JnfoSys Department
1.
•
2019 Annual Report
Table of Contents
Introduction, Overview 1
A Performance Report 2
v , , _ �►= Our Finances 3
Looking Forward 4
What We Do
Information Systems is responsible for
technologies and their infrastructures,
staff support, providers and risk manage-
ment. Those broad areas include the
connections, application frameworks and
data that comprise the recorded
knowledge needed to run the City. We are
also tasked with managing external
threats, implementing security
policies, facilitating legal compliance,
disaster planning, and helpdesk services.
Like other small IS departments, we're
generalists with specialized skills. We
cover all staff technology roles from Chief
Technology Officer to Helpdesk Techni-
cian, with a staff of two. We leverage
third -party services for large projects, of-
fice phones, proprietary software support,
fiber-optic networks, and industrial pro-
cess control computers.
Operations
The City's Information Systems De-
partment operates networks spread
over seven square miles and nine
office locations. We operate diverse
network equipment, offsite backup
facilities, antenna towers and digital
transceivers, data center power
systems, and an inventory of desk-
top, laptop and tablet computers to
support 80 to 90 City staff. Our high-
est operational priorities are security
through defense -in-depth and relia-
bility through resilience, redundan-
cies, and maintenance. Manage-
ment roles include capital projects,
budget development, centralized
purchasing, contracts and agree-
ments, risk management strategies,
and long term planning.
Selected Statistics
2019
Staff Computers and Tablets Supported
114
118
Servers (Virtual & Physical) Supported Onsite
15
13
Enterprise Storage Drives in Production
68
60
Enterprise Storage Drives Failed / Replaced
7
3
Enterprise Data Storage (raw terabytes, approx.)
29.7
55.6
Offsite Data Backup Capacity (terabytes, approx.)
95
95
Our Mission
• Provide for the
confidentiality,
integrity and
availability of
information for City
government and
stakeholders.
• Help the City and its
citizens succeed
through appropriate
technologies.
• Recognize and satisfy
the information needs
of citizens and staff,
within a framework of
value, operational
reliability and sensible
systems integration.
• Our objective is to
provide City
government with
effective, reliable ways
To use and
communicate
information.
1
InfoSys
2019 Accomplishments
• Hired and trained Vlatko
• Annual replacement of -15
desktops and laptops plus
13 laptops to PD cars ac-
quired through grant.
• Addressed infrastructure
needs —new Meraki core
switches and increased
Nutanix storage (virtual
infrastructure)
• Implemented automatic
wireless transfer of PD in -
car video —replaces manual
process
• Deployed Electronic
signatures utilizing
Docusign.
• Single Sign On (SSO)
implemented across most
applications used by staff
A Performance Report
Selected Programs & Services
How We Have Progressed
Projects
The Info -Sys Manager role was filled by Chris Curtin. Vlatko Jovanov was
promoted from within and assumed the role of Network Administrator.
Vlatko has been a fantastic addition to the team. It was anticipated that his
training would take 2+ years before he was independently able to run the
technical aspects of the department. In his first year he has shown that he is
able to do that competently. He has become Microsoft Certified and will
complete Nutanix and Cisco certification in 2020.
In 2019 the InfoSys department completed —4.5 miles of underground
installation of fiber conduit connecting the new MPD location and the
Water Treatment Plant.
InfoSys along with 4 other team members is part of the City Process
Evaluation (CPE). This project looks at ways that technology can as-
sist with everyday processes in an effort to reduce inefficiency and
streamline repetitive tasks.
Infrastructure is continually addressed as it approaches end of life. In
2019 we upgraded the drives in our virtual server stack (Nutanix) and
replaced our core switches with new Meraki switches.
City phones were migrated onto the Microsoft Office 365 (0365) plat-
form. This reduced costs while offering a better set of collaboration
tools included in 0365.
The Future
We continue to implement capital projects, primarily related to munici-
pal fiber optic networks to serve City facilities. We are pursuing com-
munity partnerships and cost sharing to leverage the benefits of broad -
scale data networks, along with the new services and economic devel-
opment opportunities that can be expected to result. Our intent is that
a municipal -scale network should ultimately benefit the community as
a whole leveraging unused fiber. It is anticipated that the City will roll
out a test neighborhood of —20 homes as proof of concept during Sum-
mer 2020. Additionally, InfoSys has a Capital Project that will install
an additional —4.5 miles of fiber conduit in Summer 2020.
Vlatko is working on a web server\DMZ (demilitarized zone) that will
allow staff to access internal City resources using a secure web portal.
This would make it possible for staff access remotely without the
use\overhead required by a VPN tunnel. Part of this project will in-
clude implementation of 2 factor authentication—username\password
plus a one timeise key.
I nfoSys
Our Finances
Fiscal Years 2018-19
7.4%
2.5%
1.7%
2.8%
12.2% VW
7.9%
1
4.6%
60.9%
Keve
n u e
FY18
FY19
General Fund 60.9%
$180,579
$195,505
•
$25,365
Library Fund 12.2%
$54,845
$ •,• 3
Recreation Fund 2.8%
$9,706
$9,073
Airport Fund 1.7%
$3,388
$5,317
Golf Fund 2.5%
$3,388
$7,156
Water Fund 7.4%
$21,652
$23,751
Sewer Fund 4.6%
$14,817
$14,817
Total Inter -Fund Transfer
$132,478
$129,807
Total of Revenues
$313,478
350,939
2.4% 5.0%
13.1%_\
0.0%_
18.1%
18.7%
33.0%
9.7%
Expense
FY18
Y19
Personnel
-go Personnel 33%
$139,578
$115,67
ategory 2 Benefits 9%
$21 239
$3
Total Personnel
$160,817
149,689
Operations
Hardware 18.7%
$71,150
$65,800
Software 18.1%
$37,493
$63,500
Website 0%
$1,500
$0
Services 13.1%
$44,960
$46,000
Repairs 2.4%
$6,750
$8,500
Supplies & Equipment 5%
$2,450
$17,450
Total Operations
$168,253
$201,250
Capital Items Requested
$77,885
$384,250
Capital Items Funded
$17,885
$0
Total of Expenses
$329,070
$350,939
3
I nfoSys
We want to
hear from you.
Anette Spickard
City Manager
(208) 634-1003
City of McCall
216 East Park St
McCall, ID 83638
aspickard@mccall.id.us
www.mccall.id.us
Chris Curtin
InfoSys Manager
(208) 634-8999
City of McCall
216 East Park St
McCall, ID 83638
ccurtin@mccall.id.us
www.mccall.id.us
Vlatko Jovanov
Network Administrator
(208) 634-8998
City of McCall
216 East Park St
McCall, ID 83638
vjovanov@mccall.id.us
www.mccall.id.us
Looking Forward
What .text: Projects & Challenges
Ongoing and Future Projects
• Deploy SharePoint environment for file access
• Install Phase 2 conduit —Summer 2020
• Web Server\DMZ—Easier access to internal resources when remote.
• Nutanix and Cisco CISSP certification—Vlatko
• Deploy 20 home test neighborhood —RAPID
• CPE process —Develop business workflows\reduce repetition and waste
Challenges
• Continue growth of the RAPID platform and the neighborhoods that
are\can be served
• Growing security threat awareness, detection, defense and response
• Technology evolves in sometimes unforeseeable ways, forcing long-term
IT planning into a narrower timeframe than, for instance, streets or parks
• Accelerating technology demands from staff, public and legal mandates
• Keeping InfoSys staff up to date through training on new and emergent
43