HomeMy Public PortalAboutAdd#6 - 5th Ave RW.PDFADDENDUM #06
ADDENDUM # #06 DATE April 10, 2018
ADDENDUM TO CONTRACT City of Tvbee Island - City Engineer
DATE OF CONTRACT February 28, 2018
PROJECT: CITY OF TYBEE ISLAND
5th AVENUE RIGHT-OF-WAY SURVEY
THE CITY OF TYBEE ISLAND (Owner) and THOMAS & HUTTON ENGINEERING CO.
(Consultant/Engineer) this 12TH day of April 2018, amend their contract dated February 28, 2018
for work, materials, or services described below.
I. SCOPE OF WORK:
A. Right -of -Way Survey
At the request of the City of Tybee Island, Thomas & Hutton will survey the
unopened portion of 5th Avenue, from Butler Avenue to 2nd Street. The corridor is
approximately 600' X 60'. We will locate visible improvements (i.e. roads, ditches,
signs) and surface appurtenances of underground utilities and obtain depths,
pipe size and type on accessible storm and sanitary sewer manholes. The City will
provide guidance with regards to the size and type of trees to be located.
Survey Phase
A. Exclusions
Lump Sum $4,100.00
Items not included in the scope of services are as follows:
• Engineering Design
• Permitting of any type
• Cost Estimating
• Construction Services
• Determination of Improvements and Associated Costs
• Accessibility construction compliance verification
• Archaeological survey and report
• Wetland, Coastal Marshland delineation, surveys, or permits
• Geotechnical investigation or report
• Phase One or Phase Two Environmental Assessments
• Endangered species survey and report
• Off-site work unless specifically covered in the scope of services
• Approvals or permits other than those related to the scope of work
covered by this contract
• Act as an expert witness for legal activities
• Georgia Department of Transportation permits or approvals.
• Telephones, cable television, gas, and power distribution systems
L:\City of Tybee Island\CO Tybee-Addendum 6 - 5th Ave RW Survey.doc
City of Tybee Island
Addendum #06
April 12, 2018
Page 2
These items can be coordinated or provided, if requested by the Owner in
writing.
2. PERIODS OF SERVICE
After receipt of a written notice to proceed from the Owner, Consultant will
commence and complete work upon a mutually agreed upon schedule
between Owner and Consultant.
The above fee arrangements are on the basis of prompt payment of our invoices and
the orderly and continuous progress of the Project.
Project related costs for all printing, travel, reproductions, and materials will be billed as
reimbursable expenses.
When approved by both parties this Addendum becomes a legal document and a part
of and subject to Terms and Conditions of said Contract.
APPROVED:
APPROVED:
THOMAS & HUTTON ENGINEERING CO. CITY OF TYBEE
By:
V. Giordano, P.E.
Title: Project Manager
Bv:
Title: City Manager
Date: Date: