HomeMy Public PortalAboutSECOND AV_1309.pdfDATE ISSUED: 11-16-2016
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
REPAIR ROOF -STORM
1309 SECOND AVE
MIKE SHEFFIELD
1309 SECOND AV
TYBEE ISLAND GA 31328
MACK KITCHENS
156 S CAMPBELL AVENUE
TYBEE ISLAND GA 31328
P
$ 0.00
$4,500.00
PERMIT #: 160760
TOTAL BALANCE DUE: $ 0,00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 - 443 Butler Avenue, Tybee Island, Georgia 31328
(912) 786.4573 - FAX (912) 786.9539
www,cityoftybee.org
/& --0 7ea-0
City of Tybee Island Georgi
912-472-5030 • Fax 91a
I j APPLICATION FOR BUILDINQ ERM39
\` PIT
Property Address:ijU� - PIN:
Check all that apply
❑ Single Family ❑ Discovery/Tearout ❑ Demolition or Relocation
❑ Duplex ❑ Footprint Changes ❑ Other
❑ Multi -Family units ❑ additional square
❑ * Commercial unit(s) feet heated/cooled
A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Ggoa gia professional license. A commercial project may require Site Plan Approval.
Details of Project:
Estimated Cost of Construction: $ (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State/National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
by
will be provided through
by means of -1
Construction debris will be disposed
I understand that l must comply with zonin flood
ie =AAA all anr1;—kin
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is inn
adversely affected as required by Article 16, Stormw ter Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impair is permitted construction.
Date: Signature: l- FEESPermit
Printed Name of Applicant: Inspections pp
Note A permit normally takes 7 to 10 days to process. Processing time for a
historic structure may be longer.
Approvals;
Planning & Zoning Manager
Building Official
Water/Sewer
Storm/Drainage
City Manager
nature
Date
l -
Cap. Cost Rec, ---------
Water
____Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL 0
Name
Mailing Address
Tele hone
Home:
Owner
Cell:
Architect or
Office:
Engineer
Cell:
Office:
Contractor
' �2
u < <
CeII:
Check all that apply
❑ Single Family ❑ Discovery/Tearout ❑ Demolition or Relocation
❑ Duplex ❑ Footprint Changes ❑ Other
❑ Multi -Family units ❑ additional square
❑ * Commercial unit(s) feet heated/cooled
A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Ggoa gia professional license. A commercial project may require Site Plan Approval.
Details of Project:
Estimated Cost of Construction: $ (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State/National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
by
will be provided through
by means of -1
Construction debris will be disposed
I understand that l must comply with zonin flood
ie =AAA all anr1;—kin
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is inn
adversely affected as required by Article 16, Stormw ter Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impair is permitted construction.
Date: Signature: l- FEESPermit
Printed Name of Applicant: Inspections pp
Note A permit normally takes 7 to 10 days to process. Processing time for a
historic structure may be longer.
Approvals;
Planning & Zoning Manager
Building Official
Water/Sewer
Storm/Drainage
City Manager
nature
Date
l -
Cap. Cost Rec, ---------
Water
____Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL 0