HomeMy Public PortalAboutDes Plaines - Bid TabBAXTER & WOODMAN CONSULTING ENGINEERS TABULATION OF BIDS Item No.Items Unit Quantity Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost 1 EVERGREEN, PICEA GLAUCA DENSATA (BLACK HILLS SPRUCE), 7' HEIGHT, BALLED AND BURLAPPED EACH 3 800.00$2,400.00$525.00$1,575.00$900.00$2,700.00$ 2 TREE, ACER X FREEMANII AUTUMN BLAZE (AUTUMN BLAZE FREEMAN MAPLE), 3" CALIPER, BALLED AND BURLAPPED EACH 4 1,000.00$4,000.00$525.00$2,100.00$1,200.00$4,800.00$ 3 SHRUB, POTENTILLA FRUTICOSA GOLD DROP (GOLD DROP BUSH CINQUEFOIL), 2' HEIGHT, CONTAINER EACH 8 110.00$880.00$72.00$576.00$160.00$1,280.00$ 4 SHRUB, BUXUS MICROPHYLLA WINTERGREEN (WINTERGREEN LITTLELEAF BOXWOOD), 2' HEIGHT, CONTAINER EACH 10 130.00$1,300.00$72.00$720.00$205.00$2,050.00$ 5 SHRUB, SPIREA BETULIFOLIA TOR (TOR BIRCHLEAF SPIREA), 2' HEIGHT, CONTAINER EACH 10 110.00$1,100.00$50.00$500.00$150.00$1,500.00$ 6 7 SHRUB, CORNUS STOLONIFERA (RED OSIER DOGWOOD), CONTAINER GROWN, 3-GALLON EACH 30 180.00$5,400.00$50.00$1,500.00$170.00$5,100.00$ 8 PERENNIAL PLANTS, ORNAMENTAL TYPE, QUART POT UNIT 0.5 2,000.00$1,000.00$2,200.00$1,100.00$7,320.00$3,660.00$ 9 PERENNIAL PLANTS, PRAIRIE TYPE, QUART POT UNIT 0.5 2,000.00$1,000.00$2,200.00$1,100.00$10,080.00$5,040.00$ 10 PERENNIAL PLANTS, WOODLAND TYPE, QUART POT UNIT 0.5 2,000.00$1,000.00$2,200.00$1,100.00$15,120.00$7,560.00$ 11 TREE FRAME AND GRATE EACH 3 3,000.00$9,000.00$3,000.00$9,000.00$3,244.00$9,732.00$ 12 13 TREE TRUNK PROTECTION EACH 2 150.00$300.00$200.00$400.00$300.00$600.00$ 14 TREE ROOT PRUNING EACH 2 500.00$1,000.00$100.00$200.00$360.00$720.00$ 15 EARTH EXCAVATION CU YD 2198 35.00$76,930.00$24.00$52,752.00$38.35$84,293.30$ 16 REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL CU YD 1091 30.00$32,730.00$24.00$26,184.00$39.35$42,930.85$ 17 TRENCH BACKFILL CU YD 269 45.00$12,105.00$45.00$12,105.00$46.75$12,575.75$ 18 SUPPLEMENTAL WATERING UNIT 61 60.00$3,660.00$60.00$3,660.00$60.00$3,660.00$ 19 PARKWAY RESTORATION SQ YD 602 30.00$18,060.00$12.00$7,224.00$22.85$13,755.70$ 20 PERIMETER EROSION BARRIER FOOT 410 4.00$1,640.00$3.50$1,435.00$7.95$3,259.50$ 21 INLET FILTERS EACH 11 200.00$2,200.00$200.00$2,200.00$180.00$1,980.00$ 22 GEOTECHNICAL FABRIC FOR GROUND STABILIZATION SQ YD 248 1.50$372.00$3.00$744.00$6.00$1,488.00$ 23 AGGREGATE SUBGRADE IMPROVEMENT CU YD 50 60.00$3,000.00$50.00$2,500.00$45.00$2,250.00$ 24 AGGREGATE BASE COURSE, TYPE B TON 109 30.00$3,270.00$32.00$3,488.00$34.10$3,716.90$ 25 AGGREGATE BASE COURSE, TYPE B 4"SQ YD 25 15.00$375.00$13.00$325.00$33.85$846.25$ 26 AGGREGATE BASE COURSE, TYPE B 8"SQ YD 1704 12.00$20,448.00$14.00$23,856.00$12.00$20,448.00$ 27 COARSE AGGREGATE