HomeMy Public PortalAboutCAMPBELL AV_22.pdfCITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 01-4-2017 PERMIT #: 170008
WORK DESCRIPTION REPAIR STEPSIRAILSTENCE
WORK LOCATION 22 N CAMPBELL AV
OWNER NAME KHYRA COVERDALE
ADDRESS 22 N CAMPBELL
CITY, ST, ZIP TYBEE ISLAND GA 31328
PHONE NUMBER
CONTRACTOR NAME KHYRA COVERDALE
ADDRESS 22 N CAMPBELL
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION /}
SQUARE FOOTAGE
OCCUPANCY TYPE P �O
TOTAL FEES CHARGED $ 65.00
PROPERTY IDENTIFICATION # 400002-13-002B
PROJECT VALUATION $1,000.00 f
TOTAL BALANCE DUE: ` $ 65.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786-4573 - FAX (912) 786-9539
www.cityoftybee.org
Cgy3�y��
r
-07, � ` ���0
Cit T Isi
/ Y of Tybee and, Georgia
912-472-5030 • Fax 912-786-9539
APPLICATION FOR BUILDING PERMIT
Property Address: �Z �% G/��1 L� PIN:—%9U,�` 3 ` ate R
Single Family
F-1Duplex
❑ Multi -Family units
r_1* Commercial unit(s)
Check all that apply
❑ Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated/cooled
ne
❑ Demolition or Relocation
❑ Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project: Rr,ppI&ti_ 9-tpt4 r t�y"RtN �� 9.0-(S iTU +_5t . S?,t s
Er +>'Ij)vit
Estimated Cost of Construction: $ 1060. oO (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
Durina construction:
On-site restroom facilities will be provided through . Construction debris will be disposed
by by means of I understand that I must comply with zonin flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by this permitted construction.
Date:ti 17 Signature: =�6W
Printed Name of Applicant: 2&6 -b CiGSTi-r
Note: A permit normally takes 7 to 10 days to process. Processing time for a
historic structure may be longer.
Approvals:
Planning & Zoning Manager
Building Official
Water/Sewer
Storm/Drainage
City Manager
ture Date
`
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL —
Name
Mailing Address
Telle ho
Owner
{kyfA Cwo,Ale
Vtir 1.111 01.ra ST
�Fts .
Home: y .
Cell:
Architect or
Engineer
Office:
Cell:
Contractor
e+��I
� VOC4t,
/O(C) 1-twy go t7m-f T b e t
Office: 4l/2- �
Cell:
Single Family
F-1Duplex
❑ Multi -Family units
r_1* Commercial unit(s)
Check all that apply
❑ Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated/cooled
ne
❑ Demolition or Relocation
❑ Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project: Rr,ppI&ti_ 9-tpt4 r t�y"RtN �� 9.0-(S iTU +_5t . S?,t s
Er +>'Ij)vit
Estimated Cost of Construction: $ 1060. oO (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
Durina construction:
On-site restroom facilities will be provided through . Construction debris will be disposed
by by means of I understand that I must comply with zonin flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by this permitted construction.
Date:ti 17 Signature: =�6W
Printed Name of Applicant: 2&6 -b CiGSTi-r
Note: A permit normally takes 7 to 10 days to process. Processing time for a
historic structure may be longer.
Approvals:
Planning & Zoning Manager
Building Official
Water/Sewer
Storm/Drainage
City Manager
ture Date
`
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL —