Loading...
HomeMy Public PortalAboutResolution No. 027-58 08-06-1958 ram. - ti RESOLUTION NO. -G R A RESOLUTION EMPLOYING AN ENGINEERING FIRM TO MAKE A DETAILED SURVEY AND COST ESTIMATE FOR STREET AND DRAINAGE IMPROVEMENTS. BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE TOWN OF RICHLAND HILLS, TEXAS, THAT: Section 1. That the engineering firm of Reaves & Gregorv.EnRineerina Firm of Fort Worth, Texas, be, and they are hereby, employed to make a detailed survey and cost estimate of the necessary street improvements and local water drainage improvement, it being understood that the engineering service shall not include the overflow water problem of Big Fossil Creek. Section 2. That the Mayor be, and he is hereby, authorized and directed to enter into a contract with said firm for the above work for a price not to exceed $ 575 .00 , providing further that said contract may provide that the said engineering firm will be employed to be the Town's engineers in the event the improvements or any substantial portion thereof are actually con- tracted to be made within one year(s), provided that such service shall include the standard service rendered by engineering firms for this type of improvement and provided further, that such charges shall not exceed the standard charge for such service in this area. PASSED AND APPROVED this ,h day of August, 1958. APPROVED: Paul C. Daniels, Layer ATTEST: Virgil Howard, Secretary • _j 7 A' ADDENDUM TO RESOLUTION # 25-58 ��---~��,,� , RESOLUTION EMPLOYING ENGINEERS � 3 FOR THE TOWN OF RICHLAND HILLS TARRANT COUNTY, TEXAS BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN OF RICHLAND HILLS, TEXAS, ACTING IN REGULAR SESSION THIS 6th DAY OF August A. D., 19 58, THE TOWN OF RICHLAND HILLS, ACTING BY AND THROUGH ITS MAYOR AND COUNCIL DULY AUTHORIZED TO ACT, DESIRES TO EMPLOY ENGINEERS TO FURNISH PROFESSIONAL ASSISTANCE IN THE FORM OF RECOMMENDATIONS AND ESTIMATED COSTS WHICH ARE NECESSARY TO DETERMINE THE AMOUNT OF FINANCING REQUIRED TO PROVIDE A PRACTICAL PROGRAM OF STREET IMPROVEMENTS AND STORM DRAINAGE FOR THE TOWN OF RICHLAND HILLS; AND, AT SUCH TIME AS FUNDS BECOME AVAILABLE, TO FURNISH COMPLETE ENGINEERING SERVICES INCLUDING DETAILED PLANS, SPECIFICATIONS AND INSPECTION OF CONSTRUCTION. THAT THE FIRM OF REAVES & GREGORY, REGISTERED PROFESSIONAL ENGINEERS, OF FORT WORTH, TEXAS, BE RETAINED TO FURNISH PROFESSIONAL SERVICES TO THE TOWN OF RICHLAND HILLS, SUBJECT TO THE FOLLOWING CONDITIONS: I . THE ENGINEERING FIRM WILL PROVIDE ADVICE AND SERVICES TO THE MAYOR AND COUNCIL BY THE FURNISHING OF ESTIMATES OF COSTS AND CONCISE RECOMMENDATIONS COVERING AN ADEQUATE STREET IMPROVEMENT AND STORM DRAINAGE PROGRAM FOR THE TOWN OF RICHLAND HILLS. SAID SERVICES SHALL INCLUDE CONFERENCES ATTENDED BY THE PRINCIPAL ENGINEERS OF THE FIRM, THE CITY OFFICIALS AND SELECTED REPRESENTATIVES OF THE TOWN FOR THE PURPOSE OF TECHNICAL EXPLANATIONS AND ARRANGING A PUBLIC EDUCATIONAL PROGRAM ON THE SUBJECT. ALL PERTINENT INFORMATION AND MAPS AVAILABLE TO THE TOWN SHALL BE SUPPLIED TO THE ENGINEERING FIRM TO ASSIST IN THE FURNISHING OF THEIR SERVICES. THE WRITTEN ESTIMATES OF COSTS AND RECOMMENDATIONS ARE TO BE FURNISHED WITHIN THIRTY (3O) DAYS FROM THE DATE OF THIS RESOLUTION. I OF 3 2. AN ADVANCE RETAINER PAYMENT OF FIVE HUNDRED SEVENTY FIVE (: 575.00) DOLLARS SHALL BE MADE TO THE ENGINEERING FIRM UPON PRESENTATION OF FIVE (5) COPIES OF THE PRELIMINARY ESTIMATE AND RECOMMENDATIONS AS A PARTIAL PAYMENT FOR THE PROFESSIONAL SERVICES WHICH WILL BE REQUIRED BY THE IMPROVEMENT PROGRAM. 3. UPON AUTHORIZATION OF THE PROJECT BY THE COUNCIL, AFTER ADEQUATE FINANCING HAS BEEN ARRANGED, THE ENGINEERING FIRM OF REAVES & GREGORY SHALL PROCEED WITi-I ALL NECESSARY ENGINEERING WORK REQUIRED FOR CONSTRUCTION OF THE PROJECT. 4. NO ADDITIONAL PAYMENTS TO THE ENGINEERING FIRM SHALL BECOME DUE OR PAYABLE UNTIL AFTER A METHOD OF FINANCING THE CONSTRUCTION OF THE PROPOSED IMPROVEMENT PROGRAM HAS BEEN PROVIDED. 5. AS SOON AS A METHOD OF FINANCING HAS BEEN APPROVED BY THE COUNCIL, A STANDARD FORM OF CONTRACT SHALL BE EXECUTED WITH REAVES GREGORY FOR FULL ENGINEERING SERVICES. THE FORM, CONTENT AND STIPULATED FEE SHALL BE CONSISTENT WITH THE LATEST SCHEDULE OF BASIC MINIMUM FEES AS PUBLISHED BY THE TEXAS SOCIETY OF PROFESSIONAL ENGINEERS. CREDIT WILL BE ALLOWED TO THE TOWN OF RICHLAND HILLS IN AN AMOUNT EQUAL TO THE PAYMENT WHICH WAS MADE FOR THE LAST PREVIOUS ENGINEERING REPORT ON THIS PROJECT, LESS THE AMOUNT OF THE PARTIAL PAYMENT MADE TO THIS ENGINEERING FIRM AS PROVIDED FOR UNDER SECTION (2) ABOVE. AFTER FURTHER DISCUSSION OF THE RESOLUTION, COUNCILMAN Gibson MOVED THAT THE RESOLUTION BE FINALLY ADOPTED AS INTRODUCED AND READ. COUNCILMAN Allen SECONDED THE MOTION. THE QUESTION BEING PUT UPON THE FINAL ADOPTION OF SAID RESOLUTION, THE ROLL WAS CALLED WITH THE FOLLOWING RESULTS: AYES L} NAYS 0 NOT VOTING 2 OF 3 THE MAYOR THEREUPON DECLARED THE MOTION CARRIED AND SAID RESOLUTION FINALLY ADOPTED. MAYOR ATT EST: ,. • 27/711 L 1- 7-4W"Xt-4 SECRETARY I 3 OF 3