BACKFILL MATERIAL CU YD 1432 45.00$64,440.00$50.00$71,600.00$45.85$65,657.20$ 28 TEMPORARY ACCESS (ROAD)EACH 1 500.00$500.00$1,000.00$1,000.00$1,728.00$1,728.00$ 29 TEMPORARY ACCESS (COMMERCIAL ENTRANCE)EACH 2 700.00$1,400.00$1,000.00$2,000.00$1,240.00$2,480.00$ 30 HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 TON 337 100.00$33,700.00$71.00$23,927.00$82.95$27,954.15$ 31 HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N50 TON 214 95.00$20,330.00$66.00$14,124.00$92.35$19,762.90$ 32 BITUMINOUS MATERIALS (PRIME COAT)POUND 3429 0.50$1,714.50$0.70$2,400.30$0.55$1,885.95$ 33 BITUMINOUS MATERIALS (TACK COAT)POUND 1539 0.50$769.50$0.70$1,077.30$0.60$923.40$ 34 PROTECTIVE COAT SQ YD 332 5.00$1,660.00$2.00$664.00$4.80$1,593.60$ 35 PORTLAND CEMENT CONCRETE PAVEMENT 8 INCH (JOINTED)SQ YD 127 60.00$7,620.00$55.00$6,985.00$81.45$10,344.15$ 36 PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH SQ FT 372 10.00$3,720.00$7.00$2,604.00$16.60$6,175.20$ 37 COLORED PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH SQ FT 2220 12.00$26,640.00$10.00$22,200.00$7.40$16,428.00$ 38 PORTLAND CEMENT CONCRETE SIDEWALK 6 INCH SQ FT 214 10.00$2,140.00$8.00$1,712.00$12.00$2,568.00$ 39 WELDED WIRE FABRIC 6X6 SQ YD 121 14.00$1,694.00$20.00$2,420.00$9.00$1,089.00$ 40 DETECTABLE WARNINGS SQ FT 36 40.00$1,440.00$25.00$900.00$48.00$1,728.00$ 41 CLAY PAVER BANDING SQ YD 15 130.00$1,950.00$270.00$4,050.00$390.00$5,850.00$ 42 STAMPED CONCRETE SURFACE PARKING STRIPE SQ FT 36 50.00$1,800.00$45.00$1,620.00$92.00$3,312.00$ 43 MIXTURE FOR CRACKS, JOINTS, AND FLANGEWAYS TON 0.6 400.00$240.00$2,000.00$1,200.00$840.00$504.00$ 44 LEVELING BINDER (MACHINE METHOD), N50 TON 21 130.00$2,730.00$100.00$2,100.00$95.00$1,995.00$ 45 HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT SQ YD 23 20.00$460.00$20.00$460.00$7.50$172.50$ 46 HOT-MIX ASPHALT SURFACE REMOVAL, 1 1/2"SQ YD 2097 7.00$14,679.00$3.00$6,291.00$7.50$15,727.50$ 47 HOT-MIX ASPHALT SURFACE REMOVAL (VARIABLE DEPTH)SQ YD 372 15.00$5,580.00$3.00$1,116.00$7.50$2,790.00$ 2 Date/Time: 6-13-2017 @ 10:00 A.M. Engineer's Job No.: 170276.40 Village of Plainfield Des Plaines Street Parking Improvements and Lockport Street (IL RTE 126) Directional Signage Engineer's Estimate D Construction Coal City, IL 60416 1 Norvilla, LLC Broadview, IL 60155 Item No.Items Unit Quantity Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost 48 CONCRETE CURB REMOVAL FOOT 20 8.00$160.00$10.00$200.00$50.00$1,000.00$ 49 COMBINATION CONCRETE CURB AND GUTTER REMOVAL FOOT 256 9.00$2,304.00$10.00$2,560.00$11.00$2,816.00$ 50 COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.12 FOOT 265 27.00$7,155.00$26.00$6,890.00$33.00$8,745.00$ 