Loading...
HomeMy Public PortalAboutPreliminary Plat Application - Crestline EngineersCRESTLINE E N G I N E E RS May 24, 2021 Cynda Herrick, AICP, CFM Valley County Planning and Zoning 219 North Main Street Cascade, Idaho 83611 Subject: 360° Ranch — C.U.P. & Preliminary Plat Application Dear Cynda, Please find attached to this letter, a submittal for the 360 Ranch project located along Norwood Road, Valley County, Idaho. The proposed development consists of a 13 -lot preliminary plat encompassing 87.70 acres total. Included in the submittal are (10) ten copies of the following items in the order listed: • Valley County C.U.P & Preliminary Plat Application — 4 pages • Valley County Application for Irrigation Plan Approval — 3 pages • Valley County Weed Control Agreement — 1 page • Impact Report (from Valley County Code 9-5-3-D) — 3 pages • Preliminary Plat — 1 sheet • Phasing Plan and Construction Timeline — 1 page • Proposed Street Names and Lots 1" = 300' Scale — 1 figure • Existing Physical Conditions with Preliminary Site Plan — 1 sheet • Landscaping Plan — 1 page • Preliminary Road, Grading, and Stormwater Management Pan — 2 sheets • Lighting Plan — 1 page • Wildfire Mitigation Plan — 1 page • Adjoining Property Owners —1 page • Record of Survey — 2 pages • Legal Descriptions — 2 pages Thank you for your attention to this submittal and please feel free to contact me by phone or email at your earliest convenience should you have any questions or comments. Sincerely, Kyle Hickman Construction Manager and Senior Environmental Specialist Crestline Engineers, Inc. 323 Deinhard Lane, Suite C • PO Box 2330 - McCall, Idaho 83638 208.634.4140 • Fax 208.634.4146 www.crestiine.eng.com • info@crestiine-eng.com Valley County Planning & Zoning Department 219 N. Main PO Box 1350 Cascade, ID 83611 www.co.valley.id.us Phone 208-382-7115 Fax 208-382-7119 C.U.P. & Preliminary Plat Application TO BE COMPLETED BY THE PLANNING AND ZONING DEPARTMENT 0 Check# or 0 Cash FILE # FEE $ ACCEPTED BY DEPOSIT CROSS REFERENCE FILE(S): DATE ❑ ADMINISTRATIVE PLAT COMMENTS: ❑ SHORT PLAT ❑ FULL PLAT When an application has been submitted, it will be reviewed in order to determine compliance with application requirements. A hearing date will be scheduled only after an application has been accepted as complete. The following must be completed and submitted with the conditional use permit application: •:• A preliminary plat containing all of the necessary requirements according to the Valley County Subdivision Regulations. •:• A phasing plan and construction timeline. + One 8% x 11" -- 300 scale drawing of the proposed subdivision showing only the street names and lots. •:• A plot plan, drawn to scale, showing existing utilities, streets, easements, ditches, and buildings. + A landscaping plan, drawn to scale, showing elements such as trees, shrubs, ground covers, and vines. Include a plant list, indicating the size, quantity, location, and name (both botanical and common) of all plant material to be used. + A site grading plan clearly showing the existing site topography and detailing the best management practices for surface water management, siltation, sedimentation, and blowing of dirt and debris caused by grading, excavation, open cuts, side slopes, and other site preparation and development. ❖ A lighting plan. ❖ A Wildfire Mitigation Plan. ❖ Names and addresses of property owners within 300 feet of the property lines. Information can be obtained through the Assessor's Office. Only one list is required. Ten (10) copies of the application and additional materials are required. We recommend you review Title 9 and Title 10 of the Valley County Code online at www.co.vallev.id.us/planning-zoning or at the Planning and Zoning Office, 219 North Main, Cascade, Idaho. Subject to Idaho Statute 55-22 Underground Facilities Damage Prevention. Page 1 of 12 6-12-2017 PROPOSED SUBDIVISION NAME 3600 Ranch APPLICANT GFL Holdings. LLC Owner® Option Holder ❑ Contract Holder 0 APPLICANT'S SIGNATURE ��1� APPLICANT'S MAILING ADDRESS PO Box 2554. McCall. Idaho 83638 PHONE (208) 315-5144 DATE Tl y /21 OWNER GFL Holdings. LLC PHONE (208) 315-5144 OWNER'S MAILING ADDRESS PO Box 2554. McCall. Idaho 83638 Nature of Owner's Interest in this Development? Residential Development AGENT/REPRESENTATIVE Aaron Cramblet FAX PHONE (208) 315-5144 AGENT/REPRESENTATIVE ADDRESS 13885 Farm to Market Road, McCall. Idaho 83638 ENGINEER Gregg Tankersley, P.E. PHONE (208) 634-4140 ENGINEER ADDRESS 323 Deinhard Lane, Suite C. PO Box 2330, McCall, Idaho 83638 1. SIZE OF PROPERTY 67.526 Acres 2. NUMBER OF ACREAGE OF ADJACENT LAND HELD BY THIS OWNER 20.17 Acres 3. ANY RESTRICTIONS ON THIS PROPERTY? Easements to See attached Record of Survey Deed Restrictions Liens or encumbrances 4. LEGAL DESCRIPTION Refer tg Attached Boundary Description from Secesh Engineering, Inc. 5. TAX PARCEL NUMBER Original: RP18NO3E282405; New parcel numbers pending. Quarter SW 1/4 Section 28 Township 18N Range 3E 6. EXISTING LAND USES AND STRUCTURES ON THE PROPERTY ARE AS FOLLOWS: Irrigated pasture. meadow. and dry grazing 7. ARE THERE ANY KNOWN HAZARDS ON OR NEAR THE PROPERTY (such as canals, hazardous material spills, soil or water contamination)? If so, describe and give location: None 8. ADJACENT PROPERTIES HAVE THE FOLLOWING BUILDING TYPES AND/OR USES: North Irrigated pasture, meadow, and dry grazing South Irrigated pasture, meadow, and dry grazing East Irrigated pasture, meadow, dry grazing, and residential West Irrigated pasture. meadow. and dry grazing Page 2 of 12 6-12-2017 8a. TYPE OF TERRAIN: Mountainous 0 Rolling IXI Flat ® Timbered 0 8b. DOES ANY PORTION OF THIS PARCEL HAVE SLOPES IN EXCESS OF 15%? No 8c. DESCRIBE ANY SIGNIFICANT NATURAL RESOURCES SUCH AS ROCK OUTCROPPING, MARSHES, WOODED AREAS: Wetlands and rock outcroppings present on property 9a. WATER COURSE:Seasonal drainage area; Mud Creek 9b. IS ANY PORTION OF THE PROPERTY LOCATED IN A FLOODWAY OR 100-YR FLOODPLAIN? Information can be obtained from the P&Z Office. Include a map if yes. No 9c. ARE THERE WETLANDS LOCATED ON ANY PORTION OF THE PROPERTY? Yes 9d. WILL ANY PART OF THE PROPERTY BE SUBJECT TO INUNDATION FROM STORMWATER OVERFLOW OR SPRING MELTING RUN-OFF? No 10a. NUMBER OF EXISTING ROADS: 0 Width Private or Public? Are the existing road surfaces paved or graveled? 