HomeMy Public PortalAboutFinancial Report - Measure AA Oversight- FY22Measure AA Bond
Annual Accountability Report
—————————————————————————————————————————————————————————
F I S C A L Y E A R E N D I N G J U N E 3 0 , 2 0 2 2
Ana María Ruiz, General Manager
Stefan Jaskulak, Chief Financial Officer
Me
a
s
u
r
e
A
A
B
o
n
d
O
v
e
r
s
i
g
h
t
C
o
m
m
i
t
t
e
e
Table of Contents
Click on the table of contents below to jump to that page. You can also click on the table of contents icon
at the bottom of every page to jump back to this table of contents.
I N T R O D U C T I O N————————————————————————————————————————————————————————
Letter from the General Manager ii————————————————————————————————————————————————————————
Letter from the Chief Financial Officer iv ————————————————————————————————————————————————————————
Mission Statement v————————————————————————————————————————————————————————
Measure AA Portfolio Map vi————————————————————————————————————————————————————————
R E P O R T————————————————————————————————————————————————————————
Executive Summary 1——————————————————————————————————————————————————————
Portfolio Allocation to Expenditure Roll Up 2——————————————————————————————————————————————————————
Portfolio Expenditures to Allocations 2——————————————————————————————————————————————————————
Land Acquisition MAA Expenditures 4————————————————————————————————————————————————————————
Priority Portfolio Actions by Region (from MAA Expenditure Plan) 7 ————————————————————————————————————————————————————————
Portfolio Expenditures (Numerically by Portfolio Number) 14————————————————————————————————————————————————————————
Financial Report by Project 84————————————————————————————————————————————————————————
A T T A C H M E N T S————————————————————————————————————————————————————————
MAA Ballot Language 94————————————————————————————————————————————————————————
Ordinance NO. 2014-02 95————————————————————————————————————————————————————————
Exhibit A: Expenditure Plan 100————————————————————————————————————————————————————————
Exhibit B: Tax Rate Statement 107————————————————————————————————————————————————————————
MAA Bond Program: Schedule of Program Expenditures 108————————————————————————————————————————————————————————
MAA Fund Balance Schedule 109————————————————————————————————————————————————————————
P H O T O C R E D I T S
Top: Rancho San Antonio Open Space Preserve by Mike Asao
Lower left: Rancho San Antonio Open Space Preserve by Jim Liskovec
Lower middle: Fremont Hills Open Space Preserve by Larry Turino
Lower right: Bear Creek Redwoods Open Space Preserve by Alisha Laborico
iMeasure AA Bond Annual Accountability Report FY22
Message from the General Manager
to the Bond Oversight Committee
In 2022, the Midpeninsula Regional Open Space District (Midpen) celebrated 50 years of caring for the land that
cares for us. Over the past half-century, we have worked together as a community to protect a 65,000-acre greenbelt
in the Santa Cruz Mountains in perpetuity. Voter approval of Measure AA in 2014 provides $300 million in general
obligation bond funding to accelerate 25 priority actions that protect natural open space lands, improve public
access through new trails and staging areas, and restore and enhance forests, streams, watersheds and coastal
grasslands.
In fiscal year 2022, Midpen celebrated a public access milestone: our 250th mile of trail with the opening of the
Grasshopper Loop Trail at La Honda Creek Open Space Preserve. This 1.3-mile, easy-access loop trail is open to hiking
year-round and welcomes on-leash dogs seasonally from mid-December through July to ensure compatibility with
Midpen’s conservation grazing program during the fall calving season.
Recently, Midpen purchased the 41.76-acre Vielbaum property as an addition to Sierra Azul Open Space Preserve,
permanently preserving forested lands and wildlife habitat within the Upper Los Gatos Creek watershed and
furthering the goals for a continuous open space greenbelt and the protection of wildlife corridors.
At Bear Creek Redwoods Open Space Preserve, we substantially completed construction of the Alma Cultural
Landscape Rehabilitation project, which is scheduled to open to the public in the fall. We also received Board
of Directors approval of the project vision and goals for the Hawthorns Area Plan and began the public
engagement process for future access.
In support of our Coastside mission to encourage viable agricultural use of land resources, we added 98 acres of
grasslands to the conservation grazing program and completed fence and water infrastructure at Mindego Ranch.
At Madrone Ranch, we made significant improvements to an existing pasture springbox and installed new water
lines, tanks and troughs. As a land management tool, Midpen’s conservation grazing program preserves grasslands
and the species that depend on them, while reducing fuel loads and wildfire risk. The stock ponds and water
infrastructure that support livestock also provide critical habitat for special status species like California red-
legged frogs in areas where coastal wetlands have been lost to drought, a changing climate, and human impacts.
These are just a few of the project highlights detailed in this report. Your work as a member of the Bond Oversight
Committee is vital to building the public trust that allows us to fulfill the mission the community bestowed
on Midpen 50 years ago. Thank you for your service and your diligence in ensuring a robust and transparent
accounting of how we invest public bond funds in these Measure AA projects.
Sincerely,
/s/ Ana María Ruiz
Ana María Ruiz
General Manager
ii Measure AA Bond Annual Accountability Report FY22
iiiMeasure AA Bond Annual Accountability Report FY22
Los Trancos Open Space Preserve by Eleanor Raab
Message from the Chief Financial Officer
to the Bond Oversight Committee
Bond Oversight Committee:
Midpen is pleased to present our seventh Measure AA Bond Annual Accountability Report. Approved by voters
in 2014, MAA is a $300 million bond measure to accelerate land acquisition, environmental restoration and
public access within Midpen lands. We present this report to you to fulfill two key tenets of this legislation—
transparency and accountability—by highlighting MAA project progress and providing an overview of bond
expenditures for FY22.
As committee members, your role is defined and authorized by Midpen board policy, adopted on Aug. 12, 2015,
which states: ————————————————————————————————————————————————————————
The committee has the following three responsibilities for each of the years the MAA general obligation tax
is collected, or revenues expended: ——————————————————————————————————————————————————————
Review plan expenditures on an annual basis to verify conformity with the expenditure plan. ——————————————————————————————————————————————————————
Review Midpen’s annual audit and annual accountability report and present the committee’s findings
to the board at a public meeting. ——————————————————————————————————————————————————————
Review any proposed amendments to the expenditure plan. ——————————————————————————————————————————————————————
The committee chair shall report the committee’s findings at a public meeting of the board.
The committee shall not have authority to recommend, advise, or direct any such matters that may fall under
its responsibility to review. The committee is not advisory to the board and has no power to determine how
General Fund monies are spent. The board retains its authority to make such decisions and determinations. ————————————————————————————————————————————————————————
As of the end of this reporting period, Midpen has spent a life-to-date total of $77.4 million in MAA bond funds.
Midpen spent a total of $2.4 million on MAA projects in FY22, with $75 million spent in previous reporting periods.
Through leveraging $10.9 million in grants and partnership funding, along with an additional $4.8 million in
interest income from the bond proceeds, available MAA bond funding has increased to $315.7 million total.
MAA projects are grouped into 25 portfolios. Projects are completed or underway in 21 of the 25 portfolios, with
progress in the current reporting year spanning 13 portfolios. Additional efforts in support of the MAA portfolios
are also noted in Portfolio Expenditures.
Looking ahead, Midpen continues to invest in projects across the 25 MAA portfolios. The adopted Budget and
Action Plan for FY23 includes projects in 10 MAA portfolios.
We thank you for your time and service to our community, including the inspection of this accountability report,
which supports the health of the environment we all share.
Sincerely,
/s/Stefan Jaskulak
Stefan Jaskulak
Chief Financial Officer
iv Measure AA Bond Annual Accountability Report FY22
v
Windy Hill Open Space Preserve by Musa Zaid
M I S S I O N The mission of the Midpeninsula Regional Open Space District
is to acquire and preserve a regional greenbelt of open space land in
perpetuity, protect and restore the natural environment, and provide
opportunities for ecologically sensitive public enjoyment and education.
C O A S T S I D E M I S S I O N To acquire and preserve in perpetuity open
space land and agricultural land of regional significance, protect and
restore the natural environment, preserve rural character, encourage
viable agricultural use of land resources, and provide opportunities for
ecologically sensitive public enjoyment and education.
Measure AA Bond Annual Accountability Report FY22
Midpeninsula Regional Open Space District
Measure AA Portfolio Map
MAA01 Open Miramontes Ridge
MAA02 New Bayfront Trails
MAA03 Purisima-to-the-Sea Trail
MAA04 Walking, Hiking and Biking Trails at El Corte de Madera
Creek
MAA05 Upper La Honda Creek Preserve
MAA06 New Trails at Windy Hill
MAA07 Driscoll Ranch Area at La Honda Creek
MAA08 Upper San Gregorio Creek Watershed
MAA09 New Trails at Russian Ridge
MAA10 Alpine Road at Coal Creek
MAA11 Welcome Center at Rancho San Antonio
MAA12 Complete Middle Stevens Creek Trail
MAA13 Expand Grazing at Cloverdale Coastal Ranch
MAA14 New Trails throughout the Redwoods
MAA15 Redwood Forest Protection
MAA16 New Access Facilities at Long Ridge
MAA17 Upper Stevens Creek Trail
MAA18 Saratoga to Sea Trail
MAA19 El Sereno Trails to Dogs and Complete Trail
MAA20 Safe Wildlife Corridors Across Highway 17
MAA21 Bear Creek Redwoods
MAA22 Cathedral Oaks at Sierra Azul
MAA23 Mount Umunhum at Sierra Azul
MAA24 Rancho de Guadalupe at Sierra Azul
MAA25 Open Loma Prieta Area at Sierra Azul
vi Measure AA Bond Annual Accountability Report FY22
Executive Summary
We are pleased to present Midpen’s 7th Measure AA Bond Annual Accountability Report. This report reflects
Measure AA expenditures from July 1, 2021 to June 30, 2022. The structure of this document is guided by MAA
ballot language, specifically Priority Portfolio Actions by Region, beginning on page 7.
The MAA expenditure plan with 25 priority actions and project portfolios were the culmination of a vision planning
effort that began in 2012. The public portion of this visioning process spanned 18 months to define Midpen’s
strategic direction for the following 40 years. In total, the vision plan yielded 54 priority actions. The top 25 priority
actions were subsequently incorporated into a ballot initiative. In 2014, voters approved MAA, a $300 million
general obligation bond, designed to fund the top 25 priority actions as described in the expenditure plan. This
MAA accountability report is arranged in parallel with that expenditure plan to facilitate review. Projects are
grouped into 25 key project portfolios organized by geographic area within District boundaries.
No changes in portfolio allocations were proposed for this reporting period. In the future, should a shift in
portfolio allocations be needed, the MAA Bond Oversight Committee will be advised.
Bond Oversight Committee Connection with the Budget and Action Plan
In keeping with its role of reviewing retrospective expenditures, this committee is not charged with reviewing the
budget or other prospective information, unless it is provided as part of an explanation of a proposed portfolio
allocation adjustment. There is, of course, a synergy between the budgeted and actual expenditures, and the
following information is provided as context for, and insight into, Midpen’s management of MAA spending.
Each year, Midpen embarks upon a priority-setting and budgeting process with the board, allowing for at least
a six-month planning process. The Budget and Action Plan is approved prior to the start of the fiscal year. The
annual budget includes a Measure AA Projects Budget Overview, providing a prospective view into the next
year’s planned spending.
Bond Issuance, Size and Look-Back Period
In June 2014, voters approved MAA to: protect natural open space lands; open preserves or areas of preserves to
public access; construct public access improvements, such as new trails and staging areas; restore and enhance
open space land, including forests, streams and watersheds; and support local agriculture.
In August 2015, Midpen issued its first tranche of general obligation bonds to cover the first few years of planned
project expenses, as well as the legally permitted look-back period of 60 days prior to the board’s certification
of election results. Midpen issued $40 million of tax-exempt general obligation bonds (Series 2015A) which have
now been fully spent, and $5 million of taxable general obligation bonds (Series 2015B).
In February 2018, Midpen issued its second tranche of $50 million in general obligation bonds to cover project
expenses planned for approximately the next three years.
1Measure AA Bond Annual Accountability Report FY22
Portfolio Allocations and Expenditures
The rollup below shows how much of the total MAA expenditure plan allocation has been used on
a life-to-date basis.
Portfolio
Allocation to
Expenditure
Roll Up
Total Life -To-Date Through 6/30/22
25.81%
Expenditure Plan Remaining
74.19%
The following chart shows the portfolio allocations approved in the expenditure plan and the life-to-date
expenditures in each portfolio through June 30, 2022. For details, please reference the financial report on page 84,
which contains actual expenditure numbers and remaining allocations.
Portfolio Expenditures to Allocations (in millions)
MAA01
MAA02
MAA03
MAA04
MAA05
MAA06
MAA07
MAA08
MAA09
MAA10
MAA11
MAA12
MAA13
MAA14
MAA15
MAA16
MAA17
MAA18
MAA19
MAA20
MAA21
MAA22
MAA23
MAA24
MAA25
$0.0 $2.5 $5.0 $7.5 $10.0 $12.5 $15.0 $17.5 $20.0 $22.5 $25.0 $27.5 $30.0
Total Life-to-Date Through 6/30/22 Expenditure Plan Remaining
2 Measure AA Bond Annual Accountability Report FY22
MAA15 Portfolio Allocation is $50.73M
Spending Trends
As of June 30, 2022, $77.4 million has been expended from MAA funds. The primary spending for FY22 was in public
access improvements associated with the Alma College Cultural Landscape Rehabilitation project at Bear Creek
Redwoods Preserve (MAA21). The Alma College Cultural Landscape is a historic site that exhibits remnants of
many layers of past human use, including the 19th-century logging boom, the vast rural estates of early 20th-
century industry leaders, and the first Jesuit college of theology on the west coast. This project provides access
to the site for safe public enjoyment in a manner that is fiscally sustainable and that highlights its historic
significance. In addition, a 1.3 mile easy-access Grasshopper Loop Trail was opened to the public at La Honda
Creek Preserve (MAA07).
Another focus area was completing the Accessibility Requirements report for the Highway 17 Wildlife Corridor
and Bay Area Ridge Trail Crossing (MAA20) projects that will provide a safe wildlife corridor and a separate
regional trail crossing of a major Caltrans highway. Other work included identifying trail alignments to connect
adjacent open space preserves on the east and west side of the proposed crossings, and to connect west to El
Sereno Open Space Preserve and Sanborn County Park. With the support of grants, funding has been secured
through the design phase. Midpen will continue to seek additional funding opportunities for the construction
phase of the project. Environmental review and ongoing public and partner outreach will continue into FY23.
Also in this reporting period, Midpen completed the following: site improvements as part of the Billingsley
and Burton Properties Site Cleanup projects at Sierra Azul Open Space Preserve (MAA25), technical studies and
presentation of draft conceptual parking area design alternatives for the Purisima-to-the-Sea Trail and Parking
Area-Feasibility Study (MAA03), and construction of the Briggs Creek Trail at Bear Creek Redwoods Preserve
(MAA21). Furthermore, Midpen purchased the 41.76-acre Vielbaum property as an addition to Sierra Azul Open
Space Preserve (MAA23). This purchase permanently preserves forested lands and wildlife habitat within the
Upper Los Gatos Creek watershed and furthers the goals of a continuous open space greenbelt and protected
wildlife corridors.
In addition to direct spending on MAA projects, Midpen prioritized key initiatives in support of MAA portfolios,
including land acquisition negotiations, visitor use surveys, operational infrastructure improvements,
environmental assessments, geotechnical studies and habitat restorations. Though the Bond Oversight
Committee review is primarily focused on actual MAA expenditures, additional accomplishments not funded
by MAA yet support these projects have been included to provide a sense of the work required to move capital
projects forward, which sometimes involves early feasibility studies and partnership collaborations. These
accomplishments are described in detail in the portfolio expenditure summary starting on page 14.
Midpen’s annual audited financial statements can be found at openspace.org/financials.
3Measure AA Bond Annual Accountability Report FY22
Of the $6 million expended in this reporting period (excluding grants), about $337,084 was related to land
acquisition and associated expenses, representing 6% of all spending for the period. The tables below contain
a breakdown of land acquisition costs by portfolio for the current fiscal year and life-to-date.
Land Acquisition MAA Expenditures (July 1, 2021–June 30, 2022)
Portfolios with
Land Acquisition
Expenses
Cost Project Type of Activity
MAA01 $75,291 Johnston Ranch Land Acquisition Lease and management agreement for the
property, including the assignment of a grazing
lease to Midpen
MAA03 $93,740 South Cowell Uplands Land Purchase Minor subdivision application fee and
associated costs
MAA23 $168,053 Vielbaum Property Acquisition Land conservation purchase
FY22 TOTAL $337,084
Land Acquisition MAA Expenditures (May 11, 2014–June 30, 2022)
Portfolios with
Land Acquisition
Expenses
Cost Project Type of Activity
MAA01 $82,907 Johnston Ranch Land Acquisition Lease and management agreement for the
property, including the assignment of a grazing
lease to Midpen
MAA02 $108,273 SFPUC Easement at Ravenswood Trail Easement property right
MAA03 $5,499,898 Riggs Property Purchase and Site Cleanup &
Remediation, Chamberlain/Lundell Trust (Lobitos
Creek), Giusti Property Rights Transfer, South
Cowell Uplands, and Rieser-Nelson Land Purchase
Includes lot line adjustment, Guisti Uplands,
Lobitos Creek, and South Cowell Uplands, and
Rieser-Nelson land conservation purchase
MAA04 $57,340 Gallaway Property Purchase Land conservation purchases
MAA05 $1,756,093 Toepfer and Ashworth Property Purchases Land conservation purchases
MAA07 $9,008,773 Apple Orchard and Events Center property
and Cunha Property Purchases
Land conservation purchase
MAA08 $2,153,910 Woodruff Redwoods Property Purchase Land conservation purchase
MAA15 $3,061,049 POST/Alpine Ranch Easement, Conley Property
Purchase and Irish Ridge Land Conservation
Easement property right and land
conservation purchases
MAA17 $754,552 Lysons Property Purchase Property Expense equals Purchase Price minus
grant income of $740,000
MAA19 $1,564,764 Gupta/Kahn Property Purchase, Dunham-
Bohlman Easement, Haight-Perry, and San Jose
Water Co land Purchase
Easement property right and land
conservation purchases
MAA22 $540,587 Freudenberg Land Purchase, Hendrys Creek Land conservation purchase, land conservation
easement to Santa Clara Valley Water District
who funded full amount of $1,500,000 for the
Hendrys Creek parcel
MAA23 $3,482,137 Meyer Property Purchase and associated costs,
Twin Creeks Land Purchase, Vielbaum Property
Acquisition
Land conservation purchases
MAA24 $1,591,996 Barth, Petersen, Navid/Gagher, Kahn Land conservation purchases
MAA25 $2,095,083 Burton Land Acquisition and Billingsley
Property Purchase
Land conservation purchases
Total Land
Acquisition MAA
Expenditures
$31,757,362
4 Measure AA Bond Annual Accountability Report FY22
Anticipated Future Trends
The Bond Oversight Committee primarily reviews retrospective expenses. The following section provides a
high-level glimpse of anticipated expenditures based on the approved fiscal year Budget and Action Plan and
operational workload. This is provided for contextual purposes and to demonstrate the progress Midpen is
making toward MAA projects.
Next year’s report, covering FY23, will include the 8th year of MAA funding. Based on the approved FY23 budget,
planned life-to-date spending is estimated to exceed $84.9 million (including grants), or approximately 28% of the
$300 million bonding capacity authorized under MAA.
The capital program for FY23 continues to progress on many phased projects and regional trail connections,
with a concentrated effort on public access related to a road-to-trail conversion of the Alpine (Road) Trail in Coal
Creek Preserve (MAA10) and phase II trails at Bear Creek Redwoods Preserve (MAA21), the next phase of work to
implement the wildlife passage and trail crossing across Highway 17 (MAA20), restoration forestry at La Honda
Creek Preserve (MAA05), and capital repairs at Bear Creek Stables in Bear Creek Redwoods Preserve (MAA21).
Finally, portfolio allocations include estimated land acquisition costs. Because purchases are primarily opportunity
driven, estimates are not tied to a specific time frame, as we do not know when properties and/or rights will be
available for purchase. The real property department actively pursues targeted opportunities for land purchases,
as well as the purchase of property rights and easements, so purchase expenses may be realized as future
opportunities become available.
