Loading...
HomeMy Public PortalAboutTYBRISA ST_408.pdfDATE ISSUED: 05-15-2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT HANG SHUTTERS/REP FACIAISOF 408 TYBRISA ST LAMAR LESTER 21 LAKE HERON CT W POOLER GA 31322-4041 404-786-8130 CELL EBI SERVICES, INC P.O. BOX 30488 SAVANNAH GA 31410 P $ 50.00 PIN #4-0008-10-007 $ 200.00 PERMIT #: 130304 TOTAL BALANCE DUE: $ 50.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: �. J��4� P. O. Box 2749 - 443 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: City of Tybee Island, Georgia 912-472-5033 or 912-472-5031 - Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT Single Family ❑ Duplex ❑ Multi -Family _ ❑ Commercial (Check all that apply) ❑ Discovery/Tearout ❑ Footprint Changes — units new square feet units heated/cooled Details of Project: S\Ak,,- Estimated Cost of Construction: $ ❑ Demolition of Structure ❑ Other (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N *Buildings older than 50 years maybe eligible to be listed on the State /National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. *Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On-site restroom facilities will be provided through Ho of- x� Construction debris will be disposed by by means of LAa I understand that I must comply with zonin flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this ermitted construction. Date: �r ILA Signature of Applicant: Printed Name CFnrv-b,s k Note: A permit. normally takes 7 to 10 days to process Approvals:Jigm Date Planning & Zoning Manager • ��.�� Building Official Water/Sewer Storm/Drainage City Manager FEE Permit Inspections Cap Cost Rec Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL ,-0 Name Mailing Address Telephone Owner (2r. Home:'/Oy - 74 813 Cell: Architect or Engineer Contractor Contractor Q -�J S I- Q Q v X6 Office: Cell: CLQ y �j Z s r Single Family ❑ Duplex ❑ Multi -Family _ ❑ Commercial (Check all that apply) ❑ Discovery/Tearout ❑ Footprint Changes — units new square feet units heated/cooled Details of Project: S\Ak,,- Estimated Cost of Construction: $ ❑ Demolition of Structure ❑ Other (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N *Buildings older than 50 years maybe eligible to be listed on the State /National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. *Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On-site restroom facilities will be provided through Ho of- x� Construction debris will be disposed by by means of LAa I understand that I must comply with zonin flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this ermitted construction. Date: �r ILA Signature of Applicant: Printed Name CFnrv-b,s k Note: A permit. normally takes 7 to 10 days to process Approvals:Jigm Date Planning & Zoning Manager • ��.�� Building Official Water/Sewer Storm/Drainage City Manager FEE Permit Inspections Cap Cost Rec Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL ,-0