HomeMy Public PortalAbout1999-101 Amending the BZ&P fee scheduleRESOLUTION NO. 99-101
A RESOLUTION OF THE VILLAGE OF KEY
BISCAYNE, FLORIDA; AMENDING THE
BUILDING, ZONING, AND PLANNING FEE
SCHEDULE; PROVIDING FOR AN
EFFECTIVE DATE.
WHEREAS, the permit building permit fees were last reviewed and amended on 1997 and
it is necessary to establish fees that reflect the actual costs associated with service of providing
permits for construction, alteration, maintenance, and repair of properties, building, and structures;
and
WHEREAS, the Building, Zoning, and Planning Fee Schedule does not provide sufficient
revenue to fund the cost of operating the building component of the Building, Zoning, and Planning
Department; and
WHEREAS, the general fund of the Village has been used to subsidize the building
component of the Building, Zoning, and Planning Department; and
WHEREAS, the planning and zoning fees are not equivalent to the cost of processing
applications relating to variances, conditional uses, site plan review, change of zoning, appeals of
administrative decisions, amendments to the Zoning and Land Development Regulations and the
Comprehensive Plan; and
WHEREAS, the general fund of the Village has been used to subsidize the processing of
applications relating to Certificates of Use, Certificates of Completion, Certificates of Occupancy,
variances, conditional uses, site plan review, change of zoning, appeals of administrative decisions,
amendments to the Zoning and Land Development Regulations, Comprehensive Plan.
NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE
VILLAGE OF KEY BISCAYNE, FLORIDA AS FOLLOWS:
Section 1. That the base building permit fee is hereby increased to the rate shown on Exhibit
«A„
Section 2. This resolution shall take effect on January 1, 2000.
PASSED AND ADOPTED this 7th day of December
/7th4
CO " i-fr1'A H. ALVAREZ, CMC, VILLAGE C
t- MAYOR JOE I. RASCO
\rIpA
'^14090)
APPROVED AS TO FORM AND LEGAL SUFFICIENCY:
RICHARD J. WEIS : , ILLAGE TTORNEY
EXHIBIT "A"
VILLAGE OF KEY BISCAYNE
BUILDING, ZONING AND PLANNING FEE SCHEDULE
Adopted by the Village Council
December 7, 1999
For additional information contact:
Building, Zoning, and Planning Department
85 West McIntyre Street
Key Biscayne, Fl 33149
305 365 5511
305 365 5556 (fax)
TABLE OF CONTENTS
A. General Information on Special Fees, Refunds, Extensions, and
Cancellations 1
Double Fees 1
Re -inspection Fees 1
Lost and Revised Plans Fee 1
Refunds, Time Limitation, and Cancellations 2
Special Projects 4
General Information 4
Inspections Requiring Overtime 4
Fees Based on Estimated Cost - Documentation Required 4
Building Permit Processing Fee 4
Contractors Registration Fee 4
Zoning Plan Review Fee 4
B. Building Permit Fees 5
Up - Front Processing Fee 5
Minimum Building Permit Fee 5
New Buildings and Additions 5
Roofing and Re -Roofing for any Building 6
Fences and/or Wall, Perimeter 6
Ornamental Iron 6
Swimming Pools, Spas, and Hot Tubs 6
Temporary Platforms and Temporary Bleachers to be used for Public Assembly 7
Demolition of Buildings 7
Demolition of Signs, Fences, and/or Wall Structures other Buildings 7
Shop Drawing Review 7
Installation or Replacement of Windows or Doors 7
Screen Enclosures, Canopies, and Awnings 8
Trailer Tie Down 8
Sign Permit Fees 8
Satellite Dish, Antenna, or Device used to Receive or Transmit a Signal
through the Air 8
Tie Down Re -Inspection 9
C. Plumbing Permit Fees 9
Minimum Plumbing Permit Fee 9
Residential Plumbing (Group I) 9
All Groups Except Group Single Family and Duplex Group I 9
Septic Tank, Settling Tanks, Gas and Oil Interceptors, and Grease Traps 9
Sewer 10
Condensate Drain (Air Conditioning) 10
Water Piping 10
Wells 10
Natural Gas or a Liquefied Petroleum 11
Water Treatment Plants, Plumbing Stations, Sewerage Treatment Plant
and Lift Stations 11
Water and Gas Mains 11
Storm and Sanitary Utility and/or Collection for Lines and Building Drain Fields 12
Temporary Toilets - Waterborne or Chemical 12
Dental Vacuum Lines 12
Construction Trailer or Manufactured Home Connections 12
D. Electrical Permit Fees 12
Minimum Electrical Permit Fee Including Repair Work for Permit 12
Permanent Service to Buildings - New Work Only 12
Feeders 13
Agricultural Service 13
Temporary Service for Construction 13
Trailer Service (Residential) 13
Trailer Service (All other groups) 13
Temporary Service for Test 13
Residential Wiring 13
All Other Wiring 14
Lighting Fixtures 15
Signs and Architectural Features (indoor neons) 15
Temporary Work on Circuses, Carnivals, Fairs, Christmas Tree Lots,
Fireworks, Tents, etc. 15
Fire Detection System 15
Master Television Antenna and Radio System 16
Burglar Alarm System 16
Intercom System 16
Energy Management 16
Swimming Pool, Electrical 17
Free Standing Service 17
E. MECHANICAL PERMITS
Minimum Mechanical Permit Fee 18
Air Conditioning and Refrigeration, including the Relocation of Equipment 18
Mechanical Single Family Residences and Duplexes Group 1 (Includes
Categories (03, 10, 41) 18
Furnaces and Heating Equipment, including Commercial Dryers, Ovens and
other Fired Objects not Elsewhere Classified 19
Fire Sprinkler System 19
Storage Tanks for Flammable Liquids 19
Internal Combustion Engines 19
Commercial Kitchen Hoods 19
Other Fees 20
F. ELEVATORS, ESCALATORS, AND OTHER LIFTING APPARATUS 20
Amusement Rides and Devices 20
G. BOILERS AND PRESSURE VESSELS 20
Boilers 20
Fees for Periodic Re -Inspection 21
H. CERTIFICATE OF USE AND OCCUPANCY AND CERTIFICATE
OF COMPLETION 21
Residential 22
Business, Wholesale, and Retail 22
Unusual Uses, Special Permits, Business, and Industrial Uses 22
Trailer Use Certificates 23
Maximum Fee 23
Change of Use or Name 23
Refunds 23
Occupancy Without a Certificate of Occupancy 24
Failure to Renew a Certificate of Occupancy 24
Certificate of Completion (C.C.) 24
Temporary C.O. "Up -Front Fee 24
C.O. and T.C.O. Inspection Fee 24
C.O. Re -inspection Fee 24
Letter of Omission Fee 25
Shutter Certification 25
I. PLANNING AND ZONING APPLICATION FEES 26
Planning and Zoning Fee Schedule 27
Appeals of Village Council Decisions 27
Preparation of Certified Record for Court 27
J. COST OF PUBLICATIONS AND RECORDS 27
South Florida Building Code, Other Code Books, Supplements, and
Departmental Publication Fees 27
Copies of Departmental Records 28
Premise Permit Fee 28
40 Year Recertification Fees 29
Structural Glazing Systems - Recertification Fees 29