10b. NUMBER OF PROPOSED ROADS: 1 Proposed width: 28' gravel or 24' paved Will the proposed roads be publicly or privately maintained? Privately Proposed road construction: Gravel ® Paved 0 11a. EXISTING UTILITIES ON THE PROPERTY ARE AS FOLLOWS: Overhead power and irrigation lib. PROPOSED UTILITIES: Septic, individual well, power, and communications. Proposed utility easement width 12' Location Adjacent to ROW 12a. SOLID WASTE DISPOSAL METHOD: Individual Septic Central Sewage Treatment Facility 0 12b. POTABLE WATER SOURCE: Public 0 Water Association 0 If individual, has a test well been drilled? Nn Depth Flow _ Nearest adjacent well ID # 460613 Depth 160' 13. ARE THERE ANY EXISTING IRRIGATION SYSTEMS? Yes Individual IXI Purity Verified? Flow 25 Are you proposing any alterations, improvements, extensions or new construction? If yes, explain: TBD 14. DRAINAGE (Proposed method of on -site retention): Roadside swales & on -site detention basins Any special drains? No (Please attach map) Soil type (Information can be obtained from the Soil Conservation District):Archable/Gestrin/Melton Loa 15. WILL STREETS AND OTHER REQUIRED IMPROVEMENTS BE CONSTRUCTED PRIOR TO THE RECORDING OF THE FINAL PLAT? Yes. and/or financial assurances If not, indicate the type of surety that will be put up to ensure the construction of the improvements within one (1) year from the date of filing the plat: Page 3 of 12 6-12-2017 16. OUTLINE OF PROPOSED RESTRICTIVE COVENANTS: Setbacks: Front County Minimum Mobile homes allowed? No Sides County Minimum Rear County Minimum Minimum construction value N/A Minimum square footage N/A Completion of construction required within 1.5 Days ❑ Months ❑ Years Resubdivision permitted? Yes, one split per lot with approval of HOA first and then P&Z Other 17. LAND PROGRAM: Acreage in subdivision 67.526 Typical width and depth of lots 406' x 333' Number of lots in subdivision 20 Typical lot area 3.05 Acres Minimum lot area 1.42 Acres Maximum lot area 6.63 Acres Lineal footage of streets 2,550 LF Average street length/lot 331 LF, Excluding Flags Percentage of area in streets 2.44 Percentage of area of development to be public (including easements) 0 Maximum street gradient 6% Indicate if subdivision is to be completely developed at one time; if not, describe stages Refer to Phasing Plan and Construction Timeline. 18. COMPLETE ATTACHED PLAN FOR IRRIGATION. 19. COMPLETE ATTACHED WEED CONTROL AGREEMENT. 20. COMPLETE ATTACHED IMPACT REPORT. It must address potential environmental, economic, and social impacts and how these impacts are to be minimized. Page 4 of 12 6-12-2017 VALLEY COUNTY PLANNING & ZONING DEPARTMENT 219 North Main Street PO Box 1350 Cascade, ID 83611 Phone 208-382-7115 Fax 208-382-7119 www.co.valley.id.us APPLICATION FOR IRRIGATION PLAN APPROVAL submitted with C.U.P. & Subdivision Applications (Idaho Code 31-3805) Applicant(s): GFL Holdings, LLC PO Box 2554 McCall, Idaho 83638 Mailing Address Telephone Numbers: (208) 315-5144 City, State Zip Location of Subject Property: Norwood Road and Johnson Lane, McCall, Idaho 83638 (Property Address or Two Nearest Cross Streets) Assessor's Account Number(s): RP 18NO3E2824051TBD Section 28 Township 18N Range 3E C.U.P Number: This land: ® Has water rights available to it Is dry and has no water rights available to it. If dry, please sign this document and return to the Planning & Zoning Department as part of your application. Idaho Code 31-3805 states that when all or part of a subdivision is "located within the boundaries of an existing irrigation district or canal company, ditch association, or like irrigation water deliver entity ... no subdivision plat or amendment to a subdivision plat or any other plat or map recognized by the city or county for the division of land will be accepted, approved, and recorded unless:" A. The appropriate water rights and assessment of those water rights have been transferred from said lands or excluded from an irrigation entity by the owner; or B. The owner filing the subdivision plat or amendment to a subdivision plat or map has provided for the division of land of underground tile or conduit for lots of one acre or less or a suitable system for lots of more than one acre which will deliver water to those land owners within the subdivision who are also within the irrigation entity with the appropriate approvals: 1. For proposed subdivisions located within an area of city impact, both city and county zoning authorities must approve such irrigation system in accordance with 50 -the irrigation system. 2. For proposed subdivisions outside of negotiated areas of city impact, the delivery system must be approved by the Planning and Zoning Commission and the Board of County Commissioners with the advice of the irrigation entity charged with the delivery of water to said lands. Page 5 of 12 6-12-2017 To better understand your irrigation request, we need to ask you a few questions. A list of the map requirements follows the short questionnaire. Any missing information may result in the delay of your request before the Planning and Zoning Commission and ultimately the approval of your irrigation plan by the Board of County Commissioners as part of final plat approval. 1. Are you within an area of negotiated City Impact? Yes X No 2. What is the name of the irrigation and drainage entities servicing the property? Irrigation: Lake Irrigation District Drainage: Unknown 3. How many acres is the property being subdivided? 