Public Works Department
2019 Annual Report
I1111f1111111111P11JIIIR.-_ '
What We Do
The Public Works Department is
responsible for maintaining fifty
miles of city streets and parking
lots, water treatment and
distribution infrastructure.
Public Works employees are on
call 24/7, 365 days each year to
handle emergency call out for
downed trees, street and traffic
light issues, snow removal, water
main breaks, water meter issues,
as well as assisting with hazardous
spills and clean up and other
community emergencies.
The Public Works Department also
assists multiple community events
such as Winter Carnival, 4th of
July, and other activities that occur
within the City 's public rights -of -
way.
Operations
Public Works has 20 full-time
employees which are comprised of:
Administration/Engineerin
Public Works Director, City
Engineer, Administrative Assistant
Streets Department
Streets Superintendent, Streets
Supervisor, Mechanic and 8
Streets Operators
Water Department
Water Systems Manager, Water
Treatment Supervisor, Water
Distribution Superintendent and
4 Water Utility Operators
The Public Works employees are
the backbone to all of the City
infrastructure systems. Our
Employees are hard working,
Table of Contents
Strategic Objectives
Performance Report
Our Finances
Looking Forward
1
2
3-4
5
Mission
McCall Public Works
Department is dedicated
to excellence, integrity,
and stewardship. We
enhance the safety,
welfare, and livability of
the community by
providing and managing
infrastructure and
services for streets, water
distributions, and water
treatment.
Vision;
Making our community
better through the critical
services we provide each
day.
1
Other Accomplishments
A Performance Report
2019 Summary of Events
o, new snow gates with wing
ombo were purchased and
installed on CAT 950 loaders.
• A new, Ford F350 Streets utility
truck was purchased.
• A new 5 year lease was secured
for (1) new CAT 950 loader to
replace a City owned loader that
was decommissioned.
• Roadway plowing was
completed for the 192 inches of
snow during Winter 18/19 with 33
days of 3+ inches of snowfall.
• A new PW Administrative
Assistant was hired
• Two (2) new Streets Operators
were hired.
• One (1) Water Operator I
received his Water Distribution I
license through IBOL; A new
Water Treatment Plant Manager
was hired.
• 136 new water customers
connected in 2019
• Rebuilt two of the three pumps
at the Legacy Raw Water Intake
Station.
• One (1) of the eleven (11) main
valve actuators was replaced
within the Water Treatment Plant
2019 Accomplishments
STREETS:
• Completion of Phase 1B (Lenora and 2nd Streetscape improvements and
Phase 2A (underground utilities on Park and Veterans Alley) of the
Downtown Core Reconstruction Project.
• Roadside drainage infrastructure improvements on Hayes, Herrick, and
Jasper as part of the Jasper Subdivision Water Main Replacement
Project.
• Microsurfacing preventative maintenance completed on 8.75 miles of the
City's —40 miles of paved roadways.
• One hundred fifty (150) public works permits issued for work within the
City's rights -of -way; automated permitting process improvements
completed .
• 200 cubic yards of new road material added to Bear Basin Road.
• 100% increase in crack sealing completed in 2019 over 2018
WATER DISTRIBUTION/TREATMENT:
• Old 4 -inch water main replacement on Park Street with new, 8 -inch
plastic piping and all new services completed as part of Phase 2A of the
Downtown Core.
• Old, 4 -inch water main replacement with 2,700 lineal feet of new new 8 -
inch plastic piping on Hayes, Herrick and Jasper Streets. All new water
services also installed
• Comprehensive chlorine generation and storage tank infrastructure
replacement completed.
• Supervisory Control and Data Acquisition (SCADA) software, operations
interface and data management system upgrade completed at the Water
Treatment Plant (WTP).
• The Water Treatment Plant now operates in an automated mode for the
first time since it was constructed in 2001.
ENGINEERING:
• Nick Zaninovich hired as the City's new City Engineer in May, 2019
• Project Manager for Jasper Subdivision Water and Drainage
Improvements Project
• Engineering review and approval on over 60 land use applications.
2
mh Streets Department
M
1
Our Finances
Fiscal Year 2019
What are the costs?
The costs for operating the
Streets Department are paid
through the General Fund. This
fund is Primarily dependent on
property tax revenue.
The department also receives
supplemental funding from the
Water Department for shared
services (administration,
management, and engineering)
Staff are now responsible for
implementing projects funded by
the Streets LOT tax which is
dedicated to street
reconstruction and maintenance.
The approved Transportation
Master plan outlines the future
use of the Streets LOT funding
for planned infrastructure
projects.
Grant funding is an additional
source that can contribute to this
budget.