BUILDING, ZONING AND PLANNING FEE SCHEDULE
A. GENERAL INFORMATION ON SPECIAL FEES, REFUNDS, EXTENSIONS AND
CANCELLATIONS
1. DOUBLE FEES: When work for which a permit is required is commenced prior
to the obtaining of a permit, the permit applicant shall be required to pay one
hundred dollars ($100.00) plus a double permit fee. In no event shall the
applicant pay less than one hundred and seventy dollars ($170.00). The
payment of the required fee shall not relieve any person, firm of corporation from
fully complying with all of the requirements of all applicable regulations and
codes, nor shall it relieve them from being subject to any of the penalties therein.
The double fee requirements shall be applicable to all divisions of the Building,
Zoning and Planning Department.
For second offense of doing work without a permit, the permit applicant shall be
required to pay twice the double permit fee plus two hundred dollars ($200.00).
For each offense thereafter, the permit applicant shall be required to pay twice
the double permit fee plus five hundred dollars ($500.00).
2. REINSPECTION FEES: When extra inspection trips are necessary due to (1)
wrong address being given on call for inspection, (2) prior rejection of work due
to faulty construction, (3) work not being ready for inspection at time specified,
(4) failure to call for final or other inspections, (5) required corrections not being
made or completed at time specified, a fee of fifty dollars ($50.00) for each
reinspection shall be charged to the permit holder in the trade concerned. If it
is determined by the field inspector concerned, that the job has the same
problem after the reinspection fee is assessed and paid, then a second
reinspection fee of one hundred dollars ($100.00) shall be charged. The
reinspection fee requirement shall be applicable to all divisions of the Building,
Zoning and Planning Department. The payment of reinspection fees shall be
required prior to requesting final inspections.
The reinspection fee for inspection of existing buildings by all trades to determine
compliance with the South Florida Building Code, but not annual inspections as
required by 305.1(d) shall be fifty-five dollars ($55.00) per inspection per trade.
3. LOST AND REVISED PLANS FEE
a. Lost Plans: When plans for new buildings and additions are lost by the
owner or contractor, a recertification fee will be required to review, stamp
and approve a new set of plans as a field copy. Such fee shall be based
on thirty percent (30%) of the original building permit fee, with a minimum
fee for Group I (single family residence) fifty dollars $50.00, and a minimum
fee for all others of ninety dollars ($90.00).
1
b. Revised Processing Fees:
1. Major plan revision after permit is issued shall be subject to a fee of
fifty percent (50%) of the original permit fee .
2. Each time plans are revised for any reason during the processing
period they shall be subject to a fee increase of fifty percent (50%)
of the original permit fee.
3_ Minor plan revision shall be subject to a fee at the rate of one dollar
($1.00) per minute of time for each review that takes longer than five
(5) minutes.
4. A fee of $75.00 shall be charged for failure to make required
corrections that were provided under a previous review.
c. Lost Building Permit Fee: A replacement fee of thirty dollars ($30.00) shall
be charged for the loss of a Building Permit document after a permit has
been issued.
d. Retrieval of Records Fee: A fee of $1.00 per page in excess of five pages
shall be charged for copies of inspection results.y
4. REFUNDS, TIME LIMITATION, and CANCELLATIONS: The fees charged
pursuant to this schedule, provided the same are for a permit required by Section
301.1 of the South Florida Building Code, may be refunded by the Director of the
Building, Zoning and Planning Department, subject to the following:
a. No refunds shall be made on requests involving:
1. permit fees of one hundred dollars ($100.00) or less; or
2. permits revoked by the Building Official under authority granted by
the South Florida Building Code, or permits canceled by court order;
or conditional permits; or
3. permits which have expired; or
4. permits under which work has commenced as evidenced by any
recorded inspection having been made by the Department; or
2
5. the original permit holder when there is a change of contractor.
b. A full refund less one hundred dollars ($100.00) or fifty percent (50%) of the
permit fee, whichever is greater, rounded to the nearest dollar, shall be
granted to a permit holder who requests a refund provided that:
1. the Department receives a written request from the permit holder
prior to the permit expiration date; and
2. the permit holder submits with the written request the applicant?s
validated copy of said permit; and
3. no work has commenced under such permit as evidenced by any
recorded inspection.
c. Where there is a change of contractor or qualifier involving a permit, the
second permit holder shall pay a fee of one hundred dollars ($100.00) to
cover the cost of transferring the data from the original permit to the second
permit, except when the original permit has expired or the original permit
fee is under one hundred dollars ($100.00), in which case the original
permit feel shall be paid.
d. A fee of sixty dollars ($60.00) shall be paid by the permit holder who
submits a written request for a permit extension as authorized under
Section 304.3(b) of the South Florida Building Code.
e. Where a permit has become null and void pursuant to paragraph 304.3(a)
of the South Florida Building Code, a credit of fifty percent (50%) of the
original permit fee shall be applied to any reapplication fee for a permit
covering the same project and involving the same plans, provided that the
complete reapplication is made within six (6) months of the expiration date
of the original permit, and provided that no refund had been made as
provided in this section. If reapplication is made after six (6) months of the
expiration date or if this is not the first reapplication made on the project,
the full permit fee shall be charged on the renewal application. The permit
reapplication must be submitted with the plans and the applicant?s validated
copy of the original permit. The amount of this fee shall be at least equal
to or higher than the minimum fee for the trade concerned.
