Loading...
HomeMy Public PortalAboutAnnual Report Public Works WaterWhat We Do Operations The Water Distribution division oversees all maintenance and op- erations of the city water system which includes all seasonal water turn ons/offs, 24/7 emergency call outs, the replacement or repair of aging/leaking service/main lines and fire hydrants, and installation of water meters The Water Treatment division oper- ates the water treatment plant, as well as the raw water pump sta- tions, water storage tanks, and dis- tribution laboratory sampling. We are responsible for the mainte- nance of pumps, filters, aerators, disinfection equipment, laboratory analysis and reporting to state and federal agencies for water monitor- ing requirements. The Public Works Department has 12 full-time employees which are comprised of the Public Works Di- rector, Utility Superintendent, Treat- ment Superintendent, Utility Supervi- sor, 2 Water Plant Operators, 5 Utility Operators, an Administrative Assis- tant that are shared with Sewer fund. Table of Contents Strategic Objectives A Performance Report Our Finances Looking Forward 1 2 3 4 Mission To provide safe, clean water to McCall residents in an efficient manner at affordable fees. To maintain, replace, repair and upgrade all water facility infrastructure and to be compliant with all state and federal regulations. Vision A Public Works Department that has modern and reliable facilities and equipment, emphasizes financial stewardship and environmental sustainability, and is accessible and responsive to our customers' needs. 1 McCall Public Works A Performance Report Selected Programs & Services 2011 Accomplishments • Repaired broken water main on Lake Street in front of Paul's Market. • Replaced three (3) old fire hydrants. • Completed water system im- provements on Boydstun Lane. • Cleaned and rehabilitated the Water Treatment Plant back- wash water pond. • Public Works initiated a study of alternatives for the disposal or recycling of the Water Treatment Plant backwash water. This study is being per- formed by Horrocks Engi- neers and SPF Water. Water Master Plan Improvements CHAPTER7. CAPITAL IMPROVEMENTS PROGRAM TABLE 7.6 • Capital Improvement Plan Schedule Improvement Description Contingency Engineering Construction Administrative (60% +1-) Total 1 Backup Power at Davis Beach (2014) 2 Backup Power at Knowles Road Booster Pump Station (2014) Backup Fire Pump at Whitetail High Booster 3 Pump Station (before occupancy) Assume No Space In Existing Building 4 12 -inch Deinhard Road Upgrade (5,100 ft) 5 10 -Inch Lake Street Upgrade (5,100 feet) 6 12 -inch Rio Vista Upgrade (2,500 ft) . 7 14 -inch Floyd and Majestic View Drive Upgrade (3,100 ft) 2007 Total 8 Increase Booster Pump Capacity at Knowles Road -100 gpm FC 9 Secure Land for Future Water Storage Tanks 10 SCADA Upgrades (Ongoing) 11 Upgrade PRV on Deinhard 12 Continue to Upgrade all 4 -inch lines (40,000 ft) 13 10 -Inch SH-55 to Lake Street Upgrade (2,600 ft) 14 12 -inch Mission Road Upgrade (13,000 ft) 15 12 -inch Koski Upgrade from Floyd to Deinhard (2,500 ft) 2017 Total 16 Increase Capacity of WTP Filters by 1.0 MGD Construct Deinhard Lane Booster Pump Station - 600 gpm FC 18 Install 700,000 Gallon Tank on East Side 19 Install 700,000 Gallon Tank on West Side 20 Install 8 -inch PRV on Lake Street 21 12 -Inch Samson Trail Upgrade (5,700 ft) 22 12 -inch Stibnite Upgrade (2,100 ft) 23 12 -inch SH-55 to 3rd Street (7,800 ft) 2032 Total Total 17 $300,000 $100,000 $400,000 $300,000 $100,000 $400,000 $500,000 $300,000 $800,000 •$600,000 $400,000 $1,000,000 $400,000 $200,000 $600,000 $300,000 $200,000 $500,000 $500,000 $400,000 $900,000 $2,900,000 $1,700,000 $4,600,000 $100,000 $100,000 $200,000 $300,000 $200,000 $500,000 $300,000 $200,000 $500,000 $100,000 $100,000 $200,000 $4,800,000 $2,900,000 $7,700,000 $300,000 $200,000 $500,000 $1,600,000 $900,000 $2,500,000 $300,000 $200,000 $500,000 $7,800,000 $4,800,000 $12,600,000 $3,000,000 $1,800,000 $4,800,000 $1,000,000 $600,000 $1,600,000 $1,000,000 $600,000 $1,600,000 $1,000,000 $600,000 $1,600,000 $300,000 $200,000 $500,000 $700,000 $400,000 $1,100,000 $300,000 $200,000 $500,000 $900,000 $600,000 $1,500,000 $8,200,000 $5,000,000. $13,200,000 $18,900,000 $11,500,000 $30,400,000 e01080580002.00CA(M 7-13 2 What are the costs? Our Finances Fiscal Year 2011 The costs for servicing the citizens of