Loading...
HomeMy Public PortalAboutTS CHU TE_9.pdfA 4 �4 CITY OF TYBEE ISLAND BUILDING PERMIT ADDED SCOPE AND VALUE DATE ISSUED: 12-4-2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION HANDRAILS I AWNING 9A CHU TERRACE THOMAS DAVIS 25 - C TELFAIR PLACE SAVANNAH GA 31415 SOUTHERN SPLENDOR FENCE 829 FIRST STREET TYBEE ISLAND GA 31328 P $ 70.00 4-0009-04-004 $1,900.00 PERMIT #: 130758 Added $1,450 for 6' & 4' fences TOTAL BALANCE DUE: $ 20.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building[ Inspector or Authorized Agent: Wp 4Gq 1� p hrri.]1 l� V P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 766-9539 www.cityoftybee.org EF City of Tybee Island, Georgia 912-472-5030 - Fax 912-786-9539 s APPLICATION FOR BUILDING PERMIT Property Address: ! S C_ h eOrr _ PIN: $�SinFamily gle Duplex ❑ Multi -Family units ❑ * Commercial unit(s) Check all that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated/cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: _,&o D cl�✓� .�r�f��r� Estimated Cost of Construction: $ ,� i� (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N • Buildings older than 50 years may be eligible to be listed on the State /National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On-site restroom facilities will be provided through . Construction debris will be disposed by by means of I understand that I must comply with zoning , flood dama a control buildin_q, fire shore protection and wetland ordinances FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaire thiselpemitted construction. 1 Date: Signature: Printed Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager �3-0-1 ss` dA (� 5b Oar40-rtCe.5 0 Sign t e Date Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL Name MailingAddress Owner �� 01,v �( 7i u5 S C/JL HomTelephone Cell: YS YS Architect or V Office: Engineer Cell: Contractor Office: Cell: $�SinFamily gle Duplex ❑ Multi -Family units ❑ * Commercial unit(s) Check all that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated/cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: _,&o D cl�✓� .�r�f��r� Estimated Cost of Construction: $ ,� i� (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N • Buildings older than 50 years may be eligible to be listed on the State /National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On-site restroom facilities will be provided through . Construction debris will be disposed by by means of I understand that I must comply with zoning , flood dama a control buildin_q, fire shore protection and wetland ordinances FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaire thiselpemitted construction. 1 Date: Signature: Printed Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager �3-0-1 ss` dA (� 5b Oar40-rtCe.5 0 Sign t e Date Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL VLA I vboN f'f { r� y Y s T r w 41 f i e-Uk L+ p a C, kck n �-o .ex-� f,a 4. LrGrd S -rte--�- �'os�r �an uj DATE ISSUED: 12-4-2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CITY OF TYBEE ISLAND BUILDING PERMIT HANDRAILS 1 AWNING 9A CHU TERRACE THOMAS DAVIS 25 - C TELFAIR PLACE SAVANNAH GA 31415 PERMIT #: 130758 CONTRACTOR NAME SOUTHERN SPLENDOR FENqXC,_31146, ISC 1012 1 ADDRESS 829 FIRST STREET HANDRAILS REQUIRED, CITY STATE ZIP TYBEE ISLAND GA 31328 340 to 38~ In height with continuous, uninterrupted grip. FLOOD ZONE AC $12, Aw 1013 BUILDING VALUATION WARM REQUIRED. SQUARE FOOTAGE Porches, balconies, decks, ramps, etc. OCCUPANCY TYPE P morerade. than 309 aW TOTAL FEES CHARGED $ 50.00 minimum h 6„ COMMERCIAL — minimum heli ht 4ht 9 2 PROPERTY IDENTIFICATION # 4-0009-04-004 Largest opening permitted is 4". PROJECT VALUATION $ 450.00 TOTAL BALANCE DUE: $ 50.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, bre, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front or building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Sox 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786.4573 - FAX (912) 786-9539 www.cityoftybee.org City of Tybee Island, Georgia 912-472-5030 • Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT Property Address: PIN: Qat Q e�Z 7 0-�'+R�" ^ J p l n d r l' �� Check a!! that apply Single Family ! ❑ Discovery/Tearout ❑ Demolition or Relocation ❑ Duplex ❑ Footprint Changes ❑ Other ❑ Multi -Family units ❑ additional square ❑ * Commercial unit(s) feet heated/cooled * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: Estimated Cost of Construction: $ H �5U (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope � the ork� o sets of construction drawings and/or a site plan may be required. Year Built: �%! `� Listed on National Historic Register or located within a National Historic District? Y • Buildings older than 50 years may be eligible to be listed on the State /National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation Durina construction: On-site restroom facilities will be provided through hU^`Qc wry Construction debris will be disposed by 7q__ c_0 rt (,�'fu< by means of arca i td I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage imp "s permitted construction. Date: !