Loading...
HomeMy Public PortalAboutVILLAGE PL_10AB DRAIN.pdfEROSION AND SEDIMENT NARRATIVE NOTES: 1, DESCRIPTION: THE PARCEL IDENTIFIED BELOW IS LOCATED IN CHATHAM COUNTY, GEORGIA AND IS CURRENTLY UNDEVELOPED AND ZONED C-2. THE DEVELOPERS INTENT IS TO CONSTRUCT A TWO -UNIT RESIDENCE WITH AN ASSOCIATED DRIVEWAY. ADJACENT AREAS ARE ZONED C-2, AND ARE EITHER UNDEVELOPED OR DEVELOPED AS RE5IDENCE5, NO IMPACTS ARE EXPECTED TO THESE ADJACENT AREAS, 2. TOPOGRAPHIC AND DRAINAGE INFORMATION: CONTOURS, BUILDINGS, ROADWAY, PROPERTY LINES ETC. TAKEN FROM SURVEY PERFORMED BY EMC ENGINEERING SERVICES, INC. THE EXISTING DRAINAGE PATTERN CONSISTS OF OVERLAND FLOW FROM THE EAST SIDE OF THE PROPERTY TO THE WEST AND FLOWS INTO A NEARBY WETLAND AREA. THE WETLAND AREA DISCHARGES INTO HORSE PEN CREEK WHICH EVENTUALLY DISCHARGES INTO THE ATLANTIC OCEAN. 3, VEGETATION: THE VEGETATION ON THE PROPERTY CONSISTS PRIMARILY OF GRASSES. ANY SUITABLE TOP SOIL WILL BE STOCKPILED ON SITE AND LATER SPREAD IN PROPOSED VEGETATIVE AREAS. 4. BUFFER REQUIREMENTS: EXCEPT AS PROVIDED IN PART IV.(III) OF THE GENERAL NPDES PERMIT NO. GAR 100001 NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50 -FOOT UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED VEGETATION OR WITHIN 25 -FEET OF THE COASTAL MARSHLAND BUFFER AS MEASURED FROM THE JURISDICTIONAL DETERMINATION LINE WITHOUT FIRST ACQUIRING THE NECESSARY VARIANCES AND PERMITS. 5. EROSION CONTROL PROGRAM: CLEARING WILL BE KEPT TO A MINIMUM. VEGETATION AND MULCH WILL BE APPLIED TO APPLICABLE AREAS IMMEDIATELY AFTER DEMOLITION AND GRADING IS COMPLETED. LAND -DISTURBING WILL BE SCHEDULED TO LIMIT EXPOSURE OF BARE SOILS TO EROSION ELEMENTS. 6. SEDIMENT CONTROL PROGRAM: SEDIMENT CONTROL WILL BE ACCOMPLISHED BY THE INSTALLATION OF SEDIMENT BARRIERS, SEDIMENT TRAP(S), SEDIMENT BASIN(S), AND CHECK DAM(S) WHERE APPLICABLE TO PREVENT SEDIMENT FROM LEAVING THE SITE AND ENTERING THE STORMWATER DRAINAGE SYSTEM. A CONSTRUCTION ENTRANCE WILL BE UTILIZED TO PREVENT SEDIMENT TRANSPORT VIA VEHICLE TRACKING ONTO PUBLIC ROADS. 7, STANDARDS AND SPECIFICATIONS: ALL DESIGNS WILL CONFORM TO AND ALL WORK WILL BE PERFORMED IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE PUBLICATION ENTITLED, "MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA". 8. SAFETY PROTECTION: CONSTRUCTION ACTIVITIES WILL BE PERFORMED IN COMPLIANCE WITH ALL APPLICABLE LAWS, RULES AND REGULATIONS. 