Loading...
HomeMy Public PortalAbout2017 Non-MFT Street Program Bid TabVILLAGE OF PLAINFIELD BASTER & WOODMAN2017 NON-MFT STREET IMPROVEMENT PROGRAM CONSULTING ENGINEER'S DATE/TIME: 06-13-2017 @ 10:30 A.M.TABULATION OF BIDS ENGINEERS JOB NO: 170239.40 No.Item Description Quantity Unit Unit Price Item Cost Unit Price Item Cost Unit Price Item Cost Unit Price Item Cost Unit Price Item Cost Unit Price Item Cost 1 EARTH EXCAVATION 19 CU YD 35.00$665.00$75.00$1,425.00$50.00$950.00$200.00$3,800.00$40.00$760.00$80.00$1,520.00$ 2 INLET FILTERS 139 EACH 120.00$16,680.00$0.01$1.39$100.00$13,900.00$0.01$1.39$165.00$22,935.00$190.00$26,410.00$ 3 AGGREGATE BASE COURSE, TYPE B 4"2,314 SQ YD 25.00$57,850.00$0.01$23.14$5.00$11,570.00$5.00$11,570.00$3.00$6,942.00$2.00$4,628.00$ 4 AGGREGATE BASE COURSE, TYPE B 8"290 SQ YD 30.00$8,700.00$10.00$2,900.00$10.00$2,900.00$11.00$3,190.00$6.00$1,740.00$0.01$2.90$ 5 BITUMINOUS MATERIALS (TACK COAT)32,092 POUND 2.00$64,184.00$0.01$320.92$0.01$320.92$0.01$320.92$0.01$320.92$1.00$32,092.00$ 6 POLYMERIZED LEVELING BINDER (MACHINE METHOD), N50 3,005 TON 85.00$255,425.00$65.00$195,325.00$72.00$216,360.00$72.00$216,360.00$79.00$237,395.00$85.00$255,425.00$ 7 HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT 367 SQ YD 10.00$3,670.00$0.01$3.67$12.00$4,404.00$10.00$3,670.00$6.00$2,202.00$12.00$4,404.00$ 8 HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 6,000 TON 70.00$420,000.00$55.50$333,000.00$59.00$354,000.00$61.20$367,200.00$61.30$367,800.00$67.00$402,000.00$ 9 INCIDENTAL HOT-MIX ASPHALT SURFACING 9 TON 400.00$3,600.00$200.00$1,800.00$220.00$1,980.00$200.00$1,800.00$160.00$1,440.00$200.00$1,800.00$ 10 HOT-MIX ASPHALT DRIVEWAY PAVEMENT, 3"290 SQ YD 50.00$14,500.00$25.00$7,250.00$20.00$5,800.00$20.00$5,800.00$30.00$8,700.00$40.00$11,600.00$ 11 MIXTURE FOR CRACKS, JOINTS, AND FLANGEWAYS 2 TON 500.00$1,000.00$1,000.00$2,000.00$850.00$1,700.00$200.00$400.00$400.00$800.00$750.00$1,500.00$ 12 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 6"290 SQ YD 60.00$17,400.00$55.00$15,950.00$59.00$17,110.00$56.00$16,240.00$60.00$17,400.00$52.50$15,225.00$ 13 PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH 18,248 SQ FT 7.00$127,736.00$6.25$114,050.00$5.25$95,802.00$6.00$109,488.00$5.50$100,364.00$5.75$104,926.00$ 14 DETECTABLE WARNINGS 1,080 SQ FT 25.00$27,000.00$15.00$16,200.00$10.00$10,800.00$25.00$27,000.00$19.25$20,790.00$22.00$23,760.00$ 15 JOINT OR CRACK ROUTING 1,524 FOOT 0.50$762.00$1.00$1,524.00$3.00$4,572.00$2.00$3,048.00$2.75$4,191.00$0.50$762.00$ 16 HOT-MIX ASPHALT SURFACE REMOVAL, 2"71,301 SQ YD 2.50$178,252.50$2.00$142,602.00$1.00$71,301.00$1.35$96,256.35$2.60$185,382.60$2.10$149,732.10$ 17 PORTLAND CEMENT CONCRETE SURFACE REMOVAL (VARIABLE DEPTH)1,101 SQ YD 4.00$4,404.00$2.00$2,202.00$2.75$3,027.75$3.00$3,303.00$2.60$2,862.60$2.50$2,752.50$ 18 DRIVEWAY PAVEMENT REMOVAL 580.0 SQ YD 10.00$5,800.00$12.00$6,960.00$15.00$8,700.00$8.00$4,640.00$14.00$8,120.00$16.50$9,570.00$ 19 SIDEWALK REMOVAL 17,855 SQ FT 3.00$53,565.00$1.50$26,782.50$1.75$31,246.25$1.50$26,782.50$1.25$22,318.75$1.90$33,924.50$ 20 CLASS B PATCHES, 10"100 SQ YD 90.00$9,000.00$100.00$10,000.00$125.00$12,500.00$150.00$15,000.00$110.00$11,000.00$140.00$14,000.00$ 21 CLASS D PATCHES, 4"697 SQ YD 70.00$48,790.00$25.00$17,425.00$32.00$22,304.00$30.00$20,910.00$34.00$23,698.00$34.00$23,698.00$ 22 VALVE BOXES TO BE ADJUSTED 1 EACH 350.00$350.00$200.00$200.00$300.00$300.00$300.00$300.00$130.00$130.00$160.00$160.00$ 23 THERMOPLASTIC PAVEMENT MARKING - LINE 6"3,480 FOOT 2.00$6,960.00$1.00$3,480.00$1.00$3,480.00$1.10$3,828.00$1.10$3,828.00$1.00$3,480.00$ 24 THERMOPLASTIC PAVEMENT MARKING - LINE 12"165 FOOT 6.00$990.00$2.25$371.25$2.25$371.25$2.48$409.20$2.20$363.00$2.25$371.25$ 25 THERMOPLASTIC PAVEMENT MARKING - LINE 24"342 FOOT 8.00$2,736.00$4.50$1,539.00$4.50$1,539.00$4.97$1,699.74$4.50$1,539.00$4.50$1,539.00$ 26 SANITARY MANHOLES TO BE ADJUSTED 2 EACH 800.00$1,600.00$650.00$1,300.00$800.00$1,600.00$800.00$1,600.00$1,000.00$2,000.00$500.00$1,000.00$ 27 FRAMES AND LIDS TO BE ADJUSTED (SPECIAL)6 EACH 400.00$2,400.00$350.00$2,100.00$750.00$4,500.00$600.00$3,600.00$850.00$5,100.00$650.00$3,900.00$ 28 TEMPORARY INFORMATION SIGNING 286 SQ FT 10.00$2,860.00$12.50$3,575.00$15.00$4,290.00$25.00$7,150.00$15.25$4,361.50$12.50$3,575.00$ 29 PRECONSTRUCTION VIDEO RECORDING 1 L SUM 2,000.00$2,000.00$1,500.00$1,500.00$10,000.00$10,000.00$5,000.00$5,000.00$8,875.00$8,875.00$1,000.00$1,000.00$ 30 CONTINGENCY ALLOWANCE 20,000 DOLLAR 1.00$20,000.00$1.00$20,000.00$1.00$20,000.00$1.00$20,000.00$1.00$20,000.00$1.00$20,000.00$ 31 COMBINATION CONCRETE CURB AND GUTTER REMOVAL AND REPLACEMENT 3,432 FOOT 35.00$120,120.00$32.50$111,540.00$35.00$120,120.00$32.00$109,824.00$29.50$101,244.00$38.50$132,132.00$ 32 PARKWAY RESTORATION 2,608 SQ YD 15.00$39,120.00$0.01$26.08$0.01$26.08$8.00$20,864.00$13.40$34,947.20$14.00$36,512.00$ 33 TRAFFIC CONTROL AND PROTECTION (SPECIAL)1 L SUM 41,880.50$41,880.50$20,350.00$20,350.00$27,000.00$27,000.00$5,000.00$5,000.00$25,450.43$25,450.43$32,000.00$32,000.00$ TOTAL PROJECT COST 1,560,000.00$ BIDDER'S PROPOSAL (AS-READ)1,063,725.95$1,084,474.25$1,116,055.10$1,255,000.00$1,355,401.25$ BIDDER'S PROPOSAL (AS-CORRECTED) Gallagher Asphalt Thornton, IL Engineer's Opinion of Probable Construction Cost PT Ferro Construction Company Joliet, IL D Construction, Inc. Coal City, IL Geneva Construction Aurora, IL Austin Tyler Construction Inc. Elwood, IL