Loading...
HomeMy Public PortalAboutSECOND AV_1309.pdfDATE ISSUED: 11-16-2016 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT REPAIR ROOF -STORM 1309 SECOND AVE MIKE SHEFFIELD 1309 SECOND AV TYBEE ISLAND GA 31328 MACK KITCHENS 156 S CAMPBELL AVENUE TYBEE ISLAND GA 31328 P $ 0.00 $4,500.00 PERMIT #: 160760 TOTAL BALANCE DUE: $ 0,00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 443 Butler Avenue, Tybee Island, Georgia 31328 (912) 786.4573 - FAX (912) 786.9539 www,cityoftybee.org /& --0 7ea-0 City of Tybee Island Georgi 912-472-5030 • Fax 91a I j APPLICATION FOR BUILDINQ ERM39 \` PIT Property Address:ijU� - PIN: Check all that apply ❑ Single Family ❑ Discovery/Tearout ❑ Demolition or Relocation ❑ Duplex ❑ Footprint Changes ❑ Other ❑ Multi -Family units ❑ additional square ❑ * Commercial unit(s) feet heated/cooled A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Ggoa gia professional license. A commercial project may require Site Plan Approval. Details of Project: Estimated Cost of Construction: $ (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N • Buildings older than 50 years may be eligible to be listed on the State/National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation by will be provided through by means of -1 Construction debris will be disposed I understand that l must comply with zonin flood ie =AAA all anr1;—kin regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is inn adversely affected as required by Article 16, Stormw ter Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impair is permitted construction. Date: Signature: l- FEESPermit Printed Name of Applicant: Inspections pp Note A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals; Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager nature Date l - Cap. Cost Rec, --------- Water ____Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL 0 Name Mailing Address Tele hone Home: Owner Cell: Architect or Office: Engineer Cell: Office: Contractor ' �2 u < < CeII: Check all that apply ❑ Single Family ❑ Discovery/Tearout ❑ Demolition or Relocation ❑ Duplex ❑ Footprint Changes ❑ Other ❑ Multi -Family units ❑ additional square ❑ * Commercial unit(s) feet heated/cooled A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Ggoa gia professional license. A commercial project may require Site Plan Approval. Details of Project: Estimated Cost of Construction: $ (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N • Buildings older than 50 years may be eligible to be listed on the State/National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation by will be provided through by means of -1 Construction debris will be disposed I understand that l must comply with zonin flood ie =AAA all anr1;—kin regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is inn adversely affected as required by Article 16, Stormw ter Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impair is permitted construction. Date: Signature: l- FEESPermit Printed Name of Applicant: Inspections pp Note A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals; Planning & Zoning Manager Building Official Water/Sewer Storm/Drainage City Manager nature Date l - Cap. Cost Rec, --------- Water ____Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL 0