9. INSPECTION & MAINTENANCE PROGRAM: EROSION CONTROL MEASURES WILL BE INSPECTED DAILY. ANY DAMAGES OBSERVED WILL BE REPAIRED BY DAYS END. CLEAN OUT OF SEDIMENT CONTROL STRUCTURES WILL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND SEDIMENT DISPOSAL ACCOMPLISHED BY ON SITE SPREADING. BARRIERS WILL REMAIN IN PLACE UNTIL SEDIMENT CONTRIBUTING AREAS ARE STABILIZED. SILT FENCES AND BARRIERS WILL THEN BE REMOVED AND THE AREAS OCCUPIED BY THESE STRUCTURES WILL BE VEGETATED. 10. PETROLEUM STORAGE, SPILLS AND LEAKS: THE PLANS PROVIDED HEREIN DO NOT ANTICIPATE THE STORAGE OF PETROLEUM PRODUCTS ON-SITE. THESE PLANS EXPRESSLY DELEGATE THE RESPONSIBILITY OF ON-SITE HAZARDOUS MATERIAL MANAGEMENT TO THE CONTRACTOR. THE CONTRACTOR SHALL NOT PARK, REFUEL, OR MAINTAIN EQUIPMENT WITHIN STREAM BUFFERS. IF THE CONTRACTOR ELECTS TO STORE PETROLEUM PRODUCTS ON SITE, THE CONTRACTOR SHALL PREPARE AN ESPCP ADDENDUM THAT ADDRESSES THE ADDITIONAL BMPS NEEDED FOR ON-SITE STORAGE AND SPILL PREVENTION FOR PETROLEUM PRODUCTS. THIS PLAN SHALL BE PREPARED BY A CERTIFIED DESIGN PROFESSIONAL AS REQUIRED BY GAR 100001 FOR INCLUSION WITH THESE PLANS. 11_ WASTE MATERIALS, INCLUDING BUILDING MATERIALS, SHALL NOT BE DISCHARGED TO WATERS OF THE STATE, EXCEPT AS AUTHORIZED BY A SECTION 404 PERMIT. 12. UPON REVIEW OF FIRM, COMMUNITY NO. 135164, BY F.E.M.A. DATED JUNE 17, 1986, IT IS MY OPINION THAT NO PORTION OF THIS PROPERTY LIES WITHIN A FLOOD HAZARD ZONE. 13_ ACCORDING TO NWI MAPS THERE ARE NO WETLANDS ON SITE_ 14. THERE ARE NO BUFFERED STATE WATERS PRESENT WITHIN 20V OF THE PROJECT SITE, A DOUBLE ROW OF TYPE SENSITIVE SILT FENCE WILL BE UTILIZED TO PROTECT ENVIRONMENTALLY SENSITIVE AREAS. 15. THE PROJECTS RECEIVING WATERS ARE A TRIBUTARY OF HORSE PEN CREEK. 16. ACCORDING TO "SOIL SURVEY OF COLUMBIA COUNTY, GEORGIA", THE EXISTING SOILS TYPES ARE AS FOLLOWS: • Cuc: CHIPLEY-URBAN LAND COMPLEX 0 TO 5 PERCENT SLOPES • On OSIER FINE SAND 0 TO 2 PERCENT SLOPES i i i i i i i i i i ORIGINAL GROUND 4 1r DIVERSION) I I�TTT=I I I I - BERM (DI) 0.5' MIN J'=111=1''' NOTES: DIVERSION BERM REQUIRED AS NECESSARY TO ACHIEVE MINIMUM 0.5 FT DEPTH ASSUMING A MINIMUM SLOPE OF 0.5% AND A MINIMUM DEPTH OF 0.5 FT, SWALE CAN SAFELY CONVEY 2.04 CFS BEFORE OVERTOPPING. i TYPICAL SWALE & BERM SECTION NO SCALE i i 70, _ SOILS DELINEATION LINE 1 11 11 � CLIC , ♦ 1 1 IOm ' I l0 1 20DRAINAGE & U71LITY EASEMENT 1 ' "I CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL ATTACHMENTS WERE PREPARED UNDER MY DIRECTION OR