HomeMy Public PortalAboutPC Resolution 2014-10-01 Recommending Approval of the Development Permit For Grand Valley Flooring, Located in a Portion of the Southeast 1/4, Southwest 1/4 of Section 20FRASER PLANNING COMMISSION
RESOLUTION NO. 2014-10-01
A RESOLUTION RECOMMENDING APPROVAL OF THE DEVELOPMENT PERMIT FOR
GRAND VALLEY FLOORING, LOCATED IN A PORTION OF THE SOUTHEAST'/,
SOUTHWEST'/ OF SECTION 20, TOWNSHIP 1 SOUTH, RANGE 75 WEST OF THE 6 TH
P.M., DESCRIBED AS FOLLOWS:
BEGINNING AT THE NORTHEAST CORNER OF SAID SOUTHEAST'/, SOUTHWEST % ;
THENCE SOUTH 000 26' EAST, ALONG THE EAST LINE OF SAID SOUTHEAST %
SOUTHWEST'/ ,259.00 FEET TO A POINT ON THE NORTHERLY RIGHT-OF-WAY LINE OF
U S HIGHWAY 40; THENCE NORTHWESTERLY ALONG SAID RIGHT-OF-WAY LINE 607.00
FEET TO A POINT ON THE NORTH LINE OF SAID SOUTHEAST'/ SOUTHWEST'/ ;
THENCE NORTH 890 45' EAST, ALONG SAID NORTH LINE, 539.35 FEET TO THE POINT
OF BEGINNING, COUNTY OF GRAND, STATE OF COLORADO.
At the regular meeting of the Fraser Planning Commission held on October 22, 2014,
Carney Investments LLC dba Grand Valley Flooring, requested recommendation of approval for
a Development Permit for property located at 76891 US Highway 40, more legally described
above,
WHEREAS, Carney Investments is the current owner of said property; and
WHEREAS, Carney Investments is requesting development permit approval which
would permit the construction of a 5,000 square foot pre -manufactured, metal, commercial
building to house Grand Valley Flooring and potentially 2 other businesses yet to be
determined;
NOW THEREFORE BE IT RESOLVED that the Fraser Planning Commission has voted
to recommend approval of the Development Permit based on the representations made at the
10/22/14 Planning Commission meeting and in accordance with the documentation that has
been reviewed by the Town of Fraser with the following conditions:
1. Correct the Sanitary Sewer Note on Sheet C3.0 of the Construction Plans to address
JRS Engineering review comment #1 on memo dated October 20, 2014.
2. Variance to waive stormwater detention requirement, as requested in the Bowman /
Vision Land letter dated October 20, 2014, is approved by Staff with the following two
conditions:
o At such time as future site improvements (development) for this parcel
increases the stormwater flow (from the entire site) to one cubic foot
per second or more above the site's undeveloped historic flow, the
property owner shall construct stormwater detention facilities in
conformance with Fraser's Standards in place at that time. Or,
o If the "water quality pond" fails to function as designed and stormwater routinely
overflows and becomes an off-site nuisance, as determined by Fraser, the
property owner shall construct stormwater detention facilities in conformance with
Fraser Standards in place at that time.
3. Applicant to provide details on the dumpster enclosure.
4. A Construction Guarantee Agreement and security must be provided in accordance with
Town policies prior to building permit issuance.
5. A CDOT utility permit is required to connect to the existing manhole in the CDOT ROW.
This permit will be coordinated with the contractor prior to commencing construction.
6. Confirm CDOT acceptance of entrance location and proposed US40 Highway
improvements prior to building permit issuance.
7. Increase the height of the wainscoting from 2ft. to aft.
APPROVED AND ADOPTED THIS 22th DAY OF OCTOBER, 2014.
FRASER PLANNING COMMISSION
Chairm
ATTEST:
Z2 e fin. rn n r
no
Town Clerk Q 1 (SEAL