Monte Bello Open Space Preserve by Midpen
5Measure AA Bond Annual Accountability Report FY22
Picchetti Ranch Open Space Preserve by Karl Gohl6Measure AA Bond Annual Accountability Report FY22
Priority Portfolio Actions by Region
From the Measure AA Expenditure Plan
South Bay Foothills
Los Gatos, Monte Sereno,
Saratoga and Santa Cruz
Mountains
Bear Creek Redwoods Open Space Preserve by Heather Diaz
P O R T F O L I O 1 8
South Bay Foothills—Saratoga-to-the-Sea Trail and Wildlife Corridor————————————————————————————————————————————————————————
Protect wildlife corridor along Highway 9————————————————————————————————————————————————————————
Connect trail to Saratoga-to-the-Sea Trail and Skyline-to-the-Sea Trail————————————————————————————————————————————————————————
Portfolio Allocation: $1,365,000————————————————————————————————————————————————————————
P O R T F O L I O 1 9
El Sereno—Dog Trails and Connections————————————————————————————————————————————————————————
Provide infrastructure to open trails to dogs————————————————————————————————————————————————————————
Develop connections to Skyline, Sanborn County Park and Lexington Reservoir————————————————————————————————————————————————————————
Portfolio Allocation: $2,254,000————————————————————————————————————————————————————————
P O R T F O L I O 2 0
South Bay Foothills—Wildlife Passage and Ridge Trail Improvements————————————————————————————————————————————————————————
Establish safe corridors for mountain lions across Highway 17————————————————————————————————————————————————————————
Establish Bay Area Ridge Trail crossing————————————————————————————————————————————————————————
Portfolio Allocation: $13,966,000————————————————————————————————————————————————————————
P O R T F O L I O 2 1
Bear Creek Redwoods—Public Recreation and Interpretive Projects————————————————————————————————————————————————————————
Open for hiking, equestrian activities————————————————————————————————————————————————————————
Provide parking areas, trails; upgrade stables————————————————————————————————————————————————————————
Restore and protect habitats for various species————————————————————————————————————————————————————————
Repair roads and trails to reduce sediment————————————————————————————————————————————————————————
Rehabilitate Alma College site————————————————————————————————————————————————————————
Portfolio Allocation: $17,478,000————————————————————————————————————————————————————————
7Measure AA Bond Annual Accountability Report FY22
P O R T F O L I O 2 2
Sierra Azul—Cathedral Oaks Public Access and Conservation Projects————————————————————————————————————————————————————————
Develop multiuse trail and plan future trails as land is available————————————————————————————————————————————————————————
Develop parking————————————————————————————————————————————————————————
Restore plant communities and soils————————————————————————————————————————————————————————
Install trailside amenities————————————————————————————————————————————————————————
Preserve additional open space and complete wildlife corridor in upper Los Gatos Creek watershed————————————————————————————————————————————————————————
Portfolio Allocation: $6,714,000————————————————————————————————————————————————————————
P O R T F O L I O 2 3
Sierra Azul—Mount Umunhum Public Access and Interpretive Projects————————————————————————————————————————————————————————
Open Mount Umunhum for multiuse public access to summit via road and trail————————————————————————————————————————————————————————
Open Bay Area Ridge Trail and nearby trail connections————————————————————————————————————————————————————————
Preserve additional open space and complete wildlife corridor————————————————————————————————————————————————————————
Portfolio Allocation: $27,972,000————————————————————————————————————————————————————————
P O R T F O L I O 2 4
Sierra Azul—Rancho de Guadalupe Family Recreation————————————————————————————————————————————————————————
Open Rancho de Guadalupe to public access————————————————————————————————————————————————————————
Develop accessible multiuse trails with amenities such as parking and family recreation————————————————————————————————————————————————————————
Restore habitat for rare species————————————————————————————————————————————————————————
Protect cultural and natural resources————————————————————————————————————————————————————————
Portfolio Allocation: $10,078,000————————————————————————————————————————————————————————
P O R T F O L I O 2 5
Sierra Azul—Loma Prieta Area Public Access, Regional Trails and Habitat Projects————————————————————————————————————————————————————————
Provide public access and recreation, including small campground————————————————————————————————————————————————————————
Develop, improve and connect regional multiuse trails to Forest of Nisene Marks State Park, protected land
to east, and Mount Umunhum————————————————————————————————————————————————————————
Protect steelhead habitat, rare plants and grasslands, and restore knob cone pine stands————————————————————————————————————————————————————————
Portfolio Allocation: $7,986,000————————————————————————————————————————————————————————
8 Measure AA Bond Annual Accountability Report FY22
Peninsula Foothills and Bay
Cupertino, Los Altos, Los Altos Hills,
Sunnyvale, Mountain View, Palo Alto,
East Palo Alto, Menlo Park, Atherton,
Redwood City, San Carlos, Woodside,
Portola Valley and Skyline
Russian Ridge Open Space Preserve by Tiffany Lo
P O R T F O L I O 2
Regional—Bayfront Habitat Protection and Public Access Partnerships————————————————————————————————————————————————————————
Partner to complete gaps in Bay Trail and develop city-to-bay trails————————————————————————————————————————————————————————
Support wetland restoration and associated interpretive facilities————————————————————————————————————————————————————————
Preserve additional bayfront open space————————————————————————————————————————————————————————
Portfolio Allocation: $5,052,000————————————————————————————————————————————————————————
P O R T F O L I O 4
El Corte de Madera Creek—Bike Trail and Water Quality Projects————————————————————————————————————————————————————————
Develop single-use biking/hiking trails, complete Ridge Trail gaps and develop trail system leading to
parking area————————————————————————————————————————————————————————
Restore damaged trails to improve water quality————————————————————————————————————————————————————————
Preserve additional open space as available————————————————————————————————————————————————————————
Portfolio Allocation: $8,376,000————————————————————————————————————————————————————————
P O R T F O L I O 5
La Honda Creek—Upper Area Recreation, Habitat Restoration and Conservation Grazing Projects————————————————————————————————————————————————————————
Open upper half of the preserve to public; provide biking/hiking/equestrian trails, dog access and staging areas————————————————————————————————————————————————————————
Provide loop and connector trails————————————————————————————————————————————————————————
Restore habitat for rare species————————————————————————————————————————————————————————
Improve fencing, corrals and water systems to reintroduce conservation grazing————————————————————————————————————————————————————————
Portfolio Allocation: $11,733,000————————————————————————————————————————————————————————
9Measure AA Bond Annual Accountability Report FY22
P O R T F O L I O 6
Windy Hill—Trail Improvements, Preservation and Hawthorns Area Historic Partnership————————————————————————————————————————————————————————
Improve trails; complete pond facilities————————————————————————————————————————————————————————
Increase multiuse trails; study possible improvements to increase dog use————————————————————————————————————————————————————————
Open Hawthorns Area; develop trails connecting to Portola Valley and Palo Alto trails————————————————————————————————————————————————————————
Partner to protect, restore and interpret historic buildings————————————————————————————————————————————————————————
Improve habitat conditions in Los Trancos Creek————————————————————————————————————————————————————————
Preserve additional scenic open space as available————————————————————————————————————————————————————————
Portfolio Allocation: $12,740,000————————————————————————————————————————————————————————
P O R T F O L I O 8
La Honda Creek and Russian Ridge—Preservation of Upper San Gregorio Watershed and Ridge
Trail Completion————————————————————————————————————————————————————————
Preserve Upper San Gregorio watershed; restore endangered species habitats————————————————————————————————————————————————————————
Support opportunities to provide additional water for fisheries————————————————————————————————————————————————————————
Complete Bay Area Ridge Trail multiuse connections and gaps————————————————————————————————————————————————————————
Provide additional public use facilities————————————————————————————————————————————————————————
Portfolio Allocation: $15,347,000————————————————————————————————————————————————————————
P O R T F O L I O 9
Russian Ridge—Public Recreation, Grazing and Wildlife Protection Projects————————————————————————————————————————————————————————
Open currently closed areas of preserve————————————————————————————————————————————————————————
Construct and extend trails————————————————————————————————————————————————————————
Improve fencing, corrals and water systems to reintroduce conservation grazing————————————————————————————————————————————————————————
Improve habitat for sensitive species; implement pond enhancement projects for garter snakes and
red-legged frogs————————————————————————————————————————————————————————
Portfolio Allocation: $5,560,000————————————————————————————————————————————————————————
P O R T F O L I O 1 0
Coal Creek—Reopen Alpine Road for Trail Use————————————————————————————————————————————————————————
Reopen Alpine Road as trail connection between Portola Valley and Skyline Boulevard————————————————————————————————————————————————————————
Reroute trails to reduce erosion and improve visitor experience————————————————————————————————————————————————————————
Portfolio Allocation: $8,017,000————————————————————————————————————————————————————————
P O R T F O L I O 1 1
Rancho San Antonio—Interpretive Improvements, Refurbishing and Transit Solutions————————————————————————————————————————————————————————
Add welcome center————————————————————————————————————————————————————————
Refurbish and add interpretive exhibits to Deer Hollow Farm————————————————————————————————————————————————————————
Support of transit improvement options such as bike trails, bike share station, bus service or additional parking————————————————————————————————————————————————————————
Portfolio Allocation: $10,811,000————————————————————————————————————————————————————————
10 Measure AA Bond Annual Accountability Report FY22
P O R T F O L I O 1 2
Peninsula and South Bay Cities—Partner to Complete Middle Stevens Creek Trail————————————————————————————————————————————————————————
Support work by cities to develop the middle section of the Stevens Creek Trail and enhance neighborhood
connections————————————————————————————————————————————————————————
Support work by partners to complete stream corridor restoration and steelhead habitat enhancement
below dam————————————————————————————————————————————————————————
Develop and install interpretive signage————————————————————————————————————————————————————————
Portfolio Allocation: $1,038,000————————————————————————————————————————————————————————
P O R T F O L I O 1 6
Long Ridge—Trail, Conservation and Habitat Restoration Projects (Saratoga)————————————————————————————————————————————————————————
Improve roadside parking and provide restrooms————————————————————————————————————————————————————————
Develop new trail connections to Eagle Rock and Devils Canyon————————————————————————————————————————————————————————
Repair trails for year-round, multiuse access————————————————————————————————————————————————————————
Protect watersheds for steelhead————————————————————————————————————————————————————————
Preserve additional open space as available————————————————————————————————————————————————————————
Implement pond and habitat enhancement restoration projects to benefit rare species————————————————————————————————————————————————————————
Portfolio Allocation: $5,140,000————————————————————————————————————————————————————————
P O R T F O L I O 1 7
Regional—Complete Upper Stevens Creek Trail————————————————————————————————————————————————————————
Complete multiuse connection between the Bay Trail and Bay Area Ridge Trail above the reservoir through
Picchetti Ranch Open Space Preserve and Lower/Upper Stevens Creek County Parks————————————————————————————————————————————————————————
Improve preserve trails and neighborhood connections————————————————————————————————————————————————————————
Preserve additional open space as available————————————————————————————————————————————————————————
Portfolio Allocation: $7,760,000————————————————————————————————————————————————————————
Monte Bello Open Space Preserve by Karl Gohl
11Measure AA Bond Annual Accountability Report FY22
Coast
Half Moon Bay,
San Gregorio, Pescadero
and La Honda
Skyline Ridge Open Space Preserve by Carol Daniels
P O R T F O L I O 1
Miramontes Ridge—Gateway to the Coast Public Access, Stream Restoration and
Agriculture Enhancement————————————————————————————————————————————————————————
Preserve scenic open space land as available, and establish wildlife corridor————————————————————————————————————————————————————————
Restore fish and red-legged frog habitats in Madonna Creek watershed————————————————————————————————————————————————————————
Partner to enhance water availability for agriculture and fish————————————————————————————————————————————————————————
Develop trail loop system, including Ridge Trail and neighborhood access points————————————————————————————————————————————————————————
Develop staging area; repair bridges————————————————————————————————————————————————————————
Portfolio Allocation: $27,774,000————————————————————————————————————————————————————————
P O R T F O L I O 3
Purisima Creek Redwoods—Purisima-to-the-Sea Trail, Watershed Protection
and Conservation Grazing————————————————————————————————————————————————————————
Complete and open multiuse Purisima-to-the-Sea Trail connection between Ridge Trail and Coastal Trail, and
new parking areas————————————————————————————————————————————————————————
Preserve additional open space as available————————————————————————————————————————————————————————
Remove fish barriers and restore Lobitos Creek————————————————————————————————————————————————————————
Restore ponds for endangered species————————————————————————————————————————————————————————
Portfolio Allocation: $7,608,000————————————————————————————————————————————————————————
P O R T F O L I O 7
La Honda Creek—Driscoll Ranch Public Access, Endangered Wildlife Protection and
Conservation Grazing————————————————————————————————————————————————————————
Open Driscoll Ranch area; provide biking/hiking/equestrian trails, limited dog access, parking areas and
interpretive displays————————————————————————————————————————————————————————
Develop loop and connector trails————————————————————————————————————————————————————————
Restore habitat for endangered species————————————————————————————————————————————————————————
Restore La Honda Creek; remove fish migration barriers————————————————————————————————————————————————————————
Portfolio Allocation: $14,825,000————————————————————————————————————————————————————————
12 Measure AA Bond Annual Accountability Report FY22
P O R T F O L I O 1 3
Cloverdale Ranch—Wildlife Protection, Grazing and Trail Connections————————————————————————————————————————————————————————
Improve fencing, corrals and water systems to increase conservation grazing and sustain large contiguous
grasslands————————————————————————————————————————————————————————
Restore habitat for endangered species————————————————————————————————————————————————————————
Provide trail connections to nearby state parks————————————————————————————————————————————————————————
Portfolio Allocation: $15,712,000————————————————————————————————————————————————————————
P O R T F O L I O 1 4
Regional—Trail Connections and Campgrounds————————————————————————————————————————————————————————
Develop trails between Butano State Park, Pescadero County Park and Russian Ridge, and between Skyline
Ridge and Portola Redwoods and Big Basin state parks————————————————————————————————————————————————————————
Partner with county and state parks to improve existing campgrounds————————————————————————————————————————————————————————
Portfolio Allocation: $3,966,000————————————————————————————————————————————————————————
P O R T F O L I O 1 5
Regional—Redwood Protection and Salmon Fishery Conservation————————————————————————————————————————————————————————
Preserve additional open space as available————————————————————————————————————————————————————————
Protect and enhance redwood stands, mountain scenery, various habitats and steelhead————————————————————————————————————————————————————————
Portfolio Allocation: $50,728,000————————————————————————————————————————————————————————
La Honda Creek Open Space Preserve by Kimberley Wong
13Measure AA Bond Annual Accountability Report FY22
Portfolio Expenditures
Numerically by Portfolio Number
Thornewood Open Space Preserve by David Henry
14 Measure AA Bond Annual Accountability Report FY22
Preface
Portfolio Expenditures includes a description of each of the top 25 MAA portfolios and its allocation, as per the
MAA ballot language under the expenditure plan. Bond funding allocations may be shifted if needed following
board approval, however, for this reporting period, no deviation from the original expenditure plan was proposed.
Portfolio expenditures listed in the description represent all project costs that have been deemed eligible for
MAA reimbursement from inception through June 30, 2022. The FY22 Notable Accomplishments are highlighted
in yellow throughout this section of the report.
Portfolios that have no incurred expenditures are included in this report to keep continuity from year to year.
Additional contextual information is included in notable accomplishments, project challenges and potential next
steps, as well as the tables and charts associated with each portfolio. Though the Bond Oversight Committee review
is focused on actual expenditures, additional accomplishments not funded by MAA, but support MAA projects, have
been included to help provide a sense of the preceding effort that is required to move MAA projects forward. The
tables and charts restate information gleaned from Midpen’s accounting system and provide another graphical way
to view the expenditures. Finally, where available, we have included photographs of the preserves in which the
projects occur.
Portfolio Progress Indicators
The following indicators show the progress to date on each element of the portfolio description.
Light blue indicates progress in this FY and darker blue indicates a previous FY, for example:————————————————————————————————————————————————————————
Not started, or little progress to report———————————————————————————————————————————————————————— Started and approximately 25% complete (in a previous FY)———————————————————————————————————————————————————————— Approximately 50% complete (with 25% completed this FY)———————————————————————————————————————————————————————— Approximately 75% complete (with 50% completed this FY)————————————————————————————————————————————————————————
Complete (with 25% completed this FY)————————————————————————————————————————————————————————
Complete (with 0% completed this FY)————————————————————————————————————————————————————————
Note: For portfolio elements that show as “complete” or fully shaded circles, there may arise future additional investments opportunities to expand upon
the stated goal. When such opportunities arise, these will be listed and noted as expanded opportunities. Also, activities that are tied to or indirectly
support portfolio elements are accounted for under the indicator circles and in the Notable Accomplishments descriptions. For example, remediation
activities that are identified as part of a land purchase would be accounted for under a portfolio element that specifies open space preservation.
15Measure AA Bond Annual Accountability Report FY22
Portfolio 1
Miramontes Ridge
Gateway to the Coast Public
Access, Stream Restoration and
Agriculture Enhancement
Miramontes Ridge Open Space Preserve by Midpen
16 Measure AA Bond Annual Accountability Report FY22
D E S C R I P T I O N———————————————————————————————————————————————————————— Preserve scenic open space land as available, and establish wildlife corridor. ————————————————————————————————————————————————————————
Restore fish and red-legged frog habitats in Madonna Creek watershed. ————————————————————————————————————————————————————————
Partner to enhance water availability for agriculture and fish. ————————————————————————————————————————————————————————
Develop trail loop system, including Ridge Trail and neighborhood access points. ————————————————————————————————————————————————————————
Develop staging area; repair bridges. ————————————————————————————————————————————————————————
Portfolio Allocation: $27,774,000 Portfolio Expenditures Through 6/30/2022: $532,190 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA01-004 Remediation Plan and Ranch Dump Clean Up, Madonna Creek Ranch
Fiscal Year 2022————————————————————————————————————————————————————————
Confirmed the approximately 240 willow stakes planted in FY21 are beginning to become established and
the site appears in good condition after winter storms.
Prior Years————————————————————————————————————————————————————————
Removed over 300 tons of hazardous waste from the riparian area and planted approximately 240 willow
stakes to revegetate the site. ————————————————————————————————————————————————————————
Completed the testing phase and identified debris and contaminants for the remediation plan and ranch
dump cleanup project. ————————————————————————————————————————————————————————
MAA01-005 Johnston Ranch Land Acquisition
Fiscal Year 2022————————————————————————————————————————————————————————
Received board approval for the purchase of the 644-acre Johnston Ranch Uplands property and entered
into a Lease and Management Agreement with Peninsula Open Space Trust (POST). The purchase preserves
coastal open space, protects grazing and agricultural lands, protects the Arroyo Leon Creek watershed and
provides future public trail opportunities in partnership with the City of Half Moon Bay and California State
Parks. Additionally, a grazing lease was assigned to Midpen by POST.————————————————————————————————————————————————————————
San Mateo County Agricultural Advisory Committee recommended approval of a lot line adjustment (LLA) in
March 2022. San Mateo County Planning Commission approved the LLA in May 2022.————————————————————————————————————————————————————————
Recorded public trail access and waterline easements between the City of Half Moon Bay and POST to
provide future trail access from downtown Half Moon Bay to the city’s Johnston house property and the
Johnston Ranch Uplands property, as well as patrol and maintenance access through the City’s property to
the Uplands property.
17Measure AA Bond Annual Accountability Report FY22
Miramontes Ridge Open Space Preserve by Leigh Ann Gessner
Prior Years————————————————————————————————————————————————————————
Completed Local Coastal Plan minor text amendments approved by San Mateo County Board of Supervisors
and California Coastal Commission.————————————————————————————————————————————————————————
A $500,000 purchase grant was approved by the California State Coastal Conservancy.————————————————————————————————————————————————————————
Signed a partnership letter of intent with the City of Half Moon Bay and POST involving the city’s Johnston
House Park and POST’s Johnston Ranch property to provide local and regional trail and parking opportunities,
support farming and ranching and protect the scenic landscape and Arroyo Leon watershed. ————————————————————————————————————————————————————————
Completed botanical study and hydrological study of pond area.————————————————————————————————————————————————————————
Completed California red-legged frog surveys and habitat characterization at Madonna Creek Ranch. ————————————————————————————————————————————————————————
MAA01-006 Madonna Creek Fish, Water Supply and Bridge Replacement
Fiscal Year 2022————————————————————————————————————————————————————————
Awaiting a fish habitat and restoration assessment recommendation letter from the Integrated Watershed
Restoration Program, coordinated by the San Mateo Resource Conservation District. Based on this
assessment, fish-passage restoration of Madonna Creek is not recommended because the quality of fish
habitat is poor relative to the California red-legged frog habitat that would be compromised by removing
the dams. Completed geotechnical and hydrologic studies show dam stability and low flood risk.
P R O J E C T C H A L L E N G E S
MAA01-005 Johnston Ranch Land Acquisition ————————————————————————————————————————————————————————
Approval of a land division application is pending resolution of a challenge to the California Coastal
Commission’s approval of minor Local Coastal Plan text amendments.————————————————————————————————————————————————————————
Acquisitions on the coast require a willing seller.————————————————————————————————————————————————————————
Access to Johnston Ranch Uplands south of Higgins Canyon Road will require acquisition of permissive
rights through City of Half Moon Bay property. ————————————————————————————————————————————————————————
The 100% fee ownership transfer of the Johnston Ranch Uplands acquisition is contingent upon County of
San Mateo approving a lot line adjustment application.————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S————————————————————————————————————————————————————————
Continue partnership with City of Half Moon Bay to develop a Memorandum of Agreement on shared
parking and trailhead at the City’s Johnston House property.————————————————————————————————————————————————————————
Continue partnership with San Mateo Resource Conservation District to develop agricultural water-supply
improvements recommended in a water management study (anticipated February 2023) and conceptual
designs of pond enhancement and bridge replacement plans.————————————————————————————————————————————————————————
18 Measure AA Bond Annual Accountability Report FY22
Portfolio 1: Miramontes Ridge—Gateway to the Coast Public Access, Stream Restoration and
Agriculture Enhancement
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $27,774,000
01-004—Remediation Plan and
Ranch Debris Cleanup, Madonna
Creek Ranch
$414,346 $5,445 $419,791
01-005—Johnston Ranch Land
Acquisition
$7,616 $75,291 $82,907
01-006—Madonna Creek Fish,
Water Supply and Bridge
Replacement
$0 $68,417 $68,417
Grand Total $27,774,000 $421,962 $149,153 $571,115 $27,202,885 2.06%
01-004—Remediation Plan and
Ranch Debris Cleanup, Madonna
Creek Ranch Grant Income
$0 ($38,925)($38,925)
Grand Total $27,774,000 $421,962 $110,228 $532,190 $27,241,810 1.92%
19Measure AA Bond Annual Accountability Report FY22
1.92%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$532,190
Expenditure Plan Remaining
$27,241,810
Portfolio 2
Regional
Bayfront Habitat
Protection and Public
Access Partnerships
Stevens Creek Shoreline Nature Area by Sebastian Velasquez
D E S C R I P T I O N————————————————————————————————————————————————————————
Partner to complete gaps in Bay Trail and develop city-to-bay trails. ————————————————————————————————————————————————————————
Support wetland restoration and associated interpretive facilities. ————————————————————————————————————————————————————————
Preserve additional bayfront open space.* ————————————————————————————————————————————————————————
Portfolio Allocation: $5,052,000 Portfolio Expenditures Through 6/30/2022: $3,417,282 ————————————————————————————————————————————————————————
* Delivering on the minimum commitments for specific portfolio elements does not preclude additional future investment as opportunities arise.
Remediation activities may indirectly support portfolio elements, contributing to a portfolio under open space preservation
N O T A B L E A C C O M P L I S H M E N T S
MAA02-001 Cooley Landing Interpretive Facilities Design and Implementation
Fiscal Year 2022 ————————————————————————————————————————————————————————
Completed sixth and final year of native plantings at Cooley Landing to enhance bayfront resource values.
Prior Years————————————————————————————————————————————————————————
Continued plant restoration activities in and around Cooley Landing Park (trail junctions, trash screen, entry sign
and ethnobotany garden). Resumed volunteer activities when allowed during the pandemic.————————————————————————————————————————————————————————
Completed habitat and plant restoration work for FY20 (part of a multi-year restoration effort). Also, 638 volunteers
in 36 working days installed approximately 1,100 native plantings at the trail junctions and parking lot. ————————————————————————————————————————————————————————
Funded the completion of design drawings, permitting and construction of public access improvements at
Cooley Landing Park, consistent with the Cooley Landing Vision Plan.————————————————————————————————————————————————————————
Completed third and final year of first phase of habitat and plant restoration work at Cooley Landing in
partnership with Grassroots Ecology. ————————————————————————————————————————————————————————
Obtained board approval for $1.25M in MAA funding for remaining project elements at Cooley Landing Park.
Amended partnership agreement to include MAA funding and coordinated reimbursement of eligible city expenses. ————————————————————————————————————————————————————————
MAA02-002 Ravenswood Bay Trail Design and Implementation
Prior Years————————————————————————————————————————————————————————
Completed remaining construction punch list items, including the SamTrans property boundary fence.————————————————————————————————————————————————————————
Completed construction of the asphalt trail, boardwalk and bridge across wetlands on the new Ravenswood Bay
Trail connection, which closed a critical 0.6-mile gap to connect 80 miles of continuous San Francisco Bay Trail. ————————————————————————————————————————————————————————
Received $700,000 in funds for public access improvements from Caltrans through a cooperative funding
agreement related to a Bay Conservation and Development Commission permit requirement for the Caltrans
San Mateo 101 Express Lanes Project. ————————————————————————————————————————————————————————
20 Measure AA Bond Annual Accountability Report FY22
————————————————————————————————————————————————————————
Completed construction of two high tide refuge islands adjacent to Cooley Marsh to provide enhanced
habitat for federally protected species, salt marsh harvest mouse and Ridgway’s rail. Island plantings and
vegetation were completed in January 2020 and will be monitored for 3-5 consecutive growing seasons.————————————————————————————————————————————————————————
Recorded trail easement from Caltrans.————————————————————————————————————————————————————————
Received approval of a memorandum of understanding with City of East Palo Alto from the city council
addressing a) patrol and emergency response, b) site security and c) future community trail access. ————————————————————————————————————————————————————————
Received two grants: $300,000 from Facebook and $1,055,328 from the California Natural Resources Agency -
Urban Greening Program.————————————————————————————————————————————————————————
Negotiated an exchange agreement and public trail easement with the City and County of San Francisco and
City of East Palo Alto. ————————————————————————————————————————————————————————
Concluded negotiations with the City and County of San Francisco, which resulted in the board of supervisors
approving a 0.6-mile Ravenswood Bay Trail easement over San Francisco Public Utilities Commission lands.
This agreement facilitated the closure of a gap within a segment of the SF Bay Trail to connect 80 miles of
continuous trail within the 500-mile route along the shoreline of the nine Bay Area counties. ————————————————————————————————————————————————————————
In Support of MAA02————————————————————————————————————————————————————————
Celebrated the public opening of the Ravenswood Bay Trail Connection Project with an innovative virtual
event that successfully garnered 1,400 views.————————————————————————————————————————————————————————
P R O J E C T C H A L L E N G E S
————————————————————————————————————————————————————————
No project challenges. ————————————————————————————————————————————————————————
21Measure AA Bond Annual Accountability Report FY22
Portfolio 2: Regional—Bayfront Habitat Protection and Public Access Partnerships
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $5,052,000
02-001—Cooley Landing
Interpretive Facilities Design
and Implementation
$1,256,300 $27,543 $1,283,843
02-002—Ravenswood Bay Trail
Design and Implementation
$5,588,765 $0 $5,588,765
SubTotal $5,052,000 $6,845,065 $27,543 $6,872,608 ($1,820,608)136.04%
02-002—Ravenswood Bay Trail
Design and Implementation
Grant Income
($2,399,998)($1,055,328)($3,455,326)
Grand Total $5,052,000 $4,445,067 ($1,027,785)$3,417,282 $1,634,718 67.64%
67.64%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$3,417,282
Expenditure Plan Remaining
$1,634,718
Portfolio 3
Purisima Creek Redwoods
Purisima-to-the-Sea Trail,
Watershed Protection and
Conservation Grazing
Purisima Creek Redwoods Open Space Preserve by Karina Garcia
D E S C R I P T I O N————————————————————————————————————————————————————————
Complete and open Purisima-to-the-Sea Trail connection between Ridge Trail and Coastal Trail,
and new parking areas. ————————————————————————————————————————————————————————
Preserve additional open space as available.* ————————————————————————————————————————————————————————
Remove fish barriers and restore Lobitos Creek. ————————————————————————————————————————————————————————
Restore ponds for endangered species. ————————————————————————————————————————————————————————
Portfolio Allocation: $7,608,000 Portfolio Expenditures Through 6/30/2022: $6,621,295 ————————————————————————————————————————————————————————
* The final step to 100% fee ownership of the South Uplands property will be achieved when a land division application is approved by the County
of San Mateo, anticipated for FY23. Delivering on the minimum commitments for specific portfolio elements does not preclude additional future
investment as opportunities arise. Remediation activities may indirectly support portfolio elements, contributing to a portfolio under open space
preservation.
N O T A B L E A C C O M P L I S H M E N T S
MAA03-001 Purisima Uplands Lot Line Adjustment and Property Transfer
Prior Years————————————————————————————————————————————————————————
Prepared record of survey and set survey monuments on the northerly boundary of the Purisima Upland
property.————————————————————————————————————————————————————————
Closed escrow on the 240-acre Purisima Upland property on July 3, 2019 and completed amendments to
property’s trail and conservation easements.————————————————————————————————————————————————————————
Received board approval to finalize lot line adjustment documents with the County of San Mateo and
transfer of the 240-acre Purisima Uplands property to Midpen, to assemble public lands for the future
Purisima-to-the-Sea Trail. ————————————————————————————————————————————————————————
Purchased the 40.2-acre Riggs property, helping to protect the Lobitos Creek watershed and spawning
habitat for coho salmon and steelhead. ————————————————————————————————————————————————————————
MAA03-002 Purisima Upland Site Clean Up and Soil Remediation
Fiscal Year 2022 ————————————————————————————————————————————————————————
Completed oil well investigations of a former oil production site that precedes Midpen land ownership.
As part of a larger clean up and remediation project, an aboveground storage tank containing hazardous
oil was cleaned and the site was issued a closure notification by the County.
Prior Years————————————————————————————————————————————————————————
Completed special status plant surveys, preliminary investigations of historic oil wells, road improvements
plans and the initiation of regulatory oversight. ————————————————————————————————————————————————————————
22 Measure AA Bond Annual Accountability Report FY22
————————————————————————————————————————————————————————
Solicited for and selected the CEQA consultant. Conducted site assessments for biological and cultural
resources. Developed draft CEQA project description. Supported ongoing coordination with the California
Geological Energy Management Division. ————————————————————————————————————————————————————————
Received county coastal development and demolition permits.————————————————————————————————————————————————————————
Completed a phase 1 environmental site assessment for a remnant structure on the property (hunting cabin).————————————————————————————————————————————————————————
Prepared right of entry for Midpen use of farm roads for site cleanup and restoration of oil facilities and
hunting cabin assessment.————————————————————————————————————————————————————————
Completed Purisima Uplands lead and asbestos abatement for the hunting cabin to inform future
demolition work.————————————————————————————————————————————————————————
Completed corral demolition, water system installation and fence installation for Bluebrush Ranch at
Purisima Creek Redwoods Preserve. ————————————————————————————————————————————————————————
Completed phase 2 oil tank and facilities assessment, including site cleanup and restoration cost estimates
to address site safety issues as part of the property land transfer.————————————————————————————————————————————————————————
Completed road erosion assessment for farm roads on Purisima Uplands property and private farm roads
providing access to the property to inform condition of property assets (roads) and need for future repairs.————————————————————————————————————————————————————————
MAA03-003 Purisima Creek Fence Construction
Prior Years————————————————————————————————————————————————————————
Completed construction of 7,500 feet of livestock fencing along the eastern and northern boundaries of the
Bluebrush grazing property to mark property boundary and prevent livestock from accessing neighboring
properties and riparian areas.————————————————————————————————————————————————————————
Began and completed initial scope of work and scheduled bid walk just before county-issued shelter-in-
place orders. ————————————————————————————————————————————————————————
Completed installation of fencing along riparian areas to keep cattle out of Purisima Creek. ————————————————————————————————————————————————————————
MAA03-004 Harkins Bridge Replacement
Prior Years————————————————————————————————————————————————————————
Completed the Harkins Bridge installation project. Project secures long-term vehicle and pedestrian access. ————————————————————————————————————————————————————————
MAA03-005 Purisima-to-the-Sea Trail and Parking Area—Feasibility Study
Fiscal Year 2022 ————————————————————————————————————————————————————————
Conducted virtual stakeholder meetings with neighbors, coastal interested parties and trail users.————————————————————————————————————————————————————————
Completed numerous technical studies: biological and cultural assessments, topographic/boundary surveys,
culvert and drainage assessment and opportunities and constraints analyses.————————————————————————————————————————————————————————
Completed presentation of vision, goals, opportunities and constraints to the Board of Directors and
community at a December online Special board meeting and virtual community open house.————————————————————————————————————————————————————————
Completed consultation with San Mateo County Farm Bureau, neighbors, grazing tenant, equestrian and
mountain bike stakeholders.————————————————————————————————————————————————————————
Developed and released visitor survey in collaboration with the Purisima Multimodal Access Study.————————————————————————————————————————————————————————
Developed draft conceptual parking area design alternatives.————————————————————————————————————————————————————————
Completed presentation of draft conceptual designs for trail and parking alternatives at an in-person open
house in Half Moon Bay.