SUPERVISION IN ACCORDANCE WITH A SYSTEM DESIGNED TO ASSURE THAT QUALIFIED PERSONNEL PROPERLY GATHER AND EVALUATE THE INFORMATION SUBMITTED, BASED ON MY INQUIRY OF THE PERSON OR PERSONS WHO MANAGE THE SYSTEM, OR THOSE PERSONS DIRECTLY RESPONSIBLE FOR \ - ` 6.3$� 6.53 GATHERING THE INFORMATION, THE INFORMATION SUBMITTED IS, TO THE BEST OF MY KNOWLEDGE AND BELIEF, TRUE, ACCURATE, AND COMPLETE. I AM AWARE THAT THERE ARE SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLUDING THE POSSIBILITY OF FINE 6 50 AND IMPRISONMENT FOR KNOWING VIOLATIONS." . "I CERTIFY, AS THE DESIGN ENGINEER, THAT THE PLAN PRE PARER OR A DESIGNEE THEREOF HAS VISITED THE SITE PRIOR TO DESIGN OF THE EROSION AND SEDIMENT CONTROL PLAN. "I CERTIFY THAT THE PERMITTEE'S EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN PROVIDES FOR AN APPROPRIATE AND COMPREHENSIVE SYSTEM OF BEST MANAGEMENT PRACTICES REQUIRED BY THE GEORGIA WATER QUALITY CONTROL ACT AND THE DOCUMENT 75 "MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA" (MANUAL) PUBLISHED BY THE STATE SOIL AND WATER CONSERVATION / � COMMISSION AS OF JANUARY 1 OF THE YEAR IN WHICH THE LAND -DISTURBING ACTIVITY WAS PERMITTED, PROVIDES FOR THE SAMPLING OF THE RECEIVING WATER(S) OR THE SAMPLING OF THE STORM WATER OUTFALLS AND THAT THE DESIGNED SYSTEM OF BEST MANAGEMENT PRACTICES AND SAMPLING METHODS IS EXPECTED TO MEET THE REQUIREMENTS CONTAINED IN THE GENERAL NPDES PERMIT NO. GAR 100001." LEVEL II . ATI #: 0 Do 75PROPOSED CONCRETE 7.D6;,71F OBERT L. TITUS, P.E. DRIVEWAY . / ]'L _ OWNER OR DEVELOPERIPRIMARY PERMITTEE; II ' D52 D53 ' YAUN CONSULTING, LLC 4267 BELFAST RIVER ROADDu RICHMOND HILL, GA 31324 6 34 �' CW1 912-507-2865 1 ION NSTRUCTEXIT . UTILIZE ON ALL N032.012709 DISTURBED AREAS ' 1 W080.84469 SEDIMENT STORAGE NOTE: THE DRAINAGE AREA PASSING THROUGH THE DISTURBED AREA AND REQUIRED SEDIMENT STORAGE IS SHOWN IN THE TABLE. IN MY 1 �' PROPOSED RESIDENCE PROFESSIONAL OPINION CONSTRUCTING A SEDIMENT BASIN IS NOT PRACTICAL CONSIDERING THE SCOPE OF CONSTRUCTION. SEDIMENT ' Co LOT 154 TYBEE VILLAGE , STORAGE IS AVAILABLE ALONG THE SILT FENCE. 6.16 PIN 4-0003-12-012 m �\ � 1 f Sd1-S / DBL ROW/ / 6.45 " RBF I X 6.31 I k � I j 6' II Z" z, ► �, CO 5E� I 1� 6.16 \ -�5� o 6.04 X6.32 ` � 1 l .19 \` �� TENTATIVE ACTIVITY SCHEDULE DESCRIPTION MONTH 1 MONTH 2 MONTH 3 MONTH 4 INSTALL AND MAINTAIN CONSTRUCTION OUTLET INSTALL AND MAINTAIN SEDIMENT BARRIERS CLEARING AND GRUBBING TEMPORARY MULCHING ROUGH GRADING FINAL GRADING, CONSTRUCTION AND LANDSCAPING REMOVAL OF SEDIMENT BARRIERS 10' DRAINAGE do U77IJTY EASEMENT x 6.08 \ _ I 1 LP I LIMITS OF DISTURBANCE ' p S 1 / l 70r �/.