HomeMy Public PortalAboutFIRST ST_103.pdfDATE ISSUED: 11-3-2016
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
REPAIR ROOF -STORM
103 FIRST ST
NITA BROWN
103 FIRST ST
TYBEE ISLAND GA 31328
AMERICAN ROOFING
41 S. MAIN STREET
STATESBORO GA 30458
P
$ 0.00
$8,000.00
PERMIT #: 160690
TOTAL BALANCE DUE: $ 0.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six m
Signature of Building Inspector or Authorized Agent:
P. O. Bog 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786-4573 - FAX (912) 786-9539
www.cityoftybee.org
Property Address:
City of Tybee IslarIcl, G
912-472-5030 • Fax 91 2_78 eoeo r 3ia
APPLICATION FOR BUILDINQ p�RMI9
PIN:
Check all that apply
Single Family ❑ DiscoverylTearout
❑ Duplex ❑ Footprint Changes
❑ Multi -Family units ❑ additional square
❑ * Commercial unit(s) feet heated/cooled
�Re
❑ Demolition or Relocation
❑ Other
A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project:
i2 -re —
Estimated Cost of Construction: (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
. Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
maybe eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On-site restroom facilities will be provided through
by by means of
. Construction debris will be disposed
I understand that I must comply with zoning. fin -A
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no Way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by this"miffed construction.
116'
Date: l l /3 Signature:/� FEES �4•
Printed Name of Applicant;
.'-SIGl �L� r� �, Permit 3$
dote: A permit normally takes 7 to 10 days to process. Processing time for a
iistoric structure may be lon-ger,
kpprovals:
'fanning & Zoning Manager
;uilding Official
Dater/Sewer
torm/Drainage
ity Manager
La—tu
e Date
r
1 !�
Inspections o2 ,
Cap. Cost Rec.
Water Tap —
Sewer Stub
Eng. Fees
Aid to Const. '�-
TOTAL ( M?, 0O
Name
Mailing Address
Tele he
OwnerHome:
e_0 �� r---
Cell:
Architect or
Engineer
Office:
Cell:
Contractor
lft�e''iL�•t c7c�.a
Office:
Cell: q,z S`j
Check all that apply
Single Family ❑ DiscoverylTearout
❑ Duplex ❑ Footprint Changes
❑ Multi -Family units ❑ additional square
❑ * Commercial unit(s) feet heated/cooled
�Re
❑ Demolition or Relocation
❑ Other
A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project:
i2 -re —
Estimated Cost of Construction: (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
. Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
maybe eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On-site restroom facilities will be provided through
by by means of
. Construction debris will be disposed
I understand that I must comply with zoning. fin -A
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no Way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by this"miffed construction.
116'
Date: l l /3 Signature:/� FEES �4•
Printed Name of Applicant;
.'-SIGl �L� r� �, Permit 3$
dote: A permit normally takes 7 to 10 days to process. Processing time for a
iistoric structure may be lon-ger,
kpprovals:
'fanning & Zoning Manager
;uilding Official
Dater/Sewer
torm/Drainage
ity Manager
La—tu
e Date
r
1 !�
Inspections o2 ,
Cap. Cost Rec.
Water Tap —
Sewer Stub
Eng. Fees
Aid to Const. '�-
TOTAL ( M?, 0O
0
r
�a
S�
��I[Got:l
CITY OF TYBEE ISLAND
CONTRACTOR REGISTRATION
RENEWAL
AMERICAN ROOFING
41 S. MAIN STREET
STATESBORO GA 30458
Business Location:
Certificate #: 03085
2016 Registration Expires on: 12/31/2016
9918 REGISTRATION - CONTRACTORS $ 20.00
Total Fees Owed for 2016 $ 20.00
This is a Contractor Registration renewal notice for calendar year 2016. All renewals are subject to approval.
Complete the enclosed Contractor Registration Application, submit with your
payment and this invoice.
Incomplete submittals will not be processed.
Any contractor operating after March 31, 2016, without having registered will be
in violation resulting in enforcement of a STOP WORK order and other penalties.
Attn: Business License Renewal • P.O. Box 2749.403 Butler Avenue • Tybee Island, GA 31328-2749
(912) 472-5072 • FAX (912) 786-5832