23Measure AA Bond Annual Accountability Report FY22
Prior Years————————————————————————————————————————————————————————
Received board authorization of consultant contract for feasibility study to analyze key project elements
such as trail alignment, trailhead and parking locations, and roadway crossings. Information to be used
for developing conceptual design project options as part of the contract. Developed a robust public
engagement plan to inform public outreach activities and to solicit broad and diverse public input. ————————————————————————————————————————————————————————
Initiated preliminary technical studies for the proposed regional trail and parking area and identified three
potential trail options for consideration.————————————————————————————————————————————————————————
Initiated public and stakeholder engagement, conducting stakeholder meetings with neighbors and
interested parties.————————————————————————————————————————————————————————
Purchased a 45-acre riparian conservation and public access easement over private property along Lobitos
Creek for protection of significant scenic, open space, riparian and natural wildlife habitat values. The
easement also contains provisions for a possible future public trail through the area. ————————————————————————————————————————————————————————
MAA03-006 South Cowell Upland Land Conservation
Fiscal Year 2022 ————————————————————————————————————————————————————————
Submitted minor subdivision application to San Mateo County in March 2022 to finalize ownership
configuration of the South Cowell Upland property.
Prior Years————————————————————————————————————————————————————————
Purchased an undivided 54% interest in South Cowell Ranch, entered into tenancy-in-common agreement providing
for exclusive use and management of upland area and for planning of future parking and trail improvements. ————————————————————————————————————————————————————————
Completed an assignment of a grazing lease with the existing rancher and a water allocation agreement
with other owners of the property. ————————————————————————————————————————————————————————
MAA03-007 Purisima-to-the-Sea Habitat Enhancement and Water Supply Improvement Plan
Fiscal Year 2022 ————————————————————————————————————————————————————————
Completed analysis of potential water supply improvements and pond restoration priorities. Identified two
springs for improvement in FY23.
MAA03-008 Rieser-Nelson Land Purchase
Prior Years————————————————————————————————————————————————————————
Purchased the 2.5-acre Rieser-Nelson property adjacent to the South Cowell property under the General
Manager’s low-value purchase authority.————————————————————————————————————————————————————————
In Support of MAA03
Prior Years————————————————————————————————————————————————————————
Received four gift parcels totaling 0.84 acres as additions to Purisima Creek Redwoods Preserve for the
purposes of watershed, open space and redwood forest preservation. ————————————————————————————————————————————————————————
Completed design and construction of a double vault restroom to replace an existing single vault. Obtained a
County of San Mateo building permit. Project improves public facilities at Purisima Creek Redwoods Preserve. ————————————————————————————————————————————————————————
Collaborated with the United States Geological Survey to install experimental fog collection stations at
Purisima Creek Redwoods Preserve to conduct research on the viability of fog water harvesting to support
agricultural uses and/or improve water availability for wildlife.————————————————————————————————————————————————————————
Completed mowing projects at October Farm to control brush encroachment and at Bluebrush Canyon to
control invasive species and reduce wildfire fuels. ————————————————————————————————————————————————————————
Attended a site tour with POST and a property owner to discuss parking and access opportunities related to
the Purisima-to-the-Sea Trail.————————————————————————————————————————————————————————
24 Measure AA Bond Annual Accountability Report FY22
P R O J E C T C H A L L E N G E S
MAA03-002 Purisima Upland Site Clean Up and Soil Remediation
————————————————————————————————————————————————————————
Special status plants required substantial scope changes to protect plant locations and required more
extensive CEQA (environmental review) process for the project. ————————————————————————————————————————————————————————
MAA03-005 Purisima-to-the-Sea Trail and Parking Area—Feasibility Study
————————————————————————————————————————————————————————
Selecting a preferred trail alignment option and conceptual parking area design alternative that balances
sensitive species and communities, existing land uses and public access. ————————————————————————————————————————————————————————
Work to design and obtain approval of roadway crossings occurs in a complex regulatory setting.————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S————————————————————————————————————————————————————————
Bring the proposed Purisima-to-the-Sea trail alignment to the board for review and approval. Initiate
additional technical studies, such as geotechnical evaluation, protocol botanical surveys and wetland
delineations to support the environmental review process————————————————————————————————————————————————————————
Complete remediation, design, and permitting for the Purisima Upland Site Clean Up and Soil Remediation project.————————————————————————————————————————————————————————
Portfolio 3: Purisima Creek Redwoods—Purisima-to-the-Sea Trail, Watershed Protection and
Conservation Grazing
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $7,608,000
03-001—Purisima Uplands Lot Line
Adjustment and Property Transfer
$425,113 $0 $425,113
03-002—Purisima Upland Site
Cleanup and Soil Remediation
$248,649 $19,408 $268,057
03-003—Purisima Creek Fence
Construction
$169,190 $0 $169,190
03-004—Harkins Bridge
Replacement
$516,917 $0 $516,917
03-005—Purisima-to-the-
Sea Trail and Parking Area -
Feasibility Study
$260,425 $182,234 $442,659
03-006—South Cowell Upland
Land Conservation
$4,842,967 $93,740 $4,936,707
03-008—Rieser-Nelson Land
Purchase
$16,715 $0 $16,715
Subtotal $7,608,000 $6,479,976 $295,382 $6,775,358 $832,642 89.06%
03-005—Purisima-to-the-Sea
Trail and Parking Area—
Feasibility Study Grant Income
($75,237)($78,826)($154,063)
Grand Total $7,608,000 $6,404,739 $216,556 $6,621,295 $986,705 87.03%
87.03%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$6,621,295
Expenditure Plan Remaining
$986,705
25Measure AA Bond Annual Accountability Report FY22
Portfolio 4
El Corte de Madera Creek
Bike Trail and Water
Quality Projects
El Corte de Madera Creek Open Space Preserve by Avery Krieger
D E S C R I P T I O N————————————————————————————————————————————————————————
Develop single-use biking/hiking trails, complete Ridge Trail gaps and develop trail system leading to
parking area. ————————————————————————————————————————————————————————
Restore damaged trails to improve water quality. ————————————————————————————————————————————————————————
Preserve additional open space as available. ————————————————————————————————————————————————————————
Portfolio Allocation: $8,376,000 Portfolio Expenditures Through 6/30/2022: $966,168 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA04-001 El Corte de Madera Creek Gallaway Property Purchase
Prior Years————————————————————————————————————————————————————————
Purchased the 1.7-acre Chet Gallaway property to remove inholding and protect watershed. ————————————————————————————————————————————————————————
MAA04-002 El Corte de Madera Creek Watershed Protection Final Phase
Prior Years————————————————————————————————————————————————————————
Completed the Watershed Protection Program, reducing sediment input into the watershed to improve
water quality for downstream creeks and waterways. ————————————————————————————————————————————————————————
MAA04-004 El Corte de Madera Creek Oljon Trail Implementation
Prior Years————————————————————————————————————————————————————————
Completed phase 3 and phase 4 of the Oljon Trail connecting Steam Donkey to the Springboard Trail. Final
construction and restoration are associated with the Watershed Protection Program.————————————————————————————————————————————————————————
Completed Oljon Trail construction, which included bridge construction, puncheon installation, road-to-trail
conversion and trail construction to open additional public recreational opportunities within El Corte de
Madera Creek Preserve.————————————————————————————————————————————————————————
Completed majority of closure and restoration of the upper segment of the Steam Donkey Trail.————————————————————————————————————————————————————————
Removed and restored existing deteriorating roads and trails to eliminate potential sources of
sedimentation within the watershed. ————————————————————————————————————————————————————————
26 Measure AA Bond Annual Accountability Report FY22
In Support of MAA04
Prior Years————————————————————————————————————————————————————————
Completed second year of sediment and stream monitoring and data collection and completed a report
on the sediment monitoring for the Watershed Protection Program 2004-2020. Data showed reduced
sedimentation in creeks after completing the Watershed Protection Program road and trail improvements.————————————————————————————————————————————————————————
Completed first year of sediment and stream monitoring and data collection.————————————————————————————————————————————————————————
Pursued Ridge Trail gaps between El Corte de Madera Creek and La Honda Creek preserves by working with
partners and meeting with landowners to convey interest in possible land or trail easement purchases. ————————————————————————————————————————————————————————
P R O J E C T C H A L L E N G E S
————————————————————————————————————————————————————————
Land acquisition to complete gaps in the Bay Area Ridge Trail requires willing seller.————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S
————————————————————————————————————————————————————————
Continue to seek willing sellers to complete gaps in Bay Area Ridge Trail.————————————————————————————————————————————————————————
Portfolio 4: El Corte de Madera Creek—Bike Trail and Water Quality Projects
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $8,376,000
04-001—El Corte de Madera
Creek Gallaway Property
Purchase
$57,340 $57,340
04-002—El Corte de Madera
Creek Watershed Protection
Final Phase
$235,934 $235,934
04-003—El Corte de Madera
Creek Watershed Protection
Reassessment
$45,507 $45,507
04-004—El Corte de Madera
Creek Oljon Trail Implementation
$627,387 $627,387
Grand Total $8,376,000 $966,168 $0 $966,168 $7,409,832 11.53%
11.53%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$966,168
Expenditure Plan Remaining
$7,409,832
27Measure AA Bond Annual Accountability Report FY22
Portfolio 5
La Honda Creek
Upper Area Recreation, Habitat
Restoration and Conservation
Grazing Projects
La Honda Creek Open Space Preserve by Blair Barnett
D E S C R I P T I O N————————————————————————————————————————————————————————
Open upper half of the preserve to public; provide biking/hiking/equestrian trails, dog access and
staging areas. ————————————————————————————————————————————————————————
Provide loop and connector trails. ————————————————————————————————————————————————————————
Restore habitat for rare species. ————————————————————————————————————————————————————————
Improve fencing, corrals and water systems to reintroduce conservation grazing. ————————————————————————————————————————————————————————
Portfolio Allocation: $11,733,000 Portfolio Expenditures Through 6/30/2022: $2,961,415 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA05-001 La Honda Creek Land Conservation Opportunities
Prior Years————————————————————————————————————————————————————————
Purchased the 38.14-acre Toepfer property to facilitate a future Ridge Trail opportunity between La Honda
Creek Preserve and El Corte de Madera Creek Preserve. ————————————————————————————————————————————————————————
Purchased the 5-acre Ashworth property to facilitate a future Ridge Trail extension opportunity between
La Honda Creek Preserve and El Corte de Madera Creek Preserve. ————————————————————————————————————————————————————————
MAA05-002 Upper La Honda Creek Grazing Infrastructure
Prior Years————————————————————————————————————————————————————————
Made significant improvements to an existing springbox located in Pasture 3 of the Lone Madrone (formerly
McDonald) Ranch property to support the conservation grazing program, which serves as a land management
tool to preserve grasslands and local biodiversity while reducing fuel loads and wildfire risk. Installed new water
tank in Pasture 3 and water trough in Pasture 4. Installed new water line from the improved springbox to the
tank and a trough. Design of springbox allows for overflow water to serve riparian area around springbox.
New water trough is designed with a permanent wildlife escape ramp for wildlife safety. ————————————————————————————————————————————————————————
Completed virtual bid process and received board approval to award the construction contract for water
infrastructure improvements to the Lone Madrone (formerly McDonald) Ranch.————————————————————————————————————————————————————————
Installed riparian protection fencing to resume conservation grazing, as well as water pipe and new water
troughs at Lone Madrone Ranch. ————————————————————————————————————————————————————————
28 Measure AA Bond Annual Accountability Report FY22
MAA05-005 La Honda Creek Red Barn Parking Area and Easy Access Trail
Prior Years————————————————————————————————————————————————————————
Began feasibility studies for a new parking area and trailhead at the Red Barn site, including conducting
traffic counts, site evaluations for a new driveway and evaluation of historic features to ensure new
improvements do not impact the historic landscape of the site.————————————————————————————————————————————————————————
Completed nine preliminary technical site investigation studies and conducted an iterative design
development process resulting in two conceptual parking and staging area design alternatives. ————————————————————————————————————————————————————————
Conducted focused stakeholder outreach for the conceptual designs. Held Planning and Natural Resources
Committee meeting and community open house to solicit public input on the Red Barn public access area
concept design alternatives. ————————————————————————————————————————————————————————
Conducted preliminary trail scouting from the proposed new parking location.————————————————————————————————————————————————————————
Completed a third design alternative based on public input received in May 2017. Presented design alternative
and additional technical information at three public meetings. On June 12, 2018, the board directed staff to
propose a process to form an advisory committee and assess alternative locations for a new parking area
that meets project goals and objectives. ————————————————————————————————————————————————————————
MAA05-007 La Honda Creek Phase II Trail Connections
Fiscal Year 2022 ————————————————————————————————————————————————————————
Completed cultural and wildlife resource surveys and reports. Hired consultant to evaluate proposed trail
alignments and initiated field investigations. Initiated protocol-level botanical surveys.
MAA05-008 La Honda Creek White Barn Structural Rehabilitation
Fiscal Year 2022 ————————————————————————————————————————————————————————
Progressed design work to 95% for the La Honda Creek White Barn Structural Rehabilitation project.
Awaiting county permit review ahead of issuing 100% plan set.
Prior Years————————————————————————————————————————————————————————
Began the environmental (CEQA) review process to evaluate any potential environmental impacts and
mitigation associated with the structure stabilization work planned for the White Barn. ————————————————————————————————————————————————————————
Completed site assessment and basis of design report analyzing four different design alternatives; presented
findings to the board, resulting in board selection of the structure stabilization design alternative.————————————————————————————————————————————————————————
Started additional assessments for the La Honda Creek White Barn project.————————————————————————————————————————————————————————
Completed historic and structural assessments for the La Honda Creek White Barn. ————————————————————————————————————————————————————————
MAA05-009 La Honda Creek Redwood Cabin Removal and Site Restoration
Fiscal Year 2022 ————————————————————————————————————————————————————————
Initiated CEQA (environmental review) process for the proposed cabin removal project. ————————————————————————————————————————————————————————
Completed and published the Draft EIR for public review and comments. Held a public hearing to receive
public comments on the Draft EIR on April 27, 2022.
Prior Years————————————————————————————————————————————————————————
Retained consultant to conduct CEQA compliance process for the planned structure demolition and site
restoration. Circulated Notice of Preparation to prepare an Environmental Impact Report (EIR) on June 9,
2021. Held a CEQA scoping session for the Draft EIR on June 23, 2021.————————————————————————————————————————————————————————
29Measure AA Bond Annual Accountability Report FY22
————————————————————————————————————————————————————————
Completed site assessment and basis of design report analyzing four different design alternatives;
presented findings to the board, resulting in board selection of the demolition design alternative.————————————————————————————————————————————————————————
Started the site assessment for the La Honda Creek Redwood Cabin project. ————————————————————————————————————————————————————————
MAA05-010 Restoration Forestry Demonstration Project
Fiscal Year 2022 ————————————————————————————————————————————————————————
Drafted the La Honda Forest Management Plan, met with stakeholders, and held a public meeting with
neighbors to review findings and recommendations.
Prior Years————————————————————————————————————————————————————————
Completed all the forest inventory and roads assessments. Compiled the findings into a draft La Honda
Forest Management Plan for board and public input.————————————————————————————————————————————————————————
MAA05-011 Lone Madrone Ranch Fence Installation
Prior Years————————————————————————————————————————————————————————
Developed a fencing plan to prevent cattle from accessing the La Honda Creek riparian corridor to protect
sensitive habitat and keep cattle from entering the neighboring private property. Signed easement agreements
and walked the proposed fence location with neighbors to make certain all parties are in agreement on the
fence installation work. Contractor to begin work in FY22. ————————————————————————————————————————————————————————
In Support of MAA05
Fiscal Year 2022 ————————————————————————————————————————————————————————
Completed multiple technical studies (traffic, biological, botanical, arborist, wetlands delineation, cultural
resources, topographical, geotechnical) in preparation for an opportunity and constraints analysis report
to be presented to the Planning and Natural Resources Committee in FY23 for the La Honda Creek Parking
and Trailhead Access-Feasibility Study project. Initiated public engagement with tabling as part of the
Grasshopper Loop Trail opening and 50th anniversary tabling at the La Honda Fair to provide a project
update to the community.
Prior Years————————————————————————————————————————————————————————
Negotiated reciprocal road access and waterline easements with neighboring property owners in the Red
Barn Area of La Honda Creek Preserve.————————————————————————————————————————————————————————
Completed the Public Access Working Group pilot engagement process with committee review in July 2020
and board approval of the final report and recommendations in October 2020. Initiated a request for proposals
for consultant services to conduct technical analyses, site opportunities and constraints analysis and a
feasibility study of the Public Access Working Group recommended sites. Released RFP on June 21, 2021.————————————————————————————————————————————————————————
Formed a Public Access Working Group with community members, constituent representative(s) from each ward,
and two board liaisons to identify new, viable parking area and trailhead options to open the central area of the
preserve to public access. Held seven Working Group meetings between August 2019 and March 2020. ————————————————————————————————————————————————————————
Developed process for and formation of the new Public Access Working Group for the La Honda Creek
Parking and Trailhead Access Feasibility Study. ————————————————————————————————————————————————————————
Pursued trail connections to the central area of La Honda Creek Preserve by meeting several times with
landowner to convey interest in possible land or trail easement purchases as part of efforts to design and
implement phase 2 trails of the La Honda Creek Preserve Master Plan. ————————————————————————————————————————————————————————
Contracted with consulting professionals to develop the La Honda forest management plan to evaluate
restoration and management priorities in the watershed.————————————————————————————————————————————————————————
30 Measure AA Bond Annual Accountability Report FY22
P R O J E C T C H A L L E N G E S
————————————————————————————————————————————————————————
Modifications to the proposed Phase II Trail alignments may be necessary to address geological concerns
based on engineering/site condition studies and could result in adjustments to the project.————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S
————————————————————————————————————————————————————————
Finalize Phase 2 trail designs for the planned trail connection between central La Honda Creek Preserve and
existing Sears Ranch Road parking lot (lower La Honda). Initiate permitting with San Mateo County and the
regulatory agencies.
————————————————————————————————————————————————————————
Construct Lone Madrone grazing water infrastructure improvements.
————————————————————————————————————————————————————————
Complete feasibility study for La Honda Parking and Trailhead. Select preferred site plan alternative(s) to
advance into environmental review and design development. Complete environmental review and continued
public and stakeholder engagement. Present final proposed parking and trailhead access project to the board
for CEQA and project approval.————————————————————————————————————————————————————————
Portfolio 5: La Honda Creek—Upper Area Recreation, Habitat Restoration and Conservation Grazing
Projects
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $11,733,000
05-001—La Honda Creek Land
Conservation Opportunities
$1,756,093 $0 $1,756,093
05-002—Upper La Honda Creek
Grazing Infrastructure
$297,432 $0 $297,432
05-005—La Honda Creek Red
Barn Parking Area and Easy
Access Trail
$327,514 $0 $327,514
05-007 La Honda Creek Phase II
Trail Connections
$0 $28,079 $28,079
05-008—La Honda Creek White
Barn Structural Rehabilitation
$142,811 $101,501 $244,312
05-009—La Honda Creek
Redwood Cabin Removal and
Site Restoration
$119,687 $88,168 $207,855
05-010—Restoration Forestry
Demonstration Project
$32,067 $4,700 $36,767
05-011—Lone Madrone Ranch
Fence Installation
$163 $63,200 $63,363
Grand Total $11,733,000 $2,675,767 $285,648 $2,961,415 $8,771,585 25.24%
25.24%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$2,961,415
Expenditure Plan Remaining
$8,771,585
31Measure AA Bond Annual Accountability Report FY22
Portfolio 6
Windy Hill
Trail Improvements,
Preservation and
Hawthorns Area Historic
Partnership
Windy Hill Open Space Preserve by Gail Wesling
D E S C R I P T I O N————————————————————————————————————————————————————————
Improve trails; complete pond facilities. ————————————————————————————————————————————————————————
Increase multiuse trails; study possible improvements to increase dog use. ————————————————————————————————————————————————————————
Open Hawthorns Area; develop trails connecting to Portola Valley and Palo Alto trails. ————————————————————————————————————————————————————————
Partner to protect, restore and interpret historic buildings. ————————————————————————————————————————————————————————
Improve habitat conditions in Los Trancos Creek. ————————————————————————————————————————————————————————
Preserve additional scenic open space as available. ————————————————————————————————————————————————————————
Portfolio Allocation: $12,740,000 Portfolio Expenditures Through 6/30/2022: $148,577 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA06-002 Hawthorns Area Plan
Fiscal Year 2022 ————————————————————————————————————————————————————————
Presented draft vision and goals for the Hawthorns Area Plan to the Planning and Natural Resources (PNR)
Committee in August 2021 and presented revised vision and goals and working group formation strategy to
PNR Committee in November. Held successful project collaboration meetings with Town of Portola Valley
staff, City Council and community stakeholders. ————————————————————————————————————————————————————————
Presented Hawthorns Area Plan planning and public engagement process to PNR Committee and secured
Board of Directors approval of project vision and goals in March 2022.————————————————————————————————————————————————————————
Released a transportation planning services RFP for consultant assistance.————————————————————————————————————————————————————————
Initiated technical studies pertaining to property boundary delineations, wetland resources, wildlife
resources, archaeological resources, historic resources and hazardous materials at the Hawthorns Area.————————————————————————————————————————————————————————
Conducted in-person neighborhood meeting with Town of Portola residents in June 2022.
Prior Years ————————————————————————————————————————————————————————
Worked with the Town of Portola Valley to establish ongoing coordination timeframe and preliminary
permit requirements. ————————————————————————————————————————————————————————
Conducted initial evaluation of potential public access programming and feasibility for new parking area
and trail. ————————————————————————————————————————————————————————
32 Measure AA Bond Annual Accountability Report FY22
In Support of MAA06
Fiscal Year 2022 ————————————————————————————————————————————————————————
To explore a possible new partnership to rehabilitate areas of the historic complex, staff initiated scoping
and retained consultants to conduct structural assessments of buildings in the Hawthorns Historic Complex.
Prior Years————————————————————————————————————————————————————————
Completed short-term repairs to the Hawthorns House foundation and temporary roof covering.————————————————————————————————————————————————————————
Held meetings with Town of Portola Valley and onsite with stakeholders and community members for
discussion of permitting approach with Town. ————————————————————————————————————————————————————————
Retained planning consultant to assist with project planning due to vacant Planner III position.————————————————————————————————————————————————————————
Conducted a parking study to assess site feasibility for a proposed parking area and driveway location. ————————————————————————————————————————————————————————
Completed a cultural resources field survey and assessment report. ————————————————————————————————————————————————————————
Initiated development of public outreach and stakeholder engagement process for site plan project to
review with board committee and Town of Portola Valley.————————————————————————————————————————————————————————
P R O J E C T C H A L L E N G E S————————————————————————————————————————————————————————
Historic complex of structures, including the main residence and garage, are in significant disrepair. ————————————————————————————————————————————————————————
Multiyear effort to secure a viable partnership for maintenance and reuse of the property has not been
previously successful. ————————————————————————————————————————————————————————
Integration of Midpen’s planning and environmental review process with the Town of Portola Valley
permitting and public engagement process is complex and requires additional coordination.————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S————————————————————————————————————————————————————————
To facilitate the planning of public access improvements at the Hawthorns Area, Midpen board committee
and board will consider formation and composition of a potential working group. Midpen will proceed with
a robust public and stakeholder engagement process to develop conceptual plan alternatives to present to
the Midpen board committee and board. ————————————————————————————————————————————————————————
Portfolio 6: Windy Hill—Trail Improvements, Preservation and Hawthorns Area Historic Partnership
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $12,740,000
06-002—Hawthorns Area Plan $40,950 $107,627 $148,577
Grand Total $12,740,000 $40,950 $107,627 $148,577 $12,591,423 1.17%
1.17%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$148,577
Expenditure Plan Remaining
$12,591,423
33Measure AA Bond Annual Accountability Report FY22
Portfolio 7
La Honda Creek
Driscoll Ranch Public
Access, Endangered
Wildlife Protection and
Conservation Grazing
La Honda Creek Open Space Preserve by Bobby Wheelock
D E S C R I P T I O N————————————————————————————————————————————————————————
Open Driscoll Ranch Area; provide biking/hiking/equestrian trails, limited dog access, parking areas and
interpretive displays. ————————————————————————————————————————————————————————
Develop loop and connector trails.————————————————————————————————————————————————————————
Restore habitat for endangered species. ————————————————————————————————————————————————————————
Restore La Honda Creek; remove fish migration barriers. ————————————————————————————————————————————————————————
Portfolio Allocation: $14,825,000 Portfolio Expenditures Through 6/30/2022: $12,425,307 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA07-001 Event Center and Apple Orchard Purchase
Prior Years————————————————————————————————————————————————————————
Purchased the 307.64-acre Apple Orchard and Event Center property, as well as a 3-acre conservation
easement from POST to protect and further restore redwood, coho salmon and steelhead habitat along
San Gregorio Creek. ————————————————————————————————————————————————————————
Completed invasive weed control work at the Apple Orchard and Driscoll Ranch properties of La Honda
Creek Preserve. ————————————————————————————————————————————————————————
MAA07-002 Fisheries Restoration, Design and Permitting
Prior Years————————————————————————————————————————————————————————
Partially funded by CDFW Fisheries Restoration Grant Program. Completed road and trail upgrades and
drainage improvements along nearly 5 miles of road to address priority erosion control sites to reduce
sediment delivery to San Gregorio Creek and tributaries.————————————————————————————————————————————————————————
MAA07-003 Fisheries Enhancement, Apple Orchard
Prior Years————————————————————————————————————————————————————————
Completed fisheries habitat enhancement project at the Apple Orchard parcel of lower La Honda Creek,
installing 13 in-stream, large woody debris structures, in partnership with the San Mateo Resource
Conservation District and CDFW Fisheries Restoration Grant Program. ————————————————————————————————————————————————————————
34 Measure AA Bond Annual Accountability Report FY22
MAA07-004 Fisheries Enhancement, Event Center
Prior Years————————————————————————————————————————————————————————
Completed fisheries restoration project at the Event Center, installing large woody debris habitat within
San Gregorio Creek to improve salmonid habitat. ————————————————————————————————————————————————————————
MAA07-005 Grazing and Water Systems Infrastructure
Prior Years————————————————————————————————————————————————————————
Completed pond reconstruction to enhance breeding habitat for California red-legged frog and to improve
the water source as a cattle stock pond. ————————————————————————————————————————————————————————
Constructed a new corral system at the previous site of the Wool Ranch house to support the conservation
grazing program. ————————————————————————————————————————————————————————
Installed riparian protection fencing, water pipe and new water troughs at Driscoll Ranch to support
conservation grazing.————————————————————————————————————————————————————————
MAA07-006 Cunha Land Purchase
Prior Years————————————————————————————————————————————————————————
Purchased the 30-acre Cunha Trust property at the end of Sears Ranch Road to provide on-site patrol and
management oversight, and to secure ownership of the private road that now serves as the driveway
entrance into the Sears Ranch parking lot. ————————————————————————————————————————————————————————
MAA07-007 Demolitions, Wool Ranch House/Sears Ranch Rd
Prior Years————————————————————————————————————————————————————————
Completed site clean-up and demolition of numerous dilapidated structures, after completing photography
documentation of the structures, to prepare the preserve for public access. ————————————————————————————————————————————————————————
MAA07-008 Lower Turtle Pond Repair—La Honda Creek
Fiscal Year 2022————————————————————————————————————————————————————————
Completed engineering designs to repair Lower Turtle Pond, which provides critical habitat for Western
Pond Turtle and also serves as a watering source for the conservation grazing program. Began permitting
partnership discussions with San Mateo Resource Conservation District.