3
5. SPECIAL PROJECTS
A fee equal to actual staff time and related costs shall be assessed for special
projects requiring research by the department in order to answer questions
proposed by developers, attorneys, realtors, or municipalities, etc., in connection
with the use, re -subdivision, and development of properties, or to determine if any
existing violations are on the property through a review of departmental records.
Such special fee only will be levied for requests outside the scope of normal
Department work. A minimum fee of fifty-five dollars ($55.00) shall be charged.
A fee equal to two dollars ($2.00) per page shall be assessed for pre-programmed
computer reports on department records. The minimum fee shall be fifty dollars
($50.00).
6. GENERAL INFORMATION
a. A $0.01 per square foot fee will be added to building permits for the State
of Florida to study building code requirements for radon gas.
b. For concurrency review, a fee of six percent (6%) of the total permit fee,
Certificate of Use and Occupancy or Zoning application fee, will be added
to original fees where a concurrency review was performed.
c. Impact fees are assessed on certain building permits, including reapplication
on expired permits.
7. INSPECTIONS REQUIRING OVERTIME: Charges for construction inspections,
which are requested in advance and where the permit applicant has requested
an employee to work overtime, shall be 1.5 times the employees hourly rate. The
fee shall be paid to the Village within 48 hours of the inspection.
8. FEES BASED ON ESTIMATED COST -DOCUMENTATION REQUIRED:
The Department may require the permit applicant to submit appropriate
documentation as proof of estimated cost of construction used to compute permit
fees.
9. BUILDING PERMIT PROCESSING FEE: A fee of twenty five dollars ($25.00)
shall be charged for processing each permit application.
10. CONTRACTOR REGISTRATION FEE: An annual fee of twenty dollars ($20.00)
shall be charged for registering general contractors.
11. ZONING PLAN REVIEW FEE: $ 20.00 minimum and $ 200.00 maximum based
on a formula of $.0025 x sq. ft.
4
6. BUILDING PERMIT FEES: Fees listed in section B include only building permit fees
and do not include plumbing, electrical or mechanical fees, certificate of occupancy
fees, or contractorltradesmen fees which are listed in the following sections:
1. UP -FRONT PROCESSING FEE: When the building permit application is
received, the applicant shall pay an up -front Processing fee equal to nine dollars
($9.00) for each 100 square feet or fractional part thereof, or five dollars ($5.00)
for each $1,000.00 of estimated value or fractional part thereof. This processing
fee is not refundable, but shall be credited toward the final building permit fee.
2. MINIMUM BUILDING PERMIT FEE:
Minimum Fee for a Building Permit: This minimum does not
apply to add on building permits issued as supplementary to
current outstanding permits for the same job.
$100.00
3. NEW BUILDINGS OR ADDITIONS:
a. Single Family and Duplex (Group 1):
0-100 sq. ft
$ 50.00
101 to 300 sq. ft
$ 85.00
301 to 500 sq. ft.
$ 125.00
501 to 1000 sq. ft.
$ 225.00
1001 to 1500 sq. ft.
$ 325.00
for each 500 sq. ft. or fraction thereof
above 1500 sq. ft.
$ 100.00
Alterations or repairs
$ 0.05 per $ 1.00 of estimated value of
work. Minimum fee of $ 100.00
b. All Other Construction:
Repairs due to fire damage
$ 0.05 per $ 1.00 of estimated value of
work. Minimum fee of $ 225.00
Storage and industrial use of Group E
and F occupancies
$ 9.25 per 100 sq. ft. or fraction thereof.
Minimum fee of $ 225.00
Shade houses
$ 0.35 per 100 sq. ft. or fraction thereof
5
, Slabs
_ $ 70.00
New construction other than as
specified herein: (water towers,
pylons, bulk storage -tank found on,
unusual limited -use buildings,
marquees, and similar construction)
$ 9.10 for each $ 1,000 of estimated
cost of fraction thereof.
1
Subsoil preparation for each $1,000 of
estimated costs
$5.25
All other construction, alterations, and
repairs
$ 18.00 per 100 sq. ft. or fraction thereof.
Minimum fee of $ 225.00
4. ROOFING AND RE -ROOFING FOR ANY BUILDING*:
Roofing shingle
$ 0.10
$ 100.00
per sq. ft.
minimum fee
Roofing tile
Other types of roofing material
$ 0.10
$ 100.00
$ 0.08
$ 100.00
per sq. ft
minimum fee
per sq. ft.
minimum fee
IN I
* Fees for buildings multiple roofs shall be based on the square footage cost of each type.
