Loading...
HomeMy Public PortalAboutResolution #2008-14, A Resolution Approving The Expenditure Not To Exceed $26,000 For Traffic Signal Mastarm Repair/Replacement i RESOLUTION# 2008-14 A RESOLUTION APPROVING THE EXPENDITURE NOT TO EXCEED $26,000 FOR TRAFFIC SIGNAL MASTARM REPAIR/REPLACEMENT WHEREAS,the traffic signal located at the Alcoa main entrance in the City of Riverdale is in need of repair/replacement after a traffic accident; and WHEREAS, on June 4, 2008, Davenport Electric Contract Company presented a Proposal pertaining to the repair/replacement of the traffic signal (the "Traffic Signal Project"),projecting that the Traffic Signal Project will cost approximately$26,000. NOW THEREFORE BE IT RESOLVED,by the City Council of the City of Riverdale, Iowa, and the City is authorized to expend$26,000 to complete the Traffic Signal Project pursuant to the Proposal submitted to it by representatives of Davenport Electric Contract Company. This Resolution shall take immediate effect. PASSED,APPROVED AND ADOPTED THIS 17th day of June, 2008. Ayes: Nays: Absent: Channon Franklin Hupp Littrel Halsey Ogigkik eff Grindle, Mayor ATTEST: /L L _'_4 -' - Theresa Ralfs, City Cler if i A�lN/U4/LU!1di�i�U I y:b4 All Davenport Electric FAX No, 5E3 2 6477 P. !j(17 J ,� JY 1 • }L,_. Davenport Electric, Contract Company Traffic Signal Mastarm Repair/Replacement 1, Emergency pall out and signal repairs temporary. $ 1,137.00 2. Temporary mast arm pole reinforcement. $ 673.00 • 3. New reinforced concrete foundation 42"x 13'(with anchor bolts). $ 2,571 C1,0 4. New 46'combination mast arm pole with ^5 luminaire area. $ 9,137.00 • • 5. New 250-watt luminaire. $ 494.00 6. New underground conduit and wiring to controller/drill hand hole. $ 1,323.00 7. Jackhammer down existing foundation, cut anchor bolts,and backfill. $ 785.00 8. Video camera replacement. $ 3,673.00 9. Opticom Preemption Detector {2-way).. $ 894.00 10. New 5-section signal MAM. $ 1,211.00 11. Nat 3-section signal SOP. $ 789.00 12. Ntfottmiraf wire(in arm)luminaire cable, and camera cable. $ 398.00 13. Remove&relocate 2 existing 3-section signals. $ 560.00 . 14. Crane truck, trailer,auger truck, backhoe, &dump truck. • $ 7'73.00 Budget Total: $ 24,318.00 Respectfully Submitted, Davenport Electric Contract Company Sy: Barry Van Blariccm,Vice President E mall: barryfiSdavenportelectric.com Cell Phone: 320-3083 • Email davenportelectric rdavenportelectric.corn 529 Pershing Ave., P.O. Box 4229, Davenport, Iowa,5280B ■ Phone:5831326-6475 r Fax: 563/326-6477