51 CONCRETE CURB, TYPE B FOOT 92 20.00$1,840.00$26.00$2,392.00$20.00$1,840.00$ 52 CONCRETE CURB, TYPE B (SPECIAL)FOOT 55 70.00$3,850.00$26.00$1,430.00$50.00$2,750.00$ 53 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT REMOVAL SQ YD 147 30.00$4,410.00$10.00$1,470.00$19.00$2,793.00$ 54 PAVEMENT REMOVAL SQ YD 592 18.00$10,656.00$15.00$8,880.00$14.00$8,288.00$ 55 SIDEWALK REMOVAL SQ FT 360 2.00$720.00$2.00$720.00$4.00$1,440.00$ 56 BOLLARD REMOVAL EACH 5 200.00$1,000.00$100.00$500.00$200.00$1,000.00$ 57 BOLLARD EACH 5 300.00$1,500.00$1,000.00$5,000.00$1,020.00$5,100.00$ 58 CLASS D PATCHES, TYPE I, 6"SQ YD 15 80.00$1,200.00$60.00$900.00$112.00$1,680.00$ 59 CLASS D PATCHES, TYPE II, 6"SQ YD 20 95.00$1,900.00$55.00$1,100.00$112.00$2,240.00$ 60 CLASS D PATCHES, TYPE III, 6"SQ YD 40 95.00$3,800.00$50.00$2,000.00$112.00$4,480.00$ 61 CLASS D PATCHES, TYPE IV, 6"SQ YD 60 60.00$3,600.00$45.00$2,700.00$112.00$6,720.00$ 62 STORM SEWER REMOVAL 10"FOOT 6 9.00$54.00$12.00$72.00$60.00$360.00$ 63 STORM SEWER REMOVAL 12"FOOT 62 13.00$806.00$15.00$930.00$10.00$620.00$ 64 STORM SEWER REMOVAL 15"FOOT 32 15.00$480.00$20.00$640.00$14.00$448.00$ 65 PIPE UNDERDRAINS 4"FOOT 60 30.00$1,800.00$25.00$1,500.00$16.00$960.00$ 66 STORM SEWERS, CLASS A, TYPE 1, 12"FOOT 224 55.00$12,320.00$55.00$12,320.00$46.00$10,304.00$ 67 STORM SEWERS, CLASS A, TYPE 1, 18"FOOT 45 80.00$3,600.00$60.00$2,700.00$152.00$6,840.00$ 68 STORM SEWER (WATER MAIN REQUIREMENTS) 12 INCH FOOT 56 150.00$8,400.00$75.00$4,200.00$112.00$6,272.00$ 69 STORM SEWER (WATER MAIN REQUIREMENTS) 16 INCH FOOT 40 200.00$8,000.00$90.00$3,600.00$158.00$6,320.00$ 70 CONCRETE BLOCKOUT FOR DRAINAGE STRUCTURES EACH 1 200.00$200.00$300.00$300.00$1,400.00$1,400.00$ 71 CATCH BASIN, TYPE A, 4'-DIAMETER, TYPE 1 FRAME, OPEN LID EACH 5 2,500.00$12,500.00$2,500.00$12,500.00$3,300.00$16,500.00$ 72 CATCH BASIN, TYPE A, 4'-DIAMETER, TYPE 11 FRAME AND GRATE EACH 2 2,500.00$5,000.00$2,600.00$5,200.00$2,900.00$5,800.00$ 73 CATCH BASIN, TYPE A, 5'-DIAMETER, TYPE 1 FRAME, OPEN LID EACH 1 3,000.00$3,000.00$3,000.00$3,000.00$4,500.00$4,500.00$ 74 PIPE UNDERDRAIN CLEANOUT, COMPLETE EACH 1 650.00$650.00$600.00$600.00$1,200.00$1,200.00$ 75 WATER QUALITY TREATMENT STRUCTURE EACH 1 20,000.00$20,000.00$19,000.00$19,000.00$25,000.00$25,000.00$ 76 STORMTRAP ACCESS HOLE RISER WITH FRAME EACH 2 2,000.00$4,000.00$2,500.00$5,000.00$1,400.00$2,800.00$ 77 STORMTRAP SYSTEM LSUM 1 145,000.00$145,000.00$180,000.00$180,000.00$160,000.00$160,000.00$ 78 DOMESTIC WATER SERVICE BOXES TO BE ADJUSTED EACH 2 150.00$300.00$200.00$400.00$564.00$1,128.00$ 79 VALVE BOXES TO BE ADJUSTED EACH 2 300.00$600.00$200.00$400.00$624.00$1,248.00$ 