5. FENCES AND/OR WALL, PERIMETER:
For each 100 linear ft. or fractional part thereof
$ 1.60
Minimum fee
$ 100.00
6. ORNAMENTAL IRON:
Per sq. ft. of coverage
$0.55
7. SWIMMING POOLS, SPAS, AND HOT TUBS
Installation or repair
$ 120.00
6
8. TEMPORARY PLATFORMS AND TEMPORARY BLEACHERS TO BE
USED FOR PUBLIC ASSEMBLY
For each 100 square feet or fractional part of platform area
$ 5.25
For each 100 lineal ft. or fraction part of seats
$ 4.50
9. DEMOLITION OF BUILDINGS
For each 100 sq. ft. or fractional part of floor area
$ 11.25
Minimum fee of $ 100.00
10. DEMOLITION OF SIGNS, FENCES, AND/OR WALL STRUCTURES OTHER
THAN BUILDINGS
Fee
$ 100.00
11. SHOP DRAWING REVIEW
a. Trusses
First 600 sq. ft. or fractional part
$ 13.65
For each 100 sq. ft. or fractional part there of
b. Precast/prestress
$ 7.00
Roof, floor, walls, and similar structures - each 1,000
fractional part
sq. ft. or
c. Overhead doors, each
$ 7.00
d. Skylights, each
$ 7.00
e. Handrails and stair rails per linear ft.
$ 1.00
f. Storefront/fixed glazing
(Under 8 ft. high x 4 ft. wide) 100 sq. ft. or part
$ 7.75
g. Walk-in coolers, each
$ 64.20
12. INSTALLATION OR REPLACEMENT OF WINDOWS OR DOORS:
Replacement of windows and exterior doors in all buildings or installation of
windows or doors in building exceeding two stories in height; or storefronts
and fixed glass 8 ft. in height or 4 ft. in vertical mullion spacing; or curtain
walls including windows and doors therein.
7
For each 100 sq. ft. or fractional part $ 6.75
Minimum fee $ 100.00
13. SCREEN ENCLOSURES, CANOPIES, AND AWNINGS
a.
Screen enclosures: each 100 sq. ft or fraction thereof
$ 9.35
b.
Free standing canopies per $ 1000.00 of estimated cost
$ 9.35
c.
Awnings and canopies attached to structures: horizontal
projection per sq. ft. of area covered
$ 0.10
d.
Storm shutters: per sq. ft. of area covered
$ 0.09
e.
Minimum fee
$ 100.00
14. TRAILER TIE DOWN
Tie down inspection fee: including tie down, plug in of plumbing and
electrical service connections per trailer (This does not include
installation of meter mounts and service equipment. Separate
mechanical plumbing and related electrical permits are required.
$ 80.00
15. SIGN PERMIT FEES
a. Minimum fee
$ 100.00
•
b. Signs: non -illuminated (per sq. ft.) (Illuminated signs under
electrical permit
$ 1.35
c. Annual renewal of Class C signs on or before October 1st of
each year (per sign)
$ 32.00
16. SATELLITE DISH, ANTENNA, OR DEVICE USED TO RECEIVE OR
TRANSMIT A SIGNAL THROUGH AIR OR SPACE
Serving a single family home, duplex, or a dwelling unit
- One fee total for all trades
$ 37.50
Serving more than two dwelling units. Per dish, antenna even if
mounted on one pole.
$ 160.00
8
17. TIE DOWN RE -INSPECTION
Minimum fee
$ 100.00
C. PLUMBING PERMIT FEES
1. MINIMUM PLUMBING PERMIT FEE
Except as otherwise specified. This minimum does not apply to add
on plumbing permits issued as supplementary to current outstanding
permits for the same job.
$ 100.00
2. RESIDENTIAL PLUMBING ( GROUP I)
New single family residence or duplex per sq. ft.
$ 0.10
Addition to single family residence or duplex per sq. ft.
$ 0.10
Minimum fee
$ 100.00
3. ALL GROUPS EXCEPT GROUP SINGLE FAMILY AND DUPLEX GROUP
I -
Roughing -in Plugged Outlets for: Bathtubs, closets, doctors, dentists, and
hospital sterilizers, autoclaves, autopsy tables and other fixtures,
appurtenances or other appliances having water supply or waste outlet, or
both, drinking fountains, fixtures discharging into traps or safe waste pipes,
floor drains, laundry tubs, lavatories, showers, sinks, slop sinks, urinals,
water heaters:
For each roughing -in or plugged outlet
$ 6.40
Each roughing -in or plugged outlet replaced on old roughing in: each
fixture
$ 6.40
Pool heaters installed, replaced, or repaired
$ 100.00
4. SEPTIC TANKS, SETTLING TANKS, GAS AND OIL INTERCEPTORS,
GREASE TRAPS
Including tank abandonment, draintile and relay for same
$ 31.70
9
5. SEWER
Each building storm sewer and each building sewer where
connection is made to a septic tank, to a collector line or to an
existing sewer or to a city sewer or soakage pit or to a building drain
outside a building.
