Loading...
HomeMy Public PortalAboutBid Tab 6-14-17No.Item QTY UNIT Unit Total Unit Total Unit Total Unit Total Unit Total Unit Total Unit Total Unit Total Unit TotalPricePricePricePricePricePricePricePricePricePrice 1 PRECONSTRUCTION VIDEO RECORDING Lump Sum $10,000.00 $10,000.00 Lump Sum 500.00$Lump Sum 2,000.00$Lump Sum 500.00$Lump Sum 527.00$Lump Sum 2,000.00$Lump Sum 2,500.00$Lump Sum 3,000.00$Lump Sum 1,500.00$2 TRENCH BACKFILL 1,226 CUYD $35.00 $42,910.00 $10.00 $12,260.00 $35.00 $42,910.00 $50.00 $61,300.00 $38.55 $47,262.30 $32.00 $39,232.00 $40.00 $49,040.00 $43.00 $52,718.00 $5.00 $6,130.00 3 DUCTILE IRON WATER MAIN, 6"558 FOOT $65.00 $36,270.00 $101.00 $56,358.00 $63.00 $35,154.00 $46.00 $25,668.00 $80.05 $44,667.90 $75.00 $41,850.00 $96.00 $53,568.00 $133.00 $74,214.00 $175.00 $97,650.00 4 DUCTILE IRON WATER MAIN, 6" RJT 307 FOOT $70.00 $21,490.00 $106.20 $32,603.40 $72.00 $22,104.00 $52.00 $15,964.00 $84.80 $26,033.60 $85.00 $26,095.00 $101.00 $31,007.00 $140.00 $42,980.00 $200.00 $61,400.005WATER MAIN FITTINGS (RJT)7,200 POUND $5.00 $36,000.00 $0.01 $72.00 $0.01 $72.00 $8.00 $57,600.00 $2.60 $18,720.00 $3.00 $21,600.00 $6.00 $43,200.00 $10.00 $72,000.00 $1.00 $7,200.006GATE VALVE, 6"3 EACH $1,800.00 $5,400.00 $1,000.00 $3,000.00 $1,500.00 $4,500.00 $100.00 $300.00 $1,449.00 $4,347.00 $3,000.00 $9,000.00 $1,300.00 $3,900.00 $1,134.00 $3,402.00 $3,500.00 $10,500.00 7 VALVE VAULT, 4'3 EACH $1,800.00 $5,400.00 $1,600.00 $4,800.00 $2,300.00 $6,900.00 $1,850.00 $5,550.00 $2,377.00 $7,131.00 $1,800.00 $5,400.00 $2,900.00 $8,700.00 $1,400.00 $4,200.00 $1,700.00 $5,100.00 8 CONNECT TO WATER MAIN (NON-PRESSURE), 8"2 EACH $2,750.00 $5,500.00 $2,400.00 $4,800.00 $4,000.00 $8,000.00 $2,200.00 $4,400.00 $5,588.00 $11,176.00 $3,000.00 $6,000.00 $1,500.00 $3,000.00 $1,900.00 $3,800.00 $4,700.00 $9,400.009CONNECT TO WATER MAIN (NON-PRESSURE), 12"2 EACH $4,000.00 $8,000.00 $3,800.00 $7,600.00 $4,000.00 $8,000.00 $2,400.00 $4,800.00 $5,572.00 $11,144.00 $4,000.00 $8,000.00 $2,000.00 $4,000.00 $1,900.00 $3,800.00 $5,250.00 $10,500.0010STORM SEWER REPLACEMENT (WATER MAIN QUALITY), 6" PVC 9 FOOT $80.00 $720.00 $80.00 $720.00 $158.00 $1,422.00 $37.00 $333.00 $98.35 $885.15 $55.00 $495.00 $170.00 $1,530.00 $44.00 $396.00 $125.00 $1,125.00 11 STORM SEWER REPLACEMENT (WATER MAIN QUALITY), 8"PVC 9 FOOT $120.00 $1,080.00 $162.00 $1,458.00 $39.00 $351.00 $157.00 $1,413.00 $62.00 $558.00 $170.00 $1,530.00 $44.00 $396.00 $130.00 $1,170.00 12 STORM SEWER REPLACEMENT (WATER MAIN QUALITY), 12" PVC 120 FOOT $100.00 $9,800.00 $75.00 $9,000.00 $52.00 $6,240.00 $50.00 $6,000.00 $106.95 $12,834.00 $77.00 $9,240.00 $110.00 $13,200.00 $77.00 $9,240.00 $110.00 $13,200.0013STORM SEWER REPLACEMENT (WATER MAIN QUALITY), 15" PVC 157 FOOT $120.00 $18,840.00 $85.00 $13,345.00 $62.00 $9,734.00 $66.00 $10,362.00 $124.15 $19,491.55 $82.00 $12,874.00 $124.00 $19,468.00 $99.00 $15,543.00 $115.00 $18,055.0014STORM SEWER REPLACEMENT (WATER MAIN QUALITY), 18"PVC 15 FOOT $120.00 $1,800.00 $68.00 $1,020.00 $61.00 $915.00 $193.30 $2,899.50 $94.00 $1,410.00 $170.00 $2,550.00 $106.00 $1,590.00 $230.00 $3,450.00 15 SANITARY SEWER REPLACEMENT (WATER MAIN QUALITY), 6" PVC 15 FOOT $80.00 $1,200.00 $100.00 $1,500.00 $155.00 $2,325.00 $50.00 $750.00 $129.10 $1,936.50 $74.00 $1,110.00 $170.00 $2,550.00 $73.00 $1,095.00 $150.00 $2,250.00 16 MOBILIZATION Lump Sum $20,000.00 $20,000.00 Lump Sum $5,200.00 Lump Sum $10,000.00 Lump Sum $15,000.00 Lump Sum $4,160.00 Lump Sum $25,000.00 Lump Sum $23,500.00 Lump Sum $6,300.00 Lump Sum $70,000.0017CURED-IN-PLACE-PIPE (MH TO MH), 8"340 FOOT $65.00 $22,100.00 $49.00 $16,660.00 $52.00 $17,680.00 $80.00 $27,200.00 $55.85 $18,989.00 $40.00 $13,600.00 $50.00 $17,000.00 $64.00 $21,760.00 $50.00 $17,000.0018CURED-IN-PLACE-PIPE (MH TO MH), 15"271 FOOT $75.00 $20,325.00 $67.00 $18,157.00 $69.00 $18,699.00 $100.00 $27,100.00 $74.50 $20,189.50 $75.00 $20,325.00 $66.00 $17,886.00 $110.00 $29,810.00 $75.00 $20,325.0019EROSION AND SEDIMENTATION CONTROL 9 EACH $200.00 $1,800.00 $150.00 $1,350.00 $90.00 $810.00 $145.00 $1,305.00 $129.00 $1,161.00 $140.00 $1,260.00 $300.00 $2,700.00 $165.00 $1,485.00 $175.00 $1,575.00 20 TEMPORARY AGGREGATE 178 TONS $40.00 $7,120.00 $35.00 $6,230.00 $25.00 $4,450.00 $23.00 $4,094.00 $21.30 $3,791.40 $17.00 $3,026.00 $25.00 $4,450.00 $15.00 $2,670.00 $10.00 $1,780.0021ASPHALT SURFACE REMOVAL (COLD MILLING), 1.5"1,498 SQYD $5.00 $7,490.00 $13.50 $20,223.00 $17.00 $25,466.00 $7.50 $11,235.00 $5.55 $8,313.90 $4.00 $5,992.00 $4.00 $5,992.00 $16.00 $23,968.00 $2.00 $2,996.0022HOT-MIX ASPHALT SURFACE COURSE , 1.5" OVERLAY 135 TONS $75.00 $10,125.00 $130.00 $17,550.00 $255.00 $34,425.00 $110.00 $14,850.00 $130.40 $17,604.00 $124.00 $16,740.00 $90.00 $12,150.00 $150.00 $20,250.00 $80.00 $10,800.0023HOT-MIX ASPHALT REMOVAL AND REPLACEMENT- 2.5" BINDER 693 SQYD $20.00 $13,860.00 $26.00 $18,018.00 $27.00 $18,711.00 $30.00 $20,790.00 $27.30 $18,918.90 $62.00 $42,966.00 $9.00 $6,237.00 $28.00 $19,404.00 $22.00 $15,246.00 24 HOT-MIX ASPHALT REMOVAL AND REPLACEMENT- 4.5" BINDER 130 SQYD $45.00 $5,850.00 $44.75 $5,817.50 $42.00 $5,460.00 $38.00 $4,940.00 $47.80 $6,214.00 $68.00 $8,840.00 $25.00 $3,250.00 $50.00 $6,500.00 $26.00 $3,380.00 25 HOT-MIX ASPHALT REMOVAL AND REPLACEMENT- 6" BINDER 140 SQYD $55.00 $7,700.00 $55.25 $7,735.00 $50.00 $7,000.00 $45.00 $6,300.00 $55.85 $7,819.00 $75.00 $10,500.00 $30.00 $4,200.00 $65.00 $9,100.00 $32.00 $4,480.0026PCC REMOVAL AND REPLACEMENT, 8"30 SQYD $70.00 $2,100.00 $80.00 $2,400.00 $195.00 $5,850.00 $110.00 $3,300.00 $94.35 $2,830.50 $124.00 $3,720.00 $212.00 $6,360.00 $95.00 $2,850.00 $81.00 $2,430.0027CONCRETE CURB AND GUTTER REMOVAL AND REPLACEMENT 38 FOOT $35.00 $1,330.00 $40.00 $1,520.00 $60.00 $2,280.00 $56.00 $2,128.00 $47.20 $1,793.60 $32.00 $1,216.00 $50.00 $1,900.00 $40.00 $1,520.00 $55.00 $2,090.00 28 PCC SIDEWALK REMOVAL AND REPLACEMENT, 6"50 SQFT $15.00 $750.00 $12.00 $600.00 $15.00 $750.00 $15.00 $750.00 $9.25 $462.50 $18.00 $900.00 $25.00 $1,250.00 $10.00 $500.00 $15.00 $750.00 29 DETECTABLE WARNINGS 20 SQFT $28.00 $560.00 $25.00 $500.00 $30.00 $600.00 $25.00 $500.00 $27.30 $546.00 $27.00 $540.00 $50.00 $1,000.00 $35.00 $700.00 $24.00 $480.0030BOLLARD10EACH$150.00 $1,500.00 $600.00 $6,000.00 $400.00 $4,000.00 $350.00 $3,500.00 $428.00 $4,280.00 $100.00 $1,000.00 $2,000.00 $20,000.00 $500.00 $5,000.00 $750.00 $7,500.0031REMOVAL AND REPLACEMENT OF UNSUITABLE MATERIAL 10 CUYD $150.00 $1,500.00 $90.00 $900.00 $75.00 $750.00 $45.00 $450.00 $78.50 $785.00 $75.00 $750.00 $70.00 $700.00 $55.00 $550.00 $30.00 $300.00 32 CONTAMINATED WASTE DISPOSAL 10 CUYD $150.00 $1,500.00 $120.00 $1,200.00 $84.00 $840.00 $65.00 $650.00 $438.00 $4,380.00 $65.00 $650.00 $135.00 $1,350.00 $100.00 $1,000.00 $60.00 $600.00 33 SOIL TESTS FOR CONTAMINANTS 4 EACH $2,000.00 $8,000.00 $700.00 $2,800.00 $900.00 $3,600.00 $1.00 $4.00 $2,173.00 $8,692.00 $1,100.00 $4,400.00 $1,500.00 $6,000.00 $1,200.00 $4,800.00 $100.00 $400.0034THERMOPLASTIC PAVEMENT MARKING - LINE 4"1,300 FOOT $1.00 $1,300.00 $4.00 $5,200.00 $1.00 $1,300.00 $2.25 $2,925.00 $3.00 $3,900.00 $2.00 $2,600.00 $3.00 $3,900.00 $6.00 $7,800.00 $3.00 $3,900.0035THERMOPLASTIC PAVEMENT MARKING - LINE 6"61 FOOT $2.00 $122.00 $7.00 $427.00 $1.50 $91.50 $4.00 $244.00 $4.70 $286.70 $8.00 $488.00 $4.00 $244.00 $8.00 $488.00 $4.00 $244.00 36 THERMOPLASTIC PAVEMENT MARKING - LINE 24"48 FOOT $8.00 $384.00 $14.00 $672.00 $6.30 $302.40 $6.50 $312.00 $18.85 $904.80 $16.00 $768.00 $10.00 $480.00 $12.00 $576.00 $16.00 $768.00 37 TRAFFIC CONTROL AND PROTECTION, (SPECIAL)Lump Sum $5,000.00 $5,000.00 Lump Sum $12,000.00 Lump Sum $40,000.00 Lump Sum $13,000.00 Lump Sum $15,486.10 Lump Sum $25,000.00 Lump Sum $5,000.00 Lump Sum $10,000.00 Lump Sum $50,000.0038REMOVAL AND RELOCATION OF SIGNS 10 EACH $1,000.00 $10,000.00 $100.00 $1,000.00 $200.00 $2,000.00 $200.00 $2,000.00 $40.00 $400.00 $200.00 $2,000.00 $200.00 $2,000.00 $100.00 $1,000.00 $250.00 $2,500.0039TEMPORARY INFORMATION SIGNING 103 SQFT $50.00 $5,150.00 $8.00 $824.00 $15.00 $1,545.00 $25.00 $2,575.00 $1.20 $123.60 $15.00 $1,545.00 $40.00 $4,120.00 $12.00 $1,236.00 $30.00 $3,090.00 Engineer's Opinion of Probable Cost: Bidder's Proposal as readBidder's Proposal as corrected $302,421.90 $358,448.90 $359,945.00 $378,690.00$362,500.00 $357,096.00 Archon Construction CompanyBrandt Excavating Len Cox & Sons ExcavatingAustin Tyler Construction, Inc. Village of Plainfield, IllinoisLockport Street Alley Water Main Improvements Phase 2 Engineer's Estimate Bid Date/Time: June 13, 2017/11:00 A.M. Engineer's Job No.: 161261.40 Superior Excavating Co. $467,641.00 H. Linden & Sons Swallow Construction Corp. $471,264.00 Sewer & Water, Inc.D. Construction, Inc. $391,412.00