67.526 Acres 4. What percentage of this property has water? TBD 5. How many inches of water are available to the property? TBD 6. How is the land currently irrigated? ® surface ❑ sprinkler ❑ irrigation well ❑ above ground pipe ❑ underground pipe 7. How is the land to be irrigated after it is subdivided? TBD ❑ surface ❑ sprinkler ❑ irrigation well ❑ above ground pipe ❑ underground pipe 8. Please describe how the head gate/pump connects to the canal and irrigated land and where ditches &/or pipes go. 9. Is there an irrigation easement(s) on the property? ® Yes 0 No 10. How do you plan to retain storm and excess water on each lot? TBD 11. How do you plan to process this storm water and/or excess irrigation water prior to it entering the established drainage system? (i.e. oil, grease, contaminated aggregates) TBD Page 6 of 12 6-12-2017 Irrigation Plan Map Requirements The irrigation plan must be on a scalable map and show all of the irrigation system including all supply and drainage structures and easements. Please include the following information on your map: ❑ All canals, ditches, and laterals with their respective names. ❑ Head gate location and/or point of delivery of water to the property by the irrigation entity. ❑ Pipe location and sizes, if any ❑ Rise locations and types, if any. ❑ Easements of all private ditches that supply adjacent properties (i.e. supply ditches and drainage ways). 0 Slope of the property in various locations. ❑ Direction of water flow (use short arrows on your map to indicate water flow direction —1" ). ❑ Direction of wastewater flow (use long arrows on your map to indicate waste water direction ). ❑ Location of drainage ponds or swales, if any where wastewater will be retained on property ® Other information: Water Rights Transfer Plan Is pendina Also, provide the following documentation: ❑ Legal description of the property. ❑ Proof of ownership. ❑ A written response from the irrigation entity and/or proof of agency notification. ❑ Copy of any water users' association agreement currently in effect which shows water schedules and maintenance responsibilities. ❑ Copy of all new easements ready for recording (irrigation supply and drainage). ❑ If you are in a city area of impact, please include a copy of the approvals by the city planning and zoning commission and city council of your irrigation plan. Applicant Acknowledgement============== I, the undersigned, agree that prior to the Planning and Zoning Department accepting this application, I am responsible to have al! the required information and site plans. I further acknowledge that the Irrigation system, as approved by the Planning and Zoning Commission and ultimately the Board of County Commissioners, must be bonded and/or installed prior to the recording of the plat or building permit. Signe Date: S ./ Z `l / 2/ - Applicant / Property Owner (Application Submitted) Page 7 of 12 642.2017 VALLEY COUNTY WEED CONTROL AGREEMENT The purpose of this agreement is to establish a cooperative relationship between Valley County and the undersigned Cooperator to protect the natural and economic values in the Upper Payette River watershed from damages related to the invasion and expansion of infestations of noxious weeds and invasive plants. This is a cooperative effort to prevent, eradicate, contain and control noxious weeds and invasive plants on public and private lands in this area. Factors related to the spread of weeds are not related to ownership nor controllable at agency boundaries. This agreement formalizes the cooperative strategy for management of these weeds addressed in Valley County's Integrated Weed Management Plan. In this continuing effort to control Noxious Weeds, Valley County Weed Control will consult with the undersigned Cooperator and outline weed identification techniques, present optional control methods and recommend proper land management practices. The undersigned Cooperator acknowledges that he/she is aware of any potential or real noxious weed problems on his/her private property and agrees to control said weeds in a timely manner using proper land management principles. COOPERATOR GFL Holdings, LLC PO Box 2554 McCall, Idaho 83638 Date: 6121-1/2 By: Valley County Weed Control Date: Page 8 of 12 6-12-2017 IMPACT REPORT (from Valley County Code 9-5-3-D) You may add information to the blanks below or attach additional sheets. ❖ An impact report shall be required for all proposed Conditional Uses. ❖ The impact report shall address potential environmental, economic, and social impacts and how these impacts are to be minimized as follows: 1. Traffic volume, character, and patterns including adequacy of existing or proposed street width, surfacing, alignment, gradient, and traffic control features or devices, and maintenance. Contrast existing with the changes the proposal will bring during construction and after completion, build -out, or full occupancy of the proposed development. Include pedestrian, bicycle, auto, and truck traffic. The new 28' wide gravel road will accommodate twenty (20) residential housing lots and may be paved at a later date if determined to be feasible. The roadway gradient is minimal, will be constructed to Valley County standards, and will be aligned within the ROW and access easement. A 24' wide (clear space between guard rails) bridge at the crossing of the Clara Foltz ditch will also be constructed as part of the roadway improvements. The owner(s) will be responsible for maintaining the roadway for the shared access. A moderate increase in traffic flow will occur during construction activities. 2. Provision for the mitigation of impacts on housing affordability. The primary purpose for subdividing the property is to create residential lot development opportunities in an area that historically has had very few. It is anticipated that the affordability of the lots will be comparable to other similar developments within Valley County. 