$ 32.10
Sewer capping/demolition
$ 32.10
6. CONDENSATE DRAIN (AIR CONDITIONING)
Per outlet
$ 4.28
Except single not manifolded A/C not exceeding 5 HP
No charge
7. WATER PIPING
1
Water service connection to a municipal or private water supply
system (for each meter on each lot)
$ 8.50
Water connection or outlets for appliance or installations not covered
by fixture set above
$ 8.50
Irrigation system, and underground sprinkler system for each zone
$ 18.00
Solar water -heater installation, equipment replacement or repair
$ 96.30
Swimming pool maintenance, water heater piping, not including well
(new installation of replacement including service connection
$ 107.00
Residential
$ 107.00
All groups excluding residential
$ 107.00
Sump pump
$ 8.55
2 inch or less water service backflow assembles
$ 37.45
2 1/2 inch or less water service backflow assembles
$ 58.85
Repairs to water piping: for each $1,000 estimated cost or fractional
part
$ 6.15
8. WELLS
All wells
$ 56.20
10
9. NATURAL GAS OR LIQUEFIED PETROLEUM
Group 1: For each outlet (includes meters and regulators
$ 6.42
Group 1: For each appliance (does not include warm air heating units,
but does include invented space heaters and vented wall heaters -No
duct work) (See Fee section E (3) for heating)
$ 6.42
All other Groups: For each outlet (includes meters and regulators
$ 10.70
All other Groups: For each appliance (does not include warm air
heating units, but does include invented space heaters and vented
wall heaters -No duct work) (See Fee section E (3) for heating)
$ 10.70
For each meter (new or replacement)
$ 4.30
For major repairs to gas pipe where no fixture or appliance installation
in involved
$ 107.00
Underground L.P. Gas Tanks
$ 107.00
Above ground L.P. Gas Tanks
$ 107.00
Change of company (no additional appliances or outlets
$ 17.00
10. WATER TREATMENT PLANTS, PUMPING STATIONS, SEWAGE
TREATMENT PLANT AND LIFT STATIONS
Water treatment plant (interior plant piping)
$ 224.70
Sewage treatment plant (interior plant piping)
$ 160.50
Lift station (interior station piping)
$ 256.80
Sewage ejector
$ 75.00
11. WATER AND GAS MAINS
Minimum fee
$ 100.00
Each 50 ft. or part thereof (On private property and other than utility
easement)
$ 7.50
11
12. STORM AND SANITARY UTILITY AND/OR COLLECT FOR LINES AND
BUILDING DRAIN FIELDS
Minimum fee
$ 100.00
Each 50 ft. or part thereof
$ 7.50
Each manhole or catch basin
$ 10.70
13. TEMPORARY TOILETS - WATERBORNE OR CHEMICAL
First temporary toilet
$ 48.15
For each additional
$ 8.85
Renewal of temporary toilet
Same fee as original fee
14. DENTAL VACUUM LINES
Each system
$ 107.00
15. CONSTRUCTION TRAILER OR MANUFACTURED HOME CONNECTIONS
Each unit
$ 107.00
D. ELECTRICAL PERMIT FEES
1. MINIMUM ELECTRICAL PERMIT FEE INCLUDING REPAIR WORK FOR
PERMIT
Except as otherwise specified. This minimum does not apply to add
on electrical permits issued as supplementary to current outstanding
permits for the same job.
$ 100.00
2. PERMANENT SERVICE TO BUILDINGS - NEW WORK ONLY
The following fee shall be charged for total amperage of service: for $ 4.80
each 100 amp. or fraction thereof
12
3. FEEDERS
Each feeder (Includes feeders to panels, M.C.C.; switch -boards,
generators; automatic transfer switches, elevators, etc.)
$ 12.85
4. AGRICULTURAL SERVICE
Per Service
$ 53.50
5. TEMPORARY SERVICE FOR CONSTRUCTION
IPer service
6. TRAILER SERVICE (RESIDENTIAL)
$ 53.50
Per service
$ 53.50
7. TRAILER SERVICE (ALL OTHER GROUPS)
Per amp (per service)
$ 58.85
8. TEMPORARY SERVICE FOR TEST
La_.... Equipment and service (30 day limit) per meter
b. Elevator (180 day limit) per elevator
$ 96.30
$ 96.30
9. RESIDENTIAL WIRING: New construction of Group I and living units of Group
H.) Applies to all electrical installations except common areas, parking lot area
and/or buildings and house service of Group H.
For new construction an additions for
each sq. ft. of floor area.
$ 0.08
Minimum fee $ 100.00
Alterations or repairs per $ 1.00 estimated
cost or fractional part
$ 0.05
Minimum fee $ 100.00
Common areas roup es: co ors, pu ounges, e evators, pumps, A/C (public
area), lights, outlets, house and emergency service, etc. These areas shall be subject to the
fees below:
of G
H includ
rrid
blic I
I
13
10. ALL OTHER WIRING
a.
Includes boxes, receptacles, switches, sign, fractional motor,
fans, low voltage outlets, empty outlets for telephone, CTV, each
outlet, 110 volt smoke detectors each outlet box
$ 1.70
b.
Special outlet up to 60 amps
$ 7.50
c.
Special outlet over 60 amps
$ 13.90
d.
Commercial equipment VA rated) X-ray outlets, commercial
cooking equipment, presses, generators, transformers,
permanently connected. For each 10 KW or fractional part
$ 7.50
e.
Motors (Fractional already covered on general outlets)
$ 9.65
Each motor
f.
Air conditioning and refrigeration system (new work). Applies to
commercial and residential, agricultural and industrial. Covers
related work, except wall or window units which are covered
under special outlets.
1. Per ton or fraction part thereof
$ 6.40
2. Air conditioning and refrigeration system strip heating,
space heating. For each 105.25 KW of fractional part
$ 7.00
3. Replacement or relocation of existing A/C and refrigeration
units (same size)
a. Per ton
$ 2.15
b. Per KW
$ 1.07
g.
Electrical equipment - replacement (existing facilities) Fee based
on cumulative cost of the following components:
1. Switchboards, M.C.C., panels, control boards. For each
$ 15.75
board
$ 21.40
2. Motor replacement for same size
a. From 1 HP to 5 HP for each motor
$ 5.35
b. From 5 HP to 100 HP for each motor
$ 4.30
c. Over 100 HP for each motor
$ 15.15
14
11. LIGHTING FIXTURES: Fee based on cumulative cost of the following
components: Includes floodlights, spotlights, parking lights, tennis court lights,
fluorescent and incandescent fixtures, etc.
a. Per fixture
$ 1.60
b. Plugmold, light track, neon strips. Each
5 feet or fractional part
$ 3.30
c. Per lighting pole (standards) (Fixture to
be charged separately)
$ 10.70 Group 1 pole
$ 16.00 Commercial pole
12. SIGNS AND ARCHITECTURAL FEATURES (INDOOR NEONS)
Per outlet
$ 13.40
Per sq. ft. of sign
$ 1.35
Repairs and re -connection each
$ 80.25
Neon strips each 5 ft. or fractional part
$ 2.70
Minimum fee
$ 100.00
13. TEMPORARY WORK ON CIRCUSES, CARNIVALS, FAIRS, CHRISTMAS
TREE LOTS, FIREWORKS, TENTS, ETC.:
Per ride or structure
$ 53.50
Minimum fee
$ 200.00
14. FIRE DETECTION SYSTEM: . Includes fire alarm systems, Halon, etc. Does not
include single 110 volt residential detectors.(needs category 04 processing).
a. Master control, New and upgrades
$ 134.75
b. Each device
$ 1.34
c. Repairs and additions to existing systems
$ 100.00
15
15. MASTER TELEVISION ANTENNA AND RADIO SYSTEM: Does not include
CABLE and telephone empty conduit system. Does include free wiring of same
a. Master Control
$ 21.40
b. Each device
$ 1.30
16. BURGLAR ALARM SYSTEM
a.
Installation wiring
$ 48.15
b.
Master control and installation devices
$ 48.15
$ 1.20 per
device
c.
Complete system
$ 96.30
d.
Repair per system
$ 48.15
17. INTERCOM SYSTEM: Includes residential, nurse call, paging, etc.
a. Each new system all groups
$ 96.30
b. Each device
$ 1.30
c. Repair each system, all groups accept Group I
$ 107.00
18. ENERGY MANAGEMENT
a. Per floor
$ 112.35
b. Each device
$ 1.30
c. Repair per floor
$ 107.00
16
19. SWIMMING POOL, ELECTRICAL: Fee based on cumulative cost of the
following components:
a.
Residential pool & spa (Group I) (Includes motor and pool lights
$ 107.00
b.
Residential combination pool/ spa (Includes motor and pool
lights
$ 107.00
c.
Pool deck lights outlets per fixture or outlet
$ 1.60
d.
Pool/spa heater per unit (residential/commercial
$ 96.30
e.
Commercial and multi -family dwelling pool and spa
$ 150.00
f.
Commercial and multi -family dwelling combination pool and spa
$ 203.00
20. FREE STANDING SERVICE: New meter and service (requires processing). Fee
based on cumulative cost of the following components: Includes lift stations,
sprinkler systems, street lighting, parking lots, etc. that require new service with
separate meter.
a.
Service -per pump
$ 0.80
b.
Outlet per outlet
$ 1.60
c.
Lighting fixture, per fixture
$ 1.60
d.
Motor 105 HP, per motor
$ 6.40
e.
Over 5 HP to 100 HP, per motor
$ 8.80
f.
Over 100 HP, per motor
$ 21.40
g.
Per lighting pole (standards)
$ 7.50
17
E. MECHANICAL PERMITS
1. MINIMUM MECHANICAL PERMIT FEE
Except as otherwise specified. This minimum does not apply to add
on mechanical permits issued as supplementary to current
outstanding permits for the same job.
$ 100.00
2. AIR CONDITIONING AND REFRIGERATION, INCLUDING THE RELOCATION
OF EQUIPMENT: Separate permits are required for electrical, water and gas
connections.
For each ton capacity or fractional part thereof
$ 16.00
3. MECHANICAL SINGLE FAMILY RESIDENCES AND DUPLEXES GROUP 1
(INCLUDES CATEGORIES 03, 10, AND 41)
a. New construction per sq. ft.
$ 7.50
b. Additions to single family residences and duplexes per sq. ft.
$ 7.5
c. Minimum fee
$ 100.00
4. AIR CONDITIONING AND REFRIGERATION, INCLUDING THE RELOCATION
OF EQUIPMENT: separate permits are required for electrical, water and gas
connections
a. For each ton capacity or fractional part thereof
$ 16.00
b. Room A/C unit
$ 37.45
c. Minimum fee
$ 100.00
18
5. FURNACES AND HEATING EQUIPMENT, INCLUDING COMMERCIAL
DRYERS, OVENS AND OTHER FIRED OBJECTS NOT ELSEWHERE
CLASSIFIED: (Includes all component parts of the system except field and
electrical lines). For vented and unvented wall heaters, see paragraph C.
a. For each KW or fraction thereof
$ 3.20
b. Minimum fee
$ 100.00
6. FIRE SPRINKLER SYSTEM
a.
Per standpipe
$ 21.40
b.
Per sprinkler head
$ 1.07
c.
Per hose rack or hose bib
$ 10.70
d.
Per connection to community supply
$ 53.50
e.
Each 50 ft. of underground piping or part thereof
$ 21.40
f.
Fire pump and/or siamese connection, each
$ 80.25
g.
Minimum fee
$ 100.00
7. STORAGE TANKS FOR FLAMMABLE LIQUIDS
Per tank
$ 160.00
8. INTERNAL COMBUSTION ENGINES
Stationary, each
$ 80.25
9. COMMERCIAL KITCHEN HOODS
Each hood
$ 133.75
19
10. OTHER FEES
a. Fire chemical halon and spray booths
$ 112.35
b. Insulation, Pneumatic Tube, Conveyor Systems, Pressure and
Process Piping, Sheet al or Fiberglass Air Conditioning Duct,
Cooling Towers, Mechanical Ventilation Ductwork or Ductless
Ventilation
1. For each $ 1,000.00 or fractional of part of estimated cost
2. Minimum fee
$ 11.25
$ 100.00
F. ELEVATORS, ESCALATORS, AND OTHER LIFTING APPARATUS
Permits and inspections are provided by Miami -Dade County. If the Village
provides these services, then the fees established by the County shall be used by
the Village.
1. AMUSEMENT RIDES AND DEVICES
a. For each portable, ride, or temporary unit (maximum of 30 day $ 101.65
b. For each permanent unit installed or altered
$ 337.00
c. Annual inspection for each ride or device at any location
(permanent installation only)
$ 33.17
G. BOILERS AND PRESSURE VESSELS: Installation permit fees: Including initial
inspections and certificate. Does not include installation or connection of field and
water lines.
