Loading...
HomeMy Public PortalAbout08 August 21, 1962 TC Minutesis T04N OF YARROW POINT kIAUTES OF THE REGULAR, COU.vCIL MEETING OF AUGUST 21, 1962. THE REGULAR MEETING OF THE COUNCIL wAS HELD CA AUGUST 21, 1962 AT 8:00 P. M. AT THE TO�iN HALL. THOSE IN ATTENDANCE WERE ROBr:RT MORROW, ART CARKEEK, SHELDON DUNNING, JOHN HELSELL, JOHN ROBERTS, GLEN SPARRO4, TED BAKEFLAN AND LORRAINE DILLE. I. THE RylEETIIIG WAS CALLED TO ORDER BY THE MAYOR. 2. A MOTION WAS MADE, SECONDED AND PASSED UNANIMOUSLY THAT THE READING OF THE MINUTES OF THE: PREVIOUS MEETING BE DISPEN3Ell ;rdITH AS ALL THOSE COUNCIL MEMBERS IN ATTENDANCE HAD RE,CEIVLD COPIES OF SAME. 3. A LETTER RECEIVED FROM THE -STATE HIGH4AY UEPARTl%.E T, FROM PAUL NCKAY, REGARDING THE 4ALK4AY TO BE BUILT BETWEEN 92ND, AygNUE iv _ E. AND 84TH AVENUL N. E. VIAS READ BY THE MAYOR. THERE WAS GENERAL llTSCUSSION. A .MOTION UAS IJADE BY SHELDON DUNNING AS FOLLOdS: "THE TOWN OF YARRO,V POINT SHOULD AND WILL ASSUME AND ATTEND TO THE. FUTURE MAINTENANCE. OF THE WALKWAY WHICH IT IS UNDERSTOOD WILL BE INSTALLi�D BY THE STATE, -HIGHWAY DEPAHT114ENT ALONG THE. NORTH SIDE OF THE; iVEYlf HIGH- WAY BETWEEN 84TH AVENUE N. E. AND 92ND AVENUE N. E. AND THAT THE MAYOR BE INSTRUCTED TO RELATE THIS DECISION -TO MR. P. J. MCKAY, DISTRICT EWGINEER OF THE STATE HIGHWAY DEPARTMENT AS RE,�UESTED IA HIS LETTER TO THE TOWN OF YARROW POINT DATED JULY 27, 1962". SECONDED BY ART CARKEEK. PASSED UNANIMOUSLY. 4. A LETTER WAS READ BY THE MAYOR FROM .ROBERT BARRETT RESPLOTING THE. NEED FOR FOOTPATHS. 5. AT THIS TIME THE DISCUSSION TURNED TO CONTEMPLATED YARROW POINT STREET IMPROVEMENTS, AND WALKWAYS. JOHN HELSELL AND CURT CliUVE.R HAVE GIVEN CONSIDERABLE TIME TO DETERMINING A SOLUTION TO THIS PROBLEM AND MR. HELSELL READ A REPORT PREPARED BY HE A14D 'L%iR_ CRUVE.R TO THE COUNCIL. REPORT ATTACHED. OUR TOWN ENGINEER COMMENTED THAT HE: HAD DISCUSSED MOST OF THIS WITH MR. HELSELL AND THAT HE AND MR. CRUVER HAVE DONE A FINE JOB IN MAKING A THOROUGH STUDY OF THE SITUATION. MR. SPARROW FEELS THAT THE REPORT IS ACCURATE AND THAT IT PROPOSES A DESIRABLE, AND WORKABLE PROGRAM. TE.D BAKL AN STATED HE WANT10 TO THANK THESE T-WO GENTLE.UN FOR ALL THEIR TIME SPENT ON SAFETY FOR YARROd POINT, BUT HE TAKES EXCEPTION TO THE FACT THAT ALL SAFETY FACTORS ARE NOT TAKEN INTO CONSIDERATION. IS OF THE, OPINION SAFETY WOULD BE SERVED BEST IF WALKWAY WAS PLACED ON EAST SIDE OF 92ND AVENUE. HE ALSO TOOK EXCEPTION TO NO SAFP;TY MARKINGS. 0 GEfihRAL DISCUSSION. L_1 PAGE 2 MINUTES OF THE REGULAR COUNCIL Mt;LTING AUGUST 21'> 1962 ROBERT MORROW PROPOSED THE SUBJECT OF A GENERAL OBLIGATION BOND ISSUE, FOR THE NEXT ELECTION. IT WAS DISCUSSED AS TO AMOUNT, HOW MANY YEARS IT SHOULD RUN, ETC, A MOTION LiAS MADE BY JOHN HELSELL THAT THL TOWN OF YARROW POINT SUBMIT A 055,000.00 GENERAL OBLIGATION BOND ISSUE TO THE RESIDENTS AT THE ELECTION ON NOVEMBER 6, 1962. THE MCTION PROPOSED BY JOHN HELSEL READS AS FOLLOWS "ORDINANCE m77, AN ORDINANCE OF THE TOWN OF YARROW POINT, WASHINGTON, PROVIDING FOR THE SUBMISSION TO THE QUALIFIED ELECTORS OF THE TOWN AT A SPECIAL ELECTION TO BE HELD THEREIN ON THE 6TH DAY OF NOVEMBER, 1962, OF THE PROPOSITION OF WHETHER OR NOT THE TOWN SHOULD ISSUE AND SELL ITS UNLIMITED TAX LEVY GENERAL OBLIGATION BONDS IN THE PRINCIPAL SUM OF $55,000 FOR THE PURPOSE OF PROVIDING FUNDS TO PAY THE; COST OF GRADING, PATTING AND IMPROVING STREETS AND ARTERIALS AND INSTALLING PEDESTRIAN PATHS WITHIN THE TOWN." SHELDON DUNNING SECONDED AND THERE WAS NO DISCUSSION. A POLL OF THE COUNCIL DISCLOSED UINANIMOUS ACCEPTANCE. THE ATTORNEY .FOR THL TOWN WAS INSTRUCTED TO CONSULT BOND CONSUL. 6. SIDE SEWERS NOT CONNECTED. AFTER DISCUSSION AMONG THE COUNCIL THE TOWN ATTORNEY WAS INSTRUCTED TO BRING LEGAL ACTION THROUGH OUR MUNICIPAL COURT UPON THOSE NOT CONNECTED ON YARROW POINT WHO HAVE NOT BEEN GIVER A TIME EXEMPTION. THIS INCLUDED THE SEWER ON THE HARLAN PROPERTY. 7. THE ATTACHED LIST OF VOUCHERS IWERE APPROVED FOR PAYMENT. 8. ROBERT MORROW COMPLIMENTED JOHN HELSELL ON HIS INTEREST AND SUCCESSFUL ENDEAVORS WITH THE. STATE HIGHWAY DEPARTMENT HHICH APPARENTLY NOW ASSURES US OF A FOOTPATH ALONG THE NEW FREEWAY. 9. THE MAYOR HEAD A REPORT FROM MIKE .FALK ON WATER ACTIVITIES AND THE PATROLLING OF SAME AROUND YARROW POINT. 10. THE MAYOR READ A REPORT FROM KEN DAY ON POLICE ACTIVITIES ON YARROW POINT. 11. THE MAYOR READ A LETTER FROM COLONEL HAMILTON DATED AUGUST 9, 1962 DIRECTED TO THE COUNCIL. 12. THE SMYOR REAPPOINTED DR. JANES IMCGRATH TO THE PLANNING COMMISSION AS OF JULY 8, 1962 FORA PERIOD OF S APPOINTED VINCENT DEDONATO AS OF JULY 8, 1962 FOR A PERIOD OF FIVE YEARS, ALSO TO THE PLANNING COMMITTEE. 13. THE MEETING CONTINUED UNTIL AUGUST 29, 1962 AT 7:00 P. M. RESPECTFULLY SUBMITTED, LORRAINE M. DIEDE TCViN CLERK r ATTEST: • R. D. MORROMAYOR STUDY BY CRUVER & HELSELL REPORT TO THE COUNCIL ON F❑OT PATHS IT IS RECOMMENDED THAT THE INITIAL STEP IN THE FOOT PATH PROGRAM BE THE INCORP❑RATION OF A 6 FOOT WIDE PATH ON THE WEST SIDE OF 92NO N. E., EXTENDING FROM THE FOUNTAIN SOUTH TO 32NO N. E. AND INTERSECTING WITH THE SCH❑❑L FOOT PATH TO BE CONSTRUCTED BY THE STATE. ADJACENT TO THE NEW HIGHWAY. IT IS FURTHER RECOMMENDED THAT THE CONSTRUCTI❑N OF THIS PATH BE MADE A PART OF THE FINAL STREET IMPR❑VEMENT PROGRAM ON 92NO N. E. IT IS BELILVED THAT THIS STREET IMPROVEMENT PROGRAM SHOULD PROVIDE THE FOLLOWING: 1. CONSTRUCT ST❑RM SEWERS IN ACCORDANCE WITH THE COMPREHENSIVE STREET PLAN. 2. WIDEN EXISTING HIGHWAY BY 4)� FEET ON EACH SIDE. (2}6 FEET OF DRIVING SURFACE PLUS 2 OF THICKENED EDGE.) 3. GRADE AREA ON BOTH SIDES OF HIGHWAY TO A DISTANCE OF 20 FEET FR❑M THE CENTER LINE. THIS SHALL INCLUDE FILLING OF THE PRESLNT DITCH. 4. CONTOUR TH@ BANK WITHIN THE RIGHT ❑F WAY TO EFFECT AN ATTRACTIVE TRANSITION TO THE ROAD GRADE. 5. SURFACE A 6 FUOT WIOL PATH ON THE, WEST SIDE WITH BLACKT❑P. 6. CONSTRUCT A BARRIER ON THE. WEST SIDE BETWEEN PATH AND ROADWAY SUCH AS LOW ATTRACTIVE FENCE DR EXTRUDED CURSING (80 GLNTS A FOOT. 7. FROuIDE BUS LOADING AREAS ON WEST SIDE. B. MOVE MAIL BOXES TO 16 TO 18 FEET FROM CENTER LINE OF ROAD ON EAST SIDE. THE F❑LLOWING CONSIDERATIONS LED TO THE CUNGLUSIONS PRLSE.NTED ABOVE: 1. IT I5 BELIEVLD THAT THL REQUIREMENT FOR WALKING AND BICYCLE PATHS IS GREATEST ON 92ND DUE T❑ THE FACT THAT IT IS THE MAIN ARTERIAL USED WHOLLY OR IN PART BY NLARLY ALL RESI❑ENTS FUR . AUTOMOBILE TRAVEL TO AND FROM HOMES. BY ITS NATURE IT IS CONDUCIVE TO HIGHER SPEEDS THAN ALL OTHER ROADS IN THE COMMUNITY WITH THE POSSIBLE EXCEPTION OF POINTS DRIVE. 2. IT IS NOW USED, AND WILL IN THE FUTURE BE USED, BY THE MAJORITY OF CHILDREN FOR T RAVLL TO AND FROM BUS STOPS. 3. THE WEST SIDE APPEARS MORE LOGICAL FOR THE FOLLOWING REASONS: 2. A. APPROXIMATELY 5 OF 6 CHILDREN SERVED BY SUS STOPS ON 92NO WILL LIVE ON THE WEST SIDE OF 92ND. THEREFORE, THE NUMBER OF STREET CROSSINGS REQUIRED WILL BE MINIMIZED. 9. THL L❑CATION ON THE WEST SIDE WILL AVOID A MAJOR CROSS —OVER IN CONNECTING WITH THE NLW PATHWAY TO THE SCHOOL. C. IF THE FOOT PATH IS BUILT WITHOUT THE ROAD IMPROVEMENT THL COST OF A PATH ON THE WEST SIDE AT ROAD LEVEL WOULD BE APPROXIMATELY 2/3 THAT OF A PATH ON THL EAST SIDE FOLLOWING EXISTING CONTOURS. A PATH ON THE EAST SIDE AT ROAD LEVEL IS NOT PRACTICAL UNLESS IT IS INCORPORATED IN THE STREET IMPROVEMENT PROGRAM. 4. IT IS BELIEVED THAT THE PATH MUST BE WELL GRADED, WELL SURFACED AND AS CONVENIENTLY LOCATED AS PMSIBLE TO ASSURE ITS USE BY BOTH BICYCLE AND FOOT TRAFFIC. 5. IT IS BELIEVED THAT THE MOST IMPORTANT SAFETY CONSIDERATION IN REGARD TO PLACEMENT OF THL PATH IS THAT UNIMPAIRED VISIBILITY OF TRAFFIC ON THE PATH BE PROVIDED FOR DRIVERS. G. IN VIEW OF CONSTRUCTION AND MAINTENANCE COST CONSIDERATIONS RND REASONS EXPRLSSED IN (4) PauO (5) ABOVE, IT IS BELIEVED THAT THE PATH SHOULD BE LEVEL WITH THE ROAD GRADE. 7. THE SIX FOOT WIDTH WAS CHOSEN TO ENCOURAGE TWO— WAY PEDESTRIAN AND BICYCLE TRAFFIC. 6. THE ADDITIONAL LEVEL AREA ON THE EAST SIDE IS PROPOSED FOR THE U5E OF LOCAL HOUSE TO HOUSE TRAFFIC WHERE THE DISTANCE TO BE TRAVELLLD DOES NOT WARRANT CROSSING AND RE —CROSSING THE STREET. 9. IT IS FELT THAT MARKED CROSSWALKS SHOULD NOT BE RELIED UPON BY PARENTS OR CHILDREN AS A GUARANTEE OF SAFETY AND THAT TRAFFIC ON YARROW POINT WILL NEVER BE HEAVY ENOUGH TO MAKE THEM A NECESSITY. TO PLACE A CROSSWALK AT ANY INTERSECTION OTHER THAN A NATURAL FOUR—WAY INTERSECTION WILL ONLY FOOL THE AUTOMOBILE AND GIVE A FALSE SENSE OF SECURITY TO THE CHILDREN. ID. THE PATHWAY PROJECT, AS PART OF THE ROAD IMPROVE- MENT PROJECT, WILL BE A RELATIVELY SMALL EXTRA COST (APPROXIMATELY S5,000.00). HOWEVER, IF THE PATHS ARE CONSTRUCTED FIRST, STREET IMPROVEMENTS, SUCH AS WIDENING OR PROVIDING STORM SEWERS, WOULD NOT ONLY BE ADDITIONAL IN COST, BUT WOULD PROBABLY NECESSITATE DESTRUCTION AND REBUILDING OF THE EXISTING PATHWAYS IN MANY PLACES. 11. IF THE PATHWAYS AND ROAD IMPROVEMENT CAN BE COMBINED CONSIDERABLE SAVINGS SHOULD ACCRUE SINCE HEAVY, LABOR— SAVING MACHINERY WILL BE USED FOR THE PROJECT. 12. THE IMPROVEMENT OF 92NO IS A MAJOR PORTION OF THE ENTIRE ROAD IMPROVEMENT PRUGRAM AND AS SUCH SHOULD BE ACCOMPLISHED AS SOON AS POSSIBLE TO AVOID THE RISING COSTS OF CONSTRUCTION WORK. 13. IT IS BELIEVED THAT IN ACCORDANCE WITH EXISTING PROVISIONS FOR OFF STREET PARKING IN THE YARROW POINT ZONING LAWS NO PARKING. ON EITHER SIDE OF 92ND N. E. SHOULD BE TOLERATED WITH THE EXCEPTION OF OCCASIONAL PARTIES WHERE ON STREET PARKING IS NECESSARY AND CAN BE OVERLOOKED. PARKED AUTOMOBILES CONSTITUTE A HAZARD TO VISIBILITY. 14. THE ROAD IMPROVEMENT COUPLED WITH SURFACED PATHS SHOULD CONTRIBUTE IMMENSELY TO THE ATTRACTIVENESS OF OUR MAIN ARTERIAL SINCE THE DITCH WILL BE FILLED AND ADJOINING LAWNS OR LANDSCAPING CAN BE NEATLY BLENDED INT❑ THE EXISTING PATHWAY OR ROADWAY. THIS IS NEARLY IMPOSSIBLE WITH THE EXISTING WEEDFILLED DITCH. 15. THE COST OF DITCH MAINTENANCE WILL BE REDUCED. 16. THE EXISTING CONCRETE ROAD HAS SUFFERED FROM THE INSTALLATION OF SEWERS AND WILL NEED RESURFACING IN THE NEXT FEW YEARS. 17. SINCE IT IS GENERALLY AGREED THAT THE EXISTENCE OF AN ATTRACTIVE PATH WILL NOT ELIMINATE ALL FOOT AND BICYCLE TRAFFIC FROM THE ROADWAY, GREATER PROTECTION SHOULD BE OFFERED TO THOSE OCCUPYING THE ROADWAY AND SHOULDERS. IT SHOULD BE NOTED THAT THE ROADWAY DEVELOPMENT PLAN PROPOSED ABOVE ALSO CONSIDERS THE SAFETY OF THOSE NOT ON THE PATHWAY BY THE FOLLOWING PROVISIONS. A. 2)6 FEET OF EXTRA DRIVING SPACE FOR BETTER DRIVER CONTROL WHEN PASSING OTHER AUTOS. B. 7Y2 FEET WIDE LEVEL AREA ON EAST SIDE OF ROAD THEREBY ENCOURAGING GREATER CLEARANCE BETWEEN AUTO AND'FOOT TRAFFIC. C. GREATER VISIBILITY BY CLEARING AND GRADING EXISTING RIGHT OF WAY, 18. IT I5 AGREED THAT -THE MAXIMUM PRACTICAL EDGE DISTANCE BETWEEN THE ROADWAY ANO THE WALK SHOULD HE MAINTAINED WHEREVER POSSIBLE; HOWEVER, A LOW BARRIER CAN BE SUBSTITUTED FOR EDGE DISTANCE. 19. THE COST OF THE ENTIRE PROJECT (PATHWAYS AND ROAD IMPROVEMENTS) IS APPROXIMATELY SG5,000.00. THE OTHER $10,0013.❑❑ IS PRESUMABLY AVAILABLE OUT OF THE SURPLUS ON HAND. THE EXTENT OF THE 1962 SURPLUS, IF ANY, CANNOT BE PRLSENTLY ASCERTAINED, ALTHOUGH THERE IS AN INDICATION THAT THERE WILL NOT BE AN APPRECIABLE SURPLUS. 20. IF THE RESIDENTS OF YARROW POINT ARE UNWILLING TO IMPOSE A BOND ISSUE OR LEVY UPON THEMSELVES IT IS BELIEVED WISE TO BUILD A PATH ON THE WEST SIDE AND TO INCORPORATE THE ROAD WIDENING, INCLUDING THE RAISED EDGE, ON TfHE WEST SIDE ONLY, SINCE THIS CAN BE DONE FOR APPROXIMATELY $15,000.00. IT IS CONSIDERED UNWISE TU BUILD THE FOOT PATH WITHOUT MAKING THE ROAD IMPROVEMENTS REQUIRED ON THE WEST SIDE SINCE THE EXISTENCE OF THE FOOT PATH WOULD SERIOUSLY HAMPER ROAD WIDENING. IT IS LIKELY THAT THE PATH WOULD BE DAMAGED AND MIGHT'REQUIRE RE- INSTALLATION. FUTURE IMPROVEMENTS ON THE EAST SIDE COULD BE MADE WITHOUT DETRIMENT TO THE WORK PREVIOUSLY FINISHED ON THE WEST SIDE. 214 A.$55,DO❑.❑D LEVY. WOULD REQUIRE AN ASSESSMENT OF $56.0OPER EACH $1,000.00 OF ASSESSED VALUATION BASED ON A TOTAL ASSESSED vALUE OF $966,993.00 (1961). A GENERAL OBLIGATION BOND OVER A TEN YEAR PERIOD WOULD INCREASE THL PRESENT TAX LEVY BY 7 MILLS. THIS AMOUNTS TO AN INCREASE IN TAXES OF SLIGHTLY LESS THAN 10% FOR TEN YEARS BASED ON THL EXISTING TUTAL MILLAGE OF 77. 0 VOUCHERS 8/21/62 CURRENT #278 - KEN DAY - SERVICES AS DEPUTY MARSHALL 0135.00 JULY tl" ASS'T BLDG. INSP. 25.00 160.00 279 - MIKE FALK - SERVICES AS DEPUTY WATER MARSHALL 50.00 280 - ROGER HAMILTON - SERVICES AS TREASURER,JULY 40.00 281 - LORRAINE M. DIEDE - SERVICES AB TOWN CLERK JULY 4150.00 5.00 STAMPS 155.00 282 - CHRIS DIEDE - RENT FOR TOWN HALL - AUGUST 75.00 283 - JAN LUND - SERVICES AS PLANNING COMM. SECRETATY JULY 10.00 284 -- KEENEY'S STATIONERY _ STATIONERY SUPPLIES JULY 8.90 285 - PACIFIC NORTHWEST BELL _ STATEMENT AUGUST 8, 1962 20.96 286 - G. T. SPARROW & ASSOCIATES STATEMENT FOR JULY 61.20 STREET # 86 - GRIFFIN FUEL CO. - OIL FOR 95TH AVENUE 8/16/62 100.88 87 - G. T. SPARROW AND ASSOCIATES - JULY STATEMENT 72.95 a VOUCHERS - JULY 17, 1962 0 CURRENT 41.35.00 #267 - KEN DAY- SERVICES AS DEPUTY MARSHALL $16c.00 AND BLDG. INSPECTOR $25.00 268 - MIKE FALK- SERVICES AS WATER SAFETY 50.00 MARSHALL - JUNE 1962 269 - ROGER HAMILTON - SERVICES AS TREAS. JUNE 40.00 210 - LORRAINE DIEDE - SERVICES AS TOWN CLERK "150.00 271 - CHRIS DIEDE -- RENT FOR TOWN HALL JULY 75.00 272 - JAN LUND - SERVICES AS PLANNING COMM. SECRETARY $ 10 .00 FOR JUNE 3 HRS. 4 1.50 TYPING FOR COUNCIL 14.50 273 - PUGET POWER -- Tights at entrance to 7/2/62 3.44 274 - KEENEYS STATIONERY SUPPLIES TO 6/7/62 13.84 275 -- G . T . SPARROW ENG . STATEMENT#6277 FOR JUNE 1962 1.68.37 276 - PACIFIC TELEPHONE NORTHWEST 7/8/62 25.98 277 - KING COUNTY FIRE DIST. #14 2nd Payment due 8/31/62 for 1962 966.99 STREET #84 - WASHINGTON ASPHALT -- 2.4 TON XC-2 6/13/62-13.73 85 - SAHLBERG EQUIPMENT, INC. - STOP SIGNS 6/29/62 34.32 is