80 VALVE VAULTS TO BE ADJUSTED EACH 3 450.00$1,350.00$600.00$1,800.00$690.00$2,070.00$ 81 MANHOLES TO BE ADJUSTED WITH NEW TYPE 1 FRAME, CLOSED LID EACH 2 750.00$1,500.00$800.00$1,600.00$1,000.00$2,000.00$ 82 REMOVING MANHOLES EACH 1 575.00$575.00$1,000.00$1,000.00$800.00$800.00$ 83 REMOVING INLETS EACH 2 300.00$600.00$600.00$1,200.00$500.00$1,000.00$ 84 TRAFFIC CONTROL AND PROTECTION LSUM 1 33,000.00$33,000.00$15,000.00$15,000.00$7,800.00$7,800.00$ 85 MOBILIZATION LSUM 1 49,000.00$49,000.00$20,000.00$20,000.00$60,000.00$60,000.00$ 86 CONTINGENCY ALLOWANCE DOLLAR 20000 1.00$20,000.00$1.00$20,000.00$1.00$20,000.00$ 87 PRECONSTRUCTION VIDEO RECORDING LSUM 1 2,000.00$2,000.00$5,000.00$5,000.00$3,000.00$3,000.00$ 88 CONSTRUCTION LAYOUT LSUM 1 9,000.00$9,000.00$12,000.00$12,000.00$5,000.00$5,000.00$ 89 SIGN PANEL - TYPE 1 SQ FT 7 50.00$350.00$25.00$175.00$600.00$4,200.00$ 90 TELESCOPING STEEL SIGN SUPPORT FOOT 10 50.00$500.00$15.00$150.00$300.00$3,000.00$ 91 PAVEMENT MARKING REMOVAL SQ FT 140 1.00$140.00$2.00$280.00$12.00$1,680.00$ 92 THERMOPLASTIC PAVEMENT MARKING - LINE 4"FOOT 422 1.50$633.00$8.30$3,502.60$11.00$4,642.00$ 93 PAINT PAVEMENT MARKING - LETTERS AND SYMBOLS SQ FT 143 6.00$858.00$5.00$715.00$8.50$1,215.50$ 94 PAINT PAVEMENT MARKING - LINE 4"FOOT 3118 0.80$2,494.40$0.50$1,559.00$2.10$6,547.80$ 95 PAINT PAVEMENT MARKING - LINE 6"FOOT 135 2.50$337.50$0.75$101.25$3.50$472.50$ 96 PAINT PAVEMENT MARKING - LINE 8"FOOT 54 3.25$175.50$1.00$54.00$10.00$540.00$ 97 PAINT PAVEMENT MARKING - LINE 24"FOOT 26 6.00$156.00$3.00$78.00$14.00$364.00$ 98 TEMPORARY CHAIN LINK FENCE, 6'FOOT 600 10.00$6,000.00$20.00$12,000.00$8.00$4,800.00$ 99 ELECTRIC SERVICE INSTALLATION EACH 1 2,000.00$2,000.00$3,500.00$3,500.00$9,600.00$9,600.00$ 100 ELECTRIC UTILITY SERVICE CONNECTION EACH 1 5,000.00$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00$ Item No.Items Unit Quantity Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost 101 UNDERGROUND CONDUIT, GALVANIZED STEEL, 3" DIA.FOOT 95 27.00$2,565.00$30.00$2,850.00$54.00$5,130.00$ 102 UNIT DUCT, 600V, 3‐1C NO.8, 1/C NO.8 GROUND, (XLP‐TYPE USE), 1" DIA. POLYETHYLENE FOOT 515 12.00$6,180.00$8.00$4,120.00$54.00$27,810.00$ 103 LIGHT POLE FOUNDATION, 24" DIAMETER FOOT 24 220.00$5,280.00$250.00$6,000.00$228.00$5,472.00$ 104 LIGHTING CONTROLLER, 120/240V, 100A, BASE MOUNTED EACH 1 8,500.00$8,500.00$7,000.00$7,000.00$12,000.00$12,000.00$ 105 LUMINAIRE, LED, HORIZONTAL MOUNT, LOW WATTAGE EACH 4 1,100.00$4,400.00$1,100.00$4,400.00$3,000.00$12,000.00$ 106 LIGHT POLE, GALVANIZED STEEL, 22 FT. M.H., TENON MOUNT EACH 4 3,700.00$14,800.00$7,100.00$28,400.00$7,200.00$28,800.00$ 107 REROUTE EXISTING CABLE/CONDUIT