1. BOILERS: the following fees apply to each boiler to be installed:
a. Boilers Tess than 837 MBTU each
$ 107.00
b. Boilers 837 MBTU to 6,696 MBTSU each
$ 107.00
c. Boilers 6,695 MBTSU and up each
$ 133.75
20
d. Steam drivers prime movers, each
$ 107.00_
e. Steam activated machinery, each
$ 107.00
f. Unfired pressure vessels (operating at pressures in excess of 60
psi and having volume of more than 5 cubic feet) each
pressure vessel
$ 107.00
2. FEES FOR PERIODIC RE -INSPECTION
a. Steam boilers (annual) each
$ 133.75
b. Hot water boilers (annual) each
$ 55.65
c. Unfired pressure vessels (annual) each
$ 50.00
d. Miniature boilers (annual) each
$ 50.00
e. Certificate of inspection (where inspected by insurance
company) each
$ 80.25
f. Shop inspection of boiler or pressure vessels per completed
vessel
$ 80.25
g. Minimum fee $ 165.00 per half day, regardless of number of
vessels inspected
$ 358.50
H. CERTIFICATE OF USE AND OCCUPANCY AND CERTIFICATE OF COMPLETION:
The following original fees shall be paid for all uses. The indicated renewal fee
applies to those uses which are required to be renewed annually by Code or by
Resolution. Nonrenewable uses are issued permanent use and occupancy certificates
which Shall remain valid for an unlimited time, unless revoked for cause or
abandoned and providing there is no change of use, ownership, or name, or that
there is no enlargement, alteration or addition in the use or structure.
21
1. RESIDENTIAL (C.O.)
Original Fee
Per -Unit
" Annual'
Fee Unit
Duplexes, per unit
Townhouses per unit
$ 37.45
None
Bungalow court
L48.15
None
Apartments, hotels, motor hotels, and all multiple family users
- per building 40-50 units
$ 58.85
None
51-100 units in a building
$ 70.00
None
101-200 units in a building
$ 80.00
None
201 or more units in a building
$ 91.00
None
Private school, day nursery, convalescent and nursing home,
hospital, ACFL and Developmentally Disabled home care
$ 96.00
$ 54.00
2. BUSINESS, WHOLESALE AND RETAIL
Original Pee
Annual Fee
Per sq. ft. of business area
$ 0.03
None
Minimum
$ 96..00
$ 60.00
3. UNUSUAL USES, SPECIAL PERMITS, BUSINESS, AND INDUSTRIAL USES
Original Fee
Annual Fee
All unusual uses , except the following
$ 210.00
$ 160.00
Churches
None
None
Cabaret, nightclub, liquor, or package store
$ 260.00
$ 265.00
Camival, circus, or amusement rides
$ 125.00
$ 105.00
22
4. TRAILER USE CERTIFICATES: Covers administrative and initial field inspection cost
for all types of construction site trailers. Fee also covers cost of site plan review.
Original Fee
Annual Fee
a. Trailers approved for temporary occupancy during
construction of a residence (section 33-168 Metro Code)
$ 193.00
$ 193.00
b. Trailer approved for commercial purposes or
development projects, including watchman's quarters
and temporary sales trailers
$ 375.00
$ 375.00
c. Construction field offices
$ 135.00
None
d. Cash escrow processing fee
$ 107.00
e. Trailer tag deposit
$ 27.00
None
f. Cash escrow processing (balloon)
$ 53.5
None
g. Cash escrow processing (demo)
$ 214.00
None
h. Demolition C. 0.
$ 321.00
None
5. MAXIMUM FEE
The maximum that the Building, Zoning, and Planning Department fee for a Certificate of
Use and Occupancy shall be an original fee of $ 600.00 with no annual renewal fee.
6. CHANGE OF USE OR NAME
When there is a change of use or name, the fee shall be the original fee listed for the use
proposed.
7. REFUNDS
No refunds shall be made of fees paid for use and occupancy permits. In case of error,
adjustment may be made by the Director of the Building, Zoning and Planning Department.
23
8. OCCUPANCY WITHOUT A CERTIFICATE OF OCCUPANCY
Original Fee
Annual Fee
$ 160.00 plus a double C.O. fee
None
P. r
9. FAILURE TO RENEW A CERTIFICATE OF OCCUPANCY
C.O.s not renewed on or before the renewal date will be assessed a $150.00
violation fee plus a double C.O. fee.
10. CERTIFICATE OF COMPLETION (C.C.)
t
Original Fee
r
Annual Fee
a. Single family residence, townhouse unit.
$ 26.75
None
b. All others
$ 53.50
None
11. TEMPORARY C.O. "UP -FRONT" FEE
When the temporary C.O. (TCO) application is received, the applicant shall pay an "up-
front" processing fee equal to twenty-five dollars ($ 26.75) This processing fee is not
refundable. This fee shall be deducted from the total cost of the TCO.
12. C.O. AND T.C.O. INSPECTION FEE
When an inspection is necessary prior to the issuance of a C.O. or TCO, an inspection fee
of thirty dollars $32.10) is charged for each inspector who is required to make a field
inspection. Temporary C.O.s will be charged at a fee equal to the final C.O. cost in addition
to the inspection fee. This fee will be needed, up to ninety (90) days.
13. C.O. RE -INSPECTION FEE
When extra inspection trips are necessary due to 1) wrong address being given on call for
inspection 2) required corrections not being made or completed at time specified 3) failure
24
to provide access to the property or use, a fee of fifty dollars $53.50) for each inspector
who must return shall be charged. Any reinspection after the initial reinspection shall
require payment of a one hundred dollars $ 107.00) fee.
14. LETTER OF OMISSIONS FEE
A fee of twenty-five dollars $ 26.75) will be charged for each trade in which an item has
been omitted prior to final inspection approval. A minimum fee of twenty-five dollars
$ 26.75) shall be charged.
15. SHUTTER CERTIFICATION
A fee of fifteen dollars ($15.00) will be charged to certify per unit.
25
I. PLANNING AND ZONING APPLICATION FEES
1. Planning and Zoning Fee Schedule: At the time of filing an application, the
appropriate fee must be paid. The amount of the fee is based on the below
schedule (calculation of the fee is cumulative for each line item):
a. Base application fee for any type of application (double base fee if the
application is the result of a violation).
