Loading...
HomeMy Public PortalAboutJONES AV_209.pdfCity of Tybee Island - Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 ���• Phone 912.472-5032 - Fax 912.786.9539 CODECOAcii ,¢ MEMBER Permit No. 7` ' Date Requested Owner's Name Date Needed Gen. Contractor Subcontractor Contact Information Project Address Scope of Work Inspector Date of Inspection Inspection I' - ^� Pass QA ail Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Permit No. Owner's Name City of Tybee Island - Community Development Dept. ai- '- � Inspection Report n�� 403 Butler Ave. - P.O. Box 2749 - Tybee Island, GA 31328 ME Phone 912.472-5032 - Fax 912.786.9539 CODE COUNCIL IMEMBER Gen. Contractor Contact Information Project Address Scope of Work Inspector Date Requested Date Needed SubcontractorK�11r�- Date of Inspection Inspection y Pass Fail E Fee_ AY4 F Inspection {A �I IMI -1 Inspection Inspection Pass ❑ Fail ❑ Fee Pass ❑ Fail ❑ Fee Pass ❑ Fail ❑ Fee d City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 Permit No. 13 ~ 0 9 G T Owner's Name Gen. Contractor EHT[ RNATIONAL MME COUNCIL MEMBER Date Requested 6-13 Date Needed �- Subcontractor 3-)4kxrn Oo.Y, -�o t4 H4,4 Contact Information P_ V - ,r Lfj Project Address 2-.3q Scope of Work r P I(2 Inspector Date of Inspection a Inspection _ :_ n I 8�ja C k . Pass E] Fail Fee i _ 1 41H j-► tl Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee DATE ISSUED: II -6-2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT MECH - REPLACE HVAC 209 JONES CRAFTON LANGLEY 1107 LANIER BLVD ATLANTA GA 30306 SUTHERN COMFORT HTG & AIR GOND 1913 E 62ND ST SAVANNAH GA 31404 P $ 380.00 4-0004-11-009 $4,000.00 PERMIT #: 130705 TOTAL BALANCE DUE: $ 380.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, ITybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786.9539 www.cityoftybee.org CITY OF TYBEE ISLAND COMMUNITY DEVELOPMENT DEPARTMENT P.O. Box 2749 • 403 Butler Ave., Tybee Island, GA 31328 Phone (912) 786-4573 • Fax (912) 786-9539 MECHANICAL PERMIT APPLICATION Location of work (street address) © Qi'2_ Contractor S �,J 4'�Q %P1 N C Address of contractor 11-1 1 Y) d's ,- Contact - Contact name & telephone number of contractor LIQ Name of property owner Mailing address of property owner Telephone number of property owner Residential Commercial New Work Replacement n Details of project I&C-CL- 7' 't w Estimated cost of construction 1 Cr ' 02- Permit Number Date work will be ready for inspection, if known ATTENTION: Inspections for Mechanical Permits are required and will be in accordance with the International Residential Code or the International Mechanical Code and the Georgia Amendments. Requirements for "change -outs." will not be less than the requirements for new installations. In addition, elevation of outside condensing units for FEMA compliance is required, Plan accordingly. Please ask if you have any questions. Owner/Contractor signature 7 Owner/t contractor printe nae I t-- u -- l ?s Date ?� Z 3� ZSR SSD