Prior Years————————————————————————————————————————————————————————
Assessed flooding risk and berm stability through hydrological and geotechnical investigations. ————————————————————————————————————————————————————————
MAA07-009 Sears Ranch Parking Area
Prior Years————————————————————————————————————————————————————————
Finalized deck replacement and installed new rails on the Harrington Creek Bridge, allowing trail users to
safely cross a major creek. ————————————————————————————————————————————————————————
Constructed the new Sears Ranch parking area, providing 22 vehicle spaces, a restroom, signage and the
main trailhead to access the trails in the southern area of the preserve. ————————————————————————————————————————————————————————
Completed phase 1 trail and road repairs in preparation for the public opening of lower La Honda Creek
Preserve, including installation of signage and self-closing gates.————————————————————————————————————————————————————————
Completed the permit-only equestrian parking area and equestrian-only trail segment connecting to the
new Folger Ranch Loop Trail. ————————————————————————————————————————————————————————
35Measure AA Bond Annual Accountability Report FY22
MAA07-010 Sears Ranch Road Repair
Prior Years————————————————————————————————————————————————————————
Completed over 3 miles of ranch road repairs, including culvert replacements, to the main ranch road in
lower La Honda Creek Preserve. These were critical for: opening the roads to public access; maintaining safe
passage for patrol, maintenance and emergency vehicle use; and providing ranch access to support the
ongoing conservation grazing program.————————————————————————————————————————————————————————
MAA07-011 Lower La Honda Creek Phase II Loop Trails
Fiscal Year 2022 ————————————————————————————————————————————————————————
Completed construction of the Grasshopper Loop Trail and opened the trail to the public, including seasonal
on-leash dog access.
Prior Years————————————————————————————————————————————————————————
Completed San Mateo County Grading, Resource Management and Building permitting processes for a new
loop trail. ————————————————————————————————————————————————————————
Performed necessary pre-construction biological surveys and coordinated with the grazing tenant.————————————————————————————————————————————————————————
Initiated construction, completing 3,400 linear feet of trail construction with compacted aggregate base surfacing.————————————————————————————————————————————————————————
Completed biological/cultural/wetland reports and provided copies to the appropriate agencies.————————————————————————————————————————————————————————
Submitted County of San Mateo permits.————————————————————————————————————————————————————————
Completed trail design at 90% (contracted with Fall Creek Engineering to design and engineer the La Honda
Creek Loop Trail).————————————————————————————————————————————————————————
Completed rare plant survey and wetland delineations to inform the design of the trail alignment.————————————————————————————————————————————————————————
In Support of MAA07
Fiscal Year 2022 ————————————————————————————————————————————————————————
Completed structural site improvements for the Agricultural Workforce Housing project to maintain critical
housing on the coast that furthers Midpen’s coastside mission to support local agriculture.
Prior Years————————————————————————————————————————————————————————
Received San Mateo County permits for the agricultural workforce housing project to repair an existing
residence that supports the conservation grazing program/agricultural program. ————————————————————————————————————————————————————————
Completed the construction bidding process. Received board approval to award the construction contract,
with construction scheduled to begin in August 2021.————————————————————————————————————————————————————————
Completed installation of new water line, storage tank and water trough.————————————————————————————————————————————————————————
Received board direction to repair an existing housing facility and to designate the residence as Agricultural
Workforce Housing.————————————————————————————————————————————————————————
Completed a housing structures assessment for the Driscoll Ranch area of La Honda Creek Preserve and secured
board approval to build/repair agricultural workforce housing in partnership with the County of San Mateo. ————————————————————————————————————————————————————————
Hosted groundbreaking ceremony and public grand opening celebration at lower La Honda Creek Preserve. ————————————————————————————————————————————————————————
36 Measure AA Bond Annual Accountability Report FY22
P R O J E C T C H A L L E N G E S————————————————————————————————————————————————————————
No project challenges identified at this time. ————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S————————————————————————————————————————————————————————
Develop plans for and construct phase 2 roads and trails that will connect the new Sears Ranch Road
parking area (lower La Honda) with the central La Honda area (upper La Honda). ————————————————————————————————————————————————————————
Portfolio 7: La Honda Creek—Driscoll Ranch Public Access, Endangered Wildlife Protection and
Conservation Grazing
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $14,825,000
07-001—Event Center and Apple
Orchard Purchase
$6,007,601 $0 $6,007,601
07-002—Fisheries Restoration,
Design and Permitting
$727,716 $0 $727,716
07-003—Fisheries Enhancement,
Apple Orchard
$16,152 $0 $16,152
07-004—Fisheries Enhancement,
Event Center
$50,000 $0 $50,000
07-005—Grazing and Water
Systems Infrastructure
$189,423 $0 $189,423
07-006—Cunha Land Purchase $3,080,705 $0 $3,080,705
07-007—Demolitions, Wool
Ranch House/Sears Ranch Road
$357,803 $0 $357,803
07-008—Lower Turtle Pond
Repair—La Honda Creek
$14,963 $31,439 $46,402
07-009—Sears Ranch Parking
Areas
$1,147,554 $0 $1,147,554
07-010—Sears Ranch Road Repair $557,044 $0 $557,044
07-011—Lower La Honda Creek
Phase II Loop Trails
$349,722 $126,155 $475,877
Subtotal $14,825,000 $12,498,683 $157,594 $12,656,277 $2,168,723 85.37%
07-002—Fisheries Restoration,
Design and Permitting Grant
Income
($230,970)$0 ($230,970)
Grand Total $14,825,000 $12,267,713 $157,594 $12,425,307 $2,399,693 83.81%
83.81%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$12,425,307
Expenditure Plan Remaining
$2,399,693
37Measure AA Bond Annual Accountability Report FY22
Portfolio 8
La Honda Creek
and Russian Ridge
Preservation of Upper San
Gregorio Watershed and
Ridge Trail Completion
Russian Ridge Open Space Preserve by Matt McLean
D E S C R I P T I O N————————————————————————————————————————————————————————
Preserve Upper San Gregorio watershed; restore endangered species habitats. ————————————————————————————————————————————————————————
Support opportunities to provide additional water for fisheries.————————————————————————————————————————————————————————
Complete Bay Area Ridge Trail multiuse connections and gaps.————————————————————————————————————————————————————————
Provide additional public use facilities. ————————————————————————————————————————————————————————
Portfolio Allocation: $15,347,000 Portfolio Expenditures Through 6/30/2022: $2,153,910 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA08-001 Folger Property Purchase
Prior Years ————————————————————————————————————————————————————————
Purchased the 190-acre Woodruff Redwoods property as an addition to La Honda Creek Preserve.————————————————————————————————————————————————————————
In Support of MAA08
Fiscal Year 2022 ————————————————————————————————————————————————————————
Surveyor completed mapping of viable access road alternative to the Woodruff Redwoods property. Entered
into a permit-to-enter with private property for Midpen access of the Woodruff Redwoods property while
negotiations for an access easement are underway with the property owner.
Prior Years————————————————————————————————————————————————————————
Completed an appraisal and initial site inspections of the Pratt Trust property. ————————————————————————————————————————————————————————
P R O J E C T C H A L L E N G E S————————————————————————————————————————————————————————
No project challenges identified at this time.————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S————————————————————————————————————————————————————————
Continue to pursue opportunities for to expand Bay Area Ridge Trail connections. ————————————————————————————————————————————————————————
38 Measure AA Bond Annual Accountability Report FY22
Portfolio 8: La Honda Creek and Russian Ridge—Preservation of Upper San Gregorio Watershed and
Ridge Trail Completion
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $15,347,000
08-001—Folger Property
Purchase
$2,153,910 $0 $2,153,910
Grand Total $15,347,000 $2,153,910 $0 $2,153,910 $13,193,090 14.03%
14.03%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$2,153,910
Expenditure Plan Remaining
$13,193,090
Russian Ridge Open Space Preserve by Chris Tracey
39Measure AA Bond Annual Accountability Report FY22
Portfolio 9
Russian Ridge
Public Recreation, Grazing
and Wildlife Protection
Projects
Russian Ridge Open Space Preserve by Chris Tracey
D E S C R I P T I O N————————————————————————————————————————————————————————
Open currently closed areas of preserve.————————————————————————————————————————————————————————
Construct and extend trails. ————————————————————————————————————————————————————————
Improve fencing, corrals and water systems to reintroduce conservation grazing.————————————————————————————————————————————————————————
Improve habitat for sensitive species; implement pond enhancement projects for garter snakes and
red-legged frogs.————————————————————————————————————————————————————————
Portfolio Allocation: $5,560,000 Portfolio Expenditures Through 6/30/2022: $628,202 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA09-001 Russian Ridge Grazing Infrastructure
Prior Years————————————————————————————————————————————————————————
Completed brush management of the south pasture at Mindego Ranch. ————————————————————————————————————————————————————————
Upgraded the corral and water system at Mindego Ranch, installing two 5,000-gallon water storage tanks,
11,000 feet of buried pipe, six water troughs and solar-powered water pump for storage tanks. Selected a
grazing tenant to manage the conservation grazing operation. ————————————————————————————————————————————————————————
MAA09-003 Russian Ridge Mindego Pond Improvement
Prior Years————————————————————————————————————————————————————————
Completed the final design, permitting and construction of the pond improvements.————————————————————————————————————————————————————————
The US Army Corps of Engineers authorized the Section 404 permit in April 2020.————————————————————————————————————————————————————————
The San Mateo County Resource Conservation District Board of Directors approved a grading permit
exemption for the 630 cubic yards of proposed grading work in February 2020.————————————————————————————————————————————————————————
Design-build entity completed project construction documents, basis of design, integrated pest
management plan and vegetation management plan in September 2019.————————————————————————————————————————————————————————
The design-build entity applied for a grading permit exemption from County of San Mateo and a section 401
permit from the RWQCB.————————————————————————————————————————————————————————
Selected a design-build firm to improve the ponds to support endangered species’ habitat. ————————————————————————————————————————————————————————
MAA09-004 Mindego Hill Trail Construction
Prior Years————————————————————————————————————————————————————————
Constructed and opened an extension of Mindego Hill Trail to the top of the prominent Mindego Hill with
360-degree panoramic views. ————————————————————————————————————————————————————————
40 Measure AA Bond Annual Accountability Report FY22
————————————————————————————————————————————————————————
Completed remediation of the Mindego Ranch area. ————————————————————————————————————————————————————————
MAA09-006 Mindego Ranch South Pasture
Fiscal Year 2022————————————————————————————————————————————————————————
Completed the addition of 98 acres of grasslands to conservation grazing program.————————————————————————————————————————————————————————
Completed fence and water infrastructure improvements to expand the conservation grazing program as a
management tool to conserve the high biodiversity of the surrounding grassland habitat and prevent brush
encroachment.
In Support of MAA09
Prior Years————————————————————————————————————————————————————————
Received board approval for the grazing tenant to perform fence and water infrastructure installation to support
the conservation grazing program. Fence construction will be performed first and begin mid-summer. Based
upon public feedback, water system improvements will include a water trough for public equestrian use.————————————————————————————————————————————————————————
The grazing tenant applied and was awarded partial funding for the water system improvements from the
National Resource Conservation Service Environmental Quality Improvement Project program. ————————————————————————————————————————————————————————
The grazing tenant completed coyote brush mowing in the planned pasture expansion area.————————————————————————————————————————————————————————
Completed year four of the San Francisco garter snake field study and ongoing bullfrog eradication work at
Mindego Ranch in Russian Ridge Preserve. ————————————————————————————————————————————————————————
P R O J E C T C H A L L E N G E S
————————————————————————————————————————————————————————
None.————————————————————————————————————————————————————————
Portfolio 9: Russian Ridge—Public Recreation, Grazing and Wildlife Protection Projects
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $5,560,000
09-003—Russian Ridge Mindego
Pond Improvement
$174,416 $0 $174,416
09-004—Mindego Hill Trail
Construction
$448,106 $387 $448,493
09-004—Mindego Hill Trail
Construction
$67,403 $0 $67,403
09-006—Mindego Ranch South
Pasture
$0 $106,475 $106,475
Subtotal $5,560,000 $689,925 $106,862 $796,787 $4,763,213 14.33%
09-003—Russian Ridge Mindego
Pond Improvement Grant Income
$0 ($168,585)($168,585)
Grand Total $5,560,000 $689,925 ($61,723)$628,202 $4,931,798 11.30%
11.30%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$628,202
Expenditure Plan Remaining
$4,931,798
41Measure AA Bond Annual Accountability Report FY22
Portfolio 10
Coal Creek
Reopen Alpine Road
for Trail Use
Coal Creek Open Space Preserve by Taylor Fortnam
D E S C R I P T I O N————————————————————————————————————————————————————————
Reopen Alpine Road as trail connection between Portola Valley and Skyline Boulevard. ————————————————————————————————————————————————————————
Reroute trails to reduce erosion and improve visitor experience. ————————————————————————————————————————————————————————
Portfolio Allocation: $8,017,000 Portfolio Expenditures Through 6/30/2022: $554,434 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA10-001 Alpine Road Regional Trail, Coal Creek
Fiscal Year 2022 ————————————————————————————————————————————————————————
Secured regulatory and county permits to proceed with construction. ————————————————————————————————————————————————————————
Completed construction design plans and bid documents and successfully bid the project.————————————————————————————————————————————————————————
Entered into a funding agreement with Santa Clara County for Stanford Recreation Mitigation Funds.————————————————————————————————————————————————————————
Retained the services of a biomonitor and prepared for construction to commence.
Prior Years ————————————————————————————————————————————————————————
Completed the CEQA process with the certification of the Initial Study/Mitigated Negative Declaration by
the board in January 2021. ————————————————————————————————————————————————————————
Submitted permit applications to the California Department of Fish and Wildlife, Regional Water Quality
Control Board, and US Army Corps of Engineers. Coordinated with San Mateo County Public Works on a
memorandum of understanding to streamline the county permitting process.————————————————————————————————————————————————————————
Completed the 65% design documents, Alternatives Analysis report, geotechnical investigation and report,
wetland and riparian delineation, botanical survey and report and an Initial Study/Mitigated Negative
Declaration CEQA document has been drafted and is ready for release for public comment. ————————————————————————————————————————————————————————
Executed a memorandum of understanding with County of San Mateo regarding future transfer of Alpine
Road to Midpen.————————————————————————————————————————————————————————
Began assessment of trail conditions and developed recommendations/alternatives and cost analysis for
repairs. Developed agreement with the County of San Mateo for long-term repairs.————————————————————————————————————————————————————————
Updated the road and trail inventory and completed preliminary conceptual design alternatives for two
large failures on Alpine Road. Presented options for repairs and improvements to the board, who selected
the approach of repairing failures to trail width (6-foot-wide standard). ————————————————————————————————————————————————————————
42 Measure AA Bond Annual Accountability Report FY22
P R O J E C T C H A L L E N G E S
————————————————————————————————————————————————————————
County of San Mateo owns a public right-of-way easement over Alpine Road Trail; repairs are being
completed under a County encroachment permit.————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S
————————————————————————————————————————————————————————
Complete construction Alpine Road Trail project.
————————————————————————————————————————————————————————
Design and construct realigned trail to replace the Bypass Trail portion of the Alpine Road Trail.————————————————————————————————————————————————————————
Portfolio 10: Coal Creek—Reopen Alpine Road for Trail Use
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $8,017,000
10-001—Alpine Road Regional
Trail, Coal Creek
$467,648 $86,786 $554,434
Grand Total $8,017,000 $467,648 $86,786 $554,434 $7,462,566 6.92%
Total Life-to-Date Through 6/30/22
$554,434
Expenditure Plan Remaining
$7,462,566
43Measure AA Bond Annual Accountability Report FY22
6.92%
OF FUNDS
USED
Portfolio 11
Rancho San Antonio
Interpretive Improvements,
Refurbishing and Transit
Solutions
Rancho San Antonio Open Space Preserve by S. Suresh
D E S C R I P T I O N————————————————————————————————————————————————————————
Add welcome center.————————————————————————————————————————————————————————
Refurbish and add interpretive exhibits to Deer Hollow Farm.————————————————————————————————————————————————————————
Support of transit improvement options such as bike trails, bike share station, bus service or additional
parking.————————————————————————————————————————————————————————
Portfolio Allocation: $10,811,000 Portfolio Expenditures Through 6/30/2022: $282,352 ———————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA11-001 New Trails to Connect Quarry Trail to Black Mountain Trail
Prior Years————————————————————————————————————————————————————————
Accepted two trail easements, two rights of first offer and rights of first refusal, and a conditional grant deed
conveyance, for properties adjacent to Monte Bello and Rancho San Antonio preserves. ————————————————————————————————————————————————————————
MAA11-002 Rancho San Antonio, Deer Hollow Farm: White Barn Rehabilitation
Prior Years————————————————————————————————————————————————————————
Completed construction of stabilization and weatherproofing improvements of the White Barn as
an important agricultural support building that provides for active environmental programming and
interpretation on site, including hosting elementary school camps, offering weekend events and providing
drop-in visitor exploration.————————————————————————————————————————————————————————
Completed project design and started the permitting process with County of Santa Clara; and issued
Request for Bids for construction. ————————————————————————————————————————————————————————
Selected consultant for the design and assessment of the Rancho San Antonio White Barn to improve
building access, structural stability and public safety.————————————————————————————————————————————————————————
With MAA and other funding, completed historic and structural assessments for the Deer Hollow Farm White
Barn; obtained Legislative, Funding, and Public Affairs Committee confirmation of partnership agreements
to fund project. ————————————————————————————————————————————————————————
MAA11-003 Rancho San Antonio (RSA) Multimodal Access—Implementation
Fiscal Year 2022 ————————————————————————————————————————————————————————
Installed new bike racks and a bike repair station. Negotiated commitments with the City of Cupertino for
road improvements that are scheduled to be implemented in FY23, with cost-sharing to be determined. ————————————————————————————————————————————————————————
Ordered a dynamic sign/traffic sensors system that will provide real-time parking availability information at
the preserve entrance and on Midpen’s website to assist with parking management.
44 Measure AA Bond Annual Accountability Report FY22
In Support of MAA11
Fiscal Year 2022 ————————————————————————————————————————————————————————
Released a Request for Proposals to solicit transportation consulting services to develop a subsidized ride
hail program and shuttle program for the preserve.
Prior Years————————————————————————————————————————————————————————
Completed multimodal access study with Planning and Natural Resources Committee review in September
2020 and January 2021, and board approval of final report and transportation demand management strategies
in April 2021. Prepared a high-level implementation plan for next steps. Completed signage installation efforts
on Foothills Expressway and St. Joseph’s Avenue in Los Altos to assist with wayfinding of the preserve. ————————————————————————————————————————————————————————
Restored the Deer Hollow Farm White Barn milk room at Rancho San Antonio Preserve, facilitating ongoing
environmental interpretation and animal husbandry at the popular farm site. ————————————————————————————————————————————————————————
Conducted a one-week tabling campaign for mountain lion awareness at Rancho San Antonio Preserve.————————————————————————————————————————————————————————
Coordinated with the City of Mountain View and Friends of Deer Hollow Farm to prepare for a historic and structural
assessment of the White Barn at Rancho San Antonio Preserve that was conducted during fiscal year 2017-18. ————————————————————————————————————————————————————————
P R O J E C T C H A L L E N G E S
————————————————————————————————————————————————————————
Implementation of some of the board-approved Tier 1 transportation demand management strategies are
dependent on partnership coordination, agreements, resources and co-implementation with other agencies.
————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S
————————————————————————————————————————————————————————
Develop a plan for a subsidized hail program and shuttle program and present implementation plan, cost
and resource implications, and performance metrics to the board to determine next steps. ————————————————————————————————————————————————————————
45Measure AA Bond Annual Accountability Report FY22
Portfolio 11: Rancho San Antonio—Interpretive Improvements, Refurbishing and Transit Solutions
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $10,811,000
11-001—New Trails to Connect
Quarry Trail to Black Mountain
Trail
$728 $0 $728
11-002—Rancho San Antonio,
Deer Hollow Farm: White Barn
Rehabilitation
$512,505 $0 $512,505
Subtotal $10,811,000 $513,233 $0 $513,233 $10,297,767 4.75%
11-002 Rancho San Antonio,
Deer Hollow Farm: White Barn
Rehabilitation Grant Income
($230,881)$0 ($230,881)
Grand Total $10,811,000 $282,352 $0 $282,352 $10,528,648 2.61%
Total Life-to-Date Through 6/30/22
$282,352
Expenditure Plan Remaining
$10,528,648
2.61%
OF FUNDS
USED
Portfolio 12
Peninsula/South Bay Cities
Partner to Complete
Middle Stevens Creek Trail
Stevens Creek Trail by Dicklyon, CC BY-SA 4-0
D E S C R I P T I O N————————————————————————————————————————————————————————
Support work by cities to develop the middle section of the Stevens Creek Trail and enhance
neighborhood connections. ————————————————————————————————————————————————————————
Support work by partners to complete stream corridor restoration and steelhead habitat enhancement
below dam. ————————————————————————————————————————————————————————
Develop and install interpretive signage.————————————————————————————————————————————————————————
Portfolio Allocation: $1,038,000 Portfolio Expenditures Through 6/30/2022: $0 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
In Support of MAA12
Fiscal Year 2022 ————————————————————————————————————————————————————————
Designated ~ four miles of existing Monte Bello Preserve trails, including the White Oak, Skid Road, and
Stevens Creek Nature Trails as part of the regional Stevens Creek Trail with formal signage. Midpen is the
first agency to install the new Stevens Creek Trail medallion signage along the regional trail corridor, with
other agencies planning to designate and sign their portions of the trail as well.
Prior Years————————————————————————————————————————————————————————
Supported work by partners to complete stream corridor restoration and steelhead habitat enhancement
below Stevens Creek Dam. Coordinated with partners, reviewed technical reports, held site visit to Deep Cliff
Golf site and produced letter of funding support. ————————————————————————————————————————————————————————
P R O J E C T C H A L L E N G E S
————————————————————————————————————————————————————————
None at this time.
————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S
————————————————————————————————————————————————————————
Continue to follow the work of other agencies and organization as they proceed to develop the middle
section of the Stevens Creek Trail to identify opportunities for Midpen support and participation. Provide
funding to the Friends of Stevens Creek to complete Deep Cliff fish passage project.————————————————————————————————————————————————————————
46 Measure AA Bond Annual Accountability Report FY22
Portfolio 12: Peninsula/South Bay Cities—Partner to Complete Middle Stevens Creek Trail
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $1,038,000
Grand Total $1,038,000 $0 $0 $0 $1,038,000 0.00%
Total Life-to-Date Through 6/30/22
$0
Expenditure Plan Remaining
$1,038,000
47Measure AA Bond Annual Accountability Report FY22
0.00%
OF FUNDS
USED
Portfolio 13
Cloverdale Ranch
Wildlife Protection,
Grazing and Trail
Connections
Cloverdale Ranch by Teddy Miller
D E S C R I P T I O N————————————————————————————————————————————————————————
Improve fencing, corrals and water systems to increase conservation grazing and sustain large
contiguous grasslands.————————————————————————————————————————————————————————
Restore habitat for endangered species.————————————————————————————————————————————————————————
Provide trail connections to nearby state parks.————————————————————————————————————————————————————————
Portfolio Allocation: $15,712,000 Portfolio Expenditures Through 6/30/2022: $0 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
In Support of MAA13
Fiscal Year 2022 ————————————————————————————————————————————————————————
Continued community engagement meetings with individuals and attended Pescadero Municipal Advisory
Council and Sustainable Pescadero meetings. Held a site visit at Lower La Honda in June 2022 with Pescadero
community members. ————————————————————————————————————————————————————————
Completed second year of botanical study, draft road and trail inventory and began preparing the rangeland
management plan.————————————————————————————————————————————————————————
Worked with the Grants Program to secure a $500,000 grant from San Mateo County to support the purchase
(increasing the total amount of available grant purchase funds to $9,943,000).