�\ / f�O� SSMHL 1 1 ^' TOPi15 V i y zrcz?��� i �' X 6.66 AC PAD ���� I SSMH TOP:6.79 rnn TEMPORARY GRASSING SCHEDULE 05D TYPE SEED SEED RATE DRAINAGE DRAINAGE FERTILIZER LIME SILT SEDIMENT SEDIMENT SEDIMENT SEDIMENT PARCEL TOTAL DIST. AREA AREA RUNOFF RUNOFF FENCE STORAGE STORAGE STORAGE STORAGE ID AREA AREA (ON-SITE) E) (OFF-SITE) " C" "C" LENGTH WIDT(FTH HEIGHT( PROVIDEDSd-1 TOTALS SEED RATE (AC] (AC) (ACREQD ESTABLISHING A PERMANENT VEGETATIVE COVER SUCH AS TREES, SHRUBS, VINES, GRASSES, OR LEGUMES ON DISTURBED AREAS. (PRE] (POST] (FT) 6-12-12 T] (CY (CY) DUST CONTROL ON DISTURBED AREAS: QC9 F_DU_j CONTROLLING SURFACE AND AIR MOVEMENT OF DUST ON CONSTRUCTION SITE, ROADWAYS AND SIMILAR SITES. (HULLED) 10 LBSJAC. 6 LBS.IAC. 311 to 711 1500 LBSJAC. 1.5 TONS/AC. BERMUDA, COMMON PROVD 4-0003-12 0.16 0.09 0.10 0.01 0.30 0.52 262.0 6 0.30 8.7 7.4 8.7 -012 Q Z C Q Q] ��dLL N O Z Z C LU !'l or Q F Q 1 f Sd1-S / DBL ROW/ / 6.45 " RBF I X 6.31 I k � I j 6' II Z" z, ► �, CO 5E� I 1� 6.16 \ -�5� o 6.04 X6.32 ` � 1 l .19 \` �� TENTATIVE ACTIVITY SCHEDULE DESCRIPTION MONTH 1 MONTH 2 MONTH 3 MONTH 4 INSTALL AND MAINTAIN CONSTRUCTION OUTLET INSTALL AND MAINTAIN SEDIMENT BARRIERS CLEARING AND GRUBBING TEMPORARY MULCHING ROUGH GRADING FINAL GRADING, CONSTRUCTION AND LANDSCAPING REMOVAL OF SEDIMENT BARRIERS 10' DRAINAGE do U77IJTY EASEMENT x 6.08 \ _ I 1 LP I LIMITS OF DISTURBANCE ' p S 1 / l 70r �/.�\ / f�O� SSMHL 1 1 ^' TOPi15 V i y zrcz?��� i �' X 6.66 AC PAD ���� I SSMH TOP:6.79 rnn TEMPORARY GRASSING SCHEDULE 05D TYPE SEED SEED RATE SEED RATE PLANTING DATES FERTILIZER LIME ..::::':'� ALONE MIXED 2/26/2018 6-12-12 ��`'� 'r RYE GRASS 40 LBSJAC. - 811 to 4115 1500 LBSJAC. 1.5 TONS/AC. BROWN TOP 40 LBSJAC. 10 LBSJAC. 411 to 7115 1500 LBS.IAC, 1.5 TONSIAC. MILLET BARRIER - SANDBAGS, BALES OF STRAW OR HAY, BRUSH, Z 0 NOTE: ALL DISTURBED AREAS SHALL BE GRASSED AND MULCHED WITH A DRY STRAW MULCH AT A RATE OF 2.5 TONS PER ACRE. PERMANENT GRASSING SCHEDULE Ds3 TYPE SEED SEED RATE SEED RATE PLANTING DATES FERTILIZER LIME ESTABLISHING A PERMANENT VEGETATIVE COVER SUCH AS TREES, SHRUBS, VINES, GRASSES, OR LEGUMES ON DISTURBED AREAS. ALONE MIXED SEEDING) 6-12-12 BERMUDA, COMMON DU DUST CONTROL ON DISTURBED AREAS: QC9 F_DU_j CONTROLLING SURFACE AND AIR MOVEMENT OF DUST ON CONSTRUCTION SITE, ROADWAYS AND SIMILAR SITES. (HULLED) 10 LBSJAC. 