McCaII are paid through an Enterprise Fund. This fund is based upon monthly base water rates and monthly usage of water. All new service connections pay a system buy -in and connec- tion fee as well. The City of McCall also ac- tively seeks out appropriate grant funding opportunities. Revenue 2% 10% Operations Revenue $1,895,561 Carry Forward $225,000 Fee & Other Revenue $45,295 Total $2,165,856 FY11 Expense 34% 9% 3C )y category - ersonne xpense $351,415 Operations Expense $359,409 Capital Expense $433,706 Debt Related Expense $841,245 Inter -Fund Transfer Expense $180,081 Total $2,165,856 24% 20% FY11 3 We want to hear from you! Peter Borner, PE Public Works Director (208) 634-3458 McCall Public Works 815 North Sampson Trail McCall, ID 83638 pborner@mccall.id.us www.mccall.id.us Levi Brinkley Utility Superintendent (208) 634-1011 Ibrinkley@mccall.id.us John Lewinski Treatment Superintendent jlewinski@mccall.id.us (208) 634-1853 Lindley Kirkpatrick, AICP City Manager (208) 634-1003 City of McCall 216 East Park St McCall, ID 83638 Ikirkpatrick@mccall.id.us Looking Forward What's Next: Projects & Challenges Improving the City Water System Water Master Plan Update: It has been five (5) years since the Water Master Plan was updated. Much has happened since 2008. A number of improvements have been made to the City's water system and the growth rate has slowed considerably. As indi- cated on Page 2 of this report, there are a number of improvements that have been identified as being needed for the future long term growth of the City of McCall. These improvements are also necessary to meet state and federal regulatory requirements. The purpose of updating the Water Master Plan is to determine if the planned improve- ments are still necessary and are they in the right order. It is also important to update the engineering and construction costs associated with each of the identified improve- ment to appropriately plan future budget needs. Water Model: The City of McCall's Water Model is a computerized analysis of the entire city water system. It is used to identify deficiencies where volume or pressure improvements are warranted. These improvements can be as simple as modifying pressure settings at the City's Pressure Reducing Valve (PRV) stations or as complex as installing new water mains, water tanks, and booster pump stations. This model needs to be updated and calibrated. Knowles Road Booster Station: This year plans are being made to provide back-up power to the Knowles Road Booster Station. This will allow the City the ability during power outages to continue providing necessary water to residents and also provide the necessary volume of water to fight fires. The power generation unit will be sized for future pump upgrades. Davis Beach Pump Station: This year plans are being made to provide back-up power to the Davis Beach Pump Station. The City relies on two pump stations to pro- vide raw water to the City's Water Treatment Plant, Legacy Park and Davis Beach. Currently, the Legacy Park Pump Station is the City's primary intake for raw water. During the summer and other times of high water demand, additional water is provided by the Davis Beach Pump Station. The use of the Legacy Park Pump Station as the primary source of water is due to this pump station already having back-up power. However the pumps within this station are significantly older than the pumps at the Davis Beach Station . By providing back-up power to the Davis Beach Station the City can then use the newer pumps at Davis Beach to provide more efficient and reliable raw water to the City Water Treatment Plant. Fire Flow Testing: It has been some time since the City undertook fire flow testing of its fire hydrants. This testing is necessary for several reasons. The first reason is it tells us almost immediately of any glaring deficiencies with a particular fire hydrant. Those hydrants that have operational issues are then placed on a list for repair or re- placement. Other reasons for fire flow testing include the calibration of the water model to make sure it is accurate and maintaining the City's fire insurance rating. Water Line/Hydrant Replacement: This year plans are being made to replace aging cast iron water mains and old fire hydrants within the City. Allowing these pipes and hydrants to remain in the system will lead to potential catastrophic failures. 4