Prior Years ————————————————————————————————————————————————————————
Initial botanical studies of the property and Lake Lucerne water system infrastructure evaluation completed.————————————————————————————————————————————————————————
State approved $8 million in funding in the 2021-22 state budget for the proposed purchase of Cloverdale
Ranch by 2023. Additional State Recreational Infrastructure Revenue Enhancement grant funding in the
amount of $1,428,000 is also available for Cloverdale that will also need to be encumbered by 2023. ————————————————————————————————————————————————————————
Initiated community engagement process to develop familiarity with neighbors and surrounding community
and to facilitate awareness of Midpen mission, values and work. Met with four agricultural and two grazing
tenants of the Cloverdale Ranch property.————————————————————————————————————————————————————————
Completed compilation of background information and existing conditions report for the Cloverdale Ranch
property. ————————————————————————————————————————————————————————
Initiated community and partner outreach, including meeting with the Resource Conservation District, La
Honda Pescadero Unified School District, Pescadero Municipal Advisory Committee, State Parks, Sustainable
Pescadero, County of San Mateo, Puente, State Coastal Conservancy and grazing tenants.————————————————————————————————————————————————————————
48 Measure AA Bond Annual Accountability Report FY22
Portfolio 13: Cloverdale Ranch—Wildlife Protection, Grazing and Trail Connections
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $15,712,000
Grand Total $15,712,000 $0 $0 $0 $15,712,000 0.00%
Total Life-to-Date Through 6/30/22
$0
Expenditure Plan Remaining
$15,712,000
49Measure AA Bond Annual Accountability Report FY22
————————————————————————————————————————————————————————
Held site tours at Cloverdale Ranch for board members, local officials, State representatives and funding
agencies.————————————————————————————————————————————————————————
Initiated bimonthly meetings and conducted staff site tours of Cloverdale Ranch with POST. ————————————————————————————————————————————————————————
Conducted ongoing due diligence investigation to evaluate site resources and obligations of a potential
future land purchase and subsequent management of POST’s 6,300-acre Cloverdale Ranch. Worked with
POST to conduct an introductory site tour for board members and key management staff to learn more
about the property. Added Cloverdale Ranch to the Capital Improvement and Action Plan for FY2018-19. ————————————————————————————————————————————————————————
P R O J E C T C H A L L E N G E S
————————————————————————————————————————————————————————
Need to complete acquisition of Cloverdale Ranch by March 2023 to meet state grant funding deadline.
————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S
————————————————————————————————————————————————————————
Continue public outreach and community engagement, including legislative engagement.————————————————————————————————————————————————————————
Complete the roads and trails inventory and rangeland management plan.————————————————————————————————————————————————————————
Bring forward the recommendation for purchase to the Real Property Committee (advisory committee) and
to the full board for final approval.————————————————————————————————————————————————————————
0.00%
OF FUNDS
USED
Portfolio 14
Regional
Trail Connections
and Campgrounds
Russian Ridge Open Space Preserve by Kate Pfaff
D E S C R I P T I O N————————————————————————————————————————————————————————
Develop trails between Butano, Pescadero County Park and Russian Ridge, and between Skyline, Portola
Redwoods and Big Basin State Park. ————————————————————————————————————————————————————————
Partner with county and state parks to improve existing campgrounds. ————————————————————————————————————————————————————————
Portfolio Allocation: $3,966,000 Portfolio Expenditures Through 6/30/2022: $0 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
In Support of MAA14
Fiscal Year 2022 ————————————————————————————————————————————————————————
Completed consultant report for the California Riding & Hiking Trails project and shared with state
representative. Sent state request to initiate process of quitclaiming trail rights at Russian Ridge and
Lower La Honda for a connection to San Mateo County’s Sam McDonald Park.
Prior Years ————————————————————————————————————————————————————————
Acquired a conservation easement from POST covering the 353-acre Alpine Ranch property to protect
redwood forests, watershed and habitat values (expensed in MAA15 portfolio). Supports MAA14 for future
trail connections and campgrounds to San Mateo County’s Pescadero Creek Park Complex. ————————————————————————————————————————————————————————
50 Measure AA Bond Annual Accountability Report FY22
Portfolio 14: Regional—Trail Connections and Campgrounds
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $3,966,000
Grand Total $3,966,000 $0 $0 $0 $3,966,000 0.00%
51Measure AA Bond Annual Accountability Report FY22
Total Life-to-Date Through 6/30/22
$0
Expenditure Plan Remaining
$3,966,000
0.00%
OF FUNDS
USED
Russian Ridge Open Space Preserve by James Pravetz
Portfolio 15
Regional
Redwood Protection
and Salmon Fishery
Conservation
Long Ridge Open Space Preserve by Leigh Ann Gessner
D E S C R I P T I O N————————————————————————————————————————————————————————
Preserve additional open space as available. ————————————————————————————————————————————————————————
Protect and enhance redwood stands, mountain scenery, various habitats and steelhead. ————————————————————————————————————————————————————————
Portfolio Allocation: $50,728,000 Portfolio Expenditures Through 6/30/2022: $3,110,818 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA15-001 Conservation Easement Upper Alpine Ranch Area
Prior Years ————————————————————————————————————————————————————————
Acquired a conservation easement from POST covering the 353-acre Alpine Ranch property to protect
redwood forests, watershed and habitat values. ————————————————————————————————————————————————————————
MAA15-002 Conley Property Purchase
Prior Years ————————————————————————————————————————————————————————
Purchased the 191-acre Conley property from POST as an addition to Long Ridge Preserve to protect
redwood forest and the upper Pescadero Creek watershed. ————————————————————————————————————————————————————————
MAA15-003 Long Ridge Property Addition
Prior Years ————————————————————————————————————————————————————————
Made appraisal and offer for a property addition. Offer was rejected. Negotiations may continue. ————————————————————————————————————————————————————————
MAA15-004 Irish Ridge Land Conservation
Prior Years ————————————————————————————————————————————————————————
Entered into a purchase agreement to extend close of escrow given time delays to finalize lot line adjustment
approvals. Received approval of minor text amendments to the Local Coastal Program from the California
Coastal Commission (CCC) that facilitates the property acquisition. Unfortunately, a San Mateo County Farm
Bureau lawsuit challenging the CCC approval has substantially deferred the acquisition, resulting in falling
out of contract with the seller.————————————————————————————————————————————————————————
Tentative map for minor subdivision to facilitate the proposed acquisition was prepared and reviewed by
county planning, building, public works and county surveyor for submittal to county planning commission.————————————————————————————————————————————————————————
Submitted lot-split application to County of San Mateo for review and is running concurrently with the
zoning amendment application.————————————————————————————————————————————————————————
Received board approval for the purchase of the 151-acre Irish Ridge (Tabachnik) property. The property
purchase is contingent upon a land division (lot-split) and a zoning amendment with County of San Mateo. ————————————————————————————————————————————————————————
52 Measure AA Bond Annual Accountability Report FY22
In Support of MAA15 and other MAA Portfolios
Prior Years————————————————————————————————————————————————————————
Completed appraisal and staff site assessment for the Boy Scouts property.————————————————————————————————————————————————————————
Purchased 190-acre Woodruff Redwoods property as an addition to La Honda Creek Preserve (expensed in MAA08
portfolio); purchase includes 51 acres of old-growth redwood forest that support MAA15 priority actions.————————————————————————————————————————————————————————
Held several meetings with SJWC executive staff concerning the potential purchase of their California Public
Utilities Commission (CPUC) regulated utility lands in addition to the potential purchase of their 182-acre
non-CPUC regulated property near El Sereno Preserve.————————————————————————————————————————————————————————
Pursued watershed protection opportunities at Sierra Azul and El Sereno preserves after state legislation
created the opportunity to purchase land governed by the CPUC. Established initial contact with site owners,
toured the property with site managers and Midpen board members and conveyed goals for a working
partnership to negotiate a mutually beneficial transaction. ————————————————————————————————————————————————————————
P R O J E C T C H A L L E N G E S
————————————————————————————————————————————————————————
Land acquisition requires willing seller.
————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S
————————————————————————————————————————————————————————
Continuing to communicate and work towards the purchase of San Jose Water Company (SJWC) lands, but
purchase is contingent on a willing seller. ————————————————————————————————————————————————————————
Portfolio 15: Regional—Redwood Protection and Salmon Fishery Conservation
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $50,728,000
15-001—Conservation Easement
Upper Alpine Ranch Area
$2,508,695 $2,508,695
15-002—Conley Property
Purchase
$509,855 $509,855
15-003—Long Ridge Property
Addition
$14,500 $14,500
15-004—Irish Ridge Land
Conservation
$77,768 $77,768
Grand Total $50,728,000 $3,110,818 $0 $3,110,818 $47,617,182 6.13%
6.13%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$3,110,818
Expenditure Plan Remaining
$47,617,182
53Measure AA Bond Annual Accountability Report FY22
Portfolio 16
Long Ridge
Trail, Conservation and
Habitat Restoration
Projects (Saratoga)
Long Ridge Open Space Preserve by Bobby Wheelock
D E S C R I P T I O N————————————————————————————————————————————————————————
Improve roadside parking and provide restrooms. ————————————————————————————————————————————————————————
Develop new trail connections to Eagle Rock and Devils Canyon.————————————————————————————————————————————————————————
Repair trails for year-round, multiuse access.————————————————————————————————————————————————————————
Protect watersheds for steelhead.————————————————————————————————————————————————————————
Preserve additional open space as available.————————————————————————————————————————————————————————
Implement pond and habitat enhancement restoration projects to benefit rare species.————————————————————————————————————————————————————————
Portfolio Allocation: $5,140,000 Portfolio Expenditures Through 6/30/2022: $0 ————————————————————————————————————————————————————————
MAA funds have not been expended on this portfolio through the reporting period, therefore there are no funds
in this portfolio for the Bond Oversight Committee to validate at this time. This does not necessarily mean that
work is not underway in this portfolio. If there is work in process, other funding sources are being utilized and
either the scope is not what was contemplated as part of this MAA portfolio, or the scope is not currently eligible
for MAA funding.
N O T A B L E A C C O M P L I S H M E N T S
MAA16-001 Long Ridge Trail Connection to Eagle Rock and Devils Canyon
Fiscal Year 2022 ————————————————————————————————————————————————————————
Completed project scouting and documented opportunities and constraints for a potential new trail
connection to Eagle Rock and Devils Canyon.
54 Measure AA Bond Annual Accountability Report FY22
Portfolio 16: Long Ridge—Trail, Conservation and Habitat Restoration Projects (Saratoga)
55Measure AA Bond Annual Accountability Report FY22
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $5,140,000
Grand Total $5,140,000 $0 $0 $0 $5,140,000 0.00%
Total Life-to-Date Through 6/30/22
$0
Expenditure Plan Remaining
$5,140,000
0.00%
OF FUNDS
USED
Long Ridge Open Space Preserve by Ken Lunders
Portfolio 17
Regional
Complete Upper
Stevens Creek Trail
Pichetti Ranch Open Space Preserve by Lynda Wong-Chung
D E S C R I P T I O N————————————————————————————————————————————————————————
Complete multiuse connection between the Bay Trail and Bay Area Ridge Trail above the reservoir
through Picchetti Ranch Preserve and Lower/Upper Stevens Creek County parks. ————————————————————————————————————————————————————————
Improve preserve trails and neighborhood connections. ————————————————————————————————————————————————————————
Preserve additional open space as available.————————————————————————————————————————————————————————
Portfolio Allocation: $7,760,000 Portfolio Expenditures Through 6/30/2022: $1,646,441 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA17-001 Land Conservation: Last Piece Upper Stevens Creek
Prior Years————————————————————————————————————————————————————————
Purchased the 60-acre Lysons property, securing land to facilitate the Upper Stevens Creek regional trail.
Leveraged partnership funds to match the MAA funds expended for this purchase. ————————————————————————————————————————————————————————
MAA17-002 Demolition & Restoration: Lobner/Lysons
Prior Years————————————————————————————————————————————————————————
Completed demolition and site restoration activities to prepare for future public access/regional trail
connection. ————————————————————————————————————————————————————————
Finalized and closed all permits.————————————————————————————————————————————————————————
Completed design and contractor bidding process to demolish existing structures for site restoration and
future public access. ————————————————————————————————————————————————————————
Evaluated the Lysons property for demolition and restoration. ————————————————————————————————————————————————————————
MAA17-004 Stevens Creek Nature Trail Bridges, Monte Bello
Prior Years————————————————————————————————————————————————————————
Completed final bridge construction and revegetation of project area.————————————————————————————————————————————————————————
Constructed two new pedestrian bridges on the Stevens Creek Nature Trail and removed one old bridge.————————————————————————————————————————————————————————
56 Measure AA Bond Annual Accountability Report FY22
P R O J E C T C H A L L E N G E S
————————————————————————————————————————————————————————
Continued coordination with Santa Clara County Parks to consider multiuse trail designation for Upper
Stevens Creek Trail and to extend the regional Stevens Creek Trail corridor across county and Midpen lands—
coordination dependent on Midpen and county staff capacity and timing given other Midpen and county
project priorities. COVID-19 continues to impact county capacity given temporary redeployment of county
staff to the Emergency Operations Center.
————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S
————————————————————————————————————————————————————————
Continue to coordinate with Santa Clara County Parks regarding project scope, review and approval process
and schedule to co-initiate the Stevens Creek Trail extension project.————————————————————————————————————————————————————————
Portfolio 17: Regional—Complete Upper Stevens Creek Trail
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $7,760,000
17-001—Land Conservation:
Last Piece Upper Stevens Creek
$1,494,552 $1,494,552
17-002—Demolition &
Restoration: Lobner/Lysons
$461,320 $461,320
17-004—Stevens Creek Nature
Trail Bridges, Monte Bello
$430,569 $430,569
Subtotal $7,760,000 $2,386,441 $0 $2,386,441 $5,373,559 30.75%
17-002—Lysons Property
Purchase Grant Income
(50% of purchase price)
($740,000)($740,000)
Grand Total $7,760,000 $1,646,441 $0 $1,646,441 $6,113,559 21.22%
21.22%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$1,646,441
Expenditure Plan Remaining
$6,113,559
57Measure AA Bond Annual Accountability Report FY22
Portfolio 18
South Bay Foothills
Saratoga-to-the-Sea Trail
and Wildlife Corridor
Saratoga-to-the-Sea Trail by Brian Malone
D E S C R I P T I O N————————————————————————————————————————————————————————
Protect wildlife corridor along Highway 9. ————————————————————————————————————————————————————————
Connect trail to Saratoga-to-the-Sea Trail and Skyline-to-the-Sea Trail. ————————————————————————————————————————————————————————
Portfolio Allocation: $1,365,000 Portfolio Expenditures Through 6/30/2022: $1,164,189 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA18-002 Saratoga-to-the-Sea Regional Trail Connection
Prior Years————————————————————————————————————————————————————————
Collaborated with partners to create virtual public celebration of trail completion.————————————————————————————————————————————————————————
Processed all reimbursement requests. Project was completed on time and under budget. ————————————————————————————————————————————————————————
Supported the City of Saratoga through all stages of trail and bridge construction and assisted with
preparations for the grand opening. ————————————————————————————————————————————————————————
City of Saratoga completed the interpretive signs.————————————————————————————————————————————————————————
City of Saratoga completed engineering design and environmental review and permitting for the proposed
Saratoga-to-the-Sea regional trail connection within city’s easement area on San Jose Water Company lands. ————————————————————————————————————————————————————————
In Support of MAA18
Prior Years————————————————————————————————————————————————————————
City of Saratoga completed phase 1 park improvements at Quarry Park, which is the trailhead for the
Saratoga-to-the-Sea Trail.————————————————————————————————————————————————————————
Finalized partnership agreement with the City of Saratoga and obtained board approval for a funding
contribution of the final design and environmental review for the Saratoga-to-the-Sea Trail. ————————————————————————————————————————————————————————
P R O J E C T C H A L L E N G E S
————————————————————————————————————————————————————————
None.
————————————————————————————————————————————————————————
58 Measure AA Bond Annual Accountability Report FY22
59Measure AA Bond Annual Accountability Report FY22
Portfolio 18: South Bay Foothills—Saratoga-to-the-Sea Trail and Wildlife Corridor
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $1,365,000
18-001—San Jose Water Land
Purchase
$3,850 $3,850
18-002—Saratoga-to-the-Sea
Regional Trail Connection
$1,160,339 $1,160,339
Grand Total $1,365,000 $1,164,189 $0 $1,164,189 $200,811 85.29%
85.29%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$1,164,189
Expenditure Plan Remaining
$200,811
Saratoga-to-the-Sea Trail by Bobby Wheelock
Portfolio 19
El Sereno
Dog Trails and
Connections
El Sereno Open Space Preserve
D E S C R I P T I O N————————————————————————————————————————————————————————
Provide infrastructure to open trails to dogs. ————————————————————————————————————————————————————————
Develop connections to Skyline, Sanborn County Park and Lexington Reservoir. ————————————————————————————————————————————————————————
Portfolio Allocation: $2,254,000 Portfolio Expenditures Through 6/30/2022: $298,187 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA19-001 Gupta/Khan Property Purchase
Prior Years————————————————————————————————————————————————————————
Purchased a 9.37-acre fee property and a 1.97-acre floating trail easement from Gupta-Khan to improve
opportunities for wildlife corridors and trail connectivity. ————————————————————————————————————————————————————————
MAA19-002 Dunham-Bohlman Easement
Prior Years————————————————————————————————————————————————————————
Purchased a 0.33-acre public trail and patrol easement from a private landowner ($15,000 purchase).
These purchases fill a gap in the Bay Area Ridge Trail between El Sereno Preserve and Sanborn County
Park (one property acquisition remains). ————————————————————————————————————————————————————————
MAA19-003 Haight-Peery Low Value Land Acquisition
Prior Years————————————————————————————————————————————————————————
Purchased the 1.87-acre Haight-Peery property, including a portion of the Aquinas Trail, as an addition to
El Sereno Preserve.————————————————————————————————————————————————————————
MAA19-004 San Jose Water Company Land Purchase
Prior Years————————————————————————————————————————————————————————
In June 2021, Midpen purchased the former San Jose Water Co. property from POST and terminated the lease
& management agreement.————————————————————————————————————————————————————————
In May 2021, the Wildlife Conservation Board approved a grant covering the full purchase price of $1,075,000.————————————————————————————————————————————————————————
In July 2020, the board approved the purchase and assignment of purchase rights of the 182.15-acre San Jose
Water property to POST to allow Midpen to secure Wildlife Conservation Board grant funds. Midpen signed a
lease & management agreement with POST to manage the property while under POST’s ownership.————————————————————————————————————————————————————————
In Support of MAA19
Fiscal Year 2022————————————————————————————————————————————————————————
Drafted trail easement and transactional documents for the acquisition of land rights (known as the El Sereno
Land Conservation project) and sent to owner and their attorney.
60 Measure AA Bond Annual Accountability Report FY22
Prior Years————————————————————————————————————————————————————————
Signed letter of intent with an El Sereno Land Conservation property owner to sell trail easement to Midpen.
Staff flagged the trail alignment in preparation of a property/trail survey.————————————————————————————————————————————————————————
Signed letter of understanding with the San Jose Water Company (SJWC). Reached agreement with SJWC to
purchase 182-acre El Sereno inholding, including Aquinas Trail as an identified section of the Bay Area Ridge Trail. ————————————————————————————————————————————————————————
Completed CEQA review and a use and management plan amendment for board approval to open existing
trails to dogs on-leash and added on-leash dog use to 6 miles of existing trail. ————————————————————————————————————————————————————————
To facilitate future MAA trail projects, initiated site investigations for regional trail connections between
Sanborn County Park, El Sereno Preserve and a potential Highway 17 Bay Area Ridge Trail crossing. ————————————————————————————————————————————————————————
P R O J E C T C H A L L E N G E S
————————————————————————————————————————————————————————
Need to secure additional trail easement to provide future Bay Area Ridge Trail connection between the
El Sereno Preserve and Sanborn County Park. ————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S————————————————————————————————————————————————————————
Continue seeking property rights required for a trail connection from Highway 17 through El Sereno Preserve
to Sanborn County Park.
————————————————————————————————————————————————————————
Continue analysis of regional trail connections between Sanborn County Park, El Sereno Preserve and a
potential Highway 17 Bay Area Ridge Trail crossing.————————————————————————————————————————————————————————
Portfolio 19: El Sereno—Dog Trails and Connections
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $2,254,000
19-001—Gupta/Khan Property
Purchase
$406,553 $0 $406,553
19-002—Dunham-Bohlman
Easement
$19,997 $0 $19,997
19-003—Haight-Perry Low Value
Land Acquisition
$52,977 $0 $52,977
19-004—San Jose Water Co Land
Purchase
$1,085,237 $0 $1,085,237
Subtotal $2,254,000 $1,564,764 $0 $1,564,764 $689,236 69.42%
19-001—Gupta/Khan Property
Purchase Grant Income
($191,577)$0 ($191,577)
19-004—San Jose Water Co Land
Grant Income
($1,027,300)($47,700)($1,075,000)
Grand Total $2,254,000 $345,887 ($47,700)$298,187 $1,955,813 13.23%
13.23%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$298,187
Expenditure Plan Remaining
$1,955,813
61Measure AA Bond Annual Accountability Report FY22
Portfolio 20
South Bay Foothills
Wildlife Passage and
Ridge Trail Improvements
St. Joseph’s Hill Open Space Preserve by Midpen
D E S C R I P T I O N————————————————————————————————————————————————————————
Establish safe corridors for mountain lions across Highway 17. ————————————————————————————————————————————————————————
Establish Bay Area Ridge Trail crossing. ————————————————————————————————————————————————————————
Portfolio Allocation: $13,966,000 Portfolio Expenditures Through 6/30/2022: $475,885 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA20-001 Wildlife Corridor: Highway 17 Crossing and
MAA20-002 Bay Area Ridge Trail: Highway 17 Crossing
Fiscal Year 2022 ————————————————————————————————————————————————————————
Completed technical field studies and environmental field surveys to inform the preparation of California
Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) environmental documents. ————————————————————————————————————————————————————————
Completed the accessibility requirements report to satisfy a Caltrans requirement.————————————————————————————————————————————————————————
Secured additional grant funding, including $50,000 from a private fund, $1 million from the Moore Foundation,
and $2 million from California Department of Parks and Recreation; submitted request for appropriation
of $400,000 in federal funds for trail connections in April 2022. As of June 2022, project fully funded through
design phase.————————————————————————————————————————————————————————
Identified trail alignments to connect adjacent open space preserves on the east and west side of proposed
crossings, and to connect El Sereno Preserve to Sanborn County Park.————————————————————————————————————————————————————————
Successfully coordinated with the Santa Clara Valley Transportation Authority (VTA) and Metropolitan
Transportation Commission (MTC) on the addition of the Highway 17 Project to the Regional Transportation
Improvement Plan (TIP) and MTC’s federal funding for the project, which MTC approved on March 23, 2022.
MTC’s funding through an exchange agreement with Midpen allows VTA to be a project partner with Caltrans
and provides a federal nexus for Caltrans to facilitate the concurrent completion of CEQA and NEPA review
to streamline environmental review and permitting and meet the targeted 2025/2026 construction timeline.
Prior Years————————————————————————————————————————————————————————
Hosted monthly meetings with Caltrans, completed cultural and biological field studies for the full project
and engineering and geotechnical studies within the Caltrans right-of-way (ROW). ————————————————————————————————————————————————————————
Developed Mitigation Credit Agreement strategy, secured Wildlife Conservation Board grant funding
($5 million), invited to submit $1 million proposal for Moore Foundation grant funding and a $50,000
proposal for Windward Fund grant funding, and supported Senator Cortese’s $2 million member request
that was approved in the FY22 state budget. ————————————————————————————————————————————————————————
Completed the request for qualifications and proposals process and contracted with AECOM for
environmental review services for compliance with CEQA and NEPA. ————————————————————————————————————————————————————————
62 Measure AA Bond Annual Accountability Report FY22
————————————————————————————————————————————————————————
Caltrans reviewed the final project study report developed by Midpen and consultants. ————————————————————————————————————————————————————————
Consultant selected and under contract for CEQA/NEPA and Caltrans project approval and environmental
documentation.————————————————————————————————————————————————————————
Submitted draft project study report to Caltrans and received initial comments. Held additional meetings
with project partners and stakeholders (Caltrans, SJWC, Green Foothills, National Wildlife Federation), as well
as a second public meeting to continue to advance a proposed wildlife crossing.————————————————————————————————————————————————————————
Conducted preplanning, trail scouting and preliminary conceptual-level design and cost estimates for a
proposed regional trail crossing over Highway 17. Completed a pre-permitting coordination meeting with
Caltrans.————————————————————————————————————————————————————————
In coordination with a consultant team, completed a draft project preliminary alternatives report for both
the wildlife corridor and regional trails crossing at Highway 17 for agency review. ————————————————————————————————————————————————————————
Engaged public and stakeholders for input on proposed draft alternatives and received agency comments
on draft report. ————————————————————————————————————————————————————————
Developed a cooperative agreement with Caltrans and developed a Caltrans project initiation document. ————————————————————————————————————————————————————————
Continued evaluation of the Highway 17 wildlife crossing and regional trail crossing through identification
and analysis of additional crossing alternatives in response to partner, stakeholder and public comment on
initial drafts.————————————————————————————————————————————————————————
Collaborated with partner agencies (Santa Clara County Parks, Valley Water, Ridge Trail, etc.) to identify best
opportunities for a public access crossing at Highway 17, including trail connections. Crossing will close a
major gap in the regionwide trail system and connect open space areas for multiple regional trails. ————————————————————————————————————————————————————————
In Support of MAA20
Prior Years————————————————————————————————————————————————————————
Signed a letter of understanding with SJWC on Dec. 23, 2019 for collaboration on watershed open space
lands, including cooperation on Wildlife and Ridge Trail crossing of Highway 17.————————————————————————————————————————————————————————
Completed preplanning and site investigations to identify potential trail routes to connect trail crossings.
Worked with consultants to develop preliminary trail design and completed draft trail connections report.
Shared draft report with stakeholders (Caltrans, SJWC, Santa Clara County Parks, etc.) for review prior to
public presentations. Scheduled public informational meeting on trail connections.————————————————————————————————————————————————————————
Conducted numerous field investigations and trail route evaluations for a potential future regional trail
crossing over Highway 17 that would become part of the Bay Area Ridge Trail near the El Sereno, St. Joseph’s
Hill and Bear Creek Redwoods preserves. ————————————————————————————————————————————————————————
Co-hosted with POST a free screening of “The Cat that Saved America” and panel discussion on wildlife
corridors and the Highway 17 wildlife crossing attended by 325 guests on April 7, 2018. ————————————————————————————————————————————————————————
Conducted additional ground-truthing and analysis on potential trail alignments that support the potential
trail crossing locations to include in a feasibility study. Identified eight trail alignments to include in the
project study report for Caltrans. ————————————————————————————————————————————————————————
63Measure AA Bond Annual Accountability Report FY22
P R O J E C T C H A L L E N G E S
————————————————————————————————————————————————————————
Complex Caltrans process and coordination with numerous project partners and stakeholders, and Midpen as
the project lead despite not owning or managing any of the underlying land or immediate trail connections.————————————————————————————————————————————————————————
Caltrans recently changed its guidance for the use of anticipated federal funding for the Project—now
requiring that actions to comply with NEPA be expanded to include connecting trails within and outside
the state ROW.————————————————————————————————————————————————————————
Consideration of more than one wildlife and multi-use trail crossing alternative requires more extensive
NEPA documentation.————————————————————————————————————————————————————————
Additional Federal funding, beyond the exchange of Midpen local funds for MTC federal funds, is not
guaranteed in a competitive environment; Midpen nonetheless intends to submit requests for state and
federal opportunities, working with legislators and partner agencies. ————————————————————————————————————————————————————————
Trail construction within the Caltrans right of way must meet ADA/ABA standards, exceptions are only
allowable for safety proposes. This results in a larger project footprint that requires additional design for
features such as retaining walls to support trails built in this topographically challenging and narrow corridor. ————————————————————————————————————————————————————————
Requires negotiations with multiple property owners to secure property rights.