Streets Department Staff:
• Public Works Director
• PW Administrative Assistant
• City Engineer
• Streets Superintendent
• Streets Supervisor
• Mechanic
• 7 Street Operators.
STREETS Revenue by Source
Property Tax
Hwy Funds & Interest
Appropriated Fund
Inter -Fund Transfers
Other Revenue
$1,685,549
$148,815.
0.00
$137,520.
$37,561
Total:
$2,009,447
STREETS Expense by Category
3
19
Personnel Expenses:
Salaries, Wages and Other
Personnel Expenses
$928,425..
Operating Expenses:
Operations Expenses
Capital Expenses
Inter -Fund Transfer
Expenses
$493,319.
$153,394.
$290,700.
Total:
$1,865,839.
What are the costs?
Our Finances
Fiscal Year 2019
The Water Department is an
enterprise fund and the costs
for operating the department
comes from two processes:
monthly water base rates and
monthly usage rates.
New water services pay a
system buy -in and connection
fee as well.
Grant funding is an additional
funding source that can
contribute to the budget.
Water Treatment &
Distribution Department
Staff:
• Water Systems Manager
• Water Distribution
Superintendent
• Water Treatment
Operations Manager
• 4 Water Operators
WATER Revenue by Source
Operations Revenue
FY19
Fee Revenue:
$65253.
Grant Revenue:
$0.
Interest Revenue
$85,468
Operations Revenue:
$2,870,914
Other Revenue:
$47,640
Total:
$3,069,278
WATER Expense by Category
Personnel Expenses
Water Distribution Personnel
Expenses
$300,660.
Water Treatment Personnel
Expenses
$198,563.
Total:
$499,223.
Water Distribution Operating
Expenses:
$229,329.
Capital Expenses:
$987,302.
Inter -Fund Expenses :
$313,008.
Debt Related Expenses:
$359,909.
Water Treatment Operating
Expenses:
$251,064.
Capital Expenses:
$494,707.
Inter -Fund Expenses:
$-94,067.
Total:
$2,541,252.
4
WE WANT TO HEAR FROM
YOU!
Looking Forward
What's Next: Projects & Challenges
Nathan Stewart
Public Works Director
(208) 634-8943
nstewart@mccall.id.us
Physical Address:
McCall Public Works Office
815 N. Samson Trail
Mailing Address:
City Hall, 216 E. Park St
McCall, ID 83638
www.mccall.id.us
Nick Zanonovich
City Engineer
208-634-3458
nzaninovich@mccall.id.us
Cris Malvich
Streets Superintendent
(208) 634-8946
cmalvich@mccall.id.us
Water Systems Manager—TBD
Levi Brinkley
Water Distribution Superintendent
(208) 634-1011
Irinkley@mccall.id.us
Stacy Lafay
Water Treatment Plant Manager
(208) 634-1853
slafay@mccall.id.us
D
Q
EVE
MISSION STREET
A Local Option Tax Street improvement Proiert
Plans and Progress Fiscal 2020:
Streets: Maintaining over 50 miles of asphalt and gravel streets is the primary
function of the Streets Department. During the fall and winter the primary ac-
tivity is snow removal prep activities and snow removal. When it is not snow-
ing, crews are busy cutting the snow floor and widening roads. During the
spring, crews are busy making sure storm drains are working properly and
repairing roads damaged by spring breakup. The summer season brings
crack sealing to prevent water from making its way below the surface and
causing erosion. As the weather continues to improve, the streets and parking
lots get a fresh striping, grading and applying dust control oil to gravel streets.
Significant projects planned in 2020 includes:
• Downtown Core Phase 2B (Park Street and Veterans Alley) roadway and
streetscape (sidewalks, lighting, landscaping) improvements. Project will
include a new driveway into the City campus parking lot and landscaping
and access improvements on the north side of City Hall.
• Roadside drainage improvements on Boydstun Lane and Boydstun Loop.
• Pavement assessment and revision of the Streets 5-10 year Capital Im-
provement Program (CIP) and Maintenance Improvement Program (MIP).
• Stormwater BMP regulation training for local designers and contractors
• Completion of the Public Works Facility Master Plan.
• Park Street/Thompson streetscape and overhead utility conversion
• Mission Street Reconstruction engineering design.
Water Treatment and Distribution: This year O&M activities will highlight con-
tinued treatment plant staff training, old meter and hydrant replacement, hy-
drant flushing, and water service and valve repairs.
Significant projects planned for 2020 includes:
• Jasper Subdivision Phase 2 Water Main and Services Replacement
(along Boydstun Lane and Boydstun Loop)
• Legacy raw water intake building and foundation Improvements and con-
ditional use permit (CUP) authorization
• 8 -inch water main connection between University Lane and Miles
Standish Road
• Water Treatment Plant filter performance assessment
5