3. Noise and vibration levels that exist and compare to those that will be added during construction, normal activities, and special activities. Include indoor and outdoor, day and night variations. Short term increase in daytime noise and vibration levels will occur during the construction process. There will be minimal noise increase due to traffic flows post -construction. Noise generated by the daily ongoings of residential dwellings will persist after residential development. 4. Heat and glare that exist and that might be introduced from all possible sources such as autos in parking areas, outdoor lights, water or glass surfaces, buildings, or outdoor activities. Short term increase in glare during the construction process due to equipment present. No permanent changes to heat or glare will be observed as a result of the roadway construction and proposed improvements once completed. Post residential home construction changes in heat and glare will occur due to buildings, homes, and vehicles and will conform to Valley County standards at that time. 5. Particulate emissions to the air including smoke, dust, chemicals, gasses or fumes, etc. both existing and what may be added by the proposed uses. Little to no net change in particulate emissions are expected outside of dust potential due to traffic on gravel roadway. Page 9 of 12 6-12-2017 6. Water demand, discharge, supply source, and disposal method for potable uses, domestic uses, and fire protection. Identify existing surface water drainage, wetlands, flood prone areas and potential changes. Identify existing ground water and surface water quality and potential changes due to this proposal. Private well water supply will furnish water to properties for domestic, irrigation, and fire protection purposes. If wetland impacts are determined necessary for the private roadway construction, they will be permitted as required. Stormwater management associated with the roadway will be addressed per Valley County standards. 7. Fire, explosion, and other hazards existing and proposed. Identify how activities on neighboring property may affect the proposed use. Construction of the roadway will serve as a firebreak and provide fire department access to the properties where currently there are no roads or access for fire suppression. 8. Removal of existing vegetation or effects thereon including disturbance of wetlands, general stability of soils, slopes, and embankments and the potential for sedimentation of disturbed soils. Existing vegetation removal mostly limited to removal of pasture/native grasses for roadway establishment and any impacts to wetland areas will be permitted accordingly with United States Army Corps of Engineers. 9. Include practices that will be used to stabilize soils and restore or replace vegetation. Areas disturbed during construction activities on the site will be re -stabilized with hard surface and re-vegetation/landscaping efforts. 10. Soil characteristics and potential problems in regard to slope stability, embankments, building foundation, utility and road construction. Include suitability for supporting proposed landscaping. There are no anticipated problems with existing soil suitability. Roadway construction will be supported by appropriate imported backfill material to stabilize sections as needed. Topsoil may be added to surface restoration areas to supplement existing soil conditions as needed for growth. 11. Site grading or improvements including cuts and fills, drainage courses and impoundments, sound and sight buffers, landscaping, fencing, utilities, and open areas. The site plan calls for creating cuts and fills for the roadway and vegetated stormwater swales and or detention basins if determined necessary. Fencing and other sight buffers will be addressed as part of the CC&Rs. 12. Visibility from public roads, adjoining property, and buildings. Include what will be done to reduce visibility of all parts of the proposal but especially cuts and fills and buildings. Include the effect of shadows from new features on neighboring property. Future residential structures may be visible from adjacent roadways and adjoining properties depending on construction and will conform to Valley County standards at that time. 13. Reasons for selecting the particular location including topographic, geographic and similar features, historic, adjoining land ownership or use, access to public lands, recreation, Page 10 of 12 6-12-2017 utilities, streets, etc., in order to illustrate compatibility with and opportunities presented by existing land uses or character. Site selection was based upon the availability of land with convenient access to McCall and Valley County. Access to recreational activities is desirable within the area including close proximity to the McCall Activity Barn Recreational Area. The site is adjacent to other residential properties with similar land use. 14. Approximation of increased revenue from change in property tax assessment, new jobs available to local residents, and increased local expenditures. Upon completion of the improvements, including the residential homes, the taxable value will increase over the value of existing pastureland. 15. Approximation of costs for additional public services, facilities, and other economic impacts. Demand on public services such as public -school systems, Fire, and EMS for the development is anticipated to be minimal. 16. State how the proposed development will impact existing developments providing the same or similar products or services. The proposed development will provide additional residential development lots in an area which historically has had very few opportunities. 