————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S
————————————————————————————————————————————————————————
Complete CEQA/NEPA document concurrently (ideally) for entire project, including crossings and trails.
————————————————————————————————————————————————————————
Complete Caltrans Project Approval and Environmental Document phase, and develop a Caltrans draft/final
Project Report.
————————————————————————————————————————————————————————
Continue to secure permission to access private properties for studies and to negotiate for property rights.
————————————————————————————————————————————————————————
Work with partners to secure federal funding and target grants to fund project construction phase.
————————————————————————————————————————————————————————
64 Measure AA Bond Annual Accountability Report FY22
Portfolio 20: South Bay Foothills—Wildlife Passage and Ridge Trail Improvements
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $13,966,000
20-001—Wildlife Corridor:
Highway 17 Crossing
$587,493 $192,744 $780,237
20-002—Bay Area Ridge Trail:
Highway 17 Crossing
$593,718 $382,427 $976,145
Subtotal $13,966,000 $1,181,211 $575,171 $1,756,382 $12,209,618 12.58%
20-001 Wildlife Corridor:
Highway 17 Crossing Grant
Income
$0 ($1,280,497)($1,280,497)
Grand Total $13,966,000 $1,181,211 ($705,326)$475,885 $13,490,115 3.41%
3.41%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$475,885
Expenditure Plan Remaining
$13,490,115
65Measure AA Bond Annual Accountability Report FY22
St. Joseph’s Hill Open Space Preserve by Chip Curry
Portfolio 21
Bear Creek Redwoods
Public Recreation and
Interpretation Projects
Bear Creek Redwoods Open Space Preserve by Rachel Pandipati
D E S C R I P T I O N————————————————————————————————————————————————————————
Open for hiking, equestrian activities. ————————————————————————————————————————————————————————
Provide parking areas, trails; upgrade stables. ————————————————————————————————————————————————————————
Restore and protect habitats for various species.————————————————————————————————————————————————————————
Repair roads and trails to reduce sediment.————————————————————————————————————————————————————————
Rehabilitate Alma College site.————————————————————————————————————————————————————————
Portfolio Allocation: $17,478,000 Portfolio Expenditures Through 6/30/2022: $13,287,107 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA21-003 Bear Creek Redwoods Stables Water System
Prior Years ————————————————————————————————————————————————————————
Combined with MAA21-004 Bear Creek Stables Site Plan Implementation. ————————————————————————————————————————————————————————
MAA21-004 Bear Creek Stables Site Plan Implementation
Fiscal Year 2022 ————————————————————————————————————————————————————————
Submitted a use permit application and hosted an interdepartmental coordination meeting with Santa Clara
County and design team. Received comments from the county requiring additional work with the design
team and resubmittal of the permit package.
Prior Years————————————————————————————————————————————————————————
Confirmed the Use Permit path to secure county permits for the repairs and began the permit application. ————————————————————————————————————————————————————————
Conducted extensive consultation with Santa Clara County Planning, Building and Fire regarding permit
requirements and permitting paths. Identified critical permitting challenges associated with legal non-
conforming site status. ————————————————————————————————————————————————————————
Completed construction document set to 50%, including the water system design. Developed temporary
construction operations plan. ————————————————————————————————————————————————————————
Combined MAA21-003 Bear Creek Redwoods Water System project with MAA21-004 Bear Creek Stables Site
Plan Implementation. ————————————————————————————————————————————————————————
Board approved the funding source and the final design direction to focus exclusively on repairs. ————————————————————————————————————————————————————————
Completed an assessment of water source options and associated cost estimates for the preserve, concluding
that the most cost effective and secure option is to execute an agreement with SJWC to complete the water
line installation from their main line as the new source of water for the preserve and Bear Creek Stables. ————————————————————————————————————————————————————————
66 Measure AA Bond Annual Accountability Report FY22
————————————————————————————————————————————————————————
Established and filed pre-1914 water rights for the preserve, installed meters and completed required annual
reporting. ————————————————————————————————————————————————————————
Advanced maintenance and repairs in the near-term and the stables site plan as a long-term solution.————————————————————————————————————————————————————————
Developed the stables site plan alternatives and secured board selection of the preferred alternative for
CEQA review purposes. ————————————————————————————————————————————————————————
MAA21-005 Bear Creek Redwoods Public Access
Prior Years————————————————————————————————————————————————————————
Submitted notice of completion to County of Santa Clara.————————————————————————————————————————————————————————
Completed restroom construction, final punch list items, repairs of damaged loop trail sections and final
payments for the parking.————————————————————————————————————————————————————————
Completed construction of a new parking lot, bridge, retaining wall improvements, vault toilet restroom,
ADA pathway and road/trail improvements, opening 6 miles of new trail to public access.————————————————————————————————————————————————————————
Completed second (final) year of cultural resource evaluations for 19 sites within the preserve. Final report
completed. Provided archaeological monitoring for parking lot and trail construction. ————————————————————————————————————————————————————————
Completed installation of two interpretive signs for the new main parking area at Upper Lake.————————————————————————————————————————————————————————
Completed an archaeological resources curation guidelines report.————————————————————————————————————————————————————————
Completed archaeological studies in advance of ground disturbance activities.————————————————————————————————————————————————————————
Conducted an engineering feasibility study to identify the preferred location for a Bear Creek Road trail
undercrossing as an option for connecting visitors between the new parking area and the western area of
the preserve.————————————————————————————————————————————————————————
Completed geologic assessment, geotechnical drilling and fault trenching. Completed regulatory/code
assessment.————————————————————————————————————————————————————————
Completed cultural resource assessments. Prepared a request for qualifications and proposals, selected and
contracted with consultant to complete a final survey/assessment reports for 10 sites, parking lot area and
Mud Lake improvements. ————————————————————————————————————————————————————————
Completed phase 1 public access road and trail construction, upgrades and drainage improvement,
including constructing two segments of new trail to complete the westside loop.————————————————————————————————————————————————————————
MAA21-006 Bear Creek Redwoods Alma College Cultural Landscape Rehabilitation
Fiscal Year 2022 ————————————————————————————————————————————————————————
Substantially completed construction, including a concrete overflow weir at Upper Lake; site improvements
at the St. Joseph’s shrine; new accessible walkways; hazardous materials abatement; site grading; and
masonry/architectural rehabilitation.
Prior Years————————————————————————————————————————————————————————
Completed demolition of the majority of nonhistorical structures and installation of bat exclusion measures. ————————————————————————————————————————————————————————
Completed a successful rebid of the site improvement and structure rehabilitation/stabilization work.————————————————————————————————————————————————————————
Presented Alma College cultural landscape plan to Santa Clara County Historical Heritage Commission for a
landmark alteration permit. County of Santa Clara Planning Department issued a landmark alteration permit
for the rehabilitation project.————————————————————————————————————————————————————————
Completed 90% of plans and specifications and prepared permit package for submission to the County of
Santa Clara planning department. Completed conversion of mansion ruins to bat habitat.————————————————————————————————————————————————————————
Conducted a recreation planning analysis for potential reuse of the Alma College chapel. ————————————————————————————————————————————————————————
67Measure AA Bond Annual Accountability Report FY22
————————————————————————————————————————————————————————
Completed an earthquake fault rupture hazard study to determine if the Alma College chapel could be occupied. ————————————————————————————————————————————————————————
Constructed two structures to provide alternative bat roosting habitat in anticipation of demolition work
at Alma College.————————————————————————————————————————————————————————
MAA21-007 Bear Creek Redwoods Preserve Plan Invasive Weed Treatment
Fiscal Year 2022————————————————————————————————————————————————————————
Removed mature French broom, cape ivy, and periwinkle, totaling just under 3,600 hours of resource
management work.
Prior Years————————————————————————————————————————————————————————
Priority invasive species within both Phase I and Phase II areas of Bear Creek Redwoods were treated using
approved methods under the Integrated Pest Management (IPM) Program.————————————————————————————————————————————————————————
Proceeded with year three of invasive weed management with disruptions from county-issued shelter-in-
place orders. ————————————————————————————————————————————————————————
Completed treatments as planned and selected contractor for final two years of project through a request
for proposals process. ————————————————————————————————————————————————————————
Completed all work under a task order with Valley Water for the implementation of grant-funded invasive
species work.————————————————————————————————————————————————————————
Implemented the first year of a targeted invasive species treatment to restore native habitat throughout
the preserve. ————————————————————————————————————————————————————————
Received a grant from Valley Water for $200,000 per year for five years with a possible five-year extension
for another $1 million.
————————————————————————————————————————————————————————
MAA21-008 Bear Creek Redwoods Ponds Restoration and Water Rights
Prior Years————————————————————————————————————————————————————————
Completed the Mud Lake Improvements Project, including the replacement of the Mud Lake spillway and
outlet, installation of 115 linear feet of storm water swale improvements, replacement of 200 linear feet of
storm water culverts and the replacement of a 60-foot-long culvert under Bear Creek Road. ————————————————————————————————————————————————————————
Executed a funding agreement with the County of Santa Clara in September 2019, which reimburses Midpen
for the Bear Creek Road culvert replacement work.————————————————————————————————————————————————————————
Project plans were reviewed and approved by the U.S. Fish & Wildlife Service, U.S. Army Corps of Engineers
(USACE), Regional Water Quality Control Board (RWQCB), and County of Santa Clara. ————————————————————————————————————————————————————————
Completed construction documents and began the permitting process to improve drainage from Mud Lake
to Briggs Creek.————————————————————————————————————————————————————————
Completed a pond assessment and management plan to determine the water needs for wildlife and habitat
values at aquatic sites. ————————————————————————————————————————————————————————
Began the first year of the western pond turtle population study and developed a western pond turtle
management plan. ————————————————————————————————————————————————————————
Completed the Mud Lake drainage improvement project plans to 60%, which allowed for pre-permitting
meetings to be held with the USACE, RWQCB and California Department of Fish and Wildlife (CDFW) to
determine the permit and review timeframe required before construction. The project will improve the
stormwater drainage system for Mud Lake.————————————————————————————————————————————————————————
68 Measure AA Bond Annual Accountability Report FY22
MAA21-009 Bear Creek Redwoods Webb Creek Bridge
Prior Years
————————————————————————————————————————————————————————
Completed the removal of an existing bridge and installation of a new bridge to provide safe public access
and patrol route.
————————————————————————————————————————————————————————
Designed the Webb Creek Bridge replacement foundation.
————————————————————————————————————————————————————————
Submitted CDFW and RWQCB permits for the Webb Creek Bridge replacement. ————————————————————————————————————————————————————————
MAA21-010 Bear Creek Redwoods Landfill Characterization and Remediation
Fiscal Year 2022————————————————————————————————————————————————————————
Contracted with historic and hazmat consultants to recover resources prior to the cleanup of the legacy landfill.
Prior Years
————————————————————————————————————————————————————————
Completed site investigations and preliminary historic resource evaluations.————————————————————————————————————————————————————————
Completed a landfill characterization and developed the project remedial approach.————————————————————————————————————————————————————————
Investigated a legacy landfill at BCR to determine size and potential constituents of concern. Scoped project,
prepared RFPQ, and selected consultant.————————————————————————————————————————————————————————
69Measure AA Bond Annual Accountability Report FY22
Alma College, Bear Creek Redwoods Open Space Preserve by Midpen
MAA21-011 Phase II Trail Improvements
Fiscal Year 2022 ————————————————————————————————————————————————————————
Completed geotechnical investigations and 65% design plans for the Northeast trailhead. Completed
construction documents and the bid package for the two slide repairs. ————————————————————————————————————————————————————————
Crew completed improvements to the all-season patrol access route.————————————————————————————————————————————————————————
Crew continued with improvements to the Phase II trail network.
Prior Years————————————————————————————————————————————————————————
Submitted permits to the California Department of Fish & Wildlife and U.S. Army Corps of Engineers. ————————————————————————————————————————————————————————
Foothills crew completed construction of Briggs Creek Trail and reroute, Public Stables Loop Trail
improvements and segments of the multiuse trail. ————————————————————————————————————————————————————————
Completed traffic studies and used the results to hire an engineering team to finalize design of the trail
crossing and northeast trailhead.————————————————————————————————————————————————————————
Completed trail feasibility analysis, basis of design document, preliminary design for trail structures, protocol
botanical surveys, cultural/biological resources report and contract amendment with consultant team. ————————————————————————————————————————————————————————
Secured traffic consultant to begin analyzing multiuse trail crossings near the Summit and over Highway 17.
————————————————————————————————————————————————————————
MAA21-012 Bear Creek Redwood Tree Restoration
Prior Years ————————————————————————————————————————————————————————
Removed all abandoned ornamental trees within the project area and installed native trees. ————————————————————————————————————————————————————————
In Support of MAA21
Prior Years————————————————————————————————————————————————————————
Completed the Bear Creek Redwoods online story map.————————————————————————————————————————————————————————
Celebrated completion of phase 1 public access improvements and progress on natural resources restoration
projects with partner ribbon-cutting and tours, media outreach and extensive public educational outreach
during the opening weekends.————————————————————————————————————————————————————————
Received board approval of the Bear Creek Redwoods Preserve Plan and certification of the accompanying EIR. ————————————————————————————————————————————————————————
Hosted a groundbreaking for the preserve parking area project on May 1, 2018.————————————————————————————————————————————————————————
Completed construction of the Alma College site fencing in April 2018 to improve site safety and security.————————————————————————————————————————————————————————
P R O J E C T C H A L L E N G E S————————————————————————————————————————————————————————
Securing a use permit from the County of Santa Clara for the Bear Creek Stables repairs requires additional
time and consultant services, extends opportunity for additional public review and comments and requires
discretionary approval from the County Planning Commission with an uncertainty of the final permitting
conditions and related costs.————————————————————————————————————————————————————————
Land acquisition requires a willing seller. ————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S————————————————————————————————————————————————————————
Finalize construction plans for high priority repairs of the stables site and secure a use permit from the County.————————————————————————————————————————————————————————
Continue integrated pest management implementation on roads and trails, and in shaded fuel break.————————————————————————————————————————————————————————
70 Measure AA Bond Annual Accountability Report FY22
Portfolio 21: Bear Creek Redwoods—Public Recreation and Interpretive Projects
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $17,478,000
21-001—Moody Gulch Fence &
Gate Improvements
$847 $847
21-004—Bear Creek Stables Site
Plan Implementation
$764,419 $69,826 $834,245
21-005—Bear Creek Redwoods
Public Access
$5,548,003 $0 $5,548,003
21-006—Bear Creek Redwoods
Alma College Cultural
Landscape Rehab
$1,848,977 $3,248,819 $5,097,796
21-007—Bear Creek Redwoods
Preserve Plan Invasive Weed
Treatment
$1,075,164 $117,236 $1,192,400
21-008—Bear Creek Redwoods
Ponds Restoration and Water
Rights
$681,517 $0 $681,517
21-009—Bear Creek Redwoods
Webb Creek Bridge
$487,492 $0 $487,492
21-010—Bear Creek Redwoods
Landfill Characterization and
Remediation
$39,195 $92,940 $132,135
21-011—Phase II Trail
Improvements
$714,273 $146,122 $860,395
21-012—Bear Creek Redwood
Tree Restoration
$90,915 $0 $90,915
Subtotal $17,478,000 $11,250,802 $3,674,943 $14,925,745 $2,552,255 85.40%
21-006—Bear Creek Redwoods
Alma College Cultural
Landscape Rehab Grant Income
$0 ($666,518)($666,518)
21-007—Bear Creek Redwoods
Preserve Plan Invasive Weed
Treatment Grant Income
($515,000)$0 ($515,000)
21-008—Bear Creek Redwoods
Ponds Restoration and Water
Rights Grant Income
($80,000)($227,620)($307,620)
21-009—Bear Creek Redwoods
Webb Creek Bridge Grant Income
($149,500)$0 ($149,500)
Grand Total $17,478,000 $10,506,302 $2,780,805 $13,287,107 $4,190,893 76.02%
76.02%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$13,287,107
Expenditure Plan Remaining
$4,190,893
71Measure AA Bond Annual Accountability Report FY22
Portfolio 22
Sierra Azul
Cathedral Oaks Public Access
and Conservation Projects
Sierra Azul Open Space Preserve by Karl Gohl
D E S C R I P T I O N————————————————————————————————————————————————————————
Develop multiuse trail and plan future trails as land is available. ————————————————————————————————————————————————————————
Develop parking.————————————————————————————————————————————————————————
Restore plant communities and soils. ————————————————————————————————————————————————————————
Install trailside amenities.————————————————————————————————————————————————————————
Preserve additional open space and complete wildlife corridor in upper Los Gatos Creek watershed. ————————————————————————————————————————————————————————
Portfolio Allocation: $6,714,000 Portfolio Expenditures Through 6/30/2022: $939,364 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA22-001 Hendrys Creek Property Land Restoration
Fiscal Year 2022 ————————————————————————————————————————————————————————
Completed removal of final bridge stream crossing. This is the last piece of Hendrys Creek Restoration
project to remove unpermitted roads and structures to restore important creek habitat for wildlife and
water quality.
Prior Years————————————————————————————————————————————————————————
Continued ongoing monitoring.————————————————————————————————————————————————————————
Coordinated with Valley Water on conservation easement held on the property, accomplished monitoring
and reporting on the long-term management plan, which is a task to be done in perpetuity.————————————————————————————————————————————————————————
Met Valley Water grant requirements and secured $269,116 through reimbursements on a $484,650 grant to
implement restoration plans at Hendrys Creek. ————————————————————————————————————————————————————————
Removed culverts that impeded the creek and restored natural creek flow.————————————————————————————————————————————————————————
Completed annual monitoring and submitted annual report to Valley Water and CDFW, as required by the
long-term management plan and CDFW permit conditions.————————————————————————————————————————————————————————
Received partnership funds to purchase the 117-acre Hendrys Creek property to protect wildlife corridors
and watershed lands. No MAA funds were used on this purchase.————————————————————————————————————————————————————————
Completed fifth year of the coordinated monitoring effort to reduce mercury within the Guadalupe River
watershed. ————————————————————————————————————————————————————————
Completed first phase of invasive plant removal and developed a partnership with the San Jose Conservation
Corps for the Hendrys Creek watershed restoration effort. ————————————————————————————————————————————————————————
Negotiated with resource agencies, including CDFW, RWQCB and USACE to finalize permits to perform
the Hendrys Creek restoration project. Rare opportunity to perform environmental restoration to benefit
wildlife and water quality. ————————————————————————————————————————————————————————
72 Measure AA Bond Annual Accountability Report FY22
MAA22-003 Freudenberg Land Purchase
Prior Years————————————————————————————————————————————————————————
Purchased the 24.41-acre Freudenberg property to protect wildlife and watershed lands. ————————————————————————————————————————————————————————
MAA22-004 Beatty Parking Area and Trail Connections
Prior Years————————————————————————————————————————————————————————
Presented programming alternatives of parking and trailhead options for committee review and feedback in
August 2020. Coordinated with partner agencies on project program elements and regulatory requirements.
Provided board FYI in September 2020 to share committee feedback and project status. Presented project in
January 2021 per board request. Also presented new information from citizen scientists about newt mortalities
along the adjacent public County roadway (Alma Bridge Road). Given this new information and concerns about
potentially further impacting the newt population, the committee recommended and the board concurred on
directing staff to defer the parking and trail project until a newt mortality study is completed along the public
roadway to inform next steps for the parking and trails project and to understand whether and if any site
improvements could be made to the roadway to protect newts during their migrations. ————————————————————————————————————————————————————————
Completed on-site field reconnaissance and preliminary assessment of the County’s Miller Point parking lot.
Met with stakeholders to develop scoping of studies regarding newts. ————————————————————————————————————————————————————————
Held consultations with Santa Clara County Parks and Valley Water regarding proposed parking and trail
development and permitting requirements.————————————————————————————————————————————————————————
Released RFPQ for consulting services to develop bridge design and evaluate the stability of the trail alignment.————————————————————————————————————————————————————————
Issued RFPs and selected consultants for site surveys, traffic, hazardous material assessments and
environmental and biological services to support the implementation of the Beatty Parking Area. ————————————————————————————————————————————————————————
Initiated traffic counts and line of sight analysis, phase 1 environmental assessments and completed
topographic surveys. Initiated conceptual parking area design.————————————————————————————————————————————————————————
Awarded a $149,906 grant from Valley Water for the Beatty Trail connection project (grant income Included
in FY20).————————————————————————————————————————————————————————
MAA22-005 Beatty House Site Security Improvements
Fiscal Year 2022 ————————————————————————————————————————————————————————
Procured and installed security fencing materials for public safety and to prevent potential vandalism/
trespassing of the unused structure.
Prior Years————————————————————————————————————————————————————————
Cancelled the Beatty House Removal Project in response to board direction provided on March 24, 2021.
Changed project scope to provide security fences around the structure; updated project name.————————————————————————————————————————————————————————
Retained consultant to conduct California Environmental Quality Act compliance process. Circulated Notice
of Preparation to prepare an Environmental Impact Report in February 2021. ————————————————————————————————————————————————————————
73Measure AA Bond Annual Accountability Report FY22
In Support of MAA22
Fiscal Year 2022 ————————————————————————————————————————————————————————
Finalized and presented report on newt mortality demonstrating the need for developing a newt crossing
across the County road. Develop a cooperative agreement with the county and solicited a request for
proposals and qualifications (RFPQ) to begin design and recommend a CEQA approach for future capital
project. The cooperative agreement with the county was approved in February.
Prior Years————————————————————————————————————————————————————————
Signed funding agreement with POST to conduct a newt mortality study along Alma Bridge Road given
concerns about roadkill levels. POST provided oversight of a consultant who developed the field methodology
for the newt study. With assistance from county parks staff, the study team completed installation of drift
fence/pitfall traps. Midpen provided a traffic counter to get daily vehicle totals over the study period. County
parks recruited volunteers who assisted the consultant team to count newts in the traps and conduct road
mortality surveys. Consultant tabulated and analyzed data and provided a draft report to document findings
and determine if road mortality is impacting the resident population to inform next steps regarding newt
protections along the roadway. ————————————————————————————————————————————————————————
P R O J E C T C H A L L E N G E S
————————————————————————————————————————————————————————
Permit monitoring requires up to 10 years of tracking and reporting, which is cumulative for every project
requiring a resource agency permit. ————————————————————————————————————————————————————————
Newt studies and enhancements are critical to address prior to continuing work on the parking area and
trail connections project. Implementation requires coordinating with multiple partners and stakeholders,
especially Santa Clara County Roads.
————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S
————————————————————————————————————————————————————————
MAA22-001: completed 4 years of monitoring and will continue for the next 5 years for up to 8 years for
resource agency permits, and monitoring required in perpetuity under the Long-Term Management
Agreement associated with the Conservation Easement with Valley Water. ————————————————————————————————————————————————————————
74 Measure AA Bond Annual Accountability Report FY22
Portfolio 22: Sierra Azul—Cathedral Oaks Public Access and Conservation Projects
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $6,714,000
22-001—Hendrys Creek Property
Land Restoration
$513,343 $0 $513,343
22-003—Freudenberg Land
Purchase
$540,587 $0 $540,587
22-004—Beatty Parking Area
and Trail Connections
$173,807 $0 $173,807
22-005—Beatty House Site
Security Improvements
$17,059 $30,796 $47,855
Subtotal $6,714,000 $1,244,796 $30,796 $1,275,592 $5,438,408 19.00%
22-001—Hendrys Creek Property
Land Restoration Grant Income
($336,228)$0 ($336,228)
Grand Total $6,714,000 $908,568 $30,796 $939,364 $5,774,636 13.99%
13.99%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$939,364
Expenditure Plan Remaining
$5,774,636
75Measure AA Bond Annual Accountability Report FY22
Sierra Azul Open Space Preserve by Ken Hickman
Portfolio 23
Sierra Azul
Mount Umunhum
Public Access and
Interpretation Projects
Sierra Azul Open Space Preserve by Xun Li
D E S C R I P T I O N————————————————————————————————————————————————————————
Open Mount Umunhum for multiuse public access to summit via road and trail.————————————————————————————————————————————————————————
Open Bay Area Ridge Trail and nearby trail connections.————————————————————————————————————————————————————————
Preserve additional open space and complete wildlife corridor. ————————————————————————————————————————————————————————
Portfolio Allocation: $27,972,000 Portfolio Expenditures Through 6/30/2022: $21,814,891 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA23-001 Mt. Um Road and Trail Property Rights
Prior Years————————————————————————————————————————————————————————
Purchased the 38.97-acre Meyer/Connolly property to protect additional open space and wildlife corridors.————————————————————————————————————————————————————————
Purchased the 28-acre Rossetta property to secure public access rights along Mt. Umunhum Road and the
Woods Trail in the Mt. Umunhum area of Sierra Azul Preserve. ————————————————————————————————————————————————————————
MAA23-002 Mt. Um Trail
Prior Years————————————————————————————————————————————————————————
Completed nearly 4 miles of the new Mt. Umunhum Trail to connect people to the summit. ————————————————————————————————————————————————————————
Completed major construction milestones on the Mt. Umunhum Trail, including the construction of an
additional 0.5-mile trail segment, the narrowing of old, abandoned road cuts into a trail and the installation
of three new pedestrian bridges and signage. ————————————————————————————————————————————————————————
Completed final preparations for opening Mount Umunhum, installing fencing, signs, horse trough, trail
construction and new bridges.————————————————————————————————————————————————————————
MAA23-004 Mt. Um Summit Restoration, Parking and Landing Zone
Prior Years————————————————————————————————————————————————————————
Volunteers and contractors installed 1,085 nursery plants. A plant maintenance contractor continues to
maintain the site with watering and weeding around previously installed nursery plants.————————————————————————————————————————————————————————
Completed phase 2 plant restoration and sign installation.————————————————————————————————————————————————————————
Created a new contract with Grassroots Ecology’s Native Plant Nursery to grow approximately 1,900 native
plants and 5 pounds of native grass and forb seed for phase 1 of the Mount Umunhum revegetation project. ————————————————————————————————————————————————————————
76 Measure AA Bond Annual Accountability Report FY22
————————————————————————————————————————————————————————
Developed a habitat restoration plan for the Mount Umunhum Summit to enhance the native plant
recolonization of the restored mountaintop, incorporating input from the Amah Mutsun tribal group on
Native American restoration techniques. ————————————————————————————————————————————————————————
Surveyed and mapped rare plant populations and collected native plant seeds in support of the restoration
planting plan. ————————————————————————————————————————————————————————
Completed the construction of the Mount Umunhum Summit restoration project, including a new parking
lot, summit shelters, turnaround area, ceremonial circle, ADA pathways, stairs, trail steps and other site
amenities. Opened Mount Umunhum Summit area to the public in September 2017. ————————————————————————————————————————————————————————
Developed and created broad interpretive displays for the Mount Umunhum summit project, providing
visitors with a substantially greater understanding of the site’s rich history.————————————————————————————————————————————————————————
MAA23-005 Mt. Um Guadalupe Creek Overlook and Bridges
Prior Years————————————————————————————————————————————————————————
Completed the design, permitting and construction for the Guadalupe Creek overlook (a featured overlook
along Mt. Umunhum Trail), including permitting and construction of three new trail bridges along the trail.————————————————————————————————————————————————————————
Installed the Guadalupe Creek overlook railings and mitigation planting and removed trail debris to open
the Woods Trail to the public. ————————————————————————————————————————————————————————
MAA23-006 Mt. Um Road Design/Permitting/Construction
Prior Years————————————————————————————————————————————————————————
Completed the construction of the Mt. Umunhum Road improvement project, including the installation of
new culverts, asphalt concrete paving, drainage structures, gabion retaining walls, guardrail, mass grading and
off haul, striping and other road safety improvements. Completion of the project opened public vehicular
access to the Mount Umunhum Summit area. ————————————————————————————————————————————————————————
MAA23-007 Twin Creeks Land Conservation
Prior Years————————————————————————————————————————————————————————
Incorporated an integrated pest management plan into the annual work plan. Completed FY20 invasive
weed work. ————————————————————————————————————————————————————————
Incorporated review of long-term management for bat species into ongoing core duties.————————————————————————————————————————————————————————
Completed site cleanup and demolition of structures to support land preservation and riparian habitat
restoration.————————————————————————————————————————————————————————
Purchased the 153.59-acre Twin Creeks property providing water quality protection within the Los Alamitos
Creek watershed, continuity of wildlife habitat corridors and the potential for a future trail connection with
Rancho Cañada del Oro Preserve. The Gordon and Betty Moore Foundation provided grant funding in the
amount of $750,000 toward the purchase of $2,800,000.————————————————————————————————————————————————————————
MAA23-009 Vielbaum Property Acquisition
Fiscal Year 2022 ————————————————————————————————————————————————————————
Purchased 41.76-acre Vielbaum property as an addition to Sierra Azul Open Space Preserve.
