Loading...
HomeMy Public PortalAboutSECOND AV_1306.pdfDATE ISSUED: 09-20-2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT SHINGLES ON STORAGE BUILDING 1306 SECOND AVE GRACE HINTON 715 ALVARADO ROW STANFORD CA 94306 BARRY A BROWN CONSTRUCTION CO PO BOX 2618 TYBEE ISLAND GA 31328 P $ 50.00 PIN 4-0007-15-010 $ 400.00 PERMIT #: 130585 TOTAL BALANCE DUE: $ 50.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. AoxtSignature of Building Inspector or Authorized Agent: �( P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org /3-oS�5' City of Tybee Island, Georgia y 912-472-5030 • Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT Property Address: 3t) to !E� r n r �_�AV PIN: Check all that apply ❑ Single Family ❑ Discovery/Tearout ❑ Demolition or Relocation ❑ Duplex ❑ Footprint Changes ❑ Other ❑ Multi -Family units ❑ additional square ❑ " Commercial unit(s) feet heated/cooled } A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may requireSitePlan Approval_ Details of Project: 1nT L rS Q 1 0'S c-) r'-" S4 r a Estimated Cost of Construction: $ 3 (materials + labor + profitloverhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the wprk, two sets of construction drawings and/or a site plan may be required. Year Built: 6 \1� Listed on National Historic Register or located within a National Historic District? Y 1 N • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation Durina construction: On-site restroom facilities will be provided through . Construction debris will be disposed by by means of I understand that I must comply with zoning, flood damage control building, fire shore protection and wetland ordinances FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Printed Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Signature Date Planning & Zoning Manager0'&—{� Building Official Water/Sewer Storm/Drainage City Manager 7D 3 - 151 ,ng�� ���c��A-- FEES��� Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL .s0 Name Mailing Address Telephone Owner Home: Cell: Architect or Office. Engineer Cell: Contractor �` r 0 n Office: Cell: g Check all that apply ❑ Single Family ❑ Discovery/Tearout ❑ Demolition or Relocation ❑ Duplex ❑ Footprint Changes ❑ Other ❑ Multi -Family units ❑ additional square ❑ " Commercial unit(s) feet heated/cooled } A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may requireSitePlan Approval_ Details of Project: 1nT L rS Q 1 0'S c-) r'-" S4 r a Estimated Cost of Construction: $ 3 (materials + labor + profitloverhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the wprk, two sets of construction drawings and/or a site plan may be required. Year Built: 6 \1� Listed on National Historic Register or located within a National Historic District? Y 1 N • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation Durina construction: On-site restroom facilities will be provided through . Construction debris will be disposed by by means of I understand that I must comply with zoning, flood damage control building, fire shore protection and wetland ordinances FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: Printed Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Signature Date Planning & Zoning Manager0'&—{� Building Official Water/Sewer Storm/Drainage City Manager 7D 3 - 151 ,ng�� ���c��A-- FEES��� Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL .s0