6 LBS.IAC. 311 to 711 1500 LBSJAC. 1.5 TONS/AC. BERMUDA, COMMON LU oU)Q L1j (UNHULLED) 10 LBS.IAC. 6 LBSJAC. 1011 to 311 1500 LBS.IAC. 1.5 TONSIAC. NOTE: ALL DISTURBED AREAS SHALL BE GRASSED AND MULCHED WITH A DRY STRAW MULCH AT A RATE OF 2.5 TONS PER ACRE. 1 1 � PROPOSED SWALE i MIN 0.5% SLOPE �O' �• -��C 1 (SEE DETAIL) eSL I i �3 ' I60 DI 6.06"RBF ' I NIi i ' 1 20' DRAINAGE dr X5.89 U77LITY EASEMENT I 1 x 6.06 ' ' 1 � 1 1 THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE ' INSTALLATION OF EROSION CONTROL MEASURES AND PRACTICES PRIOR TO, OR CONCURRENT WITH, LAND DISTURBING ACTIVITIES. THE INSTALLATION OF EROSION CONTROL AND SEDIMENT CONTROL MEASURES AND PRACTICES SHALL RUN PRIOR TO OR CONCURRENT WITH LAND -DISTURBING ACTIVITIES CONCRETE WASH DOWN AREA CW 1 ' EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL ' IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE 1. THE CONTRACTOR SHALL DESIGNATE A SPECIFIC AREA ON SITE WHERE THE WASH DOWN OF CONCRETE r_Q) EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE. MIXER CHUTES, HOPPERS, TOOLS. AND THE REAR OF VEHICLES WILL BE ACCOMPLISHED, THE WASH DOWN AREA SHALL BE LOCATED AS FAR AWAY AS POSSIBLE FROM ANY WETLANDS. DRAINAGE DITCHES AND 1 ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL OTHER ENVIRONMENTALLY SENSITIVE AREAS. THE WASH DOWN AREA SHOULD BE LOCATED IN AN AREA ' 1 ' BE STABILIZED WITH MULCH OR TEMPORARY SEEDING. THAT WILL PROVIDE A MAXIMUM DEGREE OF CONTAINMENT IN THE EVENT OF SPILLS. ANY AME NDMENTSIREVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT 2. THE CONTRACTOR SHALL INSPECT THE WASH DOWN AREA INTERMITTENTLY TO ENSURE PROPER I 1 EFFECT ON BMRS WITH A HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE CONTAINMENT IS ACCOMPLISHED. DESIGN PROFESSIONAL, 3. IN THE EVENT OF A SPILL OR LEAK THE CONTRACTOR SHALL IMMEDIATELY REPORT & REMEDIATE SAME IN 1 � � SPECIAL NOTES: ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL LAWS. ' _ 1, THE CONTRACTOR SHALL PROVIDE TEMPORARY GRASSING AND MULCHING FOR 4. WASH OUT OF THE DRUM AT THE CONSTRUCTION SITE I$ PROHIBITED. i ' ALL DISTURBED AREAS OUTSIDE OF THE RIGHT-OF-WAY FOR THE DURATION OF J THE PROJECT. NO DISTURBED AREA OUTSIDE OF THE RIGHT-OF-WAY SHALL BE ®' I LEFT UNCOVERED FOR MORE THAN TWO DAYS. I IF2, DEVELOPER(S) AND/OR CONTRACTOR(S) ARE RESPONSIBLE FOR REMOVING OR _ ' CLEANING OUT ANY SILT, DIRT, MUD OR ANY OTHER TYPE OF DEBRIS THAT FINDS WWW. Genf ia81 1. com �_ ITS WAY INTO A PRIVATE POND OR A COUNTY OWNED POND FROM THEIR SITE. IN ADDITION, THEY ARE RESPONSIBLE FOR REMOVING ANY OF THE what's below. 