GEFA LOAN APPLICATION FORM PART I
PROJECT DESCRIPTION
*Please complete in its entirety. Items left blank may cause delays in the review and approval process.
City of Tybee Island
Diane Schleicher
City Manager
403 Butler Avenue
Tybee Island, GA ci
31328 zi'code.4
Chatham
(912 786-5737
ahudson • cityoftybee.org (Secondary Email)
98-6000661
010689231
1
1
1
FOR SRF Applicants Only Has the applicant initiated or completed the State Environmental Review Process with
Georgia EPD for this project?
O YES NO O N/A
Metro North Georgia Water Planning District Is your community in the MNGWPD?
O YES ONO
If yes, are you in compliance with district plan requirements?
O YES 0NO O N/A
Consent Order Will this project eliminate a Notice of Violation (NOV), Administrative Order, Consent Order, Court
Order, etc.? If yes, provide a copy of the violation.
G YES ®NO
WaterFirst or Community of Opportunity Designation If your community has been designated a WaterFirst
Community or Community of Opportunity by the Georgia Department of Community Affairs (DCA). If yes, provide
documentation of the award(s).
63 YES NO
Service Delivery Strategy (SDS) Is the proposed project consistent with or at least not inconsistent with your
HB489 Service Delivery Strategy?
0) YES ONO
(Please attach a copy of the one or two pages from your SDS that document this).
NOTE: if you checked yes, you are certifying that the proposed project is consistent
with your HB 489 SDS.
Plumbing Code Compliance (for cities and counties only) In order to qualify for financing, you must have
adopted the high -efficiency plumbing code requirements outlined in O.C.G.A § 8-2-3. Please provide GEFA a copy
of the relevant section of your local code.
Please provide the basic information for each of the following questions:
1) Project Name and Project Description You must provide a short description of the proposed project in the
box below. Attach a separate sheet if necessary along with a copy of the preliminary engineering report.
Project Name: Water Line Replacement and UV Disinfection
Description: Project consists of a second phase of water line replacement, replacing old asbestos -
cement and lead -jointed pipes with new C-900 PVC pipe. Also, the City intends to replace its aging UV
disinfection system at the WWTF.
Please place a check mark in the space(s) next to the project type(s) that best describes the project:
WATER SUPPLY (water)
WATER QUALITY (sewer)
❑ Plant Construction
❑ Emergency Project
❑ Plant Construction
r Pump Station
❑ Plant Rehabilitation
D Water Tank
[JI Plant Rehabilitation
❑ Emergency Project
❑y Line Construction
❑ Well
❑ Line Construction
❑ CSO Tunnel
❑ Reservoir
❑ Line Rehabilitation
❑ Non -Point Source
• Line Rehabilitation
■ Other 1
❑ Other.
2) Easements
Does this project require an easement? 0 YES ® NO
If yes, please indicate how many easements?
How many has been acquired?
3) Project Cost Provide an estimated cost outline for the entire project by line item.
Construction Cost:
$ 1,670,000.00
Engineering Cost:
$ 160,000.00
Contingency Cost:
$ 167,000.00
$
$
$
Total:
$ 1,997,000.00
4) Early Project Costs Engineering and design costs incurred prior to the execution of a loan agreement are
eligible for reimbursement with a GEFA loan as long as these costs are necessary for the completion of the
project and consistent with the final budget. Does your community anticipate seeking reimbursement of
engineering or design costs incurred prior to the execution of the loan agreement?
e YES ONO
If yes, approximately how much in early costs does your community anticipate submitting for reimbursement
under the proposed loan?
$100,000.00
5) Funding sources Please list all funding sources that are proposed to be utilized to complete this project. List
each source and funding amount. (If a commitment has been secured from any of these funding sources, Iist the
commitment date and attach a copy of the commitment letter.)
Amount being requested from the Georgia Environmental Finance Authority:
$ 1,997,000.00
Other funding source(s):
Date available:
Amount:
$
$
$
Total Project Funding: $ 1,997,000.00
6) Schedule What is the proposed project schedule? If actual dates are available, please include them in the
appropriate column.
ACTION
ACTUAL DATE(S)
PROPOSED DATE(S)
Complete project planning
Click here to enter a date.
Click here to enter a date.
Initiated design
Click here to enter a date.
Click here to enter a date.
Plans & specs submitted to EPD
Click here to enter a date.
Click here to enter a date.
Bid opening
Click here to enter a date.
Click here to enter a date.
Notice of award
Click here to enter a date.
Click here to enter a date.
Notice to proceed with
construction
Click here to enter a date.
Click here to enter a date.
Initiation of construction
Click here to enter a date.
Click here to enter a date.
Completion of construction
Click here to enter a date.
Click here to enter a date.
7) Emergency Loan Will this project assist the community in meeting an emergency public health or safety need?
If yes, please explain the nature of the emergency and facilities that have failed and what repairs or additions are
needed to protect public health or the local environment.
No
8 Pro'ect En, ineer Provide the followin• information:
Thomas and Hutton
50 Park of Commerce Way
City: Savannah
State: GA
Zip Code+4 31419
Chris Stovall
(912) 721-4155
(912) 721-4255
Secondary Email
How did you hear about GEFA? (check all that apply)
® Applicant is a returning customer ❑ GEFA website—www.gefa.orq
Conference: ❑ ACCG ❑ GRWA ❑ GMA ❑ GAWP ❑ GEDA
❑ EPD representative
❑ Consulting engineer
❑ Other:
I certify that I am authorized to sign this application on behalf of our goveming body.
Authorized Official
Jason Beulterman
I certify that I am authorized to sign this application on behalf
of our goveming body.
Yes (Enter YES)
Title NA
Mayor
Date t of i71, L
C c7 : �t---_
❑ Note: Submit this application for a GEFA loan. Mail to:
Georgia Environmental Finance Authority
Attn: Water Resources Division
233 Peachtree St, NE
Harris Tower, Suite 900
Atlanta, GA 30303-1506
Rev. 2-8-2016