HomeMy Public PortalAbout20160331 - Appropriations Committee - Meeting MinutesTown of Hopkinton Appropriation Committee
Minutes of Meeting on Wednesday, March 31, 2016
Lower Level, Town Hall, Hopkinton, Massachusetts
In attendance:
Mike Manning
Hanan Cohen
Pam Waxlax
Chris Sandini
John Westerling
Jay Guelfi
Bob Dobinski
Dan Terry
The meeting was called to order by Mike at 6:05 PM.
There was no public comment at the meeting.
John Westerling, Director of Public Works, presented the capital articles for the DPW.
• Highway F-350 Pickup — $60,000 for the replacement of a 2006 F-350 pickup/utility body. The
truck has 161,000 miles on it and has received a total of $22,200 worth of repairs. The truck is
used in day to day operations and has a dedicated plow route. This was on the FY16 plan for
replacement last year.
• Highway 2002 International Dump Truck - $200,000. The truck has severe corrosion and rotting
of its frame. The truck is one of the DPW's largest vehicles so it plays an important role in its
winter operations. The truck has 35,000 miles on it and has received a total of $30,000 worth of
repairs. This was on the FY16 plan for replacement last year.
• Water Biological Filtration Wells #4 & #5 - $50,000 for a pilot program for biological filtration of
the water from wells #4 & #5 to improve the water quality be reducing the levels of iron and
manganese. These two wells are only used during our periods of peak demand in the summer
due to their elevated levels of iron and manganese. This pilot program seeks to find a way to
lower the levels of iron and manganese so that the wells can be used more often thereby
reducing our dependency on purchased water during those peak periods. There is a 828K
gallon/day potential from these wells once treated.
• Water Main Replacement — Hayden Rowe - $260,000 for the next phase of our annual water
main replacement program to replace the worst section of water mains in Town. This year's
selection is the water main on Hayden Rowe in the area of College Street. That water main has
considerable buildup of tuberculation which is affecting water quality in the area.
• Water Construction of New Grove Street Tank - $1,530,000 for the replacement of the smaller
of the two existing water tanks on Grove Street. The existing water tank is in need of
rehabilitation at a total cost of more than a half million dollars. The replacement of the water
tank is currently being designed ($75K funded at last ATM). The replacement of the tank was
recommended in the 2014 Water Supply and Treatment Evaluation Report. The amount is
higher than originally proposed as they have found the tank needs to be bigger than originally
planned. The tank being replaced is from 1922. The larger tank will also need replacing in about
5 years as part of a high pressure system.
• Water Source Supply - $1,000,000 to partner with the Town of Ashland to share the capital costs
associated with Ashland's connection to the MWRA. Ashland's connection will ensure a reliable
water supply to meet Hopkinton's daily water demands during peak periods. Hopkinton's source
of supply will not change — all of our water will continue to come from Ashland's groundwater
wells and not the MWRA. Currently our municipal agreement with Ashland, which expires in
2024, allows for up to 1 million gallons/day. We use their water filtration system (which we
helped pay for when built.) While we don't have to help pay for the MWRA connection, if we
don't Ashland may not hook in and therefore wouldn't be able to provide enough water to us.
This funding guarantees us to be able to purchase the full allotment from Ashland even during
peak periods.
On the operating budget side, John explained the drivers behind the large increases there.
With regards to Highways Storm Water System Budget, the $370,000 request is to pay the increased
costs associated with new regulations promulgated in EPA's new Municipal Separate Storm Sewer
System (MS4) permit. The EPA expects that permit to be released in March 2016. This represents an
increase of $220,000 more than prior years' appropriations. That estimate was calculated by an
engineer hired by the 30 town Central Massachusetts Regional Storm Water Coalition of which
Hopkinton is a member. Most of the cost will go to monitoring for the new regulations.
There is a request for the Pavement Management Program (PMP) for $351,000 to supplement Chapter
90 funds for a total, level funded investment $1M in our annual PMP. There is no longer a surplus in
Chapter 90 funds as it has been use to cover the shortfall of spent versus amount received from the
state in the last few years. The Town invested $1M in its PMP over the past two years and both years it
was able to increase its Pavement Condition Index (PCI). The PCI rose from 73.2 to 74.6 due to the work
completed in 2015.The goal for FY17 is to manage funds to have the greatest impact on the PCI. The
engineers provided three different budget scenarios:
• $800k investment — PCI decreases to 70 and backlog grows to $16.8M in 2021
• $1M investment — PCI slightly decreases to 72 and backlog grows to $15.5M in 2021
• $1.2M investment— PCI increases slightly to 74 and backlog grows to $13.9M in 2021
The engineers recommend budget scenario #3 to maintain the Town's strong maintenance programs
and to increase the mileage of resurfacing to limit the increase in future backlog. The DPW will manage
its funds to have the greatest, achievable impact on the PCI. That will be accomplished with a balanced
treatment program that will include crack sealing, chip sealing, milling and overlay, and full depth
reclamation. Those treatments will be spread over local and arterial streets.
Additionally, John noted that the Waste Collection & Disposal increase is an estimate as the contract
expires 7/1/16. This increase is not necessarily population driven.
We then discussed the request to overspend the Snow & Ice Removal Account. The original
appropriation at the May 2015 ATM was $350,000. We have paid invoices to date totaling $525,000 for
FY16 and expect to exceed original budget by $200,000.
Pam moved and Hanan seconded to authorize the Town to incur liability and make expenditures in
excess of available appropriations for snow and ice removal in accordance with MGL Chapter 44, section
31D in the amount of $200,000. The motion passed by a vote of 3-0.
Jay Guelfi, Director of Parks & Recreation, Bob Dobinski, P&R Commission Chair, and Dan Terry, P&R
Commission, spoke about the P&R Enterprise Fund. Jay handed out the budget analysis he completed
with Chris (see Attachment 1.) The second page breaks out the financials between programming and
non -programming revenue and expenses. Non -programming for the most part are just expense items
and P&R has little control over these fixed costs. For the most part the General Fund subsidy is the
amount needed to cover the non -programming costs as well as that portion of Full Time Salaries not
offset by programming revenue. Jay noted that he has found revenue on programs pretty predictable
across the last two years. The enterprise fund operates on a cash basis so expenses for summer camps
occur early in the fiscal year and next year's camp revenue comes in later in the fiscal year (around
April/May.)
Chris presented the retained earnings on the enterprise funds (see Attachment 2.) He noted that for
Sewer a chunk of the retained earnings will be spent each year to offset rates to draw down the retained
earnings balance some. With Water the opposite will take place as the plan is to build up the retained
earnings balance. P&R balance is adequate as it is a little more than 5%, which is what the DOR
recommends for a retained earning balance.
Hanan moved and Pam seconded a motion to approve the minutes of our 3/30/2016 meeting. The
motion passed by a vote of 3-0.
At 8:08 PM Pam moved and Hanan seconded a motion to adjourn. The motion passed unanimously, 3-0.