17. State what natural resources or materials are available at or near the site that will be used in a process to produce a product and the impacts resulting from the depletion of the resource. Describe the process in detail and describe the impacts of each part. N/A 18. What will be the impacts of a project abandoned at partial completion? The development will increase the value, access, and utility of the property. If the project is abandoned, the remaining improvements will benefit another residential project. 19. Number of residential dwelling units, other buildings and building sites, and square footage or gross non-residential floor space to be available. Twenty (20) individual lots will be available for future residential development. 20. Stages of development in geographic terms and proposed construction time schedule. The stages of construction depend on the availability of building materials, contractors, surveyors, and utility companies' scheduling. The project timing is subject to market changes and financing, but it is expected that the project will be completed by no later than the end of 2025. See attached Phasing Plan and Construction Timeline. 21. Anticipated range of sale, lease or rental prices for dwelling units, building or other site, or non-residential floor space in order to insure compatibility with adjacent land use and development. Lot prices are expected to be competitive with other similar improvements in the County. Page 11 of 12 6-12-2017 Phasing Plan and Construction Timeline 360° Ranch • This phasing timeline is dependent upon the availability of funds, contractors, surveyors, and scheduling of utility companies. We currently believe that the following schedule can be achieved within reasonable expectations. Phase 1— 2021 through 2022, Lots 1 - 4 Gravel roadway construction. Roadway drainage improvements and grading. Fire protection water storage tank installation_ Phase 2 — 2022 through 2025, Lots 5 — 20 Bridge Construction. Gravel roadway construction. Roadway drainage improvements and grading. By: v Date: 512 yh/ Aaron Cramblet Aaron Cramblet Lighting Plan 360° Ranch The roadway will have no lighting. Residential dwellings will be fitted with external lighting secured to buildings conforming to Valley County standards. Date: 572-1-// 11 Wildfire Mitigation Plan 360° Ranch The roadway itself is a form of wildfire mitigation providing a long firebreak. The roadway will also provide emergency vehicle access to the property for fire suppression efforts. Development of roadways will conform to standards for required tum arounds and access points. The subdivision will have a 30,000 -gallon water storage tank per local Fire District requirements. Site re -vegetation efforts will consist of native grasses, sod, landscaping, and grading to improve upon existing irrigated grazing land conditions to further mitigate wildfire. alf ----. Date: $"/Zy/ 71 Aaron Cramblet QRt4 ��?S liJaL SlCIr7W LAIN SLO7VCT1RG. IaC 1 3781 1®N/r 88 11rcN.L 11141,13 s%76 286434-3Hirr 4s t96-431-8118 RECORD OF SURVEY V 1O y county, st ate d ki8ho DEBOER and MIRROR POND, LLC THE M cCALL RANCH St unt w Sectkres 28 now 79. 1. 18 R. R 3 L. DAL R olm" [aud1. Mao ID6E 56939 07E DRIVE 1751 .59 ' =t1,4== 1 av 58939'07 T 1546 .85' l' -`1115510N 5T. 58939.49"E 1774.57' 589^56:167 266 a 79 --� --__�__- 79236 ACRES bat 'Tar 10 1.6Hrm• N89 '59.4911' 1219.21 ' .14 58955'487 • 011 IMO 2 20.06 ACRES $ 2: =o+$ 118938 '48E 15 141526 ' -__ 141120' __-_•�•• N89'S8'4 T I. 1 3 Pm" 20 .141 ACRES X18 a 4 400 01' ' v .0 .11g 1 u 5893 9'261 5693802 E 11 .a. = i cI(v 20.509 ACRES ee SV2 SEVA FEW, i1 ashKx 26 - - eo p 2027 AC 1. = z NVa SWIM NWV4 18 x rllalifif7• 71 r..•e -rl 1370.67 l�mm • 10 589'59'32T 27 7006 AC 30 32763 AC N89 73 '5674 106 251' 1114611 SEE DETAIL 4 1.20 58976'SfE 1294.81' 1111 wrwwv .r 811.... 1. • ▪ Am Y am a. El n to } 1- F 0 lad eco Scale 1" Y -I tpp�� DETAIL A I• • , Y`ri-rte .`" 1 . r_lt 1 rr •- 1t 1MTO N to fNK a 30 1' __L�_ L12 se_Brrsr r L--.. nua 71 r -4 ` I it 4 _Awl �18 11. 11111=111..1.- L1"1 i'. ;t:IMi.-7/ =17 r?If-r,1a1 wra j ,7 :170 11011‘ ILI IfsC., Ins .star.1 t.rl[ L .:I:a1t::_.1 [d7 Eaui'l iCIJ<L '!"J f ii•iiu�y"4 C±7t_r_a_l Im_J111.e "'r 1CCM 4ali. Sri 1 1 •111 T. 1 7.82 8 [s17iTclali(WWII o a =a 7 ti] 3I] [s'1�:' :�r i 61Ci21d 8E3= S7f=EF3 10 i*IIi iW_7./ >4'-'16C Fa7 WI EF1 fuss E1�:_e7MELMA [c:J L1:1 .17 mr11. l GFi.L7 U BFL I)iir :il MSI:AI' ET- -7 .C-:• 7wa171 LEGE ND de nt b6 .4 104 y line e .ecttan breaLdo. n Mel m .dg. al 1/0.9184 ray 0 prop ose4 e aseme nt Imes • - ousting fe nce Ines • found monument of n oted ® found R .O .W. monum ent O Pa tter Polo 0 found br as. cop s et oL18mimtn c op set 5/8' mbar w/ cop found 5/8' ebor o ak. p oint. nothing set l0und dru08111n cop Iow d 5/8 ' mbar found 5/8" rebar Su mv ev M arra She asttm is we r o..., r. rr.. - 110 nom. roar. �w 18.18 w ...woogel womb. r Sw um, Refere nces ....b. rm. .. tart l ei _WPM Ara IMr. .r NOM 1M1 o •.r .� mw . ra r non, >� .▪ wr r PI MIL `r..1..111111. M uw. r Yllyii ai r. r.gr.l NM 1111 1. R od 1L Skilan o hal ee se noel Lend S...e.w. d0 bl• eby certify teal Nis pl ot ma mound from nobs t oken cluing no act od 1..Vey .lade .ode wq 9408* (urine io n 7n Av8- Nay of 707 4 old [mat it Rorer 7•preemb fN pooh, MW.ee ow 61tews as recd ded in sod kid note. SHEET 1 of 4 I 1 13 I 1'.r rM 0*8 .no. 10.0 A.lP•6 •. 08 ' 11 P1Y.14 SK]F ILIN LW, SW VCTe16. IIC 1270t 1C pN1r Masa i. ipei 97639 ae-63l-36% rf. 201434 -OM RE CORD OF SURVEY ValieY County. State of Idaho DEBOER and MIRROR POND. LLC THE McCALL RANCH 5elmt . m S.ctsls 2e e nd 29, 1. Ia N.. A. 3 E .. 5 .14 . Wiley County. lawn e � M ''nn FP ak} 44 -- mi`mr 20109 ACRES mi~„ 27 � �y`�T'- .E' �� 1 SEE DETAIL a 1OI2r— ; V2 5EV4 IEV4 r'O2 2 0011 AL -= -- '1g 45 612 �-- 7� II 0 «' SE978'37 C � ... w t • ••': e .... .."'''..*"...F:15% .13 r�" Mz�>.