Loading...
HomeMy Public PortalAboutBAY ST_1075.pdfPermit No. Owner's Name Gen. Contractor City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472-5032 • Fax 912.786.9539 Contact Information Project Address Scope of Work Inspector Inspection Date Requested Date Needed _ Subcontractor Date of Inspection Pass �,. Fail ❑ Fee Inspection Pass Fail❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee IITERh,4TIOi�Ai CODE COUNCIL MEMBER CITY OF TYBEE ISLAND BUILDING PERMIT ADDED SCOPE & VALUE DATE ISSUED: 0- 4L3 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION PERMIT #: 130508 DOCK/CROSSOVER - RESIDENTIAL 1075 BAY ST CAMILLE SILVA PO BOX 1501 TYBEE ISLAND GA 31328 912-257-5679 HARRISON CONSTRUCTION & DESIGN PO BOX 2386 TYBEE ISLAND GA 3132ARC 311.5.x3, 19C -101Z I HANDRAILS REQUIRED. 34" to 38" in height with continuous, uninterrupted grip. IRC 319,180 1013 P GUARDS REQUIRED. $ 117.00 Porches, balconies, decks, ramps, otc. 4-0021-16-001B more than 34" above floor or wvde: RESIDENTIAL -- minimum h"ht 38" $4,300.00 COMMERCIAL _ minimum he41% 4Z' Largest opening permitted is 411 . ADDED $800 FOR ADDITIONAL HANDRAILS TOTAL BALANCE DUE: $ 4.00 Il is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. Ir this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Dianne Otto From: Barreiro, Deb [Deb. Barreiro@dnr.state.ga.us] Sent: Thursday, October 10, 2013 3:54 PM To: Craig Harrison Cc: Dianne Otto Subject: RE: Beaman crossover Thanks for providing me with a drawing of the proposed modification to enhance the safety of the permitted crossover authorized by SPC Permit # 413. Your request to add handrails and steps to reduce the slope of the ramp are consistent with the permitted footprint for the dune crossover. I have added the drawing to the file. db From: Craig Harrison [mailto:designzz2011@att.net] Sent: Wednesday, October 09, 2013 5:52 PM To: Barreiro, Deb Subject: Beaman crossover Thanks • Craig Harrison • Harrison Construction & Design • P.O. Box 2386 Tybee Island, Ga. 31328 Mobil, (912) 412-0793 • E-mail, desig=20119att.net. Imo- I'1 -i3 ? y- o c e-� Ls) / L. ") -0 � - �— , -:t :) 1. 0, C-,- fv-56-- E) 44� "An Appr®ved Set of Plans Must Remain on job Site at All Times„ EXISTING GRADE OF DUNE --� 17'-7" 14" 11-411 6 3/8" F— CO CO 5'-5" f6 �_o» Cq CO RAMP SLOPE = 1 P" RISE PER 1 ' OF RUN 0 EXISTING BOARDWALK 11C 11.5.6, "BC 1012.1 'ANORAILS RE=QUIRED. REVIEW FOR CODE COMPLIANCE � 34" to 38" in height with continuous, Every off has been made to Identity uninterrupted grip. ff code violations, no oversight by the IRC 312, !BC 1013 reviewer shall be construed as authority GUARDS REQUIRED. to violate, cancel, alter or set aside any applicable caries or ordinances. The ?orches, balconies, decks, ramps, etc. review and permit should not be construed AS BUILT DUNE CROSSOVER pore than 3 RESIDENTIAL above floor or grade: IAL —minimum height 36" as a warranty or guarantee. CONSTRUCTION COMPLETED 10103113 COMMERCIAL — minimum height 42 Reviewed lay z�.1 Date c Largest opening permitted is 4". ALL CONSTRUCTION MUST COMKY WITH THE SSTD +o _a4 ANO THE IRC ONE AND TWO FAMILY DWELLING CODE Zdo& EDITION ANIS STATE OF GEORGIA AMENDMENTS EXISTING GRADE OF DUNE —— RAMP SLOPE = 1 J " RISE PER I- OF RUN 17'-7" - + 5'-5" �I` PROPOSED RAMP MODIFICATION, INCLUDE A STEP AT EACH END TO REDUCE SLOPE $0 WALK RECE! ED 9 iS 10/05/13 IM -7 U) .X UJ O 0 CU U ..O O no 00 N _M co M co co C � N Ur O x N M C N � O T- 0) 0) a REM 10109113 SCALE 3,1 _ 1, 16 EXISTING GRADE OF DUNE EXISTING GRADE OF DUNE RAMP SLOPE = 1 ;" RISE PER 1 ' OF RUN 17'-7" + 5'-5" AS BUILT DUNE CROSSOVER �` f CONSTRUCTION COMPLETED 10/Q,3/13 WALK PROPOSED RAMP MODIFICATION; INCLUDE 7k" STEP AT EACH END TO REDUCE SLOPE AND HANDRAILS M WALK 10/05/13 r■1 PE no co N M_ co co c) co fB I- N 0 O X - N O -0 — m C o N� L� r SCALE all = 11 16 d E City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. P.O. Box 2749 ME= Tybee Island, GA 31328 --�•. Phone 912.472-5032 • Fax 912.786.9539 CODE COUNCIL 4-0t.nni...r'n MEMBER Permit No. Date Requested Owner's Name Date Needed Gen. Contractor Subcontractor Contact Information Project Address Scope of Work Inspector Date of Inspection Inspection �* Pass Fail 1:1 [:] Fe Inspection Inspection Inspection tc ��, � 5.�-r G:cx���tc•R�� S, �� I�. /�. I�.A+►�� 6 U1 Pass ❑ Fail ❑ Fee Pass ❑ Fail ❑ Fee Pass ❑ Fail ❑ Fee CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED. 09/24/2013 TO CORRECT OWNER'S NAME WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION DOCK/CROSSOVER - RESIDENTIAL 1075 BAY ST CAMILLE SILVA PO BOX 1501 TYBEE ISLAND GA 31328 912-257-5679 HARRISON CONSTRUCTION & DESIGN PO BOX 2386 TYBEE ISLAND GA 31328 P $ 113.00 4-0021-16-001B $3,500.00 TOTAL BALANCE DUE: PERMIT #: 130508 $ 0.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: )IL -A fv%j� 0it13 P. 0. Box 2749 - 403 Butler Avenue, Tybee island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org DATE ISSUED: 08-14-2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT DOCK/CROSSOVER - RESIDENTIAL 1075 BAY ST CAMILLE SILVA PO BOX 1501 TYBEE ISLAND GA 31328 912-257-5679 HARRISON CONSTRUCTION & DESIGN PO BOX 2386 TYBEE ISLAND GA 31328 P $ 113.00 4-0021-16-001 B $3,500.00 PERMIT #: 130508 9124113 CORRECTED OWNER'S NAME TOTAL BALANCE DUE: $ 0.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityottybee.org CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 08-14-2013 PERMIT #: 130508 WORK DESCRIPTION DOCKICROSSOVER - RESIDENTIAL WORK LOCATION 1075 BAY ST OWNER NAME CHARLES SILVA JR ADDRESS PO BOX 1501 CITY, ST, ZIP TYBEE ISLAND GA 31328-1501 PHONE NUMBER CONTRACTOR NAME HARRISON CONSTRUCTION & DESIGN ADDRESS PO BOX 2386 CITY STATE ZIP TYBEE ISLAND GA 31328 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 113.00 PROPERTY IDENTIFICATION # PIN #4-0021-16-OO1B PROJECT VALUATION $3,500.00 TOTAL BALANCE DUE: $ 113.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Buticr Avenue, Tybee Island, Georgia 31328 (912) 7864573 - FAX (912) 786-9539 www.cityoftybee.org 13 -o5aJ, 10 Property Address: I City of Tybee Island, Georgia 912-472-5033 or 912-472-5031 - Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT (Check all that apply) Single Family ❑ Discovery/Tearout ❑ Duplex ❑ Footprint Changes — ❑ Multi -Family units new _ square feet ❑ Commercial units heated/cooled Details of Project: [ _ J V V -\.(C c NS2 -79c3 ❑ Demolition of Structure ❑ Other _ Estimated Cost of Construction: $__ '5s[o (materials + labor + profitloverhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: tl 7 S' Listed on National Historic Register or located within a National Historic District? Y I N *Buildings older than 50 years maybe eligible to be listed on the State /National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. *Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -size restroom facilities will be provided through / 7� ��� �e j -T Construction debris will be disposed by �—'cf;i 4-, f -1l _ �_� by means of -riz_L'C I understand that I must comply with zoning. Flood damage control buildinq, fire shore protection and wetland ordinances FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept, rpsponsibility for any corrective action that may be necessary to restore drainage impaired by th 9�mitted ods=uct ��� 7 re Date: 7 12-6113 Signature of Appl Printed Name < Nate: A Permit normally takes 7 to 10 days to process Approvals: r Signat r D t Planning & Zoning Manager T., 3 Building Official Water/Sewer Storm/Drainage City Manager FEES Permit Inspections Cap Cost Rec Water Tap Sewer Stub Eng. Fees Aid to Const. �~ TOTAL *10D f '9'5?,.4j- a l,dA ons 41, 0 '�'o Name Mailin Ad ess T Telephone I I lit 1,24-c u P-�vti 56 f Home: Owner 7.. i --V- -I-- JA4,f , &- Cell: Architect or i , ' ' ',5 N 5cs�7 �:v d d 2�c��1�. '11'_)A_ Engineer ° > : ,J i Gd B'Do7, aas 3 C aw" %e -i) ftvc,— Office: < 3 Contractor ('0yj . �.'° r,; y t L �} Cell: C (Check all that apply) Single Family ❑ Discovery/Tearout ❑ Duplex ❑ Footprint Changes — ❑ Multi -Family units new _ square feet ❑ Commercial units heated/cooled Details of Project: [ _ J V V -\.(C c NS2 -79c3 ❑ Demolition of Structure ❑ Other _ Estimated Cost of Construction: $__ '5s[o (materials + labor + profitloverhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: tl 7 S' Listed on National Historic Register or located within a National Historic District? Y I N *Buildings older than 50 years maybe eligible to be listed on the State /National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. *Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -size restroom facilities will be provided through / 7� ��� �e j -T Construction debris will be disposed by �—'cf;i 4-, f -1l _ �_� by means of -riz_L'C I understand that I must comply with zoning. Flood damage control buildinq, fire shore protection and wetland ordinances FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept, rpsponsibility for any corrective action that may be necessary to restore drainage impaired by th 9�mitted ods=uct ��� 7 re Date: 7 12-6113 Signature of Appl Printed Name < Nate: A Permit normally takes 7 to 10 days to process Approvals: r Signat r D t Planning & Zoning Manager T., 3 Building Official Water/Sewer Storm/Drainage City Manager FEES Permit Inspections Cap Cost Rec Water Tap Sewer Stub Eng. Fees Aid to Const. �~ TOTAL *10D f '9'5?,.4j- a l,dA ons 41, 0 '�'o LEAD-BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child -occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate R40t. Important Lead Hazard information for Families Child Care Providers and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead-based painted or coated surfaces or components more than 6 ft2 per interior room or 24 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. Asbestos/Environmental Notification to Georgia EPD for Pro'ects Involving Demolition Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Shc — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; hftp:l/www.gaswcc.org/docs/field—manual-4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood postypost spacing, e C or A. (Signature for receipt o,f1l%JL1e /d Paint, els,+tos, and BMP notices. Date �._`i�-iii i / l � ' ' I�iL ``i i.- •^i'i r `j r Printed Name tr 0GEORGA. DEPARTMENT OF NATURAL RESOURCES COASTAL RESOURCES Dlv1S{ON MARK WILLIAMS COMMISSIONER 11A 12 .S .2012 Judith Silva Beaman 3522 Ashford Dunwoody Road NE Atlanta, GA 30319-2002 A.G.'SPUD' WOODWARD DIRECTOR RE: Shore Protection Act Permit #413, Construction and Maintenance to an Access Stairway and Connecting Walkway, Lots 4A-1 & 4A-2 of the Serjan Subdivision, Bay Ward Tybee Island, Chatham County Dear Ms. Beaman: The Shore Protection. Committee considered and approved permit #413 referenced above under the Shore Protection Act O.C.G.A. §12-5-230 et. seq. The permit placards and permit conditions are attached to this letter. All decision documents, as well as all other plans, documents and materials submitted during the application process become terms of this permit and are now enforceable conditions. This letter and attachments are to be held by you for your files and for inspection by any authorized persons. The expiration date for the permit is five (5) years from the date of issuance. However, no construction may commence within the area of jurisdiction of the Act until the expiration of thirty (30) days following the date of issuance, provided there is no legal appeal of this permit, you have all other necessary federal, state and local authorizations and you have met all of the standard and special conditions as required by this permit. Project Description: The permit allows for the construction and maintenance of an access stairway and connecting walkway to the existing permitted, shared, dune crossover located within a 5' easement on the shared property line for Lots 4A-1 and 4A-2. The structure will consist of a 4' X 16' set of stairs with a 4' X 18' walkway. Standard and special conditions apply to this permit. Permit Placard: Enclosed is the permit placard to be posted at the work site (within 24 hours) for the duration of the construction activity. Post Construction Re uirements: Conn fiance Certification and File Maintenance Also enclosed is a Certification of Compliance that must be submitted to us within 30 days following completion of the permitted activity. Pleasc include this compliance form with the post -construction survey, if required under the special conditions. Department staff will assess compliance and provide you with a written verification of project completion and compliance. ON1. l.[}.\SLRVS\#101\ x\`:%y I MWNSWICK. GFORGIA 41520 8686 91.1. Li,°IS � fA\ 91.1. Ui.UI.43 I WW\1'.O MNI A I GAD(\IUMUi Camille Molero Silva SPA Pemnt #413 Page 2 of 2 JUIN 2 6 101 Conveyance of Ownership Interest: If you as the permit holder sell, lease, rent, or otherwise convey the land or any portion of the land for which the permit was issued, you must notify the Department within 30 days of this transfer or conveyance. The permit shall continue in force in favor of the new owner, lessee, tenant, or other assignee so long as there is no change in the use of the land as set forth in the original application. The Department will transfer the permit to the new owner with all of the original terms and conditions. We ask that you carefully read through this document and attachments and comply with the terms and conditions of this permit. Feel free to contact me if you need clarification of any of these conditions or for assistance with this project. Sincerely, Brad Gane Chief Ecological Services Section Enclosures: SPC Permit #413, Permit Conditions, Compliance Certificate cc: City of Tybee Island Planning and Zoning file 6222012.125821PM SPA413 MARK WILLIAMS COMMISSIONER 7-1k GEORGIA DEPARTMENTOF NATURAL. RESOURCES COASTAL RESOURCES DIVISION SPC Permit #413 Final Findings and Permit Conditions June 22, 2012 A.G. -SPUD" WOODWAIRM DI RECTOR Camille Molero Silva Construction and Maintenance an Access Stairway and Connecting Walkway Lots 4A-1 & 4A-2 of the Ser an Subdivision, Bay Ward Tybee Island, Chatham County Project Description: The permit allows for the construction and maintenance of an access stairway and connecting walkway to the existing permitted, shared, dune crossover located within a 5' easement on the shared property line for Lots 4A-1 and 4A-2. The structure will consist of a 4' X 16' set of stairs with a 4' X 18' walkway. Standard and special conditions apply to this permit. SHORE PROTECTION ACT O.C.G.A. 4 12-5-230 STANDARD PERMIT CONDITIONS 1. The project must comply, as applicable, for areas permitted herein, with all other Federal, State, and local statutes, ordinances, and regulations, and the applicant must obtain all licenses and permits prior to commencement of construction. 2. This permit does not resolve actual or potential disputes regarding ownership of or rights in or over the property upon which the subject project is proposed, and shall not be construed as recognizing or denying any such rights or interests. 3. All plans, documents, and materials contained in this permit application, required by the Shore Protection Act O.C.G.A. 12-5-230 et. seq. are apart of this permit and conformance to such plans, documents, and materials are a condition of this permit. No change or deviation from these plans, documents, and materials shall be permitted without prior notification and approval by the Department or Committee. 4. No further encroachment or construction shall take place within State jurisdiction, except as permitted by the Shore Protection Committee. Any modification of the plans or structure in the jurisdictional area must be reviewed and approved by the Department prior to construction. 5. A construction placard will be required to be btained from the Department up to 30 days prior to the start of project construction and m st be posted at the site. This placard will ON1 CONS[ RVAI ION WAY 1 1;MI SWICK. GFOKGIA 31520 868o I"AX`)P.0.31-13 \V1V\\Cl't�r.VG�hlvit.t�R( Camille Molero Silva- SPA 9413 Final Conditions Page 2 of 3 include certain steps in the construction of the permitted project that must be approved by the Department prior to construction. 6. The exact location and configuration of this project must be reviewed onsite and approved by Department staff immediately prior to beginning construction. Minor changes to the location may be allowed or required in areas that have eroded or accreted subsequent to the original jurisdictional determination. 7. No construction materials may be disposed of in the jurisdictional area of the Shore Protection Act. 8. Any incidental impacts associated with the construction of this project must be rectified by restoring areas to their pre -construction topographic and vegetative states. 9. The public shall maintain rights of ingress and egress on the foreshore beach area seaward of the ordinary high water mark. 10. If the permitted improvements are damaged, fall into disrepair, become dilapidated, are not meeting their expected usefulness, or are not maintained at a serviceable level, then it is the responsibility of the owner to remove the improvements. A new permit will be required to retain and repair the structure, improvement or asset if it loses its structural integrity and is no longer serviceable. 11. The Shore Protection Committee is not bound in the future to protect any asset or improvements authorized by the permit. 12. The permit must be posted onsite within twenty-four (24) hours of beginning construction. 13. A copy of the above conditions must be supplied to the person in charge of construction. SHORE PROTECTION ACT SPECIAL CONDITIONS FOR CROSSWALKS 1. The height of the structure(s) shall be at least 36" above the grade of the sand dune and the width shall be no greater than 6'as measured from the outside posts at the time of construction, to allow for sand movement or accretion in the dynamic dune field. 2. The terminal point of the crossover(s) shall be seaward of the seaward most dune but shall not encroach into the active intertidal beach unless authorized by the Shore Protection Committee (SPC). 3. The structure(s) shall begin at the landward toe of the landward most dune. 4. Vegetation may be cleared only for the width of the permitted structure. The maintenance trimming of jurisdictional vegetation will only be allowed within 6" of the sides of the structure and 7' high over the structure. Trimming must be done using hand tools. 5. Heavy equipment is prohibited in the Shore Protection Act Jurisdiction. The project must be constructed using hand tools. 6. Clearing and grading of dunes is not authorized in conjunction with the construction of this project; stockpiling material in the dunes is prohibited. 7. No motorized vehicles will be allowed on the structure(s) except for motorized wheelchairs for handicapped persons and emergency vehicles. 8. If the shoreline erodes it will be the responsibility of the applicant to move the permitted structure back to the dry sand beach. Permittee must obtain the appropriate authorizations from the Department Staff and/or the SPC. 9. Any sand needed to restore the site to pre -project vegetated and topographic conditions, or for backfilling, must be beach quality and obtained from an upland source and not from the Camille Molero Silva- SPA #413 Final Conditions Page 3 of 3 beach. Permittee must obtain the appropriate authorizations from the Department Staff and/or the SPC. SPECIAL CONDITIONS 1. The permitted stairs and walkway are for the exclusive use of Ms- Silva and her heirs. Unless sooner terminated, this permit shall expire upon the expiration of the easement upon which it relies. Upon expiration of the walking easement, all rights associated with the use of the structure will revert to the owners of Lots 4A-1 and 4A-2. 2. Nothing in this permit shall be construed to adjudicate, establish, extend, expand, or diminish any rights arising under that certain walking easement granted to Ms. Silva by Arnold J. Seyden, Jr. and Randolph Warner on April 8th, 1996. Any conflicts that exist or may arise between Ms. Silva and other persons dealing with property rights related to said easement are property rights questions and should be resolved between private parties in a court of law as contemplated by O.C.G.A 12-5-238(4). 3. Permittee may be required to provide a post -construction survey that locates the structures as indicated in the application materials. Landscaped trees must be designated as such on the survey. Such survey shall comply with the Georgia Plat Act, O.C.G.A. § 15-6-67 et seq. e Georgia Shore Protection Committee PERMIT Issued Pursuant to O.C.G.A. 12-5-230 To: Camille Molero Silva For:. The permit allows for the construction and maintenance of an access stairway and connecting walkway to the existing permitted, shared, dune crossover located within a 5' easement on the shared property line for Lots 4A -i and 4A-2 . The structure NNU consist of a 4' X 16set of stairs iNdth a 4' X iW walkway. Standard and special conditions apply to this permit. f of c eo°°°ep o Date: June 22, 2012 a° ° Expiration Date: June 227 2017 Pennit Number: 413 Authorized By: �-- `. GEORGIA For further information, please contact the DNR Coastal Resources Division at (912) 264-7218 C k)A\ I M KI I', I H"`I -(� V Q� "DEPAEQRGIA COASTAL RESOURCES DIVISION MARK WILLIAMS A.G.'SPUD' WOODWARD COMMISSIONER DIRECTOR CERTIFICATION OF COMPLIANCE FOR THE CONSTRUCTION AND MAINTENANCE OF PROJECTS PERMITTED UNDER THE SHORE PROTECTION ACT PERMITTEE: Name: Camille Molero Silva Address: 1075 Bay Street City or Town: Tybee Island Island or Waterway: Atlantic Ocean County: Chatham Permit Number: SPA #413 Within 30 days of completion of the activity authorized by this permit, sign this certification and return it to the Habitat Management Program of the Ecological Section at the address listed below. Please note that your permitted activity is subject to compliance inspections by DNR representatives before and after completion of the project. If you fail to comply with the permit terms and conditions it may be subject to suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and conditions of the said permit. Signature of Permittee: Date: ON1. CONSI RVAI ION WAY I BRUNSWICF:. GEORGIA 31520 8686 )I.'..2a-t.7?IS f:\\ `11 �?[;)._II•t; WW\\tOIN, rntG.\[)NR.ORG ''An Approxxi gat zif p'rars Must RMain On u'.Ob Site at A11'iimes" !A SGT/D�l� Sc,4 4Z" yrr- /LO" /'T . /C . A-5 46901f 4 REVIf='.>4�:r'�.: �4•!:"P=i'.:iC_ Every rlfi.:rt har 1!- sn .. ',:a .:T i:K♦:j� cote vio:a€ion_, a:-;rf_lcht tru ins rel'I'ewn S',]il be i.y to violate, or set aside �/ n any sppifcwbie c:o� or Qrdlnanoes.The T%o '✓ i� 40114.01je•w tris, perm;: sho::.d no' i_--.. construed 'a 4ii2Y,. 1."ky %) rafti8f.. a-•,iewev _ Z �8 Ja�ST" CONS" JVION MUST COMPLY WITH THE _ . 1(2.94 -IND THE IRC ONE AND TWO i<W4 L-.iNIG CODE ;&Yk _ DITION �x IND uFATE GEORGIA AMENDMENTS X595 A.AY1) 1A/d,0n 171IAJA:� Ail II ., _ :aw L5_.l 7-_Tk ary AeL-.,_.J ._ _i.. .1�_. _!. _t 360. R•811.6.1 i!ANDFAILS A R-312 GIJARAlL6 binirs oro thiDa n 3D" mri alght requirji 34"13 hatndreils. Pt: ,-bzlcsnles. romp 6 decks :rore then 30" aboys prl•.e req ui,e 36" quardr611s. LdrI6111 Open;,ly pe(mitted la 4" ATLANTIC 0C y. %Tc vGA. LOT J p VARK 4 A 10' WALKING EASEMENT TO PROVIDE 'rACCESS � TO THE bEACH CENTERED ON S:i PROPERTY LINE AS OESCRTEED IN DECD 500K 172 Y PAOL` 854. N 66'3600■w� .. 100.E n wooccre Rn. Ary ce • • i ,K o I I } ( a� l I I l • 10 oa,� ' I . rF 10. D� 20.004 _I IT —L0T TTI I a N I O �� O. 3 I eV I 1 �N• � I! � •� If g L V�000ew Oec1c � „1 O I '1.rl �= ' uI. _�1 Q # _ 1 I m_ e �a' - P I Iy.�t10Y7' >Uo; ci LOT �.0 �' I uu�i O 7 0 3-A I i F ( SHIPWATCH n 3 1 J( O i LOT a o u IS DUNES (i 1 js1o11A.e� AFC a r oa tU a sl PHASE IIII R L _ J p w- ou"m WWATGH I f Q .f ow �7glY 110000117111! U N I It. 0 OM EIaL7< 0¢R► +ur • bi N I I p I z ROCK A-V I b +1'2 d A6ryAtT� I � � � i ORlvGWAY I � LOT Z 14 I I 3 "C1 .. �_ pROKGN SHIPWATCH .. ulr D t o . I 100.00' S 66.36'00■ f I i W .0 LTeL LOT C4 L[Ne A CEIV( p^+� z" BAY S T R E E TaY'� 2°'9 7s' R ONFR? p REFERENCES: PRO 4P PAGE 177 SMO 13-S PAGE D03 IPF DENOTES IRON PIPE FOUND DO 172--Y PAGE 854 PIKS DENOTES 'PK' NAIL SET _ SURVEY FOR: PATRICK CMF DENOTES CONCRETE MMUMEUT FOUND In accordance with F.I.R. N. Error QT Closure; 1/INPINI7T SEAMAN nap no. 135164 0001 C. Index revised {PLAT) June 17. 1906, this property Angular Error. 19 Per Porn does Fall ■Ith1n a designated T od Aroo: 0.2870 Acre 112,500 of.) flood hazard area. SZone AS ELEV 13) E",Pm.■n U80d: Total Statlon ASF,SUILT SURVEY OF LOT 3 B OF A SUBDIVISION OF LOTS 3 AND 4, BEACH BLOCK 6, BAY WARD AND ACCOMPANYING 10' WALKING EASEMENT KNOWN AS 1076 BAY STREET TYBEE ISLAND, CHATHAM COUNTY,: GaORGIA 4 0 R G ! JAMES N. KEATON 4�otis'cq�4 Ga. Reg. No. 2743 20 10 O 20 40 k7. 27R3 SCALE 1- - 20 rT �+ f•1 ` 4aP C.'1A.eg11'1 SawcrGl Im .muni', INC. suRys ,�� P.O. BM 61649 SAVANNAH GEORGIA 31420 NDyryEEi? 11. 2001 912-303-0382 r� Y � VMFO FF for [4f 0lE '°OAK T _ Tov os- (aaac >'KFA $'WIR P� . WAUWVAy� e", ` 4" To 21" AM'Jc r_�rto M Piio. mr, encs as -v- 12A — VW. TDP UVGK FLEV 16,0 KWnlW(t NOTES: 1. ALL LUMBER SHALL BE PRESSURE TREATED. 2. ALL FASTENERS SHALL BE HOT DIPPED GALVANIZED. 3. CONNECTION TO EXISTING BOARDWALK SHALL BE FLUSH. 4. CONTRACTOR SHALL USE APPROPRIATE EQUIPMENT AND CONSTRUCTION TECHNIQUES SO AS TO MINIMIZE DISTURBANCE TO LANDWARD DUNE. 5, DECK SURFACE SHALL BE NO MORE THAN 30" ABOVE EXISTING GRADE OF THE DUNE. 6. SLOPE OF STAIRS SHALL BE FIELD ADJUSTED TO MINIMIZE THE DISTANCE REQUIRED TO TRAVERSE THE DUNE. 34" STANDARD WOODEN POST AND PICKET HANDRAIL: 4X4 POSTS, LINE POSTS VC.C. 2X6 CAP RAIL, CONT. 2X4 BOTTOM RAIL 2X2 PICKETS, 4" MAX. OPENING 10 7.5 "An Approved Set of Plans Must Remain on Job SIte at All Times" REVIEW FOR CODE COMPLI NCE Every effort has been made t dentify code violations, no oversigi by the reviewer shall be construed as 11 thority to violate, cancel, alter or se aside any applicable codes or ordlnan es review and permit should not be c nstrued as a warranty or gusrantes. TYP. RaYlowed 9y V -H pattyul—f S 4'-0" DECK BOARD, TYP. 2X8 JOIST, 24"O.C., TYP. 2X10 BEAM,2 12X8 EACH POST, TYP. 4X4 POST, 5' MIN. EMBEDMENT, TYP. ;0311.,Effl6 G G1&2.1 IANDRAILS REQUIRED. ED BOARDWALK: SECTIO14" to 3$" in heiUh with contint SCALE: 1/2"=1'-0" Jni nterru pted grip. IRC 312, 18C 1013 1 6' $''TY9. GUARDS REQUIRED. -'orches, balconi9$ � B s, rami - ,ore than 30" above floor or gri ESIDENTIAL —minimum hei he id — i I �. 2x6 DECK BOARD, 112" GAP, TYP. (LANDWARD DUNE) 2X8 JOIST, 24"O.C., TYP. F prepared for: Mr. & Mrs. Beaman 1075 Bay Street Tybee Island, GA 31328 EXISTING GRADE 4X4 POST, 5' MIN. EMBEDMENT, TYP. -- 2X12 STRINGER, TYP. TI 2X6 DECK BOARDS, 1/2" GAP, TYP 2x10 BEAM, TYP. (2 EACH POST) 04 POST, 5' MIN. EMBEDMENT. TYP. EXISTING BOARDWALK PROPOSED BOARDWALK: ELEVATION SCALE: 1/4" = 1'-D" Tybee Island: Dune Crossover O,R L * 140. LA00141-08 * seaFr A7c,�`` `GAEL prepared by: Root Design Studio 5099 Woodridge Way Tucker, Georgia 30084 atc. 36" 42 "An Approved Set 2f PIMS Mutt ReAtadn nrt �.eb Site at A11't"imss" SGT/D At le ��r= /? Orr SCA 01 AS A69014? RF -VIEW Hf,4t;r` :QPM. ;very atti. :rt ha -+.ti code vloiat;ar,� to violate, e��..�i, �' .; or set aside 0�Cx 40142.0&i�yan,rl Lierm r ;7c� r r 3na Consiucd "0P;5�r'.:1;-TION MUST COMPLY WITH THE " 1G-R--AF1D THE IAC ONE AND TWO Uft!...iNu �ADE ZGi-v __IrDITION IND T.ATG GEORGIA AMENDMENTS I� 7a 414wi) MAP Puov.�5 .;dl � icis�.,M'7s ..r_ rlw� �..i.r+ :,,, rr,..�► J..1. rs1.-rr, .�, �f.. , i_. _ ..! _ .f -- f 1 ' SuL R-311.5.1 PANa.IAILS i 9.313 G1JAft0aA1L S111ta ore than 30i' ln'j oight require 34"1:1 hendrallo. / / . .