Loading...
HomeMy Public PortalAboutAnnual Report Public Works StreetsWhat We Do Operations The Public Works Department is responsible for maintaining more than fifty miles of city streets and parking. This includes patching, seal coating, paving, grading, sand- ing and snow removal. Additional activities include the painting of all street markings, repairing and re- placements of all street signage, clearing hazards in city right-of- ways, as well as maintaining the city's storm drains culverts and streetlights. The Streets Division also issues permits for work performed by con- tractors within the City's rights -of - ways for construction of sidewalks, driveways, underground utilities, and mailboxes. The Public Works Department also is responsible for all vehicle and equipment repair and maintenance. The Public Works Department has 12.5 full-time employees which are comprised of the Public Works Di- rector, City Engineer, Street Superin- tendent, Street Supervisor, 6.5 equipment operators, a Mechanic and an Administrative Assistant. Table of Contents Strategic Objectives A Performance Report Our Finances Looking Forward 1 2 3 4 Mission To provide safe and well maintained public streets, storm drains, culverts, streetlights, signs, and traffic signals. As a Public Works Department it is our goal to provide 24 hour response to emergencies. The Public Works Department also acquires, maintains and operates an adequate fleet of vehicles and equipment to accomplish 111, the goals of the City of McCall. Vision A Public Works Department that has modern and reliable facilities and equipment, emphasizes financial stewardship and environmental sustainability, and is accessible and responsive to our customers' needs. 1 McCall Public Works A Performance Report Selected Programs & Services 2011 Accomplishments • Completed the construction of Deinhard Lane from 3rd Street to Thula Street. In -411 cluded with this construction was the installation and com- pletion of a storm drain pro- ject started in September 2012. Construction costs were $568,000. • Completed the repairs to five hundred feet (500') of Wooley Avenue due to damage from the spring breakup. Construc- tion costs were $50,000. • Completed the paving of ice cream alley including storm drain improvements. Con- struction costs were $18,000. • Completed pavement condi- tion analysis of all city streets. • Completed traffic counts for all major streets in McCall. • Completed sign inventory of all regulatory and other traffic signs. • Completed speed studies on SH 55, Deinhard Boydstun connector and 3rd Street. • Completed the painting of the Public Works Building as an Boy Scout Eagle project. Pavement Management Remaining Service Life Distribution for Asphalt Street Network (Based on a 20 Yr Life Cycle Analysis) 40.0% a 35.0% 30.0% • 25.0% c 20.0% 15.0% 10.0°o a 5.0°o 0.000 19-20 16-18 13-15 10-12 7-9 4-b 1-3 .0 Remaining Service Life (Yrs) Remaining Service Life Distribution for Gravel Street Network (Based on a 10 Yr Life Cycle Analysis) 35.0% 30.0% • 25.0% 20.0% 15.0% 10.0% 5.0% 0.0% 9-1,1 7-8 5-6 3-4 1-2 0 20.0% Remaining Service Life (Yrs) 2 What are the costs? Our Finances Fiscal Year 2011 McCall Public Works The costs for operating the Public Works Department are paid through the General Fund which is a fund that de- pends on property tax reve- nue. The City of McCall ag- gressively pursues grant and other funding opportunities. For instance, this past year a $568,000 ARRA grant paid for the re -construction of Deinhard Lane including the storm drain pipe, curb, gutter & sidewalk. A portion of the cost of the sign inventory was paid through a grant from LHTAC. The Economic Impact of the Public Works Department on the City Numerous additional jobs were created in the commu- nity and in Idaho as a result of the Public Works operation and maintenance activities as well as specific Capital Im- provement projects. New street construction street, maintenance activities, mate- rials and supplies, gas, and diesel all contribute to Idaho's economy. Revenue 16% 3% oy source Proli jillrigtenue $1,248,280 Grant Revenue $400,000 Appropriated Fund $54,105 Inter -Fund Transfer Expense $149,875 Other Revenue $174,779 Total $2,027,039 20% 1141mo, 61% FY11 Expense )y Category •ersonne xpense $818,723 Operations Expense $434,995 Capital Expense $174,117 Inter -Fund Transfer Expense $146,283 Grants $452,921 Total $2,027,039 FY11 3 Looking Forward What's Next: Projects & Challenges We want to hear from you! Peter Borner, PE Public Works Director (208) 634-3458 McCall Public Works 815 North Sampson Trail McCall, ID 83638 pborner@mccall.id.us www.mccall.id.us Lindley Kirkpatrick, AICP City Manager (208) 634-1003 City of McCall 216 East Park St McCall, ID 83638 Ikirkpatrick@mccall.id.us www.mccall.id.us J Improving City Streets & Snowplowing Pavement Management System: Pavement Management is a program for improving the quality and performance of pavements and minimizing costs through good man- agement practices. A Pavement Management System is a set of defined procedures for collecting, analyzing, maintaining, and reporting pavement data, to assist the deci- sion makers in finding optimum strategies for maintaining pavements in serviceable condition over a given period of time for the least cost. A Pavement Management Sys- tem (PMS) is designed to provide objective information and useful data for analysis so that road managers can make more consistent, cost-effective, and defensible deci- sions related to the preservation of a pavement network. The City of McCall has com- pleted a complete condition assessment of all asphalt and gravel streets and is imple- menting a pavement management system. Sign Inventory: The City of McCall has completed a sign inventory of all regulatory, street and informational signs within the City. All regulatory signs are required to main- tain a minimum reflectivity standard. Those signs that do not meet those standards are required to be replaced. Street signs are now required to meet new standards for uni- form type, size and style of lettering to make them more visible and easier to read. Fleet Management: The City of McCall has implemented a fleet management system to assure that all City vehicles and equipment receive the proper maintenance in a timely manner. All maintenance, repair and fuel usage costs for each vehicle or piece of equipment are tracked. The fleet management system is used to maintain and keep reliable the City's fleet of vehicles and equipment in a cost-efficient manner. Snow Removal: Currently the City of McCall has nine equipment operators that utilize plow trucks, grader and loaders for snow removal within the City. It typically takes the street crew between eight to ten hours to clear snow from a typical 3" to 6" snow storm. The Public Works Department augments its existing fleet of equipment with three pieces of rental equipment. This equipment includes a grader and two front-end loaders. Public Works is also evaluating the effectiveness of a "snow -gate" during the winter of 2011-2012. The use of snow -gates will have financial considerations as well as operational impacts to how Public Works removes snow. Street & ROW Maintenance: Street and Right -of -Way maintenance remains the pri- mary function of the Public Works Department. With over 50 miles of asphalt and gravel streets, Public Works crews remain busy all year long. During the winter of course the primary activity is snow removal. When it isn't snowing, crews are busy cutting snow floor and widening roads. During the spring, crews are busy making sure drains are working properly and repairing roads damaged by spring breakup. During the busy summer season, crews are busy painting traffic lines and crosswalks, repair- ing streets, grading and applying dust control oil to gravel streets. In the fall, crews are at work delineating streets with snow poles, clearing brush and trees that can hinder snow removal operations. 4