HomeMy Public PortalAboutRevision No OC-26F - Project No VKB 99806900f • uaIneb H. Lummmgs, mc. 3575 Northwest 53rd Street Fort Lauderdale, FL 33309 mminas ewe c Contrac`ors Department of Management Services State of Florida -Facilities Development Attn: Mr. Rafael Martinez Sr., Project Director Park Trammel Building 1313 North Tampa Street Suite 106 Tampa, Fl 33602 RE: Key Biscayne Civic Center State Project # VKB 9806900 JAC Project # 99-1-38 Phone 954-733-4211 Fax 954-485-9688 Website www lamesacummings.com April 5, 2002 Dear Mr. Martinez, We are herewith submitting Revision # OC-26F Add 2 layers of 5/8" drywall to the ceiling of elevator #2 Shaft. In accordance with OBM field report # 3 dated march 27, 2002. Please see the attached back up and summary for the work in the amount of $ 1,727.00 This credit will be applied against the Owners Contingency. We respectfully reserve our rights to request additional time should it become apparent this work will delay the completion of project. Sincerely, Frank Sedmak Project Manager Cc: William R. Derrer Rob Maphis Jud Kurlancheek OBM Gus Escobar 1 XCKC06E641 INTERIOR SYSTEMS INC. 3625 WEST BROWARD BLVD - FORT LAUDERDALE, FLORIDA 33312 - (54) 581-0713 - FAX 581-0788 Cost Proposal Date: April 1, 2002 From: Scott Vidal To: James A. Cummings, Inc. 3575 Northwest 53rd Street Fort Lauderdale, Florida 33309 Attn: Frank Sedmak Regarding: Elevator # 2 Job Name: Fire Rescue Building Contract #: B & B Job #: 010541 Proposal #: 012 The total price for this revision is: Material: $ 320 Labor: 5 1,182 Profit: $ 225 Total: 5 1,727 Please note the following qualifications: Add drywall in the Elevator # 2 ceiling. Wall extensions above the concrete is included. Scaffolding is included. Please call with any comments. METAL FRAMING - DRYWALL - ACOUSTICAL CEILINGS - EXTERIOR FINISH SYSTEMS OBM Miami, Inc 2600 Douglas Road. Suite 510 -- Coral Gables, Florida 33134 Tel.: (305)445-7811 - Fax: (305) 445-0997 • E-mail: obmm�a obintnet PROJECT: DATE: PRESENT a SITE: VKB Fire Station March. 27, 2002 Chief Baron, `'KB Bill Hilton, Cummings Bill Pappas, Cummings Gus Escobar, OBM I WORK 1N PROGRESS: j Roofing felts and metal hip caps. Drywall. Electrical "j' boxes. FIELD REPORT :: 3 PROJECT #: 9808( OBSERVATIONS: 1 01. Work continues on the security system, although it I» s been two week ; since a stop was put on the work by the village manager and subsequently by OBM. In ads iition, the S15,004. +- approved for the electrified hardware is no longer required. Cummin ;s was told this at the previous she visit on March 20th. 02. Nothing has been done on the Dias. 03. Stucco work an the building appears close to complete. The work is e t.ceJient. One minor correction needs to be made at the tower, see attached sketch. 04. Electrical light fixture locations were verified REQUIRING ACTION/INFORMATION: 1, 01. OBM discussed cabinet shop drawings and additional costs with cabin .t manufacturer. The additional costs were eliminated and a small credit is expected. 02. The underside of the elevator shaft roof shall be i hr fire rated. Install 12) layers of Nil" type 'X' gypsum board. 03. The walls in the day room shall receive openings. The openings in the 'alts shall have a sill ht. of 42" and shall commence at the columns and ran to ether aide to 1 'Le electrical lines running in the wall. Both openings shall be the same width. There she uld be no bender and the ceiling should run continuous from the Day Room to the adjacent (:orridor. If a header is required match the upper header ht at the Kitchen floor. COPIES. El OWNER CONTRACTOR CONSULTANTS REPORT BY- tiny Fsrnhar PG._L— OF ? OBM Miami, Ii c 2600 Douglas Road, Suite 510— Coral Gables, Florida 3313 - Tel,: (305)433-731i • Fax: j3O^) 445-0997 • E-mai Ubrnrnaa obml.net CONTINUATION SHEET PROJECT: FIELD REPORT #: REQUIRING ACTION/INFORMATION: 04. The aiC compressor line running in the Apparatus Room needs to rue in the ceiling plenum of rooms 110 and 105. 05. We are awaiting a cut sheet of a new light of the gym. The new fixture is a flour. Cage fixture. 06. The range will be moved slightly, to be centered, under the hood. The i;hift is 9" to the right. The cabinet manuf. was going to coordinate this with the contractor ® OWNER COPIES: {'ffiCONTRACTOR REPORT RY. Cina Facnhssr PG..y_� OF 2 CONSULTANTS Terrtph re rard Rapurt Farm ubu OBM Miami, Inc 2600 Douglas Road, Suite 510— Coral Gables, Florida 33134 Tel.: (305) 445-7811 ' FAX: (305) 445-6997 • E-mail: obn miagobmi.net REVISION/DRAWING DATE 03/28/02 REVISION # I PROJECT VKB FIRE STATION DWG# 15 DRAWINGS REVISED COMMENTS Day Room wall openings 013M CA..x. curr r14. -r614 sr= Dre% 1 1 1 l t t Rfi4Rlpistc Ravtinons-D wg doc CCILI . ,J, 1-44Ek :n. (Mos ireavlt ;OD M:..r &L O PTIfez r ,,to�rZ. c car- - 1 1 :02.