HomeMy Public PortalAbout1998-51 West Mashta Bridge construction Chang Order Nos. 1-4RESOLUTION NO. 98-51
A RESOLUTION OF THE VILLAGE OF KEY
BISCAYNE, FLORIDA; AUTHORIZING THE
VILLAGE MANAGER TO EXECUTE THE
ATTACHED CHANGE ORDERS NUMBERS 1-4
FOR THE WEST MASHTA BRIDGE
CONSTRUCTION PROJECT; PROVIDING FOR
AN EFFECTIVE DATE.
NOW THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF KEY
BISCAYNE, FLORIDA AS FOLLOWS:
Section 1. The Village Manager is authorized to execute the attached change orders 1-4
for the West Mashta Bridge construction project.
Section 2. This resolution shall take the effect immediately upon adoption.
PASSED AND ADOPTED this 13th day of October , 1998.
;X9R JOHN F. FESTA
:y'
CONCHITA H. ALVAREZ, VILLAGE CLERK
RICHARD WEISS, VILLAGE ATTORNEY
APPROVED AS TO FORM AND LEGAL SUFFICIENCY:
PROJECT: West Mashta Drive Bridge
Project No.: 30118
OWNER: Village of Key Biscayne
OWNERS CONSULTANT: C.A,P. Engineering Consultants, Inc.
DESIGN I BUILD FIRM: Cone Constructors, Inc.
NOTICE TO PROCE$ DATE: December 22,1997
You are directed to make the following changes in the Contract Documents.
DESCRIPTION: Adjust Contract time per the summary below
PURPOSE OF CHANGE ORDER: To review the Contract Tune to reflect the time
required to accomplish all the permitting requirements of Dade County DERM and the
Army Corps of Engineers. Additional time is required to:
1) Obtain approval of Miami Dade County Commission at the earliest,.
available hearing, scheduled for April 21, 1998..
2) Obtain approval of Army Corps of Engineers required for dredging work
associated with construction of temporary roadway.
CHANGE IN CONTRACT TIME: Original Contract time: _. . S days
Additional Contract tip
Total Contract time with
approved Change Order. 360 days
RECOMMEND: APPROVED
By: By: _ By:
Owners Consultant Owner
Date:
F:`DATACLVCAPt3Q 111Chg old 1.wpd
PROJECT:
OWNER:
OWNERS CONSULTANT:
DESIGN I BUILD FIRM:
West Mashta Drive Bridge
Project No.: 3011B
Village Cif Key Biscayne
C.A.P. Engineering Consultants, Inc.
Cone Constructors, Inc.
NOTICE TO PROCEED DATE: December 22, 1997
You are directed to make the Tdllowing changes in the Contract Documents.
DESCRIPTION: Adjust Contract Price and Contract lime per the summary below
PURPOSE OF CHANGE ORDER: To revise the Contract Price and Contract Time to reflect additional
geotechnical cost and additional time for Florida Power and Light to re-route power lines out of work
area.
CHANGE IN CONTRACT PRICE:
Original Contract Price
$801.30Q.00
Previous Change Orders.
No.1
$0.00
Contract Price prior to this C.O.
$801. 001oo
Net increase this C.O.
:4
Contract Price with all approved C.O.
$804.951.25
RECOMMEND:
By:
Owners Consultant
CHANGE IN CONTRACT TIME:
Original Contrict Time
300 days
Net Change from Previous C.O.
60 days
Contract Time prior to this C.O.
360 days
Net increase this C.O.
14 days
Contract Time with approved C.O.
374 days
APPROVED
By:
Owner
Date:
F:IDATACI. CAPL3ot 11dryond3wpd
A
gib
w
IMP
gni
NPR
inn
OPENI
OMR
ORZO
ASTELLA
CARBALLO
THOMPSON
SALMAN
Engineers
Architects
Planners
E80005022
AAC0021 42
•
November 25, 1997
Village of Key Biscayne
Office of the Village Manager
85 West McIntyre Street
Key Biscayne, Florida 33149
Attention:
Reference;
Mr. Sam Kissinger
City Manager
West Mashta Drive Bridge
Project No.: 3011-B
Dear Mr. Kissinger.
At the pre -proposal conference for this project, held on 7/16/97, it was stated that the
existing Geotechnical information may be inadequate, and that the Village will pay direct
cost for any additional geotechnical investigation that Is related to the design of the bridge,
pending approval of the cost by the Village.
We have reviewed the available geotechnical information, and based on our preliminary
pile length calculations, have determined that additional testing is required. We need a
minimum of one SPT'on either side of the bridge to a depth of 50 feet in order to properly
design the piles.
We have obtained a proposal from Keith & Schnars for this additional testing -- which is •
attached, for your review and approval:
If you have any questions or comments regarding. the above, please do not hesitate to
contact us.
Sincerely,
Corzo Castella Carbailo Thompson Saiman, P.A.
Ramon Castella, P.
RC/er
cc: Steve Kasper, Cone Constructions .
Richard Bunnell, Bunnell Foundations
C'Spr'oleclepraposaNp971 e5-3
901 Ponce de Leon Blvd.. Suite 900 Corot Gables. Horida 33134 305.445.2900 1.800.448.0227 Facsimile 305.445.3366
Equal Opportunity Employer
J1/26/1997 13:33
9547830077
KE I TH&Sc WARS --GEOT PAGE 02 .
d
•
Mr. Ramon Castella
C3TS
Keith and Schnars
P.A. Proposal No. P97 A33.MK
November 2b_ 199] age. 2
COST AND TENS
Presented on the attach r i Exhibit I is our costs for performing these services. We will not exceed
our budget unless the ft Id conditions are significantly different than those anticipated or the site is
not accessible to our t ck mounted drill jig. In either event, you will be notified prior to any
increase in costs. If yo wish us to proceed, please have the party responsible for payment sign
the appropriate space o the Request for Professional Service Agreement Form and return one
copy to use. for our fit
If you should have any
working with you on
•
Respectfitily submitted,
KEITH and SCHNARP.A.
En:'neers-Planner -Su ors
uestions concerning this information, please call. We look forward to
s project.
Hugo ' oleda
Laboratory Manager,
technical Division
Attachment
HA/rt
KEITH anti SC:li ARS, P.A.
wt ti t N C Ci g1 lC - 014 0.144.4 S .j 11. V • Q [t ti
•
•
PROJECT:
OWNER:
OWNERS CONSULTANT:
DESIGN t BUILD FIRM:
West Mashie Drive Bridge
Project No.: 30118
Village of Key Biscayne
C.A.P. Engineering Consultants. Inc.
Cone Constructors. Inc.
NOTICE TO PROCEED DATE; December 22. 1997
You are directed to make the following changes in the Contract Documents.
DESCRIPTION: Adjust Contract Price
PURPOSE OF CHANGE ORDER: To revise the Contract Price to reflect additional cost to furnish and
install four (4) 6" diameter PVC conduits as per FP&L requirements.
CHANGE IN CONTRACT PRICE:
Original Contract Price
S(101.300.00
Previous Change Orders
No. 1 - No.2
$3.8§145
Contract Price prior to this C.O. .
S804c951 „25
Net increase this G.O.
Contract Price with ail approved C.O.
$ 8064.75
RECOMMEND:
By:
. Owners Consultant
CHANGE IN CONTRACT TIME:
Original Contract Tune
300 dttits
Net Change from Previous C.O.
�4 days
Contract Time prior to this C.Q.
374 days
Net increase this C.O.
9 days
Contract Time with approved C.O.
X74 days,
APPROVED APPROVED
By: By:
Owner Design I Build Firm
Date:
P ADATAc.LvcAMoi 1i cngoroH.wpd
VO'd b6b9-I917, gOE '1Lsu3 6ut.AaauL6u3 •d'V`3 ti£b:LO 86 -8Y -c
A. C.A.P. Engineering Consultants, Inc.
.•..••.•• • -.VM . • • ••.•••IMF.
c
September 17. 1998
Mr. Stephen D. Kasper
Vice President of Special Operations
Cone Constructors, Inc.
