Loading...
HomeMy Public PortalAboutFIRST ST&FIFTH AV.pdfDATE ISSUED: 08-5-2016 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND 4 BUILDING PERMIT PERMIT #: 160443 ELECTRICAL PERMIT 5TH AVE & IST ST S LJ 0,4-' ir C1c�r� 2510 NORWOOD AVENUE SAVANNAH GA 31406 DARREN HODGES 2510 NORWOOD AVENUE SAVANNAH GA 31406 P S 50.00 $ 200.00 TOTAL BALANCE DUE: $ 50.00 It is understood tbat if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, Tire, soil and sedimentation, wetlands, marshlands protection and share protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31325 (912) 786-4573 - FAX (912) 756-9539 www.cityoftybee.org ��1 l CITY OF TYBEE ISLAND L BUILDING & ZONING DEPARTMENT P.O. Box 2749, Tybee Island, GA 31328 ` 1 Phone (412) 786-4573 Fax (9I2) 785-9539 ELECTRICAL PERMIT APPLICATION Date Location of work Contractor Address of ( & TEMPORARY SERVICE AFFIDAVIT New Work K_tRelllacement Property Owner ` C,�� Telephone a Date work will be ready for inspection, if known r Permit N n Estimated cost of construction D  _ AJC Unit and Heat Pum Attic Ventilation Fan Bell Transmitter  low voltage Border/Outline Lighting Building Saw Exit Li is  life safety Heat Pum Meter Box Motors : h Outlets  110 volts circuit Parking Lot Lights Pool Lights  . rounding Range  commercial Range Hood  commercial Service: amps Sign Circuit - wattage Smoke Detector  low voltage Spa or Tub  grounding Special Outlet swimming fool  grounding Water Heater Welder -220 volts circuit WeII Pum  grounding X-ray Other o Means shall be provided to disconnect all conductors from the service -entrance conductors. NEC 230.70 APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this po ' ma in disconnection of the electrical service until all violations and deficiencies are corrected. Owner/Contractor Signature Date Owner/Contractor Printed Naive Application approved by Date ff Q2WR014 MapViewer - Savannah Area GIS A QR(1))1 0 50 l00ft -80.845, 32.014 17 http://www. sagis.org/Home/Map# ly Tybee Island of J- ORInxi?mr, PAA City of Tybee Island • Community Development Dept. a * Inspection Report — 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 =MM' INTERNATIO A '^+ham„moi Phone 912.472-5032 • Fax 912.786.9539 CODE COUNCIL MEMBER Permit No. Owner's Name Gen. Contractor Contact Information Project Address Scope of Work Inspector Inspection Date Requested Date Needed _ Subcontractor Date of Inspection pass, Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass 11 Fail ❑ Fee