,Y -
Town Of Hopkinton
PARKS & RECREATION ENTERPRISE FUND - BUDGET ANALYSIS
PARKS & RECREATION ENTERPRISE FUND
B udget 2016 YTD 2016
FY 16 Pr ojected Budget 2017
PARKS & RECREATION REVENUES
Field Usage Charges
Fruit Street Usage Charges
Program Charges:
Youth Summer Sports Clinics
Ski Program
Basketball In -Town Program
Summer Playground groups
Babe Ruth Bas eball
TDA Drivers ED
Other Pr ograms (girls lacrosse, Flag Fo otball, Tennis)
Sub Total
Other Revenue:
Boat Permits
Beach Permits
Sub Total
TOTAL REVENUES
14,340
60,000 30,140
240
14,340
65,000
14,340
65,000
65,226 12,678 65,226 65,226
50,390 45,675 45,675 45,675
44,525 47,835 44,525 44,525
120,000 11,680 120,000 120,000
10,000 10,000 10,000
7,225 13,761 19,265 19,265
50,940 23,952 50,940 50,940
422,646 185,961 434,971 434,971
5,450 3,060 5,450 5,450
4,800 5,944 4,800 4,800
10,250 9,004 10,250 10,250
432,896 194,965 445,221 445,221
PARKS & RECREATION EXPENDITURES
Personal Services 195,679 93,817 195,679 195,379
Electricty 3,000 3,225 3,000 3,000
R&M Recreational Facilities 69,000 11,450 22,900 22,900
R&M Fruit Street 29,000 20,105 29,000 29,000
R&L Dept . Equipment 45,000 1,887 45,000 45,000
Advertising 1,800 1,096 1,800 1,800
Recreational Supplies 60,000 9,470 60,000 60,000
Debt Se rvice 42,250 42,250 40,850
Misc Other Contract
Youth Summer Sports Clinics 50,156 50,156 50,156
Ski Program 48,473 48,473
Basketball In -Town Program 35,593 35,593
Summer Playground Groups 22,911 22,911 22,911
Other Pro grams (girls lacrosse, Flag Football, Tennis) 44,951 44,951 44,951
Sub Total 180,000 118,018 202,084 202,084
INDIRECT COSTS 36,635 37,369
TOTAL 630 -PARKS & RECREATION (B) 662,364 259,068 601,713 637,382
Excess (deficiency) of rev enues ov er (unde r) expen ditures (229,468) (64,103) (156,492) (192,161)
Park & Rec Budget Analysis
FY 2017
Full Time Salaries
Programming
Summer Playground Groups
Summer Sports Clinics
Basketball In -Town Program
Ski Program
Babe Ruth Baseball
Fruit Street
TDA Drivers ED
Other Programs (Lacrosse, Volleyball, Flag Football)
Field use
Sub total Programming
Non Programming
Sandy Beach
Indirect Costs
DPW Budget Transfer
Town Common
Other expenses
Sub total Non Programming
Total Parks & Rec
General Fund Subsidy 2017
Revenue
Expenses
138,578
120,000 77,640
65,226 50,156
44,525 35,593
45,675 48,473
10,000 4,189
65,000 29,000
19,265 9,633
48,690 59,221
14,340 22,900
432,721 336,805
10,250
2,250
12,500
64,675
37,369
30,155
18,800
11,000
161,999
Net Gain (loss)
(138,578)
42,360
15,070
8,932
(2,798)
5,811
36,000
9,633
(10,531)
(8,560)
95,917
(54,425)
(37,369)
(30,155)
(16,550)
(11,000)
(149,499)
445,221 637,382
(192,161)
(192,161)
Parks & Recreati on
FY 17 Non Program Related Expenses
Sandy Beach (including debt)
Indirect Costs
DPW Budget Transfer
Town Common
Other Expenses (ice rink)
T otal
54,425
37,369
30,155
16,550
11,000
149,499
See Schedule
Service for cutting grass and trash removal
Landscaping, Irrigation and events
Ice Rink, EMC Park and other small costs
3/4
Town Of Hopkinton - Parks & Recreati on
Statement of Profit & L oss - Sandy Beach
Actu al Projected Budget
FY 15 FY 16 FY 17
Revenues:
Boat Permits 6,134
Beach Passes 4,943
T otal Revenues
5,250 5,250
5,000 5,000
11,077 10,250 10,250
Expenses:
Debt service 43,650 42,250 40,850
Staffing 18,484 18,484 18,854
Electricity 464 464 473
Plumbing 325 1,785 1,821
Water testing 1,125 1,125 1,148
Other 1,737 1,500 1,530
Total Expenses 65,785 65,608 64,675
Net Gain (Loss) (54,708) (55,358) (54,425)
4/4
Town of Hopkinton
Balance of Retained Earnings
as of 6/30/15
Prepared for the Approriations Committee
Sewer 2,178,196.98
Water 24,107.12
Recreation 38,752.62