6735 South Lois Avenue
Tampa, Florida 33616
Re: West Mashta Cstive Bridge
Relocation of FP&L Overhead lines underground
C.A.P. Project No.: 3011b
Dear Mr. Kasper.
We received you correspondence of September 11, 1998, concerning the cost
breakdown for the work to be performed in conjunction with FP&:. to relocate the
overhead lines underground.
The cost for furnishing and installing four (4) 6" diameter PVC conduits (complete) as
per FP&L requirements is approved except for the 5% mark up.
•
We will prepare a change order for a lump sum a` .`
The FP&L portion of the cost breakdown is still being reviewed by the Village.
If you have any questions, please contact me at your earliest convenience.
Very truly yours,
C.A.P. Engineering Consultants, inc.
Andrew Pierce. P.E.
Project Manager
•
c: C. Sam Kissinger - Village of Key Biscayne
100 Mk cIo Mile
(305)461-S464
461-S4t4
•
•
Suite 300
www.c:aper%9.cnm
f:1DATACtvCAPt30ttvwne.$dk Pd
• Coral (able:',, f londa 3313'
• -1;3x: (305)461-5494
ZO'd
.�•: r t,..:a 0110001:1114V/01110."1.11i•4.! Art nn f.nK.ktyor
b6b9 - t91 SO£ ' 4• L• su3 6u t... esau t au3 ' d'tl' O VC LO 96 -9t -des
[ENE&
FOUDURT ion, i nt.
Cone Constructors, Inc.
6735 South Lois Avenue
Tampa, Florida 33616
Attn.: Steve Kasper
(813) 837-2991 Office
(813) 839-8921 Fax
phone (305) 594-99(
4
September 11, 1998
Re: West Mashta Drive Bridge Project
Project 11-3011B
Subj.: CHANGE ORDER REQUEST
Relocation of Permanent FP&L
Power Lines
Per your request, please find the following Change Order Proposal breakdown for the work to be
performed in conjunction with FP&L to place all permanent power lines under the road bed of the
bridge structure, instead of existing overhead service.
1. Furnish and install four 6" diameter PVC conduits $ 2,400.00
as per FP&L requirements, a total of 400 feet at
$ 6.00 per foot .
2. Furnish and install 6" PVC couplings and radius $ 640.00
bends as necessary.
3. Provide excavation and backfilling as required to $ 450.00
accommodate FP&L conduit up to new pole locations
as necessary.
Total .$ 3,490.00
Mark-up (15%) $ . 523.50
Total Change Order Request
$ 4,013.50
Please forward this Request for Change Order to the Village for processing.
7801 n.w. 66th street I miami,
flori.da: 33166
foundation piling • seawalls • cofferdams • marinas • • bridges
drilled shaft construction • cast in situ retaining walls • injection grouting
marine engineering contractors in south Florida" since 191 1
"
6 7 3 5 S O U T H L O I S A V E N U E - T A M P A , F L O R I D A 3 3 6 1 6
P . O . B O X 2 2 8 6 9 , T A M P A , F L 3 3 6 2 2 - 2 8 6 9
P H O N E ( 8 1 3 ) 8 3 7 - 2 9 9 1 - F A X ( 8 1 3 ) 8 3 9 - 8 9 2 1
V i l l a g e o f K e y B i s c a y n e
O f f i c e o f t h e V i l l a g e M a n a g e r
8 5 W e s t M c I n t y r e S t r e e t
K e y B i s c a y n e , F l o r i d a 3 3 1 4 9
A t t n : M r . C . S a m u e l K i s s i n g e r
V i l l a g e M a n a g e r
( 3 0 5 ) 3 6 5 - 5 5 0 7 O f f i c e
( 3 0 5 ) 3 6 5 - 8 9 3 6 F a x
S e p t e m b e r 1 1 , 1 9 9 8
R e : W e s t M a s h t a D r i v e B r i d g e
P r o j e c t N o . : 3 0 1 1 - B
S u b j . : R E Q U E S T F O R C H A N G E O R D E R ; 1 '