1 AFOREMENTIONED ITEMS THAT COME FROM THEIR SITE ONTO PRIVATE OR Know , COUNTY OWNED PROPERTIES TO INCLUDE RIGHTS OF WAY. Call what's before you dig. p GEORGIA UNIFORM CODING SYSTEM FOR SOIL EROSION AND SEDIMENT CONTROL PRACTICES GEORGIA SOIL AND WATER CONSERVATION COMMISSION STRUCTURAL PRACTICES CODE PRACTICE DETAIL MAP SYMBOL DESCRIPTION CD CONSTRUCTION;.: EXIT ..::::':'� co Vf_ A CRUSHED STONE PAD LOCATED AT THE CONSTRUCTION SITE EXIT TO PROVIDE A PLACE FOR REMOVING MUD FROM TIRES THEREBY 2/26/2018 CHECKED BY: ��`'� 'r SCALE: PROTECTING PUBLIC STREETS. �7AREA DSZ STABILIZATIONDS2 LABEL COVER WITH FAST GROWING SEEDINGS ON Sd� SEDIMENTLEAVING �' m A BARRIER TO PREVENT SEDIMENT FROM THE CONSTRUCTION SITE. IT MAY BE Z BARRIER - SANDBAGS, BALES OF STRAW OR HAY, BRUSH, Z 0 m DISTURBED LU LOGS AND POLES, GRAVEL, OR A SILT FENCE, E Ds3 AREA STABILIZATION (WITH PERM INpICA7E TYPE rD53 VEGETATIVE PRACTICES CODE PRACTICE DETAIL MAP SYMBOL DESCRIPTION 10' DISTURBED GRAPHIC SCALE V = 10' EMC SURVEY DATE: 2/26/2018 CHECKED BY: ��`'� 'r SCALE: ESTABLISHING A TEMPORARY VEGETATIVE �7AREA DSZ STABILIZATIONDS2 O COVER WITH FAST GROWING SEEDINGS ON U) 0 (WITH TEMP �' m DISTURBED AREAS. Z SEEDING) Z 0 m DISTURBED LU E Ds3 AREA STABILIZATION (WITH PERM �, '��� 4 rD53 ESTABLISHING A PERMANENT VEGETATIVE COVER SUCH AS TREES, SHRUBS, VINES, GRASSES, OR LEGUMES ON DISTURBED AREAS. O U m o C) CD E SEEDING) OI) V DU DUST CONTROL ON DISTURBED AREAS: QC9 F_DU_j CONTROLLING SURFACE AND AIR MOVEMENT OF DUST ON CONSTRUCTION SITE, ROADWAYS AND SIMILAR SITES. CULVERT UNDER ENTRANCE (IF NEEDED) DIVERSION RIDGE (SEE NOTE 6) N.S.A. .A. R-2 (1.5"- 3.5" ' j II S COARSE AGGREGATE T 1= GEOTEXTILE UNDERLINER 6" MIN. TIRE WASH RACK AREA/TIRE WASHERS SUPPLY WATER TO WASH ENTRANCE ELEVATION WHEELS IF NECESSARY FLOW I, NOTES: 1. AVOID LOCATING ON STEEP SLOPES OR AT CURVES ON PUBLIC ROADS. 2. REMOVE ALL VEGETATION AND OTHER UNSUITABLE MATERIAL FROM THE FOUNDATION AREA, GRADE, AND CROWN FOR POSITIVE DRAINAGE. 3. AGGREGATE SIZE SHALL BE IN ACCORDANCE WITH NATIONAL STONE ASSOCIATION R-2 (1.5"-3.5" STONE). 4. GRAVEL PAD SHALL HAVE A MINIMUM THICKNESS OF 6". 5, PAD WIDTH SHALL BE EQUAL FULL WIDTH AT ALL POINTS CF VEHICULAR EGRESS, BUT NO LESS THAN 201. 