� Ln � � -,294 .81' 11 Ji woo_ -Lfafi3 TAI w r 393'•23 ,,,.r,,, 1 v r+iemart , �a.m.m i lO S89 '.59:i2 'E k , 175�7 'il N7i^B `1... err rj S� k 20117 ACRES E~ 569 36?ra'E��{' .jDry i 6 „F. NV2 IEV4 5EV4. 3. � 2_ vi,... i ' 28 W. i Ioe19 AL 11;,0 1 - t" 1 � � .� 1� iii. 1� _ h M , 13,174:41,. .....58939.461 i I `.E 1 4 nq 46.677 AC 8f [I • 1 j�• 7o .t4E AGRE.s P' • r i , a 1 1`6 /5EE DETAIL a w . r j• 5V2 IEV 4 5EV 4 1 0 ` ' I ,m ' •i' N90U0'OMC nrn ti'• 145952'24'W :Es. � Ili 122p8 85' I1' r3J1 .9i VI P .. Qd i1.Y . 1 ��r6iU —•.—.. 1331. .p---- .. ..—eef.rK-e��1.••iin ' .s -• •a^ 91: N8932'24'N' YY 4.. .4'14 . rR .OT �1�; t , r 44 4 son °; 1 6 1 5 L 1E 2 SEV44 5EV41 w• ^ 2 01T7 ACRES 1 20-310 A CRE S '! ,1 SWV 1 1 i 7 Ca Ohl; alb �� s� •i Nun rl it; v1- n• v1� rI 21 70.166 AGR£s 1 ri I I V2 ..?El./4 SEI/li 33 I I .. .... ...1i It 5 I I k 1,5 ,N--���� 3ili?�° .s.Tr---le7b'---�----e.7 .tV- dee r- e.u.r� 89 9 2T LAf1E t ,r. r o rte LANE 1]35"20' 33 a H693 9'02' i $89'48'JJi � a 1 ..:'r m i1 ON DETAIL E3 I• • IO0' ri• ', .// IR RRirllwa ,46 men. 51.11___,r-" iii ---------- _Cory, fable Cl IY6.. ;ll -1M- 3=1 , 11 -xG,: 10-11•11, 7. ��-' tom:' e'1>•Ii d� .you- .. r..3 -IIM yii>i'-rti�i�iii'i'i�'^{'A ::', m'o :I 1 mziir./11 :•'1�� ..Iw...... usrr J � e +. u. 1 r[:1 L .m _-. ■ C. : x: a I ew'rr 11 oble MSurrey RrferenCte now PA. Or .l t. nom .• aw•1 IFS Yi v:Pp o QPa ` f.MI ZIP KW. * P M.....WM.'Mr 111 1- 1- 1— nA e+.raen .p} I en " w _ . -040 -5 wa rp..y 1. Ir e r rye 300 600 Scal e I' — 300' LEGEND ck enl b oundary line section Ereot,dawn lines edge of Ir oveled may proposed easem ent tines -. .— a misting lanc e O nes found m onument as noted + found R.O. W. monument la pone, pole m 0 • • O O f ou nd br ass cop set akomilwm c op set 5/6' mbar r/ cop found 5/8' mbar cote. pa nt. nothi ng set fou nd al uminum cop found 5/8' rebor ro und 5/8' reb or 5, Rod 11 . Siilto o Pr ofessi onal La d Sumner, ds hereby oAifr !hot this pl at wee pr.pmea Iron notes teen do n m school Posey no de u nder my sired s up ervision 6r Aprt_ 'Joy of 2020. std put R eene et5 repr e.e nte the poi nts . moon s a rt eiasa nen a1 r et arded in acid rw4d eol.s. SHEET2of4 "- 1= ap a=nu Mad rwec.Plr mu 14.c IMI I IMMO SECESH ENGINEERING, INC. 335 Deinhard Lane, Suite 1 P.O. Box 70 McCaII, ID 83638 208-634-6336 • FAX 208-634-6322. BOUNDARY DESCRIPTION 360 RANCH SUBDIVISION A parcel of land, located in Section 28 T.18N., R.3E., B.M., more particularly described as follows: COMMENCING at the west 1/4 corner of said Section 28 as shown on a Record of Survey filed in Book 14 at Page 25 of Surveys, Records of Valley County, Idaho; thence, along the west line of said Section 28, A.) S.0°27'38"W., 125.25 feet to the POINT OF BEGINNING; thence, departing said section line, 1.) S.89°56' 14"E., 473.28 feet to a point in Clara Foltz Ditch; thence, along said ditch, 2.) along a curve to the right having a radius of 90.00 feet, an arc length of 108.32 feet, through a central angle of 69°17'06", and a chord bearing and distance of N.36°39'50"E., 102.32 feet; thence, 3.) N.71°18'23"E., 392.59 feet; thence, 4.) N.71°I 6'43"E., 864.91 feet to the beginning of a tangent curve; thence, 5.) along said curve to the right having a radius of 470.00 feet, an arc length of 116.66 feet, through a central angle of 14°13'17", and a chord bearing and distance of N.78°23'21"E., 116.36 feet; thence, tangent from said curve, 6.) N.85°30'00"E., 136.76 feet to the beginning of a tangent curve; thence, 7.) along said curve to the right having a radius of 425.00 feet, an arc length of 583.75 feet, through a central angle of 78°41 '53", and a chord bearing and distance of S.55°09'04"E., 538.94 feet; thence, tangent from said curve, 8.) S.15°48'07"E., 55.19 feet; thence, departing said ditch, 9.) S.89°16'57"E., 167.74 feet; thence, 1 10.) S.0°26'28"W., 1284.56 feet to a point in said Clara Foltz Ditch; thence, along said ditch, 11.) N.77°21 '46"E., 71.86 feet; thence, departing said ditch, 12.) S.0°26'28"W., 90.53 feet; thence, 13.) N.89°52'24"W., 487.46 feet; thence, 14.) N.68°23'29"W., 1258.26 feet; thence, 15.) N.18°43'22"W., 345.21 feet to the beginning of a non -tangent curve; thence, 16.) along said curve to the right having a radius of 68.00 feet, an arc length of 172.10 feet, through a central angle of 145°00'46", and a chord bearing and distance of S.63°1 7'26"W., 129.71 feet to the beginning of a reverse curve; thence, 17.) along said curve to the left having a radius of 35.00 feet, an arc length of 41.93 feet, through a central angle of 68°38'52", and a chord bearing and distance of N.78°31 '37"W., 39.47 feet; thence, tangent from said curve, 18.) S.67°08'57"W., 83.51 feet to a point in said Clara Foltz Ditch; thence, along said ditch, 19.) 5.23°08'27"E., 222.26 feet to the beginning of a tangent curve; thence, 20.) along said curve to the right having a radius of 72.00 feet, an arc length of 191.38 feet, through a central angle of 152°17'57", and a chord bearing and distance of 5.53°00'32"W., 139.81 feet; thence, tangent from said curve, 21.) N.50°50'30"W., 197.29 feet to the beginning of a tangent curve; thence, 22.) along said curve to the left having a radius of 520.00 feet, an arc length of 91.28 feet, through a central angle of 10°03'26", and a chord bearing and distance of N.55°52' 13"W., 91.16 feet; thence, tangent from said curve, 23.) N.60°53'56"W., 470.35 feet to a point on the west line of said Section 28; thence, along said section line, 24.) N.0°27'38"E., 378.88 feet to the POINT OF BEGINNING. CONTAINING 66.88 Acres, more or less. 2 PROJECT LOCATION 1 CRESTLINE ENGINEERS 323 DEINHARD LANE. SUITE C • PO BOX 2330 McCALL IDAHO 83638 208.634.4140 • 208.634.4146 FAX DATE 360 RANCH VALLEY COUNTY, IDAHO PROPOSED SUBDIVISION STREET NAMES AND LOT PROJECT 20037 5/24/2021 DRAWN I FIGURE NO. AMD I 1 OF 1 NOTES: a a 1 1 1 1. 