77Measure AA Bond Annual Accountability Report FY22
In Support of MAA23
Fiscal Year 2022 ————————————————————————————————————————————————————————
Discussing potential purchase of San Jose Water Company land, which would connect Mount Umunhum to
the Cathedral Oaks area of Sierra Azul Preserve.————————————————————————————————————————————————————————
Completed radar tower repairs at Mount Umunhum, including abatement of all interior hazardous materials,
installation of a new roof and roof hatch, exterior concrete and rebar repairs, guardrail installation, gutters
and downspout installation, ventilation louvers and wildlife screening installation, installation of interior
floor coverings and miscellaneous interior item demolition and disposal. Notice of completion was filed and
east summit area was reopened to the public.
Prior Years ————————————————————————————————————————————————————————
Completed the Mt. Umunhum Road Improvements Project in June 2020, which included the installation of
paved bicycle turnouts, repairs to roadside drainage scupper, curb repairs, the application of sharrows and
installation of a solid double yellow centerline. Installed additional road safety signs and markers.————————————————————————————————————————————————————————
Completed the basis of design for the Radar Tower 2nd assessment and presented it to the board in
November 2019. The board selected the long-term repair option and approved the development of construction
documents for the selected scope of work. Construction documents were in development by the project
engineer. Draft 65% plans and specifications were delivered to Midpen in June 2020.————————————————————————————————————————————————————————
Finalized and recorded the Mount Umunhum public access easement, drainage easements, fee property
and patrol/maintenance easement to Mt. Thayer, ensuring legal access to these areas of the preserve.————————————————————————————————————————————————————————
Continued to respond to wildlife entrapment issues at the Mount Umunhum radar tower. ————————————————————————————————————————————————————————
Submitted an application to nominate Mount Umunhum as one of the 2018 Great Places in California, an
award program under the American Planning Association California Chapter in March 2018. The APA Great
Places jury selected Mount Umunhum as one of three Great Places in California for 2018. ————————————————————————————————————————————————————————
Stayed in communication with Mount Umunhum neighbors for the summit and road projects before, during
and after the grand opening.————————————————————————————————————————————————————————
Produced a “Stories of Mount Umunhum” audio tour app and made it available for free download on iTunes
and Google Play. The app offers a virtual guided tour of the summit. ————————————————————————————————————————————————————————
Held the Mount Umunhum grand opening on Sept. 17, 2017, with extensive media coverage.————————————————————————————————————————————————————————
P R O J E C T C H A L L E N G E S
————————————————————————————————————————————————————————
None.————————————————————————————————————————————————————————
78 Measure AA Bond Annual Accountability Report FY22
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $27,972,000
23-001—Mt. Um Road and Trail
Property Rights
$1,271,318 $0 $1,271,318
23-002—Mt. Um Trail $959,548 $0 $959,548
23-004—Mt. Um Summit
Restoration, Parking and
Landing Zone
$10,458,358 $0 $10,458,358
23-005—Mt. Um Guadalupe
Creek Overlook and Bridges
$259,311 $0 $259,311
23-006—Mt. Um Road Design/
Permitting/Construction
$6,282,378 $0 $6,282,378
23-007—Twin Creeks Land
Conservation
$3,735,925 $0 $3,735,925
23-009—Vielbaum Property
Acquisition
$0 $168,053 $168,053
Subtotal $27,972,000 $22,966,838 $168,053 $23,134,891 $4,837,109 82.71%
23-004—Mt. Um Summit
Restoration, Parking and
Landing Zone Grant Income
($570,000)($570,000)
23-007—Twin Creeks Land
Conservation Grant Income
($750,000)($750,000)
Grand Total $27,972,000 $21,646,838 $168,053 $21,814,891 $6,157,109 77.99%
Portfolio 23: Sierra Azul—Mount Umunhum Public Access and Interpretation Projects
77.99%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$21,814,891
Expenditure Plan Remaining
$6,157,109
79Measure AA Bond Annual Accountability Report FY22
Portfolio 24
Sierra Azul
Rancho de Guadalupe
Family Recreation
Sierra Azul Open Space Preserve by Derinda Lesher
D E S C R I P T I O N————————————————————————————————————————————————————————
Open Rancho de Guadalupe to public access. ————————————————————————————————————————————————————————
Develop accessible multiuse trails with amenities such as parking and family recreation. ————————————————————————————————————————————————————————
Restore habitat for rare species. ————————————————————————————————————————————————————————
Protect cultural and natural resources.————————————————————————————————————————————————————————
Portfolio Allocation: $10,078,000 Portfolio Expenditures Through 6/30/2022: $1,591,996 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA24-001 Barth Property Purchase
Prior Years————————————————————————————————————————————————————————
Purchased 4-acre Barth property improving access into the preserve from Hicks Road. ————————————————————————————————————————————————————————
MAA24-002 Petersen Property Acquisition
Prior Years————————————————————————————————————————————————————————
Purchased the 23.41-acre Petersen property to protect grassland habitat and water quality in the Guadalupe
Creek watershed. ————————————————————————————————————————————————————————
MAA24-003 Property Exchange Navid/Bagher
Prior Years————————————————————————————————————————————————————————
Negotiated a property exchange with Navid/Bagher covering 3.42 acres, further improving access from
Hicks Road to the preserve. ————————————————————————————————————————————————————————
MAA24-004 Kahn Property Acquisition
Prior Years————————————————————————————————————————————————————————
Purchased the 24.01-acre Kahn property for open space and watershed protection. ————————————————————————————————————————————————————————
In Support of MAA24
Fiscal Year 2022 ————————————————————————————————————————————————————————
Staff further consulted with the Muwekma Ohlone Tribe on a cultural site that relates to a Valley Water
Exchange Agreement within the Rancho de Guadalupe Area of Sierra Azul Preserve.
80 Measure AA Bond Annual Accountability Report FY22
Prior Years————————————————————————————————————————————————————————
Staff met with the Muwekma Ohlone Tribe to discuss the protection of a cultural site in the vicinity of Valley
Water’s proposed staging area.————————————————————————————————————————————————————————
Midpen discussed buffer areas with Valley Water for a proposed staging area.————————————————————————————————————————————————————————
Staff worked with Santa Clara County Planning Department and the Open Space Authority to propose
amendment to Santa Clara County zoning ordinance for permitting exemptions for low intensity park and
open space parking and trail improvements. Santa Clara County Board of Supervisors approved Zoning
Ordinance Amendment allowing exemptions from land use permitting.————————————————————————————————————————————————————————
Valley Water conducted a natural resources assessment of a potential construction staging area on Midpen
property that can be subsequently repurposed into a new public use staging area to access the Rancho de
Guadalupe area of the preserve in May 2020. ————————————————————————————————————————————————————————
Pursued land conservation opportunities by continuing to work with a landowner and consulting with
County of Santa Clara planning department about possible lot line adjustments or remainder lot legalization
along Pheasant Creek. ————————————————————————————————————————————————————————
Continued to negotiate with Valley Water about a land exchange to facilitate widening of Hicks Road near
Guadalupe Reservoir and construction of a potential new parking area for the preserve. ————————————————————————————————————————————————————————
P R O J E C T C H A L L E N G E S
————————————————————————————————————————————————————————
Land acquisition requires a willing seller.
————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S
————————————————————————————————————————————————————————
Continue negotiations for potential land acquisition.
————————————————————————————————————————————————————————
Complete western pond turtle studies. ————————————————————————————————————————————————————————
Portfolio 24: Sierra Azul—Rancho de Guadalupe Family Recreation
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $10,078,000
24-001—Barth Property Purchase $300,035 $300,035
24-002—Petersen Property
Acquisition
$700,603 $700,603
24-003—Property Exchange
Navid/Bagher
$39,184 $39,184
24-004—Kahn Property
Acquisition
$552,174 $552,174
Grand Total $10,078,000 $1,591,996 $0 $1,591,996 $8,486,004 15.80%
15.80%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$1,591,996
Expenditure Plan Remaining
$8,486,004
81Measure AA Bond Annual Accountability Report FY22
Portfolio 25
Sierra Azul
Loma Prieta Area Public
Access, Regional Trails
and Habitat Projects
Sierra Azul Open Space Preserve by Karl Gohl
D E S C R I P T I O N————————————————————————————————————————————————————————
Provide public access and recreation, including small campground. ————————————————————————————————————————————————————————
Develop, improve and connect regional multiuse trails to Forest of Nisene Marks State Park, to protected
land to the east, and to Mount Umunhum.————————————————————————————————————————————————————————
Protect steelhead habitat, rare plants and grasslands, and restore knob cone pine stands.————————————————————————————————————————————————————————
Portfolio Allocation: $7,986,000 Portfolio Expenditures Through 6/30/2022: $2,398,668 ————————————————————————————————————————————————————————
N O T A B L E A C C O M P L I S H M E N T S
MAA25-001 Burton Land Acquisition
Prior Years————————————————————————————————————————————————————————
Purchased the 40-acre Burton/Robinson property to protect additional habitat within the Loma Prieta area. ————————————————————————————————————————————————————————
MAA25-002 Billingsley Property Acquisition and Site Cleanup
Fiscal Year 2022————————————————————————————————————————————————————————
Successfully bid the project and completed construction to remove site structures, metal shop, shipping
containers and all associated debris from the site following the property purchase. Salvaged four existing
water tanks and staged at an existing concrete pad for future use. Completed hazardous materials
abatement, performed site grading and installed final erosion control.
Prior Years————————————————————————————————————————————————————————
Purchased the 130.23-acre Billingsley property as an addition to the Loma Prieta area of Sierra Azul Preserve
to facilitate the future Mt. Umunhum to Sea regional trail corridor and eliminate an inholding to the Preserve.————————————————————————————————————————————————————————
Sent letters of intent and negotiations are occurring on a key 35-acre inholding property near the
intersection of Mt. Umunhum Road and Loma Prieta Road.————————————————————————————————————————————————————————
MAA25-003 Burton Property Site Cleanup
Fiscal Year 2022————————————————————————————————————————————————————————
Successfully bid the project and completed the site cleanup, abating and removing two unpermitted
structures, two horse corral structures and miscellaneous debris from across the site. Performed site
grading and installed final erosion control.
82 Measure AA Bond Annual Accountability Report FY22
P R O J E C T C H A L L E N G E S
————————————————————————————————————————————————————————
Land acquisition requires a willing seller.
————————————————————————————————————————————————————————
P O T E N T I A L N E X T S T E P S
————————————————————————————————————————————————————————
Finalize acquisition of land rights for the Umunhum to the Sea Trail connection to the Forest of Nisene
Marks State Park.————————————————————————————————————————————————————————
Portfolio 25: Sierra Azul—Loma Prieta Area Public Access, Regional Trails and Habitat Projects
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Total Portfolio Allocation $7,986,000
25-001—Burton Land Acquisition $410,150 $0 $410,150
25-002—Billingsley Property
Acquisition and Site Cleanup
$1,684,933 $251,287 $1,936,220
25-002—Burton Property Site
Cleanup
$0 $52,298 $52,298
Grand Total $7,986,000 $2,095,083 $303,585 $2,398,668 $5,587,332 30.04%
30.04%
OF FUNDS
USED
Total Life-to-Date Through 6/30/22
$2,398,688
Expenditure Plan Remaining
$5,587,332
83Measure AA Bond Annual Accountability Report FY22
Financial Report by Project
Measure AA Expenditures
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Portfolio 1: Miramontes Ridge—Gateway to the Coast Public Access, Stream Restoration
and Agriculture Enhancement
Total Portfolio Allocation $27,774,000
01-004—Remediation Plan and
Ranch Debris Cleanup, Madonna
Creek Ranch
$414,346 $5,445 $419,791
01-005—Johnston Ranch Land
Acquisition
$7,616 $75,291 $82,907
01-006—Madonna Creek Fish, Water
Supply and Bridge Replacement
$0 $68,417 $68,417
Subtotal $27,774,000 $421,962 $149,153 $571,115 $27,202,885 2.06%
01-004—Remediation Plan and
Ranch Debris Cleanup, Madonna
Creek Ranch Grant Income
$0 ($38,925)($38,925)
01 Total $27,774,000 $421,962 $110,228 $532,190 $27,241,810 1.92%
Portfolio 2: Regional—Bayfront Habitat Protection and Public Access Partnerships
Total Portfolio Allocation $5,052,000
02-001—Cooley Landing
Interpretive Facilities Design and
Implementation
$1,256,300 $27,543 $1,283,843
02-002—Ravenswood Bay Trail
Design and Implementation
$5,588,765 $0 $5,588,765
Subtotal $5,052,000 $6,845,065 $27,543 $6,872,608 ($1,820,608)136.04%
02-002—Ravenswood Bay Trail
Design and Implementation Grant
Income
($2,399,998)($1,055,328)($3,455,326)
02 Total $5,052,000 $4,445,067 ($1,027,785)$3,417,282 $1,634,718 67.64%
84 Measure AA Bond Annual Accountability Report FY22
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Portfolio 3: Purisima Creek Redwoods—Purisima-to-the-Sea Trail, Watershed Protection
and Conservation Grazing
Total Portfolio Allocation $7,608,000
03-001—Purisima Uplands Lot Line
Adjustment and Property Transfer
$425,113 $0 $425,113
03-002—Purisima Uplands Site
Cleanup and Soil Remediation
Assessment
$248,649 $19,408 $268,057
03-003—Purisima Creek Fence
Construction
$169,190 $0 $169,190
03-004—Harkins Bridge Replacement $516,917 $0 $516,917
03-005—Purisima-to-the-Sea Trail
and Parking Area—Feasibility Study
$260,425 $182,234 $442,659
03-006—South Cowell Upland Land
Conservation
$4,842,967 $93,740 $4,936,707
03-008—Rieser-Nelson Land Purchase $16,715 $0 $16,715
Subtotal $7,608,000 $6,479,976 $295,382 $6,775,358 $832,642 89.06%
03-005—Purisima-to-the-Sea Trail
and Parking Area—Feasibility Study
Grant Income
($75,237)($78,826)($154,063)
03 Total $7,608,000 $6,404,739 $216,556 $6,621,295 $986,705 87.03%
Portfolio 4: El Corte de Madera Creek—Bike Trail and Water Quality Projects
Total Portfolio Allocation $8,376,000
04-001—El Corte de Madera Creek
Gallaway Property Purchase
$57,340 $57,340
04-002—El Corte de Madera Creek
Watershed Protection Final Phase
$235,934 $235,934
04-003—El Corte de Madera Creek
Watershed Protection Reassessment
$45,507 $45,507
04-004—El Corte de Madera Creek
Oljon Trail Implementation
$627,387 $627,387
04 Total $8,376,000 $966,168 $0 $966,168 $7,409,832 11.53%
85Measure AA Bond Annual Accountability Report FY22
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Portfolio 5: La Honda Creek—Upper Area Recreation, Habitat Restoration and Conservation
Grazing Projects
Total Portfolio Allocation $11,733,000
05-001—La Honda Creek Land
Conservation Opportunities
$1,756,093 $0 $1,756,093
05-002—Upper La Honda Creek
Grazing Infrastructure
$297,432 $0 $297,432
05-005—La Honda Creek Red Barn
Parking Area and Easy Access Trail
$327,514 $0 $327,514
05-007—La Honda Creek Phase II
Trail Connections
$0 $28,079 $28,079
05-008—La Honda Creek White Barn
Structural Rehabilitation
$142,811 $101,501 $244,312
05-009—La Honda Creek Redwood
Cabin Removal and Site Restoration
$119,687 $88,168 $207,855
05-010—Restoration Forestry
Demonstration Project
$32,067 $4,700 $36,767
05-011—Lone Madrone Ranch Fence
Installation
$163 $63,200 $63,363
05 Total $11,733,000 $2,675,767 $285,648 $2,961,415 $8,771,585 25.24%
Portfolio 6: Windy Hill—Trail Improvements, Preservation and Hawthorns Area Historic Partnership
Total Portfolio Allocation $12,740,000
06-002 —Hawthorns Area Plan $40,950 $107,627 $148,577
05 Total $12,740,000 $40,950 $107,627 $148,577 $12,591,423 1.17%
86 Measure AA Bond Annual Accountability Report FY22
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Portfolio 7: La Honda Creek—Driscoll Ranch Public Access, Endangered Wildlife Protection
and Conservation Grazing
Total Portfolio Allocation $14,825,000
07-001—Event Center and Apple
Orchard Purchase
$6,007,601 $6,007,601
07-002—Fisheries Restoration,
Design and Permitting
$727,716 $727,716
07-003—Fisheries Enhancement,
Apple Orchard
$16,152 $16,152
07-004—Fisheries Enhancement,
Event Center
$50,000 $50,000
07-005—Grazing and Water Systems
Infrastructure
$189,423 $189,423
07-006—Cunha Land Purchase $3,080,705 $3,080,705
07-007—Demolitions, Wool Ranch
House/Sears Ranch Road
$357,803 $357,803
07-008—Lower Turtle Pond Repair—
La Honda Creek
$14,963 $31,439 $46,402
07-009—Sears Ranch Parking Areas $1,147,554 $1,147,554
07-010—Sears Ranch Road Repair $557,044 $557,044
07-011—Lower La Honda Creek
Phase II Loop Trails
$349,722 $126,155 $475,877
Subtotal $14,825,000 $12,498,683 $157,594 $12,656,277 $2,168,723 85.37%
07-002—Fisheries Restoration,
Design and Permitting Grant Income
($230,970)($230,970)
07 Total $14,825,000 $12,267,713 $157,594 $12,425,307 $2,399,693 83.81%
Portfolio 8: La Honda Creek and Russian Ridge—Preservation of Upper San Gregorio Watershed
and Ridge Trail Completion
Total Portfolio Allocation $15,347,000
08-001—Folger Property Purchase $2,153,910 $2,153,910
08 Total $15,347,000 $2,153,910 $0 $2,153,910 $13,193,090 14.03%
87Measure AA Bond Annual Accountability Report FY22
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Portfolio 9: Russian Ridge—Public Recreation, Grazing and Wildlife Protection Projects
Total Portfolio Allocation $5,560,000
09-001—Russian Ridge Grazing
Infrastructure
$174,416 $0 $174,416
09-003—Russian Ridge Mindego
Pond Improvement
$448,106 $387 $448,493
09-004—Mindego Hill Trail
Construction
$67,403 $0 $67,403
09-006—Mindego Ranch South
Pasture
$0 $106,475 $106,475
Subtotal $5,560,000 $689,925 $106,862 $796,787 $4,763,213 14.33%
09-003—Russian Ridge Mindego
Pond Improvement Grant Income
$0 ($168,585)($168,585)
09 Total $5,560,000 $689,925 ($61,723)$628,202 $4,931,798 11.30%
Portfolio 10: Coal Creek—Reopen Alpine Road for Trail Use
Total Portfolio Allocation $8,017,000
10-001—Alpine Road Regional Trail,
Coal Creek
$467,648 $86,786 $554,434
10 Total $8,017,000 $467,648 $86,786 $554,434 $7,462,566 6.92%
Portfolio 11: Rancho San Antonio—Interpretive Improvements, Refurbishing and Transit Solutions
Total Portfolio Allocation $10,811,000
11-001—New Trails to Connect
Quarry Trail to Black Mountain Trail
$728 $0 $728
11-002—Rancho San Antonio,
Deer Hollow Farm: White Barn
Rehabilitation
$512,505 $0 $512,505
Subtotal $10,811,000 $513,233 $0 $513,233 $10,297,767 4.75%
11-002—Rancho San Antonio,
Deer Hollow Farm: White Barn
Rehabilitation Grant Income
($230,881)$0 ($230,881)
11 Total $10,811,000 $282,352 $0 $282,352 $10,528,648 2.61%
Portfolio 12: Peninsula and South Bay Cities—Partner to Complete Middle Stevens Creek Trail
Total Portfolio Allocation $1,038,000
12 Total $1,038,000 $0 $0 $0 $1,038,000 0.00%
Portfolio 13: Cloverdale Ranch—Wildlife Protection, Grazing and Trail Connections
Total Portfolio Allocation $15,712,000
13 Total $15,712,000 $0 $0 $0 $15,712,000 0.00%
88 Measure AA Bond Annual Accountability Report FY22
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Portfolio 14: Regional—Trail Connections and Campgrounds
Total Portfolio Allocation $3,966,000
14 Total $3,966,000 $0 $0 $0 $3,966,000 0.00%
Portfolio 15: Regional—Redwood Protection and Salmon Fishery Conservation
Total Portfolio Allocation $50,728,000
15-001—Conservation Easement
Upper Alpine Ranch Area
$2,508,695 $0 $2,508,695
15-002—Conley Property Purchase $509,855 $0 $509,855
15-003—Long Ridge Property
Addition
$14,500 $0 $14,500
15-004—Irish Ridge Land
Conservation
$77,768 $0 $77,768
15 Total $50,728,000 $3,110,818 $0 $3,110,818 $47,617,182 6.13%
Portfolio 16: Long Ridge—Trail, Conservation and Habitat Restoration Projects (Saratoga)
Total Portfolio Allocation $5,140,000
16 Total $5,140,000 $0 $0 $0 $5,140,000 0.00%
Portfolio 17: Regional—Complete Upper Stevens Creek Trail
Total Portfolio Allocation $7,760,000
17-001—Land Conservation: Last
Piece Upper Stevens Creek
$1,494,552 $1,494,552
17-002—Demolition & Restoration:
Lobner/Lysons
$461,320 $461,320
17-004—Stevens Creek Nature Trail
Bridges, Monte Bello
$430,569 $430,569
Subtotal $7,760,000 $2,386,441 $0 $2,386,441 $5,373,559 30.75%
17-002—Lysons Property Purchase
Grant Income (50% of purchase price)
($740,000)($740,000)
17 Total $7,760,000 $1,646,441 $0 $1,646,441 $6,113,559 21.22%
Portfolio 18: South Bay Foothills—Saratoga-to-the-Sea Trail and Wildlife Corridor
Total Portfolio Allocation $1,365,000
18-001—San Jose Water Land
Purchase
$3,850 $3,850
18-002—Saratoga-to-the-Sea
Regional Trail Connection
$1,160,339 $1,160,339
18 Total $1,365,000 $1,164,189 $0 $1,164,189 $200,811 85.29%
89Measure AA Bond Annual Accountability Report FY22
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Portfolio 19: El Sereno—Dog Trails and Connections
Total Portfolio Allocation $2,254,000
19-001—Gupta/Khan Property
Purchase
$406,553 $0 $406,553
19-002—Dunham-Bohlman
Easement
$19,997 $0 $19,997
19-003—Haight-Perry Low Value
Land Acquisition
$52,977 $0 $52,977
19-004—San Jose Water Co Land
Purchase
$1,085,237 $0 $1,085,237
Subtotal $2,254,000 $1,564,764 $0 $1,564,764 $689,236 69.42%
19-001—Gupta/Khan Property
Purchase Grant Income
($191,577)$0 ($191,577)
19-004—San Jose Water Co Land
Grant Income
($1,027,300)($47,700)($1,075,000)
19 Total $2,254,000 $345,887 ($47,700)$298,187 $1,955,813 13.23%
Portfolio 20: South Bay Foothills—Wildlife Passage and Ridge Trail Improvements
Total Portfolio Allocation $13,966,000
20-001—Wildlife Corridor: Highway
17 Crossing
$587,493 $192,744 $780,237
20-002—Bay Area Ridge Trail:
Highway 17 Crossing
$593,718 $382,427 $976,145
Subtotal $13,966,000 $1,181,211 $575,171 $1,756,382 $12,209,618 12.58%
20-001—Wildlife Corridor: Highway
17 Crossing Grant Income
$0 ($1,280,497)($1,280,497)
20 Total $13,966,000 $1,181,211 ($705,326)$475,885 $13,490,115 3.41%
90 Measure AA Bond Annual Accountability Report FY22
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Portfolio 21: Bear Creek Redwoods—Public Recreation and Interpretive Projects
Total Portfolio Allocation $17,478,000
21-001—Moody Gulch Fence & Gate
Improvements
$847 $847
21-004—Bear Creek Stables Site
Plan Implementation
$764,419 $69,826 $834,245
21-005—Bear Creek Redwoods
Public Access
$5,548,003 $0 $5,548,003
21-006—Bear Creek Redwoods Alma
College Cultural Landscape Rehab
$1,848,977 $3,248,819 $5,097,796
21-007—Bear Creek Redwoods
Preserve Plan Invasive Weed
Treatment
$1,075,164 $117,236 $1,192,400
21-008—Bear Creek Redwoods
Ponds Restoration and Water Rights
$681,517 $0 $681,517
21-009—Bear Creek Redwoods
Webb Creek Bridge
$487,492 $0 $487,492
21-010—Bear Creek Redwoods
Landfill Characterization and
Remediation
$39,195 $92,940 $132,135
21-011—Phase II Trail Improvements $714,273 $146,122 $860,395
21-012—Bear Creek Redwood Tree
Restoration
$90,915 $0 $90,915
Subtotal $17,478,000 $11,250,802 $3,674,943 $14,925,745 $2,552,255 85.40%
21-006—Bear Creek Redwoods
Ponds Restoration and Water
Rights Grant Income
$0 ($666,518)($666,518)
21-007—Bear Creek Redwoods
Preserve Plan Invasive Weed
Treatment Grant Income
($515,000)$0 ($515,000)
21-008—Bear Creek Redwoods
Ponds Restoration and Water
Rights Grant Income
($80,000)($227,620)($307,620)
21-009—Bear Creek Redwoods
Webb Creek Bridge Grant Income
($149,500)$0 ($149,500)
21 Total $17,478,000 $10,506,302 $2,780,805 $13,287,107 $4,190,893 76.02%
91Measure AA Bond Annual Accountability Report FY22
92 Measure AA Bond Annual Accountability Report FY22
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Portfolio 22: Sierra Azul—Cathedral Oaks Public Access and Conservation Projects
Total Portfolio Allocation $6,714,000
22-001—Hendrys Creek Property
Land Restoration
$513,343 $0 $513,343
22-003—Freudenberg Land Purchase $540,587 $0 $540,587
22-004—Beatty Parking Area and
Trail Connections
$173,807 $0 $173,807
22-005—Beatty House Site Security
Improvements
$17,059 $30,796 $47,855
Subtotal $6,714,000 $1,244,796 $30,796 $1,275,592 $5,438,408 19.00%
22-001—Hendrys Creek Property
Land Restoration Grant Income
($336,228)$0 ($336,228)
22 Total $6,714,000 $908,568 $30,796 $939,364 $5,774,636 13.99%
Portfolio 23: Sierra Azul—Mount Umunhum Public Access and Interpretation Projects
Total Portfolio Allocation $27,972,000
23-001—Mt. Um Road and Trail
Property Rights
$1,271,318 $0 $1,271,318
23-002—Mt. Um Trail $959,548 $0 $959,548
23-004—Mt. Um Summit Restoration,
Parking and Landing Zone
$10,458,358 $0 $10,458,358
23-005—Mt. Um Guadalupe Creek
Overlook and Bridges
$259,311 $0 $259,311
23-006—Mt. Um Road Design/
Permitting/Construction
$6,282,378 $0 $6,282,378
23-007—Twin Creeks Land
Conservation
$3,735,925 $0 $3,735,925
23-009—Vielbaum Property
Acquisition
$0 $168,053 $168,053
Subtotal $27,972,000 $22,966,838 $168,053 $23,134,891 $4,837,109 82.71%
23-004—Mt. Umunhum Summit
Restoration, Parking and Landing
Zone Grant Income
($570,000)($570,000)
23-007—Twin Creeks Land
Conservation Grant Income
($750,000)($750,000)
23 Total $27,972,000 $21,646,838 $168,053 $21,814,891 $6,157,109 77.99%
Project Expenditure
Plan
Total Through
Prior Period
6/30/21
Current Period
7/1/21 Through
6/30/22
Total Life-to-
Date Through
6/30/22
Expenditure
Plan
Remaining
Percent
Expended
Portfolio 24: Sierra Azul—Rancho de Guadalupe Family Recreation
Total Portfolio Allocation $10,078,000
24-001—Barth Property Purchase $300,035 $300,035
24-002—Petersen Property
Acquisition
$700,603 $700,603
24-003—Property Exchange Navid/
Bagher
$39,184 $39,184
24-004—Kahn Property Acquisition $552,174 $552,174
24 Total $10,078,000 $1,591,996 $0 $1,591,996 $8,486,004 15.80%
Portfolio 25: Sierra Azul—Loma Prieta Area Public Access, Regional Trails and Habitat Projects
Total Portfolio Allocation $7,986,000
25-001—Burton Land Acquisition $410,150 $0 $410,150
25-002—Billingsley Property
Acquisition and Site Cleanup
$1,684,933 $251,287 $1,936,220
25-003—Burton Property Site Cleanup $0 $52,298 $52,298
25 Total $7,986,000 $2,095,083 $303,585 $2,398,668 $5,587,332 30.04%
Subtotal $300,000,000 $82,310,225 $5,969,143 $88,279,368 $211,720,632 29.43%
Reimbursements from Grants
and Other Contributions
($7,296,691)($3,563,999)($10,860,690)
GRAND TOTAL $300,000,000 $75,013,534 $2,405,144 $77,418,678 $222,581,322 25.81%
93Measure AA Bond Annual Accountability Report FY22
9494Measure AA Bond Annual Accountability Report FY22
MAA Ballot Language
YES ✓To improve access to hiking and biking opportunities, protect and preserve redwood forests, natural open
spaces, the scenic beauty of our region and coastline, critical wildlife habitat, restore creeks to protect water
quality, and reduce forest fire risk; shall Midpeninsula Regional Open Space District be authorized to issue up
to $300 million in bonds, at a tax rate not to exceed $3.18 per $100,000 of assessed value of property owned,
with expenditures verified by an independent citizen oversight committee?NO
MAA Votes by County
County Yes No
Votes %Votes %
Santa Clara 50,977 68.8%23,109 31.2%
Santa Cruz 1 50.0%1 50.0%
San Mateo 24,783 66.3%12,606 33.7%
Total 75,761 68.0%35,716 32.0%
Original MAA Promotional Graphic
95
96
97
98
ATTEST:
/s/ Larry Hasset
—————————————————
Secretary
Board of Directors
APPROVED AS TO FORM:
/s/ Sheryl Schaffner
—————————————————
General Counsel
APPROVED:
/s/ Cecily Harris
—————————————————
President
Board of Directors
/s/ Jennifer Woodworth
—————————————————
District Clerk
99
EXHIBIT A
Expenditure Plan
TITLE: To improve access to hiking and biking opportunities, protect and preserve redwood forests, natural
open spaces, the scenic beauty of the region and coastline, critical wildlife habitat, restore creeks to protect
water quality, and reduce forest fire risk.
