Loading...
HomeMy Public PortalAboutFIRST ST_103.pdfDATE ISSUED: 11-3-2016 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT REPAIR ROOF -STORM 103 FIRST ST NITA BROWN 103 FIRST ST TYBEE ISLAND GA 31328 AMERICAN ROOFING 41 S. MAIN STREET STATESBORO GA 30458 P $ 0.00 $8,000.00 PERMIT #: 160690 TOTAL BALANCE DUE: $ 0.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six m Signature of Building Inspector or Authorized Agent: P. O. Bog 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-9539 www.cityoftybee.org Property Address: City of Tybee IslarIcl, G 912-472-5030 • Fax 91 2_78 eoeo r 3ia APPLICATION FOR BUILDINQ p�RMI9 PIN: Check all that apply Single Family ❑ DiscoverylTearout ❑ Duplex ❑ Footprint Changes ❑ Multi -Family units ❑ additional square ❑ * Commercial unit(s) feet heated/cooled �Re ❑ Demolition or Relocation ❑ Other A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: i2 -re — Estimated Cost of Construction: (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N . Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you maybe eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On-site restroom facilities will be provided through by by means of . Construction debris will be disposed I understand that I must comply with zoning. fin -A regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no Way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this"miffed construction. 116' Date: l l /3 Signature:/� FEES �4• Printed Name of Applicant; .'-SIGl �L� r� �, Permit 3$ dote: A permit normally takes 7 to 10 days to process. Processing time for a iistoric structure may be lon-ger, kpprovals: 'fanning & Zoning Manager ;uilding Official Dater/Sewer torm/Drainage ity Manager La—tu e Date r 1 !� Inspections o2 , Cap. Cost Rec. Water Tap — Sewer Stub Eng. Fees Aid to Const. '�- TOTAL ( M?, 0O Name Mailing Address Tele he OwnerHome: e_0 �� r--- Cell: Architect or Engineer Office: Cell: Contractor lft�e''iL�•t c7c�.a Office: Cell: q,z S`j Check all that apply Single Family ❑ DiscoverylTearout ❑ Duplex ❑ Footprint Changes ❑ Multi -Family units ❑ additional square ❑ * Commercial unit(s) feet heated/cooled �Re ❑ Demolition or Relocation ❑ Other A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: i2 -re — Estimated Cost of Construction: (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N . Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you maybe eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On-site restroom facilities will be provided through by by means of . Construction debris will be disposed I understand that I must comply with zoning. fin -A regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no Way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this"miffed construction. 116' Date: l l /3 Signature:/� FEES �4• Printed Name of Applicant; .'-SIGl �L� r� �, Permit 3$ dote: A permit normally takes 7 to 10 days to process. Processing time for a iistoric structure may be lon-ger, kpprovals: 'fanning & Zoning Manager ;uilding Official Dater/Sewer torm/Drainage ity Manager La—tu e Date r 1 !� Inspections o2 , Cap. Cost Rec. Water Tap — Sewer Stub Eng. Fees Aid to Const. '�- TOTAL ( M?, 0O 0 r �a S� ��I[Got:l CITY OF TYBEE ISLAND CONTRACTOR REGISTRATION RENEWAL AMERICAN ROOFING 41 S. MAIN STREET STATESBORO GA 30458 Business Location: Certificate #: 03085 2016 Registration Expires on: 12/31/2016 9918 REGISTRATION - CONTRACTORS $ 20.00 Total Fees Owed for 2016 $ 20.00 This is a Contractor Registration renewal notice for calendar year 2016. All renewals are subject to approval. Complete the enclosed Contractor Registration Application, submit with your payment and this invoice. Incomplete submittals will not be processed. Any contractor operating after March 31, 2016, without having registered will be in violation resulting in enforcement of a STOP WORK order and other penalties. Attn: Business License Renewal • P.O. Box 2749.403 Butler Avenue • Tybee Island, GA 31328-2749 (912) 472-5072 • FAX (912) 786-5832