360 RANCH IS LOCATED IN; SECTIONS 28 AND 29 T. 18N, R.3E. B M. VALLEY COUNTY IDAHO 2. THE SUBDIVIDER OF THIS PROPOSED DEVELOPMENT 16: CFI. HOLDINGS, LLC PO BOX 2554 MCCALL, IDAHO 63538 3. THE LAND SURVEYOR OF THIS PROPOSED DEVELOPMENT I5: SECESH ENGINEERING, INC. 335 DEINHARD LANE, SURE 1 PO BOX 70 MCCALL, ID 83638 4 THE EXISTING ZONING IS AGRICULTURAL 5. THE TOTAL AREA FOR THE SITE IS APPROXIMATELY 187.70 ACRES, THE REMAINDER PARCEL AREA TO 80 SEPERATED FROM THE SITE 15 APPROXIMATELY 320.17 ACRES. THE TOTAL PROPERTY AREA FOR THE SUBDIVISION IS ±66.58 ACRES. 6. REFER 70 EXHIBIT NO. EX -1 FOR EXISTING CONDITIONS AND TOPOGRAPHY. DEVELOPMENT DATA: PROPERTY AREA PRIVATE RIGH T-OF-WAY AREA LOTS) AREA OPEN SPACE AREA LEGEND: 66.56 ACRES 4.43 ACRES 61. 32 ACRES 0.81 ACRES S ITN Is PROPERTY BOUNDARY ADJACENT PROPERTY UNE RIGHT-OF-WAY ROAD CENTER UNE SECTION UNE QUARTER SECTION UNE SDTTEENTH SECTION UN E EXISTING EASEMENT UNE PROPOSED LOT UNE PROPOSED EASEM ENT UNE PHASE UNE / / / / / / / / / / / / / / / / / / / / / / / PROPERTY UNE TABLE UNE LENGTH BEARINGSTART NORTHING START EASING END NORTHING ENO FASTING 11 55.19 515' 48' 07.00'0 1167339. 39 2534736.83 1167286.29 2534751. 86 L2 71.86 N7T 21' 46.00'0 1165999. 57 2534909.70 1166015.39 2534979.82 L3 90.53 50' 26' 28.00'W 1166015.39 2534979.82 1155924,86 2534979.12 L4 83.51 S67' 08' 57.00.W 1166665.80 2533056.47 1166633. 37 2532979.52 PROPERTY CURVE TABLE CURVE LENGTH RADIUS DELTA CHORD DIRECTION CHORD LENGTH C1 108.84 90. 00 69.29 1436' 39' 181E 102. 33 C2 116.66 470. 00 14. 22 N78' 23' 21'E 115. 36 C3 583.75 425. 00 78. 70 S55' 09' 04" E 538.94 C4 172. 10 68. 00 145.01 563' 17' 26'W 129. 71 C5 41. 93 35.00 68.65 N78' 31' 37" W 39. 47 C5 191.36 72.00 152. 30 553' 00' 32'W 139.8I C7 91.26 520.00 10.06 N55' 52' I7'W 91.14 o to pa 1� 1.42 AC " 4 .\ op F' 1. 87 AD \ \ ` OFEI-'1 - . _229. _ -IDOL- , 5 E ( ! err 3.06 AC 569' 56' 0 223 ' 473. • 213' 1 k �\ >1 PROPOSED 12' SNOW AN0 UTILI TY EASEMENT 1 2 326 \ 12' .47.6,41,\b, 1.47 AC • \V \ ` •1. \ %S. \ REMAINDER 20.17 AC IP. *°s1 ID r a ASS 7 3.08 AC 9 2. 77 AC 19 w° 3. 32 AC \\\ 1.58 AC \ ,iA \71` 1 '46.4. 1 y1++ 1 'AeN 1 f ��--// 1 \?r ' 3. 83 AC 50' 2.97 AC A. ^'68 zae, ae w EXISTING 50' IRRIGATION EASEMENT rCZ'res-30'13C16'._ °• ▪ %▪ 4\ � `• • EXISTING 20' POWER 10 \ \\ EASEMENT TO BE \ ABANDONED 3.22 AC \ \\ 20' 4J0. 15 5.53 AC PROPOSED 20' IRRIGATION EASEMENT h 9' 1 7" E EN SPACE 4.61 AC I I 113' 12 5 .94 AC \ \ > 7 1 ' 11 ^I� PROPOSED 30' SNARED ACCESS EASEMENT / / / / / / / (T) NORTH O 75 150 300 450 1 =I SCAL E 1' - 150' NO. REVISION BY DATE VALLEY COUNTY LAND USE APPLICATION SUMITI AL AM O 5124(2021 DESIGN GTT DRAWN AMD CHECKED GT1' APPROVED GT1' C CRESTLINE ENGINEERS 323 DEINHARD LANE, SUITE C • PO BOX 2330 McCALL, IDAHO 83638 208.634.4140 • 208 .634.4146 FAX 360 RANCH VALLEY COUNTY, IDAHO PRELIMINARY PLAT VERIFY SCALE 6A6 I$ CNE 1NCH ON FULL SIZE DIUI NNO 0 1• PROJECT 20037 D ATE 5124(2021 DRAWING NO. EX -1 SHEET NO . 1 OF 4 k f 1 8 NOTES: 1. E XITING PROPERTY BOUNDARIES. BASE MAP AND TOPOGRAPHY DATA AS SHOW N ON THIS PLAN ARE BASED UPON SURVEY DATA PROVIDED BY SECESH ENGINEERING, INC. 2. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTENCE OF OBJECTS OR UTILITIES SHOWN ON THESE DRAW INGS AS THE INFORMATION HAS BEEN OBTAINED FROM 506RCES OF VARYING RELIABILITY. 3. THE PROPERTY SLOPES ACROSS THE SITE ARE APPROXIMATELY 2% TO 8%. THE SOILS LOCATED ON THE PROPERTY CONSISTS OF ARCHABAL/GESTRIN/MELTON LOAM. 4. THE PROJECT IS LOCATED IN: QVPaLOOOMdON i SECTIONS 26 AND 29 T. 1BN, R.3E. B.M. VALLEY COUNTY IDAHO � ll 1 1.42 AC s TH12-20 12' •PROPOSED 12' SNOW AND un 1 EASEMENT 2 `\ !� 1.47 AC . ' . 4 \1.67 AC • 35' WIDE COUNTY ROAD \ DEDICATED TO VALLEY COUNTY • �` MT -20 •�, . - \ \\ RIGHT-OF-W AY TO DE TH3-20 sods ya1� N l / EXISTING CLARA FOLTZ DITCH IRRIGATION DIVERSION HEAD GATE (TYP. OF 4) - ` _ - -!- ▪ l_ / r - . 5264 I / REMAINDER 20. 17 AC AA 2.17 AC 5074 5 . 3. 1AC PROPOSED FIRE ROTECTION ATER TANK 7 \'• \5 \ \.\ • \ \ \\ - 6 3.06 AC PROPOSED BRIDGE 36'Lx24'W CLEAR BETWEEN GUARD RAJ \ \ 5054 • 7 TH2-20. 43 5064 19 3.32 AC 2 97 AI 20 15 6.63 AC/ EXISTING 20' POWER I, EASEMENT TO BE ABANDONED •// PROPOSED 20' IRRIGATION EASEMENT • LEGEND: PEN SPACE \0.81 AC /6- g▪ : 07116-20 ni 0 PROPERTY BOUNDARY EXISTING RIGHT-OF-WAY UNE EXISTING EASEMENT LINE EXISTING CONTOUR EDGE OF EXITING DITCH EXISTING EDGE OF PAVEMENT EXISTING FENCE APPROXIMATE VIVIA NO BOUNDARY D arr= POWER POLE SEPTIC TEST HOLE LOCATION PHASE UNE EXISTING IRRIGATION DIVERSION/HEAD GATE PROPOSED 30' SHARED ACCESS EASDAENT REVISION BY DATE DESIGN GTT NORTH SC ALE 1" 100' 300 1 VALLEY COUNTY LAND USE APPLICATION SUMITTAL AMO DRAWN AMD GTT APPROVED CCRESTLIN E E NGINEERS 323 DEINHARD LANE , SUITE C PO BOX 2330 McCALL. IDAHO 83638 208 634.4140 208.634.4146 FAX 360 RANCH VALLEY COUNTY, IDAHO EXISTING PHYSICAL CONDITIONS WITH SITE PLAN VERIFY SCALE WA 3 OK INCHON PR OJECT 20037 DATE 5124/2021 ORAWtNG NO . SHEET NO. J Landscaping Plan 360° Ranch Currently there are no specific plans for landscaping within the development. All areas disturbed during the construction process will be re -vegetated utilizing native grasses, sod, landscaping, or any combination of the above. An entryway feature into the subdivision is anticipated and the design will be submitted for review prior to construction if determined necessary. By Date: 6/zyl zi Aaron Cramblet a 8 r r 9 GRADING AND DRAINAGE NOTES: LEGEND: 1. STORMW ATER MANAGEMENT TO BE COMPLETED ONSTTE USING VEGETATED SW ALES AND SURFACE DETENTION IF NECESSARY. 2. PRELIMINARY STORM WATER CALCULATIONS CAN BE PROVIDED UPON REQUEST. 3. THE GRADING AND STORM WATER MANAGEMENT AS SHOWN ON THIS DRAW ING IS CONCEPTUAL FINAL CONSTRUCTION DRAWINGS SHOWING DETAILED DESIGN WILL BE SUBMITTED FO R REVIEW AND APPROVAL BY VALLEY COUNTY PRIOR TO THE START OF ANY PROJECT CONSTRUCTION. 