HomeMy Public PortalAboutGEN GEORGE MARSHALL_105.pdfDATE ISSUED: 11-20-2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
HVAC CHANGEOUT
105 GEN GEO MARSHAL BLVD
MICKELL WEST
105 GEN GEORGE MARSHALL BLVD
TYBEE ISLAND GA 31328
OLD COAST HVAC
102 W 36TH STREET
SAVANNAH GA 31401
P
$ 70.00
4-0001-08-011
$4,925.00
PERMIT #: 130731
TOTAL BALANCE DUE: $ 70.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. d. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786-4573 - FAX (912) 786-9539
www.rityoftybee.org
11/20/2013 06:56 70:19127869539 FROM:4048554349 Page: 2
nl+ �
16,
CITY OF TYBEE ISLAND
COMMUNITY DEVELOPMENT DEPARTMENT
P.O. Box 2749 • 403 Butler Ave., Tybee Island, GA 31328
Phone (912) 786-4573 • Fax (912) 786-9539
MECHANICAL PERMIT APPLICATION Avs
Location of work (street address) O
rrzt7� „�'"1r4r2.5'h�trt , �[_vl�
Contractor Q11� —t�9 /mac t C
Address of contractor
Contact name & telephone number of contractor
Name of property owner ,/vI /k's -
Mailing
ks
Mailing address of property owner :' ; �.✓ "y@fLCy X72 rr tL� ,,�5� vii
Telephone number of property owner �'– f 94;
Residential % Commercial
New Work Replacement
Details of project ;c, j
Estimated cost of construction
Pe t - Number
It /�0'73/
Date work will be ready for inspection, if known %{ � *
ATTENTION:
I<nspeetians for Mechanical Permits are required and will be in accordance with the
International Residential Code or the International Mechanical Code and the Georgia
Amendments.
Requirements for "chano-oats" wili not be less than the requirements for new installations. In
addition, elevation of outside condensing units for FENIA compliance is required. Plain
accordingly. Please ask if yoti havc uiy questions.
O7ef/Contrabtor signature
Z -Ac frr2G/�.C�z Own
Owner/Contractor printed name
Da
Z)
I
-Zo-I 3