Supervisory Variance (any type of use) $ 55.00
Single family and duplex (Administrative and
Regulatory Variance) $ 150.00
Multiple Family (Administrative and
Regulatory Variance) $ 315.00
Commercial and Hotel (Administrative and
Regulatory Variance) $ 500.00
Site Plan Review
Administrative $ 160.00
Village Council $ 320.00
Appeal of an Administrative Decision $ 1,000.00
Amendment to the Zoning and Land
Development Regulations $ 1,000.00
Change of Zoning District $ 1,000.00
Comprehensive Plan, Amendment
Comprehensive Plan, Change of Land Use
b. Advertising fee if notice in a newspaper
1. published in the Village
2. published in a newspaper that meets the
requirements of Chapter 163 of Florida Statutes
26
$ 2,500.00
$ 2,500.00
$ 300.00
$ 4,500.00
c. Mailing fee:
d. Size of property
e. Number of hotel or apartment units
$ .50 per mailing address.
$ 100.00 per 10 acres or any
fraction thereof
$ 55.00 per 15 units or any
fraction thereof
f. Size of buildings - non residential only $ 55.00 per 5,000 sq. ft. or any
fraction thereof
2. APPEALS OF VILLAGE COUNCIL DECISIONS
For every application for an appeal of a decision by the village Council, there shall be paid
to the Building, Zoning and Planning Department, for the processing for each and every
application, a fee of three hundred and fifteen dollars ($315.00), to be paid at the time of
application. Site plan modification, where permitted, to appeal requests will be processed
at an additional cost of three hundred and fifteen dollars ($315.00)
3. PREPARATION OF CERTIFIED RECORD FOR COURT
For the purpose of court appeals, herein the Director for the Building, Zoning and Planning
Department is requested to make available the record upon which the decision of the
Council is based, there shall be paid to the Building and Zoning Department, for the
preparation of a certified copy for the record, a fee of two hundred and sixty five dollars
($265.00) to be paid at the time of request
J. COST OF PUBLICATIONS AND RECORDS
1. SOUTH FLORIDA BUILDING CODE, OTHER CODE BOOKS, SUPPLEMENTS,
AND DEPARTMENTAL PUBLICATION FEES:
The charge for each copy of the South Florida Building Code, other code books or
supplements thereto or other Departmental Publications shall be assessed by the
Building and Zoning Department in the amount equal to the low bid printing cost plus
the demonstrable cost to the department selling and distributing such code books,
27
code supplements or departmental publications. The charge for publications of
Construction Lien Law information are limited to five dollars ($5.00) per copy of
publication as permitted under Chapter 713 of the Florida Statute.
2. COPIES OF DEPARTMENTAL RECORDS
Plan Reproductions from microfilm or CD disc:
Plan Reproduction from microfilm or disc -per sheet 5.00
Reproduced Records - per page .15
Double sided copies - per page .20
Certified copies - per page 1.00
Notary Public Service - per document 1.00
Research and Ordering Plans 5.00
K. PREMISE PERMIT FEE
In accordance with provisions of the South Florida Building Code and Chapter 10 of the
Code of Metropolitan Dade County, each firm or organization in Dade County which
performs its own maintenance work with certified maintenance personnel as well as helpers
thereunder may pay to Village of Key Biscayne an annual Master and subsidiary premise
permit fee in lieu of other fees for maintenance work. Such fee shall be paid to the Building,
Zoning and Planning Department and such permit shall be renewed annually at a fee which
is calculated in accordance with the provisions of this subsection.
1. CALCULATION OF THE INITIAL MASTER PREMISE PERMIT FEE:
Each firm or organization which obtains an annual Master premise permit shall include in
their application for such permit the total number of maintenance personnel, including
helpers and trainees thereunder assigned to building, electrical, plumbing or mechanical
work. The Master Premise Permit fee shall be computed by multiplying the total number
of such employees times fifty dollars ($50.00). The minimum Master premise permit fee
shall be nine hundred and forty-five dollars ($945.00).
28
2. CALCULATION OF THE INITIAL SUBSIDIARY PREMISE PERMIT FEE:
Each firm or organization which utilizes decentralized locations in addition to the main
location described under point 1 above, may additionally apply for a Subsidiary Premise
Permit for each such decentralized location. Such application for a Subsidiary Premise
Permit shall include the same information required in point 1 above. The Subsidiary
Premise Permit Fee shall be computed by multiplying the total number of such employees
times fifty dollars ($50.00). The minimum Subsidiary Premise Permit fee shall be two
hundred and sixty-five dollars ($265.00).
3. RENEWAL OF PREMISE PERMIT:
Prior to each premise permit expiration, the holder will be sent a renewal notice to continue
the premise permit for the next renewal period. The calculation of the renewal premise
permit fee shall be the same as the method used to calculate the original premise permit
fee. No allowances shall be made for late renewal fees or part year renewal fees.
L. 40 -YEAR RECERTIFICATION FEES
For every application for 40 -year recertification under Section 104.9 of the South Florida
Building Code there shall be paid to the Building, Zoning and Planning Department, for the
processing of each application, a fee of two hundred and fifty dollars ($250.00). For every
application for subsequent recertification at 10 year intervals thereafter, there shall be paid
to the Building, Zoning and Planning Department, for the processing of each application,
a fee of two hundred and fifty dollars ($250.00).
Recording Fees: Established by the Clerk of the Court).
M. STRUCTURAL GLAZING SYSTEMS - RECERTIFICATION FEES
For the initial application for structural glazing recertification and each subsequent
application under Sections 104.9 and 3515 of the South Florida Building Code there shall
be paid to the Building, Zoning and Planning Department, for the processing of each
application, a fee of two hundred and fifty dollars ($250.00).
29
N. PERMIT SYSTEM FEES
For every building permit (building, electrical, public works, plumbing, mechanical, signs
and zoning) a fee of six dollars ($6.00) shall be assessed. These fees shall be used to
purchase and maintain the building permit system including software and upgrades.
30