4. STORLIWATER M ANAGEMENT INCLUDING EROSION AND SEDIMENT CONTROL FOR THE PROJECT WILL. BE IMPLEMENTED PER VALLEY COUNTY REQUIREMENTS. 5. REFER TO THE "STATE OF IDAHO. CATALOG OF STORMWATER BEST MANAGEMENT PRACTICES FOR IDAHO cmEs AND COUNTIES" FOR FURTHER DETAILS ON BHP IMPLEMENTATION AND INSTALLATION. 6. ALL EROSION AND SEDIMENT CONTROL BMP'S SHALL BE INSTALLED PRIOR TO THE START OF ANY PROJECT CONSTRUCTION OR EARTH DISTURBING ACTIVITIES AND SHOULD REMAIN IN PLACE UNTIL ALL DISTURBED/EXPOSED AREAS HAVE BEEN STABILIZED AND/OR REVEGETATED. 5110 5100 5090 5050 5070 5060 5050 1~O 0 I 1 10+0 I I —kr I. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL BMP'S IN ACCORDANCE WITH LOCAL. STATE AND FEDERAL REQUIREMENTS. 6. WORK ACTR/ITIES SHALL TAKE PLACE W ITHIN THE CLEARING LIMITS AS SHOWN ON THIS PLAN. CONTRACTOR SFIALL PRESERVE NATURA L VEGETATION OUTSIDE OF CLEARING LITS. 9. THE IMPLEMENTATION OF THESE EROSION AND SEDIMENT CONTROL MEASURES INCLUDING INSTALLATION, MAINTEN ANCE. REPLACEMENT. AND UPGRADING OF THIS PLAN IS THE RESPONSIBILITY OF THE CONTRACTOR UN TIL ALL PROJECT CONSTRUCTION 15 COMPLETED AND APPROVED BY THE OWNER. THE OWNER SHALL BE RESPONSIBLE FOR ALL M AINTENANCE AFTER TH E PROJECT 15 APPROVED. 10. IN GENERAL ALL SITE GRADING ADJACENT TO NEW BUILDING STRUCTURES SHAD. BE SLOPED TO DRAIN AWAY FROM THE BUILDING AT A MINIMUM OF 1.5% W HARDSCAPE AREAS AND 4% IN LANDSCAPE AREAS. AREAS BETWEEN NEW STRUCTURES AND PROPERTY BOUNDARIES W ILL BE SLOPED TO KEEP STORMWATER ON SITE AND RELEASED INTO EXISTING LANDSCAPED AREAS_ 11+UU 4 T, 4IX1 1s +D0 I-• —44+4 APPROXIMATE LOCATION OF PROPOSED CULVERT VEG — _ LOT 2 PROPERTY BOUNDARY sow- EXISTING CONTOUR _15010- PROPOSED CONTOUR PROPOSED GRAVEL ROADWAY — . . . — PROPOSED DRAINAGE SWALE/FLOW UNE VEG PRESERVE EXISTING VEGETATION PROPOSED CULVER T SILT FENCE --- CLEARING/CONSTRUCTION LIMITS \ PHASE BOUNDARY + W y + LOT 5 + W + 7l) W + HIGH PT STA - 14+65.00 APPROXIMATE LOCATION OF / PROPOSED CULVERT / .."' ""• •• • S-•••• "" PROPOSED BRIDGE 36'LI124'W CLEAR BETWEEN GUARD RAJ • / LOT/6 LOT 19 1 In • LOT 7 /A4F /CVEG}..• APPROXIMATE LOCATION OF - PROPOSED CULVERT ct G1 - GL _-- LOT 18 NORTH 0 25 50 NIGH PT LL0V PVT STA - P11 ELEV AD w K - I50. 00' .. 3D/0.0n-LOW 15+ 00.00 - 5079. 46 -5. 00% 30.00 VC R PT LL7 PV1 STA 1 PN ELEV AD - K - 200.C]' - 2U Otl.Dn 19+00.00 - 5068.21 5. 50% 36.36 VC r um PI L1.t PV1 STA - P11 ELEV AD - K - 150.00' of - JU/H.tl<JI 23+00 .00 • 5050.21 -3.50% 42.96 VC g g o II g1O N^ gN {to `^ + `rte �^ 8- •. in +n _ • g to „ +, g • BREAK STA o rt in 11 FINISHED GRADE yJ f/11-1 co y(71 IJ yj L'i E BREAK S . ^ mini ,���m +/` 0g' r T�fjWf tv oo dl r _����� �_ _2.50% APPROXIM ATE PROPOSED LOCATION :LILVERT OF EXISTING GROUND L T . ' ✓ Y cam 0 GROUND ELEVATION AT CENTERLINE HORIZONTAL SCALE: " - 50' VERTICAL SCALE: I' - 1Q' /_.:sMEDGATITcTE (VERIFYPERSHEETSIZE) TBD ROAD APPROXI MATE PROPOSED LOCATION CULVERT OF 5070.5 5071.5 0 ZLOS 9Y'ILOS ^ 04 pnp 1!] o 1f1 wn 5074. 0 5075. 46 _ 5075.0 o� y4j Y) Qp u, ¢,� ltl u, 'ppch Y'+ o s73 5076.46 5074.9 ^np n� .7f 4/" y� ,...2 to �o oo� 22 om YY �"pp� �j 3 oo 0 0 m !, ❑ Sri 'r ph .ipo . rlp n. Cps �a� �g a� Sri § yj Ell r 10 s g - m d, o § Y'1 10+ 00 11+00 12+00 13+ 00 14+00 15+0D 16+00 17+00 18+00 19 +00 20 +00 21 1 00 22*OD 23+00 100 SCALE: 1" - 50' 5110 5100 5090 5060 5070 5050 5050 24+00 C1/4. 150 NO. REVISION BY DATE VALLEY COUN TY LAND USE APPLICATION SUMITTAL AA1D 5124/2021 DESIG N GTVAMO DRAWN AMD CHECKED GTT APPRO VED GTT C CRESTLINE ENGINEERS 323 DEINHARD LANE, SUITE C PO BOX 2330 McCALL, IDAH O 83638 208.634.4140 • 208.634 4146 FAX 360 RANCH VALLEY COUNTY, IDAHO PRELIMINARY ROAD, GRADING AND STORMW ATER MANAGEMENT PLAN - 1 VERIFY SCALE BAR IS O NE INCH ON FULL 5I2[ DRAWN; 0 1 PROJECT 20037 DATE 5/2412021 DRAWING NO EX -3 SHEET NO 3 OF 4 NOTES: 1. SEE EXHIBIT NO. EX -3, SHEET 3 FOR PRELIMINARY ROAD. GRADING. AND STORMWATER MANAGEMENT NOTES AND LEGEND. / 5 fi A LOT 6 5120 5110 5100 5090 5080 5070 5060 rn m .17 LOT 7 APPROXIMATE LOCATION OF PROPOSED CULVERT SCALE, 1' - 50' LOT 16 LOW PT STA - 25+57.14 1 LOT 8 LOW PT STA - 27+00. 00 LOT 9 Cl HIGH PT STA - 30+50.00 vec } HIGH P7 STA - 32+15 .00 LOT 10 1 0 LOT 12 LOT 11 NORTH 0 25 50 5074 100 LUW P'1 PM MI LLLv STA - ELEV AD - K- 200. 00' - 7U/C. b61 25+00.00 • 5077.96 3.50% 57.14 VC LU Yf MI LLtll PVI STA - PVI ELEV AD - K- 200. 0b' H. .UIH 1.46 28+00.00 - 5082. 96 1.75% 14. 27 VC Mill 19 P14 PVI LLGV-- b ?atr/b STA - 29+75.00 ELEV - 5090.40 AD - -3.75% K-40. 00 150. 00' VC _ L Ham MI PVI PVI LLLV - J]'J1.. 0 STA - 32 +75 .00 ELEV - 509 AD - -2 .507 K-80.00 200 .00' VC .90 o 0 + 8co IQi Ng 80 Q Q1 O 8 a1 7i 8 +0II II o 8 0 n Nn Y ;52 VI ¢ pa ei � 'al � N N 0 _ Ew ® 0 .50%cc .m _'. _ i _ — _ ` E., �In co 0 La . 0> L It0 ID� uri ,� ." FINISHED GRADE EXISTING GROUND �_,�, 2.00X --_ y HORIZONTAL SCALE; - - 50' VERTICAL SCALE: r . 10' (VERIFY PER SHEET SIZE) APPROXIMATE PROPOSED LOCATION .ULVERT OF TBD ROAD EXISTING /— FINISHED GROUND ELEVATION GRADE AT CENTERLINE ELEVATION AT CENTERLINE 5079.71 5078.4 5077.5 5078.96 5077.2 m Q; •+ bO n ill r., ^ m Yl '4',' ,r) F n , rt y IS • � Olm m RI Y9 --r m Ifl N OH m , N On m NI El i0 a$ m N O1 1 ON pm 2 O n ppOi $ t[I Oa 6Oi S � § ON ppOi N v� pp�� m YI s' h� ^ ppOi ,§ N O� �q^1 0, § In Y]n pm § en pm r. § N .. .0 •-w m ,§, nr pg pm S N • I` i, a� m'$ •'1 �Y m 2 X1 '1 1 24+ 00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 5120 5110 5'22 5090 5080 5070 5060 36 +00 36+50 150 NO, REVISIO N BY DATE VALLEY COUNTY LAND 195E APPLICATION S,. M. TTAL AM D 5f240 021 DESIGN OTT/AMD DRAWN AN D CHECKED GTT APPROVED GTT C CRESTLINE EN GINEERS 323 DEINHARD LANE, SUITE C • PO BOX 2330 McCALL, IDAHO 83638 208,634 .4140 208 .634 .4146 FAX 360 RANCH VALLEY COUNTY, IDAHO PREL' MINARY ROAD, GRADING AND STOR MWATER MANAGE MENT PLAN 2 VERIFY SCALE S ARIS ONE INCH ON FULL S]SE ORAWA AS 001INI=I�1 PROJE CT 20037 DATE 512472021 DRAWI NG NO EX -4 SHEET N O. 4 OF 4