LSUM 1 400.00$400.00$1,200.00$1,200.00$18,000.00$18,000.00$ 108 REMOVE EXISTING HANDHOLE EACH 1 500.00$500.00$800.00$800.00$1,800.00$1,800.00$ 109 HANDHOLE EACH 1 2,000.00$2,000.00$1,200.00$1,200.00$4,800.00$4,800.00$ 110 UNDERGROUND CONDUIT, GALVANIZED STEEL, 1" DIA.FOOT 80 11.50$920.00$30.00$2,400.00$42.00$3,360.00$ 111 CONDUIT ATTACHED TO STRUCTURE, 1" DIA., PVC COATED GALVANIZED STEEL FOOT 25 55.00$1,375.00$65.00$1,625.00$108.00$2,700.00$ 112 STEEL COMBINATION MAST ARM ASSEMBLY AND POLE, 36 FT EACH 1 8,000.00$8,000.00$8,500.00$8,500.00$9,600.00$9,600.00$ 113 CONCRETE FOUNDATION TYPE E 36-INCH DIAMETER FOOT 13 205.00$2,665.00$300.00$3,900.00$420.00$5,460.00$ 114 PAINT NEW COMBINATION MAST ARM AND POLE, UNDER 40 FEET (SPECIAL)EACH 1 1,500.00$1,500.00$2,500.00$2,500.00$3,000.00$3,000.00$ 115 ILLUMINATED SIGN, LED EACH 2 3,500.00$7,000.00$4,600.00$9,200.00$3,600.00$7,200.00$ 116 MODIFY EXISTING LIGHTING CONTROLLER EACH 1 300.00$300.00$1,800.00$1,800.00$5,400.00$5,400.00$ 117 ELECTRIC CABLE IN CONDUIT, SERVICE, NO. 12 3C EACH 150 0.91$136.50$4.00$600.00$30.00$4,500.00$ 118 HANDHOLE, POLYMER CONCRETE, 12"X12"X12", TIER 8 EACH 2 500.00$1,000.00$1,000.00$2,000.00$1,800.00$3,600.00$ 119 HANDHOLE, POLYMER CONCRETE, 12"X18"X18", TIER 8 EACH 2 1,000.00$2,000.00$1,800.00$3,600.00$1,800.00$3,600.00$ 120 ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE) 3/C NO. 8 FOOT 330 7.20$2,376.00$5.00$1,650.00$24.00$7,920.00$ 121 2" DIAMETER HDPE, SCHEDULE 40 CONDUIT FOOT 280 16.00$4,480.00$9.00$2,520.00$30.00$8,400.00$ 122 TYPE SOW FLEXIBLE CORD WITH WATERTIGHT RECEPTACLE EACH 3 250.00$750.00$25.00$75.00$930.00$2,790.00$ 123 PARKING SIGN (INSTALL ONLY)LSUM 1 8,000.00$8,000.00$2,000.00$2,000.00$14,000.00$14,000.00$ 124 CLASS B PATCHES, TYPE III, 8 INCH SQ YD 16 130.00$2,080.00$150.00$2,400.00$132.00$2,112.00$ 125 WATER MAIN (OPEN CUT), 6-INCH FOOT 35 110.00$3,850.00$200.00$7,000.00$140.00$4,900.00$ 126 WATER MAIN FITTINGS POUND 700 5.00$3,500.00$7.00$4,900.00$11.00$7,700.00$ 127 CONNECTION TO WATER MAIN (NON-PRESSURE), 12-INCH EACH 1 3,000.00$3,000.00$3,000.00$3,000.00$6,000.00$6,000.00$ 128 GATE VALVE, 6-INCH EACH 1 2,000.00$2,000.00$2,000.00$2,000.00$4,600.00$4,600.00$ 129 VALVE VAULT, TYPE A, 4'-DIAMETER, TYPE 1 FRAME, CLOSED LID EACH 1 2,500.00$2,500.00$3,000.00$3,000.00$4,500.00$4,500.00$ 130 SANITARY SERVICE LINES, 6-INCH OPEN CUT FOOT 52 100.00$5,200.00$100.00$5,200.00$75.00$3,900.00$ 131 SANITARY BRANCH FITTINGS - 15"X6" PVC TEE EACH 1 200.00$200.00$1,000.00$1,000.00$2,200.00$2,200.00$ Engineer's Estimate of Cost 912,308.90$ Bidder's Proposal (As-Read)847,453.45$1,106,191.75$ Bidder's Proposal (As-Corrected)847,453.45$1,106,192.60$