� be balasnlos, romp E docks rose than 30" ?bora prx ,e raqu,'oe 366 quardrelle. L.ArAoat opening permlttid fa 4" Root Design Studio, LLC 5099 Woodridge Way Tucker, Georgia 30084 (404) 895-2253 www.RootDStudio.com March 23, 2012 Deb Barriero, Project Manager Georgia Department of Natural Resources EPD Coastal District Office Savannah, Georgia 31405 RE: 1075 Bay Street, Tybee Island, GA — Dune Cross Over Dear Mrs. Barriero, In reference to the project located at 1075 Bay Street, and the attached drawing, please let this letter stand on record that to the best of my ability and knowledge, the project has been designed to meet the applicable construction standards required for this district of the state and the County of Chatham. Please contact me if you have any additional questions. Sincerely, Michael Kidd, FILA Root Design Studio, LLC �0 R No. LAOG I •rL r d3`,'4 PE P,?� TYBEE ISLAND POLICE DEPARTMENT GA0250600 P.O. BOX 1340 Tybee Island, GA 31328 Incident Report Printed Date: 09114/2013 Printed Time: 3:07 PM Page 1 of 4 Incident No. 9f11'4no-.ianw Incident Type Counts Code Attempt Neighborhood Complaint 1 1-N ❑ Primary Location: Secondary Location: Business 1013 Bay Street 1075 Bay Street City State Zip County Tybee Island GA 31328 Chatham Zone North Incident Date Time Date Time Report Date Time Stranger Weapon Type mise 09/14/2013 09:31 To 09/14/2013 12:53 09/1412013 12:53 No F66 -RESIDENCE Case Type Case Status City Marshal Handled by Officer Complainant Seq. No. Name: (Last, First, Middle) Home Phone Work Phone Other Phone Seyden Arnold J Jr. 1912-786-4750 7: Address 1013 Ba Street Tybee Island GA 31328 Permanent 1 Other Address I Race Sex Date of Birth Age Employer School White IM 10/15/1940 72 Height Weight 1240 Hair Eyes DLN DL State ID Number SSN 6'00" Brown Brown 1056061432 IGA 2eq. No. Name: (Last, First, Middle) Home Phone Work Phone Other Phone Seyden Sue 1912-786-4750 Address 1013 Bay Street Tybee Island GA 31328 Permanent 1 Other Address Race Sex Date of Birth Age Employer School White F 05/26/1947 66 Height Weight Hair Eyes DL,N DL State ID Number SSN Offender/Suspect/Subject Seq. No. Name: (Last, First, Middle) Home Phone Work Phone Other Phone 1 Beaman Patrick (404)852-7903 Address 1075 Bay Street Tybee Island, GA 31328 Permanent/ Other Address Reporting Officer Badge Suffix Signature Sgt. Warren (Hodad) Millikan 1084 01 Approving Supervisor Officer Badge Suffix Signature Sgt. Warren (Hodad) Millikan 1084 01 Approving Officer Badge Suffix Signature TYBEE ISLAND POLICE DEPARTMENT Printed Date: 09/14/2013 GA0250600 Printed Time: 3:07 PM P.O. BOX 1340 Tybee Island, GA 31328 Page 3 of 4 Incident Report F cident No.013093604 Mr Beaman and Mr Harrison stated that construction of the cross over would be entirely within the five foot easement. At Mr Seyden's request, I spoke with his attorney (Mr Smart). Mr Smart repeatedly stated that the Court ordered injunction to stop the construction process was in place. Mr Smart repeatedly stated that Mr Beaman and Mr Harrison were trespassing. I attempted to advise Mr Smart that Mr Beaman was in possession of a valid building permit. I attempted to advised Mr Smart that the copy of the Court order presented to me by Mr Seyden was unsigned. Mr Smart continued to shout into the phone and refused to allow me to speak. I returned the phone to Mr Seyden. I advised Mr Seyden that I was not able to rule Mr Beaman and Mr Harrison were trespassing based solely on Mr Smarts assertions. I advised Mr Seyden that I would attempt to gain additional information regarding the matter from Dianne Otto (Zoning). Mr Seyden and Mr Smart asserted that the permit was not valid since it was issued in the name of a deceased person. I telephoned Ms Otto. I advised her of the situation. Ms Otto stated that the City was aware of the pending Civil litigation between Mr Seyden and Mr Beaman. Ms Otto stated that she was unaware of a Court ordered injunction halting the construction. Ms Otto stated that Mr Beaman was in possession of a valid permit. Ms Otto stated that the permit was valid even through it was issued in the name of a deceased person. Ms Otto stated that the permit was issued utilizing information available through the City's Incode system. I relayed Ms Otto's assertion to Mr Seyden. Mr and his wife (Sue) stated a desire to contact the City Attorney (Bubba Hughes). Due to the fact that the Seydens are represented by council (Mr Smart), I did not contact Mr Hughes on their behalf. I advised Mr and Mrs Seyden that they could contact Mr Hughes themselves if they desired. advised Mr Seyden and Mr Beaman, that at the time, I had no knowledge that would cause me to halt the construction of the crossover. I advised Mr Seyden and Mr Beaman of my conversation with Ms Otto. I requested both parties be respectful of each other. I provided both parties with my contact information and requested they call me if they experienced any further difficulties. Sgt Powers and I cleared the scene at 1031. At 1113, 1 was once again dispatched to 1013 Bay Street for a dispute. I returned to the property. I spoke with Mr Beaman and Mr Harrison. Mr Harrison stated that Mr Seyden had pulled up a number of the orange flags delineating the easement. Mr Harrison and Mr Beaman stated that a verbal confrontation had occurred between the parties (Mr Harrison & Mr Beaman 1 Mr Seyden & his friend "Ron"). Mr Seyden stated that he had spoken with the City Manager and the construction of the cross over was to be halted. Reporting Officer Badge Suffix Signature Sgt. Warren (Hodad) Millikan 1084 01 Approving Supervisor Officer Badge Suffix Signature Sgt. Warren (Hodad) Millikan 1084 01 Approving Officer Badge Suffix Signature TYBEE ISLAND POLICE DEPARTMEV GA0250600 P.O. BOX 1340 Tybee Island, GA 31328 Incident Report Printed Date: 09/14/2013 Printed Time: 3:07 PM Page 4 of 4 Incident No. 2013093604 I contacted the City Manager. The City Manager stated that she had spoken to Mr Hughes. The City Manager stated that based on her discussions with Mr Hughes, the City would "reluctantly" issue a Stop Work order for the project. The City Manager stated that she was en route to the scene to discuss the matter with the parties. The City Manager arrived at Mr Beaman`s residence. The City Manager advised Mr Beaman that due to the ongoing Civil litigation surrounding the construction of the dune cross over, she was issuing a Stop Work order. The City Manager instructed me to prepare a Stop Work order listing "Matter under Civil litigation" in the violation section. I prepared the order and issued it to Mr Beaman. Mr Beaman and Mr Harrison requested that Mr Seyden be asked to refrain from removing any more of the orange flags delineating the easement. I agreed to do so. requested Mr and Mrs Seyden refrain from removing the flags. Mr and Mrs Seyden were noncommittal in their responses. Mr Beaman and Mr Harrison removed their tools from the easement. Reporting Officer Sgt. Warren (Hodad) Millikan Approving Supervisor Officer Sgt. Warren (Hodad) Millikan Approving Officer Badge Suffix Signature 1084 01 Badge Suffix Signature 1084 01 Badge Suffix Signature TYBEE ISLAND POLICE DEPARTMEW GA0250600 P.O. BOX 1340 Tybee Island, GA 31328 Incident Report Printed Date: 09/14/2013 Printed Time: 3.07 PM Page 2 of 4 Incident No. 2013093604 0 , Race Sex Date of Birth Age Employer School White M Height Weight Hair Eyes DLN DL State ID Number SSN a Court Name ❑ Suspect ❑ Juvenile ❑ War. App. ❑ Arrest Arrest Date ❑ Primary Aggressor ❑ Warrant ❑ Juv. Arrest ❑ Subject Seq. No. Name: (Last, First, Middle) Home Phone Work Phone Other Phone 2 Harrison Craig 1786- Address S Campbell Avenue T bee Island, GA 31328 Permanent / Other Address Race Sex Date of Birth Age Employer School White M Height Weight Hair JEyes DLN DL State ( ID Number SSN Court Name ❑ Suspect ❑ Juvenile ❑ War. App. ❑ Arrest Arrest Date ❑ Primary Aggressor ❑ Warrant ❑ Juv. Arrest ❑ Subject GCIC Entry ❑ Requested ❑ Warrant ❑ Missing Person ❑ Vehicle ❑ Article ❑ Boat ❑ Gun ❑ Securities Additional ❑A & B❑Supplemental ❑Citation ❑ Accident ❑ Victim Bill of Rights ❑ Vehicle Impound ❑ Inv. Rpt ❑ Evidence Form Clearance Clearance Date: Narrative On the above date and time I was contacted by Sgt Powers via cell phone reference a dispute at 1013 Bay Street. I went to the location. I spoke with the complainant (Arnie Seyden). Mr Seyden stated that he was in possession of a Court ordered injunction halting construction of a dune cross over on the easement to the north of his property. I examined the document presented by Mr Seyden. The document had not been signed by a Judge. I spoke with the neighbor (Patrick Beaman) attempting to construct the cross over. Mr Beaman presented a permit issued by the City of Tybee for construction of a dune cross over (Permit # 130508). Mr Beaman stated that he was also in possession of a permit from the DNR for the construction of the crossover. Mr Beaman and his contractor (Craig Harrison) showed me the walking easement from 1075 Bay Street (Beaman's property) to the dunes at the rear of 1013 Bay Street (Seyden's property). The easement was delineated by a series of orange flags. Mr Harrison and Mr Beaman stated that the flags were placed in accordance with the survey submitted to the City at the issuance of the building permit. Reporting Officer Badge Suffix Signature Sgt. Warren (Hodad) Millikan 1084 01 Approving Supervisor Officer Badge Suffix Signature Sgt. Warren (Hodad) Millikan 1084 01 Approving Officer Badge Suffix Signature ������ ��.����������Q 'Jct t ��