�- `I - i� Signature: Printed Name of Applicant:T,�1rr- C, r 0) Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Signatur Date 1 ).-4-13 FEES Name Mailing Address Telephone Owner NY ;tIrv' �&Vi3 CV_uS AvPkj-e Home: Cell: 9l� - Architect or Engineer Sewer Stub Office: Cell: Contractor1 < .rdpr, � 5k 1�' P 4Slc.nc4 �� Office: Cell: %l -- 7 0-�'+R�" ^ J p l n d r l' �� Check a!! that apply Single Family ! ❑ Discovery/Tearout ❑ Demolition or Relocation ❑ Duplex ❑ Footprint Changes ❑ Other ❑ Multi -Family units ❑ additional square ❑ * Commercial unit(s) feet heated/cooled * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: Estimated Cost of Construction: $ H �5U (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope � the ork� o sets of construction drawings and/or a site plan may be required. Year Built: �%! `� Listed on National Historic Register or located within a National Historic District? Y • Buildings older than 50 years may be eligible to be listed on the State /National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation Durina construction: On-site restroom facilities will be provided through hU^`Qc wry Construction debris will be disposed by 7q__ c_0 rt (,�'fu< by means of arca i td I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage imp "s permitted construction. Date: !�- `I - i� Signature: Printed Name of Applicant:T,�1rr- C, r 0) Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager Signatur Date 1 ).-4-13 FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL Chatham County Board of Assessors: 2013 Property Record Caird 4-0009-04-004 2013 Chatham County Board of Assessors Page 1 of 2 4-0009-04-004 Property Record Card 9 T S CHU TER TYBEE ISLAND APPRAISER jlmarine W PT OF 5 RESUB OF 105 TYBEE 60 X 70 JUNG MARLENE DORIS CAMA ASMT 2000 LAST INSP 06/08/2007 PO OX 658 168,000 168,000 LAND 1 APPR ZONE 000008 S[MSBURY C 127,600 127,600 BLDG i FOR SALE 07/14/00 $239,900 GRANTEE -SESSIONS SHIRLEY 17,300 17,300 OBXF 5 1994 ADD CHG B-12-98 DH PER 312,900 312,900 Cost - MS SALES BOOK/ INS VI QU RSN PRICE PAGE PROPERTY 09 Aug 214N 0559 WD I Q 230,000 2000 JLM GRANTOR:SESSIONS SHIRLEY ADD CHG PER POCARD GRANTEE:JUNG MARLENE D 11/02/04 JM 23 Sep 1971 0340 NA I U UG TY01 HS10 REMVD NJV 12-11- 1998 00 GRANTOR:SPROUL ROBERT ETAL FOR SALE 07/14/00 $239,900 GRANTEE -SESSIONS SHIRLEY ADD CHG 10-28-98 DH PER 21 Oct 169U 0580 WD I Q 120,00C 1994 ADD CHG B-12-98 DH PER GRANTOR:AKWS EUEL & DORIS OWNER GRANTEE:SPROUL ROBERT ET AL FOR SALE 316/98 $249,000 01 Dec I U U5 62,000 1986 SHIRLEY SESSIONS TY95 GRANTOR: 169U58D. GRANTEE: 25.48 COMMENTS: PROPERTY 28 Jun 2005 ADD CHG PER NOTE 06/28/05 JLM 02 Nov 2004 ADD CHG PER POCARD 020213.00 T213 TYBEE BTL 11/02/04 JM 11 Dec 2000 TY01 HS10 REMVD NJV 12-11- DIM 2 UNITS OL 00 15 Aug 2000 FOR SALE 07/14/00 $239,900 28 Oct 1998 ADD CHG 10-28-98 DH PER 140325 OWNER 12 Aug 1998 ADD CHG B-12-98 DH PER 0 456.00 A OWNER 13 Mar 1998 FOR SALE 316/98 $249,000 15 Dec 1994 *SANDRA JEAN CARROLL & 140326 SHIRLEY SESSIONS TY95 Solid Wall/Stab AV 169U58D. Chatham County Tax Commissioner ME= p ia•* Ptapeay Tax State t CODES PROPERTY 0006 RESIDENTIAL USE UTA 0004 Tybee Island NBHD 020213.00 T213 TYBEE BTL BLDG # BEACH EXEMPTIONS DIM 2 UNITS OL HISTORY LAND IMPR TOTAL 2012 168,000 102,000 270,000 Cama 2011 168,000 97,900 265,900 Cama 2010 354,900 102,000 456,900 Cama 2009 355,000 103,000 4513,000 Over 2008 580,000 61,000 641,000 Over 2007 580,000 61,D00 641,000 Over 2006 641,000 A/C 2005 246,000 82,500 328,500 Cama 2004 209,500 88,000 297,500 Cama 2003 209,500 88,500 298,000 Cama 2002 155,000 68,500 243,500 Cama 2001 160,000 81,000 241,000 Cama 2000 241,000 A/C 1999 66,500 81,000 147,500 Cama 1998 158,000 A/C 1997 66,500 107,000 173,500 Cama 1996 24,150 81,030 105,180 Cama 1995 24,150 85,500 109,650 Cama 1994 24,150 64,790 88,941) Cama 1993 24,150 42,660 66,810 Over 1992 24,150 42,660 66,810 Over EXTRA FEATURES ID# BLDG # SYSTEM DESC DIM 1 DIM 2 UNITS OL UNIT PRICE RCN AYB EYB DT ECON FUNC SP SP% RCNLD MKT VALUE 140325 86319 AV CPT FLAT/SHED RF D 0 456.00 A B.43 3,844 1985 1985 IR 2,652 2,700 140326 86319 Solid Wall/Stab AV 0 0 160.00 A 25.48 4,077 1985 1985 IR 2,813 2,800 140327 66319 KNEE WALLIGLS/STPS 0 0 448.00 A 31.82 14,255 1985 1985 IR 9,836 9,800 140328 86319 Slab wlwalls Under 0 0 208.00 A 12,49 2,598 1985 1985 IR 1,793 1,800 140329 86319 SLAB/STEP AV 0 0 30.00 A 11.24 337 1985 1985 IR 233 200 LAND D# USE DESC FRONT DEPTH UNITS /TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE 110852 SINGLE FAMILY RES 60 70 4,200.00 -SF 40.00 C1 16BOOD d04 -t, 000 3 -a 3f4 goo http ://boa. chathameounty.org/DesktopModulesIChathamCountylBoardofAsse ssorslPropert... 12/4/2013