1. SUMMARY
Founded by voters in 1972, the Midpeninsula Regional Open Space District (“District”) has protected, in
perpetuity, 62,000 acres of open space containing 26 preserves and more than 220 miles of trails that serve
Santa Clara, San Mateo, and a portion of Santa Cruz counties. The District’s preserves provide a scenic
backdrop to the region offering residents places for hiking, biking, horseback riding, or simply connecting with
nature, close to home. Throughout its 41-year history the District has used taxpayer dollars wisely, leveraging
funds to bring in state, federal, and private grant money, and providing annual audits in a transparent public
process. The District is governed by a publicly elected board of directors.
Over the years, the number of acres and miles of trails the District owns and maintains have steadily
increased, as have the number of visitors and the cost of land. Expanding public access, restoring sensitive
environments and purchasing land are costly, yet are high priorities for the public.
To reinforce and expand these types of services and resources, the Board of Directors is placing this
funding measure on the June 3, 2014 ballot.
$300 million in General Obligation Bonds will be sold. The bond repayment would be financed by an
annual property tax override based on a tax rate not to exceed $3.18 per $100,000 of assessed value of
property owned per year.
This Expenditure Plan outlines priority actions identified by the public and proposed by the District to be
funded with bond proceeds. Part B describes each priority action and describes what goals it will achieve. Part
C of the Expenditure Plan describes the establishment of an independent Citizen Oversight Committee.
Measure AA Ballot Language, as approved by voters on June 3, 2014100
2.PRIORITY ACTIONS
The priority actions listed below are the result of a process that combined scientific analysis with broad
public engagement to create a shared vision for the future of the District and the region’s open space. Each
priority action may address one or more of the following as more specifically described in the table Priority
Actions, By Region attached to this Expenditure Plan:
•Improved hiking, biking, and equestrian opportunities
•Protection and preservation of redwoods, natural open spaces, the scenic beauty of the region
and coastline, critical habitats
•Restoration of creeks to protect water quality
•Reduction of forest fire risk
Priority actions are distributed throughout the District as depicted on the map attached to this
Expenditure Plan.
If approved, the bond proceeds would be allocated to fund the capital improvements necessary to
implement the priority actions listed below. Note: the number associated with each priority action does not
denote its priority level, but is only used for identification purposes to correlate with the locations depicted on
the map.
The estimates associated with each priority action are in 2014 dollars. These are estimates only, and
the actual costs may change in implementation.
The District may annually review and propose amendments to the Expenditure Plan to provide for the
use of additional federal, state and local funds, to account for unexpected revenues, or to take into
consideration unforeseen circumstances. The District shall act on no more than one package of amendments
each fiscal year. The District shall establish a process for proposed Expenditure Plan amendment(s) which
ensures that the Citizen Oversight Committee is included in the development. Upon completion of this
process, amendments(s) to the Expenditure Plan must be passed by a two-thirds majority of the District Board
in a publicly noticed meeting.
Measure AA Ballot Language, as approved by voters on June 3, 2014 101
PRIORITY ACTIONS, BY REGION
South Bay Foothills
(Los Gatos, Monte Sereno, Saratoga, and Santa Cruz Mountains)
18 South Bay Foothills: Saratoga-to-Sea Trail and Wildlife Corridor
Protect wildlife corridor along Highway 9. Connect trail to Saratoga-to-Sea Trail and Skyline-to-Sea Trail.
$1,365,000
19 El Sereno: Dog Trails and Connections
Provide infrastructure to open trails to dogs. Develop connections to Skyline, Sanborn County Park, & Lexington
Reservoir. $2,254,000
20 South Bay Foothills: Wildlife Passage and Ridge Trail Improvements
Establish safe corridors for mountain lions across Highway 17. Establish Bay Area Ridge Trail crossing.
$13,966,000
21 Bear Creek Redwoods: Public Recreation and Interpretive Projects
Open for hiking, equestrian activities. Provide parking areas, trails; upgrade stables. Restore & protect habitats
for various species. Repair roads & trails to reduce sediment. Rehabilitate Alma College site. $17,478,000
22 Sierra Azul: Cathedral Oaks Public Access and Conservation Projects
Develop multi-use trail & plan future trails as land is available. Develop parking. Restore plant communities and
soils. Install trailside amenities. Preserve additional open space and complete wildlife corridor in upper Los Gatos
Creek watershed. $6,714,000
23 Sierra Azul: Mt. Umunhum Public Access and Interpretation Projects
Open Mt. Umunhum for multi-use public access to summit via road and trail. Open Bay Area Ridge Trail and
nearby trail connections. Preserve additional open space and complete wildlife corridor. $27,972,000
24 Sierra Azul: Rancho de Guadalupe Family Recreation
Open Rancho de Guadalupe to public access. Develop accessible multi-use trails with amenities such as parking
and family recreation. Restore habitat for rare species. Protect cultural and natural resources. $10,078,000
25 Sierra Azul: Loma Prieta Area Public Access, Regional Trails and Habitat Projects
Provide public access and recreation, including small campground. Develop, improve, connect regional multi-use
trails to Forest of Nisene Marks State Park, to protected land to east, and to Mt. Umunhum. Protect Steelhead
habitat, rare plants and grasslands, restore Knobcone Pine stands. $7,986,000
Measure AA Ballot Language, as approved by voters on June 3, 2014102
Peninsula Foothills and Bay
(Cupertino, Los Altos, Los Altos Hills, Sunnyvale, Mountain View, Palo Alto, East Palo Alto,
Menlo Park, Atherton, Redwood City, San Carlos, Woodside, Portola Valley, Skyline
2 Regional: Bayfront Habitat Protection and Public Access Partnerships
Partner to complete gaps in Bay Trail and develop city-to-bay trails. Support wetland restoration and associated
interpretive facilities. Preserve additional bayfront open space. $5,052,000
4 El Corte de Madera Creek: Bike Trail and Water Quality Projects
Develop single-use biking/hiking trails, complete Ridge Trail gaps, and develop trail system leading to parking
area. Restore damaged trails to improve water quality. Preserve additional open space as available.
$8,376,000
5 La Honda Creek: Upper Area Recreation, Habitat Restoration and Conservation Grazing
Projects
Open upper half of the preserve to public; provide biking/hiking/equestrian trails, dog access, and staging areas.
Provide loop & connector trails. Restore habitat for rare species. Improve fencing, corrals, and water systems to
reintroduce conservation grazing. $11,733,000
6 Windy Hill: Trail Improvements, Preservation and Hawthorns Area Historic Partnership
Improve trails, complete pond facilities. Increase multi-use trails, study possible improvements to increase dog
use. Open Hawthorns Area; develop trails connecting to Portola Valley and Palo Alto trails. Partner to protect,
restore, and interpret historic buildings. Improve habitat conditions in Los Trancos Creek. Preserve additional
scenic open space as available. $12,740,000
8 La Honda Creek/Russian Ridge: Preservation of Upper San Gregorio Watershed & Ridge Trail
Completion
Preserve upper San Gregorio watershed; restore endangered species habitats. Support opportunities to provide
additional water for fisheries. Complete Bay Area Ridge Trail multi-use connections and gaps. Provide additional
public use facilities. $15,347,000
9 Russian Ridge: Public Recreation, Grazing and Wildlife Protection Projects
Open currently closed areas of preserve. Construct and extend trails. Improve fencing, corrals, and water
systems to reintroduce conservation grazing. Improve habitat for sensitive species, implement pond
enhancement projects for garter snakes and red-legged frogs. $5,560,000
10 Coal Creek: Reopen Alpine Road for Trail Use
Reopen Alpine Road as trail connection between Portola Valley & Skyline Blvd. Reroute trails to reduce erosion
and improve visitor experience. $8,017,000
11 Rancho San Antonio: Interpretive Improvements, Refurbishing, and Transit Solutions
Add welcome center, refurbish and add interpretive exhibits to Deer Hollow Farm. Support of transit improvement
options such as bike trails, bikeshare station, bus service, or additional parking. $10,811,000
12 Peninsula/South Bay Cities: Partner to Complete Middle Stevens Creek Trail
Support work by cities to develop the middle section of the Stevens Creek Trail and enhance neighborhood
connections. Support work by partners to complete stream corridor restoration and steelhead habitat
enhancement below dam. Develop and install interpretive signage. $1,038,000
16 Long Ridge: Trail, Conservation and Habitat Restoration Projects (Saratoga)
Improve roadside parking and provide restrooms. Develop new trail connections to Eagle Rock and Devils
Canyon. Repair trails for year-round multi-use access. Protect watersheds for steelhead. Preserve additional
open space as available. Implement pond and habitat enhancement restoration projects to benefit rare species.
$5,140,000
17 Regional: Complete Upper Stevens Creek Trail
Complete multi-use connection between the Bay Trail & Bay Area Ridge Trail above the reservoir through
Picchetti Ranch Open Space Preserve & Lower/Upper Stevens Creek County Parks. Improve Preserve trails and
neighborhood connections. Preserve additional open space as available. $7,760,000
Measure AA Ballot Language, as approved by voters on June 3, 2014 103
Coast
(Half Moon Bay, San Gregorio, Pescadero, La Honda,)
1 Miramontes Ridge: Gateway to the Coast Public Access, Stream Restoration and Agriculture
Enhancement
Preserve scenic open space land as available, and establish wildlife corridor. Restore fish and red-legged frog
habitats in Madonna Creek watershed. Partner to enhance water availability for agriculture and fish. Develop
trail loop system, including Ridge Trail and neighborhood access points. Develop staging area, repair bridges.
$27,774,000
3 Purisima Creek Redwoods: Purisima-to-Sea Trail, Watershed Protection and Conservation
Grazing
Complete and open multi-use Purisima-to-Sea trail connection between Ridge Trail and Coastal Trail, and new
parking areas. Preserve additional open space as available. Remove fish barriers and restore Lobitos Creek.
Restore ponds for endangered species. $7,608,000
7 La Honda Creek: Driscoll Ranch Public Access, Endangered Wildlife Protection and
Conservation Grazing
Open Driscoll Ranch Area; provide biking/hiking/equestrian trails, limited dog access, parking areas, and
interpretive displays. Develop loop & connector trails. Restore habitat for endangered species. Restore La
Honda Creek; remove fish migration barriers. $14,825,000
13 Cloverdale Ranch: Wildlife Protection, Grazing and Trail Connections
Improve fencing, corrals, and water systems to increase conservation grazing and sustain large contiguous
grasslands. Restore habitat for endangered species. Provide trail connections to nearby State parks.
$15,712,000
14 Regional: Trail Connections and Campgrounds
Develop trails between Butano, Pescadero County Park, Pescadero, Russian Ridge, and between Skyline and
Portola Redwoods, Big Basin State Park. Partner with County and State Parks to improve existing campgrounds.
$3,966,000
15 Regional: Redwood Protection and Salmon Fishery Conservation
Preserve additional open space as available. Protect and enhance redwood stands, mountain scenery, various
habitats and steelhead salmon. $50,728,000
Measure AA Ballot Language, as approved by voters on June 3, 2014104
Measure AA Ballot Language, as approved by voters on June 3, 2014 105
3.INDEPENDENT CITIZEN OVERSIGHT COMMITTEE
An Independent Citizen Oversight Committee will be formed to verify expenditures of bond proceeds.
The Independent Citizen Oversight Committee will consist of seven at-large members, all of whom shall be
District residents. The Citizen Oversight Committee will be selected by the Board and interviewed and
approved in open session, and will be subject to the conflict of interest constraints of the California Political
Reform Act.
The responsibilities of the Committee include:
•Review Plan expenditures on an annual basis to verify conformity with the Expenditure Plan.
•Review District’s Annual Audit and Annual Accountability report and present the Committee’s findings
to the Board at a public meeting.
•Review any proposed amendments to the Expenditure Plan.
Measure AA Ballot Language, as approved by voters on June 3, 2014106
EXHIBIT B
TAX RATE STATEMENT
An election will be held in the Midpeninsula Regional Open Space District (the "District") on June 3,
2014, to authorize the sale of up to $300 million in bonds of the District to provide public access and acquire,
restore, and preserve open space throughout the District as described in the ballot measure. If the bonds are
approved, the District expects to sell the bonds in several series over time. Principal and interest on the bonds
will be payable from the proceeds of tax levies made upon the taxable property in the District. The information
contained in numbered paragraphs 1 - 3 below is provided in compliance with sections 9400-9404 of the
Elections Code of the State of California.
1. The best estimate of the tax which would be required to be levied to fund this bond issue during the
first fiscal year after the sale of the first series of bonds, based on estimated assessed valuations available at
the time of filing of this statement, is $1.00 per $100,000 of assessed valuation in fiscal year 2015-16.
2. The best estimate of the tax rate which would be required to be levied to fund this bond issue during
the first fiscal year after the sale of the last series of bonds, based on estimated assessed valuations available
at the time of filing of this statement, is $2.90 per $100,000 of assessed valuation in fiscal year 2044-45.
3. The best estimate of the highest tax rate which would be required to be levied to fund this bond
issue, based on estimated assessed valuations available at the time of filing of this statement, is $3.18 per
$100,000 of assessed valuation in fiscal year 2034-35.
Voters should note that the estimated tax rates are based on the estimated ASSESSED VALUE of
taxable property on the respective County's official tax rolls, not on a property's market value. Property owners
should consult their own property tax bills to determine their property's assessed value and any applicable tax
exemptions.
Attention of all voters is directed to the fact that the foregoing information is based upon the District's
projections and estimates only, which are not binding upon the District. The actual tax rates and the years in
which they will apply may vary from those presently estimated, due to variations from these estimates in the
timing of bond sales, the amount of bonds sold and market interest rates at the time of each sale, and actual
assessed valuations over the term of repayment of the bonds. The dates of sale and the amount of bonds sold
at any given time will be determined by the District based on its needs for funds and other factors. The actual
interest rates at which the bonds will be sold will depend on the bond market at the time of each sale. Actual
future assessed valuation will depend upon the amount and value of taxable property within the District as
determined by the respective County Assessor in the annual property value assessment process.
Dated: _______, 2014.
_________________________
General Manager
Midpeninsula Regional Open Space District
Measure AA Ballot Language, as approved by voters on June 3, 2014 107
The notes to the financial statements are an integral part of this statement.
cts
Expenditures Expenditures
from from
July 1, 2021 Inception
through through
Project No. Project Description June 30, 2022 June 30, 2022
AA01 $1 4 9 ,1 5 3 $5 7 1 .1 1 5
AA02 2 7 ,5 4 3 6 ,8 7 2 ,6 0 8
AA03 295.38 2 6,775,3 5 8
AA04
AA05 285,648
-9 6 6 ,1 6 8
2 ,9 6 1 ,4 1 5
AA06 107,627 1 4 8 ,5 7 7
AA07 157,594 12,656,277
AA08
AA09 106,862
-2 ,1 5 3 ,9 1 0
7 9 6 ,7 8 7
AA10 8 6 ,7 8 6 5 5 4 ,4 3 4
AA11 513,233
AA15 - 3,110,818
AA17
AA1 8 -
AA19
AA20 5 7 5 ,1 7 1
2,386 ,4 4 1
1 ,1 6 4 ,1 8 9
1 ,5 6 4 ,7 6 4
1 ,7 5 6 ,3 8 2
AA21 3,6 7 4,943 11,250,80 2
AA22 3 0 ,7 9 6 1,244,796
AA23 1 6 8 ,0 5 3 22,966,838
AA24
AA25 3 0 3 ,5 8 5
Miramontes Ridge - Gateway to San Mateo Coast
Regional: Bayfront Habitat Protection & Public Access Partnerships
Puris ima Creek Redwoods: Purisma-to Sea Trail, Watershed & Grazing
El Co rte de Madera Creek: Bike Trail & Water Quality Pro j ect s
La Honda Creek - Upper Recreati o n Area
Hawt horn Public Access Impr oveme nts
Drisc oll Ranch Public Access , Wildlife Prote ction & Grazing
La Honda /Ru ssian Ri dg e: Upper San Gregor io Wat ershed
Russian Ridge: Public Recreation, Grazing & Wildlife Protection
Coal Creek: Reopen Alpine Road for Trail Use
Ranch o San Antonio: Interpretive Improvements, Refurbishing
Regio nal: Redwood Protection & Salmon Fishery Conservation
Regional: Complete Upper Stevens Creek Trail
South Bay Foothills: Saratoga-to-Sea Trail & Wildlife Corridor
El Seren o Dog Park & Connec ti on s
South Bay Foothills: Wildlife Passage/Ridge Trail Improvements
Bear Creek Redwoods: Public Recreation & Interpretive Projects
Sierra Azul: Cathedral Oaks Public Access & Conservation Projects
Sierra Azul: Mt Umunhu m Public Access & Interpretation Projects
Sierra Azul: Rancho de Guadalupe Family Recreation
Sierra Azul: Loma Prieta Area Public Access, Regional Trails/Habitat Project
1,591 ,9 9 6
2 ,3 9 8 ,6 6 8
5 ,9 6 9 ,1 4 3 8 8 ,2 7 9 ,3 6 8
(3,563,999)(10,860,690)
Total MAA Bond Project Expenditures
Prior period adjustment (transfer of expenditure from Fund 40 Saratoga to the Sea)
Reimbursements from Grants, Contributions, and Other Funds Total MAA Bond
Proj ect Expenditures - Net Reimbursements $ 2 ,4 0 5 ,1 4 4 $ 7 7 ,4 1 8 ,6 7 8
Midpeninsula Regional Open Space District
Measure AA Bond Program
Schedule of Program Expenditures June 30, 2022 (unaudited)
This page is an excerpt from the Annual Comprehensive Financial Report for fiscal year ended June 30, 2022, page 85.
Annual audited financial statements can be found at openspace.org/financials.
-
Financial Report of Revenues, Expenditures
and Changes in Fund Balance
Measure AA Capital Projects Fund
For the Fiscal Year Ended June 30, 2022
Budgeted Amounts Actual Unaudited
(GAAP Basis)
Variance to Final
Budget
More (Less)Original Final
Revenues
Grant Income $3,088,932 $4,013,932 $3,563,999 $(449,933)
Investment Earnings 209,000 209,000 621,680 412,680
Total Revenues 3,297,932 4,222,932 4,185,679 (37,253)
Expenditures
Salaries and Employee Benefits 619,300 585,629 397,294 (188,335)
Capital Outlay 8,078,139 6,682,747 5,571,849 (1,110,898)
Total Expenditures 8,697,439 7,268,376 5,969,143 (1,299,233)
Excess (Deficiency) of Revenues
Over (Under) Expenditures
(5,399,507)(3,045,444)(1,783,464)1,261,980
Other Financing Sources
Transfers In - - - -
Transfers Out - - (3,797,669)(3,797,669)
Total Other Financing Sources - (3,797,669)(3,797,669)
Net Change in Fund Balance (5,399,507)(3,045,444)(5,581,133)(2,535,689)
Fund Balance Beginning 22,134,964 22,134,964 22,134,964 -
Prior Period Adjustment - - - -
Fund Balance Beginning—Adjusted 22,134,964 22,134,964 22,134,964 -
Fund Balance Ending $16,735,457 $19,089,520 $16,553,831 (2,535,689)
109Measure AA Bond Annual Accountability Report FY22
Monte Bello Open Space Preserve by Jan Gazenbeek
M I D P E N I N S U L A R E G I O N A L O P E N S P A C E D I S T R I C T
330 Distel Circle
Los Altos, California 94022-1404
650-691-1200
info@openspace.org
openspace.org
PRINTED ON POST
CONSUMER WASTE PAPER