HomeMy Public PortalAboutTS CHU TE_8 (3).pdf/IEF i _,4
DATE ISSUED: 12-20-2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
INSTALL PARKING AREA
8 CHU TERRACE-APTS
8 T.S. CHU LLC
PO BOX 2497
TYBEE ISLAND GA 31328-2497
CORY SCOVILLE CONSTRUCTION
604 ATKINSON AVE
SAVANNAH GA 31404
P
$ 65.00
4-0009-03-012
$4,000.00
PERMIT #: 130810
TOTAL BALANCE DUE: $ 65.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
'4;��Signature of Building Inspector or Authorized Agent: �.
-2- �&44
4 W n r% c0.��L��
P. Q. Sox 2749.403 Butler Avenue,'Iybee Island, Georgia 31328
(912) 786-4573 - FAX (912) 786-9539
www.cityoftybee.org
13 -o91 0
LE
City of Tybee Island, Georgia
912-472-5030 • Fax 912-786-9539
=` APPLICATION FOR BUILDING PERMIT
L _r
Property Address: C� C`1 PIN: 40011) 0
Check all that apply '.i J�
❑ Single Family ❑ Discovery/Tearout ❑ Demolition or Relocation
❑ Duplex ❑ Footprint Changes ❑ Other
❑ Multi -Family units ❑ additional square
❑ * Commercial unit(s) feet heated/cooled
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project:�f'_C•�—
Estimated Cost of Construction: $ 2-1000 (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On-site restroom facilities will be provided through . Construction debris will be disposed
by by means of I understand that I must comply with zoning, flood
damage control building, fire shore protection and wetland ordinances FEMA regulations and all app licable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impair d by this permitted construction. A r '.Ve Ja
Date: Signature: FEES
A -','Printed Name of Applicant: �ti` I< -SL � e Permit
Note: A permit normally takes 7 to 10 days to process. Processinq time for a
historic structure may be longer,
Approvals:
Planning & Zoning Manager
Building Official
Water/Sewer
Storm/Drainage
City Manager
I -t r-, 12 -13-13
nspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL �r
Name
Mailing Address
Telephone
Owner
I LJ
Home:
Cell:
Architect or
Office:
Engineer
Cell:
ContractorC
� ,_
,'i ke- s`� .
Office:
Cell: `7,D(,_ (I
Check all that apply '.i J�
❑ Single Family ❑ Discovery/Tearout ❑ Demolition or Relocation
❑ Duplex ❑ Footprint Changes ❑ Other
❑ Multi -Family units ❑ additional square
❑ * Commercial unit(s) feet heated/cooled
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project:�f'_C•�—
Estimated Cost of Construction: $ 2-1000 (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On-site restroom facilities will be provided through . Construction debris will be disposed
by by means of I understand that I must comply with zoning, flood
damage control building, fire shore protection and wetland ordinances FEMA regulations and all app licable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impair d by this permitted construction. A r '.Ve Ja
Date: Signature: FEES
A -','Printed Name of Applicant: �ti` I< -SL � e Permit
Note: A permit normally takes 7 to 10 days to process. Processinq time for a
historic structure may be longer,
Approvals:
Planning & Zoning Manager
Building Official
Water/Sewer
Storm/Drainage
City Manager
I -t r-, 12 -13-13
nspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL �r
GUIDE TO PERMEA61LE PAVEMENT ON TYBEe ISLAND
The Georgia Coastal Stormwater Supplement (GCSS) provides information on common types of permeable pavements.
The City of Tybee island adopted the GCSS on April 12, 2012, Section 7 of the GCSS is located at
http://www.gaepd.org/Files PDF tech uide w b CoastalStormwater Section 7 Georgia Coastal Stormwater Supple
ment 2009.pdf. The entire manual is at http://www.gaepd.org/Documents/CoastalStormwaterSupple nent.htmi. A
description of permeable pavement in paragraph 7.8.4, Permeable Pavements, reads: "Permeable pavements represent
an alternative to traditional impervious paving surfaces. They typically consist of an underlying drainage layer and an
overlying permeable surface layer. A permeable pavement system allows stormwater runoff to pass through the surface
course (i.e. pavement surface) into an underlying stone reservoir, where it is temporarily stored and allowed to infiltrate
into the surrounding soils or conveyed back into the storm drain system through an underdrain (see Figure 7.28). This
allows permeable pavement systems to provide measurable reductions in post -construction stormwater runoff rates,
volumes and pollutant loads on development sites."
Five types of permeable pavement the GCSS recommends and Tybee Island supports are briefly described below. Figure
7.29 of the GCSS provides photos of each of these except porous asphalt.
1. Pervious Concrete (also known as
porous concrete) is similar to
conventional concrete in structure
and form, but consists of a special
open -graded surface course, typically
4- to 8 -inches thick, that is bound
together with Portland cement.
2. Porous Asphalt is similar to pervious
concrete, and consists of a special
open -graded surface course bound
together by asphalt cement. (There
are no known uses of porous asphalt
within the City of Tybee Island.)
3
Permeable Interlocking Concrete
Pavers (PICP) are solid structural
units (e.g. blocks, bricks) that are
installed in a way that provides
regularly spaced openings through
which stormwater runoff can rapidly
pass through the pavement surface
and into the underlying stone reservoir (Figure 7.28).
Figure 7.24: Various Permeable Pavement Surfacer.
4. Concrete Grid Pavers (CGP) are precast concrete units that allow rainfall and
stormwater runoff to pass through large openings that are filled with gravel, sand or
topsoil and turf. See GCSS Figure 7.28. A concrete header curb or brick/concrete
block ribbon with a maximum width of 12 -inches (flush or 1/8 -inch higher than the
contained permeable pavement) must be installed around the perimeter of the
permeable pavement. Building foundations and garage floors may serve as a portion
of the perimeter. The edge of a paved road may not serve as a perimeter.
5. Plastic Grid Pavers (PGP) are similar to CGP. They consist of flexible, interlocking
plastic units that allow rainfall and stormwater runoff to pass through large
openings that are filled with gravel, sand or topsoil and turf. A header curb is
required.
uub Hgure i.ZO: components of a
Permeable Pavement system
V
a
j//(f� 1f/ •'a."�7 (f � E i/% [ L Z � �- � l Z' /y� , ^�/�2(7/. � r � /j �, �
��4 L
E
6 k
A l l
, X
'