6. A DIVERSION RIDGE SHOULD BE CONSTRUCTED WHEN GRADE TOWARD PAVED AREA IS GREATER THAN 2%. 7. INSTALL PIPE UNDER THE ENTRANCE IF NEEDED TO MAINTAIN DRAINAGE DITCHES. 8. WHEN WASHING IS REQUIRED, IT SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN (DIVERT ALL SURFACE RUNOFF AND DRAINAGE FROM THE ENTRANCE TO A SEDIMENT CONTROL DEVICE). 9. WASHRACKS ANDIOR TIRE WASHERS MAY BE REQUIRED DEPENDING ON SCALE AND CIRCUMSTANCE. IF NECESSARY, WASHRACK DESIGN MAY CONSIST OF ANY MATERIAL SUITABLE FOR TRUCK TRAFFIC THAT REMOVE MUD AND DIRT. 10. MAINTAIN AREA IN A WAY THAT PREVENTS TRACKING ANDIOR FLOW OF MUD ONTO PUBLIC RIGHTS -OF -WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR ANDIOR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT, Co CRUSHED STONE CONSTRUCTION EXIT FRONT VIEW T 4' MAX. O.C. 1 SIDE VIEW Z FABRIC Z FLOW (WOVEN WIRE It FENCE BACKING) _ is M � Z - - - TRENCH Z CQ _ 211 r r NOTES: 1. USE STEEL OR WOOD POSTS OR AS SPECIFIED BY THE EROSION, SEDIMENTATION, ANDOLLUTION CONTROL PLAN. 2. HEIGHT (-) IS TO BE SHOWN ON THE EROSION. SEDIMENTATION, AND POLLUTION CONTROL PLAN. 3. GDOT QPL 36 ALTERNATIVE sal -s SILT FENCE -TYPE SENSITIVE VICINITY MAP w 5 ox�j 'i 1�13A r1ry�-_ 12 4 rrsc, j JW 113 gas, i 4 `'JA, �� ¢ 1 14 r1la� z1�, 7 S HIO i= +tQ JB 'le ?�gySp��'. 4 1A 1�" 1w $ a ZAC 14 ?1 z 3 1 w mi o 1 Q y4 1 ill I 1 '< r� `6113' ' r�7g r� 6 w Q m Z 0 a_ U u1 W Z 0 V) W GEORGIA SOIL AND WTER Z WS W CC CONSERVATION COMMISSION Robert L Titus II LEVEL II CERTIFIED DESIGN PROFESSIONAL CERTIFICATION NUMBER: 0000008775 ISSUED: 121112015 EXPIRES: 121112018 0RG �c qtr �FRr L.���% 10' 5' 0' DRAWN BY: AC B 10' J GRAPHIC SCALE V = 10' EMC SURVEY DATE: 2/26/2018 CHECKED BY: (Z SCALE: Y DATE: r O U U) 0 Of V Z m Z LL] Z 0 m 0 LU E 0 LUr ❑ e C/3 w O U m o C) CD E U) OI) V L)CC) QC9 `n CJ � J W C3L Z) LU oU)Q L1j 0- ) moos E m LU J¢ r,'1L.L �.J LU vv Ctrl @ X 07 ¢ Q Z C Q Q] ��dLL N O Z Z C LU !'l or Q F Q ~_ � w J C17U) 0 W � � r Q z m Q T3J J 2' O J 40L�mtw 0 w _j w I ,` U Z NO.: 18-8528.700 DRAWN BY: AC B DESIGNED BY: J SURVEYED BY: EMC SURVEY DATE: 2/26/2018 CHECKED BY: (Z SCALE: 111=10' DATE: 4/23/2018 O Z 0 0 LUr ❑ LU r r1 Z [] w F_ � J W C3L Z) LU oU)Q 0- (D oe5 LU J¢ _ LU LUQ Q Q] w J O I ' I J >_ C) !'l or Q F ~_ � ❑ W � � r Q Q 0U) J ❑ W J LU W W Z F_ F_ o W O LI, PROJECT NO.: 18-8528.700 DRAWN BY: AC B DESIGNED BY: ACB SURVEYED BY: EMC SURVEY DATE: 2/26/2018 CHECKED BY: RLT SCALE: 111=10' DATE: 4/23/2018 SHEET 1 OF 1