Loading...
HomeMy Public PortalAboutGEN GEORGE MARSHALL_105.pdfDATE ISSUED: 11-20-2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT HVAC CHANGEOUT 105 GEN GEO MARSHAL BLVD MICKELL WEST 105 GEN GEORGE MARSHALL BLVD TYBEE ISLAND GA 31328 OLD COAST HVAC 102 W 36TH STREET SAVANNAH GA 31401 P $ 70.00 4-0001-08-011 $4,925.00 PERMIT #: 130731 TOTAL BALANCE DUE: $ 70.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. d. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.rityoftybee.org 11/20/2013 06:56 70:19127869539 FROM:4048554349 Page: 2 nl+ � 16, CITY OF TYBEE ISLAND COMMUNITY DEVELOPMENT DEPARTMENT P.O. Box 2749 • 403 Butler Ave., Tybee Island, GA 31328 Phone (912) 786-4573 • Fax (912) 786-9539 MECHANICAL PERMIT APPLICATION Avs Location of work (street address) O rrzt7� „�'"1r4r2.5'h�trt , �[_vl� Contractor Q11� —t�9 /mac t C Address of contractor Contact name & telephone number of contractor Name of property owner ,/vI /k's - Mailing ks Mailing address of property owner :' ; �.✓ "y@fLCy X72 rr tL� ,,�5� vii Telephone number of property owner �'– f 94; Residential % Commercial New Work Replacement Details of project ;c, j Estimated cost of construction Pe t - Number It /�0'73/ Date work will be ready for inspection, if known %{ � * ATTENTION: I<nspeetians for Mechanical Permits are required and will be in accordance with the International Residential Code or the International Mechanical Code and the Georgia Amendments. Requirements for "chano-oats" wili not be less than the requirements for new installations. In addition, elevation of outside condensing units for FENIA compliance is required. Plain accordingly. Please ask if yoti havc uiy questions. O7ef/Contrabtor signature Z -Ac frr2G/�.C�z Own Owner/Contractor printed name Da Z) I -Zo-I 3