Loading...
HomeMy Public PortalAboutSIXTH ST_3.pdfDATE ISSUED: 12-14-20.16 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT REPAIR ROOF -STORM 3 SIXTH ST MURRY ARKIN 3 SIXTH STREET TYBEE ISLAND GA 31328 A PLUS QUALITY CONTRACTING INC 532 COBBLESTONE CIR BLOOMINGDALE GA 31302 P $ 0.00 4-0005-07-002 $6,560.00 PERMIT #: 160912 TOTAL BALANCE DUE: $ 0.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous Iocation in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance_ Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org 01C City City of Tybee Island, Georgia 912-472-5030 • Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT Property Address: • PIN: Single Family ❑ Duplex ❑ Multi -Family units ❑ " Commercial unit(s) Check all that apply [71DiscoverylTearout F-1FootprintChanges ❑ additional square feet heated/cooled ne /9 79 — 01k ❑ Demolitio r Relocation L -other �yi5 , A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia profesgonal license. A commercial project may require Site Plan Approval. Details of Project: Estimated Cost of Construction: (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: 1175- Listed on National Historic Register or located within a National Historic District? Y 1 �j • Buildings older than 50 years may be eligible to be listed on the State /National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation Durinci construction: On-site restroom fagilities will be provided throug A) 4 Construction debris will be disposed by i.l in by means of I understand that I must comply with Zonflood damage control, building, fire shore protection and w a"n'd ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: FEES' Pri ted Name of Applicant: Permit a"�$"�00 InspectionsJ. DD Note: A permit normally takes 7 to 10 days to process Processing time for a Cap. Cost Rec. -� . historic structure ma be longer. Water Tap Name Mailing Address Tele ho Owner u+r r 4, L� �`? [�� 7 Home: Cell: 4133 - L Architect or Engineer t ;�- - (( Office: Cell: Contractor 14S COA h-r.c� 1K'uat lPt�mznd f .0 . )c S.23 .� �t Office: Cell: V Z —&S - Single Family ❑ Duplex ❑ Multi -Family units ❑ " Commercial unit(s) Check all that apply [71DiscoverylTearout F-1FootprintChanges ❑ additional square feet heated/cooled ne /9 79 — 01k ❑ Demolitio r Relocation L -other �yi5 , A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia profesgonal license. A commercial project may require Site Plan Approval. Details of Project: Estimated Cost of Construction: (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: 1175- Listed on National Historic Register or located within a National Historic District? Y 1 �j • Buildings older than 50 years may be eligible to be listed on the State /National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation Durinci construction: On-site restroom fagilities will be provided throug A) 4 Construction debris will be disposed by i.l in by means of I understand that I must comply with Zonflood damage control, building, fire shore protection and w a"n'd ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: FEES' Pri ted Name of Applicant: Permit a"�$"�00 InspectionsJ. DD Note: A permit normally takes 7 to 10 days to process Processing time for a Cap. Cost Rec. -� . historic structure ma be longer. Water Tap Sewer Stub Approvals: /4 �i ature D to-{ Eng. Fees Aid to Const. Planning & Zoning Manager _ t ;�- - (( Building Official Water/Sewer StormlDrainage City Manager TOTAL , 66) v CITY OF TYBEE ISLAND CONTRACTOR REGISTRATION RENEWAL A PLUS QUALITY CONTRACTING INC ROBERT OGLESBY P.O. BOX 523 RICHMOND HILL GA 31324 Business Location: OFF-TYBEE Certificate #: 01950 2016 Registration Expires on: 12/31/2016 9918 REGISTRATION - CONTRACTORS S 20.00 Total Fees Owed for 2016 S 20.00 Attn: Business License Renewal • P.O. Box 2749 •403 Butler Avenue • Tybee Island, GA 31328-2749 (912) 472-5072 • FAX (912) 786-5832 �� ICity of Tybee Island - Community Development Dept. Inspection Report 403 Butler Ave. - P.O. Box 2749 - Tybee Island, GA 31328 Phone 912.472-5032 - Fax 912.786.9539 Permit No. Owner's Name Gen. Contractor Contact Information Project Address Scope of Work Inspector Inspection Inspection Inspection Date Requested Date Needed Subcontractor Date of Inspection Pass Q' Pass Q' Fail n Fee Fail Q' Fee Fail Q' Fee Inspection Pass Q' Fail Q' Fee INTER NAT I9AAL CODE COUNCIL MEMBER