHARGED $ 0,00 AL — minimum height COMMERCIAL —minimum height PROPERTY IDENTIFICATION # PIN #4-0003-12-025 3rgest Open ;Inq'Permittod 'a 4" PROJECT VALUATION $ 200.00 TOTAL BALANCE DUE: $ 0,00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must he posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Propertyperty Address: City of Tybee Island, Georgia 912-472-5033 or 912-472-5031 - Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT �451 ane QC (Check all that apply) ❑ gle Family ❑ Discovery/Tearout ❑ Demolition of Structure Duplex ❑ Footprint Changes — ❑ Other ❑ Multi -Family units new _ square feet ❑ Commercial units heated/cooled Details of Project: -o_ ('d �-" a.>J o-o—w Estimated Cost of Construction: $ 2-06 x_ -)U (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N * Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. * Also see the Tybee Island Land Development Code Article 14: Historic Preservation Durina construction: On-site restroom facilities will be provided through ■ p,"yLao"J"0A . Construction debris will be disposed by 1 locate rjwykv_A by means of e,t, jovvi-2 . in I understand that I must comply with tonflood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: , • t- .. nw Signature of Applicant:. c Printed Name S ►✓1 Note: A permit normally takes 7 to 10 days to process Approvals.- Planning pprovals:Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager FEES Name Mailing Address Telephc Owner Water Tap Home: Cell: Architect or .Sa 5ERr-k En ineer TOTAL Office: Contractor 1--�>6 _i3o J;73 T .e�e Cell: 2 _►4 ane QC (Check all that apply) ❑ gle Family ❑ Discovery/Tearout ❑ Demolition of Structure Duplex ❑ Footprint Changes — ❑ Other ❑ Multi -Family units new _ square feet ❑ Commercial units heated/cooled Details of Project: -o_ ('d �-" a.>J o-o—w Estimated Cost of Construction: $ 2-06 x_ -)U (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N * Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. * Also see the Tybee Island Land Development Code Article 14: Historic Preservation Durina construction: On-site restroom facilities will be provided through ■ p,"yLao"J"0A . Construction debris will be disposed by 1 locate rjwykv_A by means of e,t, jovvi-2 . in I understand that I must comply with tonflood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: , • t- .. nw Signature of Applicant:. c Printed Name S ►✓1 Note: A permit normally takes 7 to 10 days to process Approvals.- Planning pprovals:Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager FEES Perm it Inspections Cap Cost Rec Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL